SlideShare a Scribd company logo
1 of 2
MATT SILK
34810 N. 139th
St., Scottsdale, AZ, 85262 Cell (602) 502-0575
E-mail: s4matt.s@gmail.com
OBJECTIVE / INTRODUCTION
To obtain a position in Operations Manager / General Manager which will best utilize my skill sets to
increasing company production, customer satisfaction, safety, quality and improving the bottom line.
Major strengths include: strong work ethics, organization, self-starter, energetic, detailed, strong leadership,
multitasking and I meet deadlines. Managerial experienced in large-scale environments in United States,
Ireland and Mexico.
BUSINESS EXPERIENCE
2007 to Present
Aksarben Companies, Inc; Phoenix, AZ (General Contractor)
Operations Manager
Manage daily operations for a general contractor consisting of Industrial, Facility, Manufacturing, Medical,
Dental and Office tenant improvements.
Duties include managing profit and loss, supervision of Project Managers, construction budgets; cost
controls, Safety/OSHA compliance, construction budgets, purchasing, accounts receivable and accounts
payable. Generate AIA contracts, subcontracts, master vendor agreements, spreadsheets and inventory
control. Set up detailed project budgets in Sage Master Builder. Chair weekly Project Managers meetings.
Run P & L reports on projects, along with quarterly and year-end reports. E-Verify all new employees and
keep employee files.
• Re-organized all document controls to capture some $200,000 in change orders lost per year.
• Set –up custom company cost controls to monitor all project budgets. By doing so we were able to
correct labor or material issues before a problem arose.
• Author company safety manual, policies, roles and responsibilities.
2003 to 2007
Dean, Gilbert, AZ
General Manager/Operations Manager
Manage daily operations for masonry, landscape pavers, structural steel and miscellaneous iron company.
Duties included managing profit and loss, supervision of Estimators, Project Managers, shop & field,
purchasing, safety, fleet vehicle/heavy equipment purchase, construction budgets and inventory control.
Create company polices, safety manual, cost controls and roles & responsibilities. Space planning for entire
office, shop and yard. In charge of hiring, training, annual reviews, discipline and termination of
employees. Perform annual company P & L reports with budget forecasting for upcoming year. Chair
weekly Project Managers, Estimators and production meetings to review project’s status and performance.
Oversee company safety/OSHA compliance. Generate quarterly and year-end P & L reports. Track P & L
on projects and PM/Estimator production.
• Installed new (custom) labor, material, overhead, field and shop cost control systems. Made
adjustments in production and material purchased to increase company profits by 25%.
• Designed and supervised the new 40,000 sq ft facility for the relocation of office staff, shop fabrication
and fleet maintenance. This included (15) hooded welding stations, (2) industrial paint booths,
saw/machine shop, fleet maintenance area; inventory storage, yard storage, raw and finished material
storage.
• Increased revenue dollars form $9MM to $65MM and profit from 6% to 25%. This was accomplished
by becoming more efficient through cost controls.
1
1993 to 2003
Performance Contracting Inc. Tempe, AZ
Division Manager
Manager of the technology department for cleanrooms and design build projects for Intel, Motorola,
Microchip, ST Microelectronics, Raytheon, etc with project values from $250K to over $18MM.
Duties included profit and loss, supervision of Project Managers, Project Engineers, Estimators,
Superintendents and safety/OSHA compliance. Responsible for hiring, annual reviews and terminations of
employees within my division. Manage RFP’s, estimating, bidding, construction budgets, contract
negotiation, project management, subcontract negotiation, purchasing, schedules, spreadsheet, inventory
control, project controls, RFI’s, change order processing, customer relations and project close out.
• Increased original projected margins on the following directly managed projects: Intel Fab 6, Intel Fab
12, Intel Fab 14 (Ireland), Intel Fab 22, Motorola MOS 12, ST Microelectronics, Raytheon (DB),
ATMI (DB), Photronics (DB), ADE Phase Shift (DB) and Microchip. A full project list is available
upon request.
• Senior Project Manager/Estimator of architectural finishes for Intel Fab 12 with a field crew of 150, a
value of over $18MM and a scheduled duration of four years.
• Chosen to assist in a successful start-up of architectural finishes for Intel Fab 14 in Leixlip, Ireland.
• Five time Eagle award winner out of 330 Area Managers, Project Managers and Estimators for
outstanding performance in customer satisfaction and company profits.
EDUCATION
OSHA-30, OSHA-10, SSTA, Dust Control Certification
Dale Carnegie Graduate- Class #84, Chandler AZ. Diploma
PCG College for Branch Management, Lenexa, KS. Diploma
PCG College for Estimating, Palm Springs, CA. Diploma
PCG College for Project Management, Tempe, AZ. PMP Certification
Westinghouse ASD Estimating/Construction Course, Wayne, MI. Certificate
Technical Construction Course, Detroit, MI. Certificate
AutoCAD Course, architectural and structural design, Phoenix, AZ. Diploma.
Academy of Drafting/ITT Tech, Tempe, AZ. Majors: Architectural, Structural, and Civil/Topographical.
Associates Degree.
COMPUTER SKILLS
Expert in Microsoft Office: Word, Excel and Project. Advanced in Sage Master Builder, Timberline,
QuickBooks, Fabtrol, Boeing SSPN/Maximo, Expedition, Outlook, Internet, E-Verify and spreadsheets.
PERSONAL
Married for 23 years to my lovely wife Bonnie and have two adult children Chelsea and Dillon.
Thank you for your time and consideration for a position with your company.
Respectfully
Matt Silk
2

