The nature of the project
For example – is this a completely new
detached building; an extension to an existing
building; a refurbishment job; restoration of
an historic structure; reinstatement after fire
damage or neglect; a repair and maintenance
programme involving many buildings?
The scope of the works
For example – is there something unusual about the
size, complexity or location of the works; are there
site problems of access, storage or movement; does
the work involve the basic trades and skills of the
industry; does an innovative design demand
sophisticated construction methods; is there
specialist subcontractor’s work with a design
content; is there a high content of specialist
engineering installations; is this a single
construction operation, phased work, or part of a
term programme?
Measure of control by the client
For example – should design be wholly in
the hands of the client’s consultants; can
some detail design be placed as a
contractor’s responsibility; should there be
provision for design by specialist
subcontractors; to what extent does the
client wish to control selection of specialist
subcontractors; what measure of control
will the client wish to exert over materials
and workmanship; how much reliance can
be placed on performance specified
requirements?
Accountability
For example – does the client aim for
single point responsibility; is it the
intention to appoint a project
manager or client’s representative;
where is responsibility intended to lie
for specific matters — with
consultants, contractor, specialist
sub-contractors?
Accountability
For example – does the client aim for
single point responsibility; is it the
intention to appoint a project
manager or client’s representative;
where is responsibility intended to lie
for specific matters — with
consultants, contractor, specialist
sub-contractors?
Accountability
For example – does the client aim for
single point responsibility; is it the
intention to appoint a project
manager or client’s representative;
where is responsibility intended to lie
for specific matters — with
consultants, contractor, specialist
sub-contractors?
Appointment of a contractor
For example – is this to be by
negotiation or by competitive
tendering; is the contractor to be
appointed to carry out construction
work only; is the contractor to have
some responsibility for design; is the
contractor to be appointed early to
undertake primarily a management
role?
● Certainty of final cost
For example – is a lump sum
contract preferred; will it be a
fixed price or with fluctuations; do
the circumstances dictate re-
measurement and an ascertained
final sum; must all tenders be on a
competitive basis?
Start and completion times
For example – is this to be ‘fast track’
with the shortest overall programme a
priority; is an early start date desirable;
will there be adequate time to prepare
full information for tendering purposes;
do circumstances dictate a specific
completion date; can the contractor be
provided with exclusive possession right
from the start?
Restrictions
For example – does the site raise
security problems or problems in
relation to surrounding property such
as access or noise; are there
restrictions on working hours; will the
building be still in operation and
occupied during the course of the
works; is the work to be phased; is
there a specific requirement concerning
the sequence of operations?

More Related Content

What's hot

Third Party Solar Financing
Third Party Solar FinancingThird Party Solar Financing
Third Party Solar FinancingSolarbabaGlobal
 
Green field project making of production plant
Green field project making of production plantGreen field project making of production plant
Green field project making of production plantVikram Bakshi
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyFrancis Ho
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Constructionshillier38
 
PP1 assignment presentation slides
PP1 assignment presentation slidesPP1 assignment presentation slides
PP1 assignment presentation slidesDoreen Yeo
 
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remediesProcurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remediesPavitr1203
 
Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Lee Maserian R.D.I.
 
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروع
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروعالمحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروع
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروعEgypt Scholars Inc.
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesMcCarthy Holdings, Inc.
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentationTimun Loh
 
The Support Tool for Effective Procurement Strategies (STEPS)
 The Support Tool for Effective Procurement Strategies (STEPS) The Support Tool for Effective Procurement Strategies (STEPS)
The Support Tool for Effective Procurement Strategies (STEPS)OECD Governance
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A SeminarPang Khai Shuen
 

What's hot (20)

CAREER HISTORY
CAREER HISTORYCAREER HISTORY
CAREER HISTORY
 
Third Party Solar Financing
Third Party Solar FinancingThird Party Solar Financing
Third Party Solar Financing
 
Green field project making of production plant
Green field project making of production plantGreen field project making of production plant
Green field project making of production plant
 
Project Delivery Method Selection Tool
Project Delivery Method Selection ToolProject Delivery Method Selection Tool
Project Delivery Method Selection Tool
 
Using Two-Stage Tendering Effectively
Using Two-Stage Tendering EffectivelyUsing Two-Stage Tendering Effectively
Using Two-Stage Tendering Effectively
 
Tendering in Construction
Tendering in ConstructionTendering in Construction
Tendering in Construction
 
PP1 assignment presentation slides
PP1 assignment presentation slidesPP1 assignment presentation slides
PP1 assignment presentation slides
 
Project closure
Project closureProject closure
Project closure
 
Procurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remediesProcurement system in the Indian construction industry issues and remedies
Procurement system in the Indian construction industry issues and remedies
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)Construction Phase Mgmt Srvcs (2)
Construction Phase Mgmt Srvcs (2)
 
Pp1 final
Pp1 finalPp1 final
Pp1 final
 
Design-Build Procurement Approaches
Design-Build Procurement ApproachesDesign-Build Procurement Approaches
Design-Build Procurement Approaches
 
Procurement plan-template-1.2
Procurement plan-template-1.2Procurement plan-template-1.2
Procurement plan-template-1.2
 
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروع
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروعالمحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروع
المحاضرة السابعة: تنفيذ المشروع وإدارة فريق العمل والاتصالات خلال المشروع
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Design-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful OutcomesDesign-Build: The Owner’s Role in Successful Outcomes
Design-Build: The Owner’s Role in Successful Outcomes
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
 
The Support Tool for Effective Procurement Strategies (STEPS)
 The Support Tool for Effective Procurement Strategies (STEPS) The Support Tool for Effective Procurement Strategies (STEPS)
The Support Tool for Effective Procurement Strategies (STEPS)
 
