Villa Montessori needed a new campus as their existing one was outdated. They chose Modular Solutions to design and build the new campus using a modular construction approach. This allowed site work and factory fabrication to occur concurrently, speeding up construction. The new 10,000 square foot campus was completed in under 90 days, coming together quickly through modular construction.
Learn a better way to build, Modular School Campus Case Study
1.
2. VILLA MONTESSORI NEEDED A NEW CAMPUS
THE EXISTING CAMPUS WAS READY FOR AN UPGRADE
THE BOARD DECIDED TO MAKE A MOVE AND
CHOSE A BETTER WAY TO BUILD
www.ModularSolutionsLtd.com
4. MODULAR SOLUTIONS, LTD
A DESIGN-BUILD CAMPUS SOLUTION
VILLA MONTESSORI HAD ACCESS TO “DONATED” ARCHITECTURAL SERVICES, OUR TEAM HELPED FACILITATE
ALL THE MISSING PIECES, AND COORDINATE A WORKING SET OF DRAWINGS FOR THE CITY AND THE STATE
TO APPROVE FOR CONSTRUCTION TO BEGIN
Providing Architectural , General Contractor, & Prefabrication Plant Services – Accelerating The Construction Schedule
20. FOR MORE INFORMATION CONTACT US:
www.ModularSolutionsLtd.com
M o d u l a r S o l u t i o n s , L t d
Mailing Address: P O Box 15507-Phoenix, AZ 85060
Physical Plant Address: 5439 S. 43rd Avenue- Phoenix, AZ 85041
Email: information@Mod-sol.com
Toll Free Phone: 800-441-8577 x 1 (sales) Local Arizona: 602-952-9741 x 1 (Sales)
Website: www.ModularSolutionsLtd.com
You tube Channel: https://www.youtube.com/user/Modularsolutionsltd
Licensed/bonded/insured in multiple states
A B E T T E R W AY T O B U I L D