Procurement Strategies: A Seminar
Procurement Strategies: A SeminarProcurement Strategies: A Seminar
Procurement Strategies: A Seminar
 

Similar to Cm516 ppt 4

Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkDaniel Ross
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Gregoire Lesecq
 
Another Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham ZeinounAnother Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham ZeinounPMILebanonChapter
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project DeliverySHKLaw
 
Large Complex Industrial Projects:Owner specific role and associated requirem...
Large Complex Industrial Projects:Owner specific role and associated requirem...Large Complex Industrial Projects:Owner specific role and associated requirem...
Large Complex Industrial Projects:Owner specific role and associated requirem...Jeremie Averous
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1Lee Pei Gie
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureHASMANIRA
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract formskohwenqi
 
Project Value Delivery methodology and interventions
Project Value Delivery methodology and interventionsProject Value Delivery methodology and interventions
Project Value Delivery methodology and interventionsJeremie Averous
 
Introduction to Project and Project Management
Introduction to Project and Project ManagementIntroduction to Project and Project Management
Introduction to Project and Project ManagementMahbubun Nabi Rasel
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryMECandPMV
 

Similar to Cm516 ppt 4 (20)

Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
 
TOPIC1.pdf
TOPIC1.pdfTOPIC1.pdf
TOPIC1.pdf
 
Project Management
Project ManagementProject Management
Project Management
 
Raj new resume 2015
Raj new resume 2015Raj new resume 2015
Raj new resume 2015
 
CV - Azwyn Abd Aziz
CV - Azwyn Abd AzizCV - Azwyn Abd Aziz
CV - Azwyn Abd Aziz
 
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
CCPC Certified Construction Project Consultant by Syseneg Academy sysenegacad...
 
Another Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham ZeinounAnother Project Hit the wall by Eng Hisham Zeinoun
Another Project Hit the wall by Eng Hisham Zeinoun
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project Delivery
 
Sub contract copy
Sub contract   copySub contract   copy
Sub contract copy
 
Large Complex Industrial Projects:Owner specific role and associated requirem...
Large Complex Industrial Projects:Owner specific role and associated requirem...Large Complex Industrial Projects:Owner specific role and associated requirem...
Large Complex Industrial Projects:Owner specific role and associated requirem...
 
Professional Practice 1
Professional Practice 1Professional Practice 1
Professional Practice 1
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Project Value Delivery methodology and interventions
Project Value Delivery methodology and interventionsProject Value Delivery methodology and interventions
Project Value Delivery methodology and interventions
 
Introduction to Project and Project Management
Introduction to Project and Project ManagementIntroduction to Project and Project Management
Introduction to Project and Project Management
 
PwC-troubled-projects
PwC-troubled-projectsPwC-troubled-projects
PwC-troubled-projects
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
Turning your project around
Turning your project aroundTurning your project around
Turning your project around
 

Recently uploaded

Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Smisbafathima9940
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 

Recently uploaded (20)

Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
situational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima Ssituational leadership theory by Misba Fathima S
situational leadership theory by Misba Fathima S
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
Becoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette ThompsonBecoming an Inclusive Leader - Bernadette Thompson
Becoming an Inclusive Leader - Bernadette Thompson
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 

Cm516 ppt 4

  • 1.
  • 2. The nature of the project For example – is this a completely new detached building; an extension to an existing building; a refurbishment job; restoration of an historic structure; reinstatement after fire damage or neglect; a repair and maintenance programme involving many buildings?
  • 3. The scope of the works For example – is there something unusual about the size, complexity or location of the works; are there site problems of access, storage or movement; does the work involve the basic trades and skills of the industry; does an innovative design demand sophisticated construction methods; is there specialist subcontractor’s work with a design content; is there a high content of specialist engineering installations; is this a single construction operation, phased work, or part of a term programme?
  • 4. Measure of control by the client For example – should design be wholly in the hands of the client’s consultants; can some detail design be placed as a contractor’s responsibility; should there be provision for design by specialist subcontractors; to what extent does the client wish to control selection of specialist subcontractors; what measure of control will the client wish to exert over materials and workmanship; how much reliance can be placed on performance specified requirements?
  • 5. Accountability For example – does the client aim for single point responsibility; is it the intention to appoint a project manager or client’s representative; where is responsibility intended to lie for specific matters — with consultants, contractor, specialist sub-contractors?
  • 6. Accountability For example – does the client aim for single point responsibility; is it the intention to appoint a project manager or client’s representative; where is responsibility intended to lie for specific matters — with consultants, contractor, specialist sub-contractors?
  • 7. Accountability For example – does the client aim for single point responsibility; is it the intention to appoint a project manager or client’s representative; where is responsibility intended to lie for specific matters — with consultants, contractor, specialist sub-contractors?
  • 8. Appointment of a contractor For example – is this to be by negotiation or by competitive tendering; is the contractor to be appointed to carry out construction work only; is the contractor to have some responsibility for design; is the contractor to be appointed early to undertake primarily a management role?
  • 9. ● Certainty of final cost For example – is a lump sum contract preferred; will it be a fixed price or with fluctuations; do the circumstances dictate re- measurement and an ascertained final sum; must all tenders be on a competitive basis?
  • 10. Start and completion times For example – is this to be ‘fast track’ with the shortest overall programme a priority; is an early start date desirable; will there be adequate time to prepare full information for tendering purposes; do circumstances dictate a specific completion date; can the contractor be provided with exclusive possession right from the start?
  • 11. Restrictions For example – does the site raise security problems or problems in relation to surrounding property such as access or noise; are there restrictions on working hours; will the building be still in operation and occupied during the course of the works; is the work to be phased; is there a specific requirement concerning the sequence of operations?