More Related Content

What's hot

Facilities 8-4-15
Facilities 8-4-15Facilities 8-4-15
Facilities 8-4-15Larry Jones
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015Tim Gilliatt
 
Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer Lee
 
Resume - William Killion - Oct 2015
Resume - William Killion - Oct 2015Resume - William Killion - Oct 2015
Resume - William Killion - Oct 2015William Killion
 
Thiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRPThiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRPThirumurugan B
 
kevin-salerno-resume
kevin-salerno-resumekevin-salerno-resume
kevin-salerno-resumeKevin Salerno
 
Naveen-Planning Engineer
Naveen-Planning EngineerNaveen-Planning Engineer
Naveen-Planning EngineerNaveen. DM
 
TGivens 2016 Plant Engineer
TGivens 2016 Plant EngineerTGivens 2016 Plant Engineer
TGivens 2016 Plant EngineerTracy Givens
 
CARY HAMAR-UPDATED Resume10-07-15
CARY HAMAR-UPDATED  Resume10-07-15CARY HAMAR-UPDATED  Resume10-07-15
CARY HAMAR-UPDATED Resume10-07-15Cary Hamar
 
Operations Manager Resume
Operations Manager ResumeOperations Manager Resume
Operations Manager ResumeGreg Domingue
 
Steve Vogt 7 21 16
Steve Vogt 7 21 16Steve Vogt 7 21 16
Steve Vogt 7 21 16Stephen Vogt
 
Tandler Resume August 2015
Tandler Resume August 2015Tandler Resume August 2015
Tandler Resume August 2015Robert Tandler
 
Kimmi Y Resume 052015
Kimmi Y Resume 052015Kimmi Y Resume 052015
Kimmi Y Resume 052015Kimmi Hnath
 
It specialist (best) CV template
It specialist (best) CV templateIt specialist (best) CV template
It specialist (best) CV templateMina Gergis
 

What's hot (19)

Resume Karen Hartley
Resume Karen HartleyResume Karen Hartley
Resume Karen Hartley
 
Main Resume
Main ResumeMain Resume
Main Resume
 
Facilities 8-4-15
Facilities 8-4-15Facilities 8-4-15
Facilities 8-4-15
 
GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015GilliattTimothyResLiberty2015
GilliattTimothyResLiberty2015
 
Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)Spencer_Lee_Resume (2016)
Spencer_Lee_Resume (2016)
 
Resume - William Killion - Oct 2015
Resume - William Killion - Oct 2015Resume - William Killion - Oct 2015
Resume - William Killion - Oct 2015
 
Thiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRPThiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRP
 
Dustin-Alexander (4)
Dustin-Alexander (4)Dustin-Alexander (4)
Dustin-Alexander (4)
 
kevin-salerno-resume
kevin-salerno-resumekevin-salerno-resume
kevin-salerno-resume
 
Naveen-Planning Engineer
Naveen-Planning EngineerNaveen-Planning Engineer
Naveen-Planning Engineer
 
TGivens 2016 Plant Engineer
TGivens 2016 Plant EngineerTGivens 2016 Plant Engineer
TGivens 2016 Plant Engineer
 
CARY HAMAR-UPDATED Resume10-07-15
CARY HAMAR-UPDATED  Resume10-07-15CARY HAMAR-UPDATED  Resume10-07-15
CARY HAMAR-UPDATED Resume10-07-15
 
Operations Manager Resume
Operations Manager ResumeOperations Manager Resume
Operations Manager Resume
 
RES060116-NCL
RES060116-NCLRES060116-NCL
RES060116-NCL
 
Steve Vogt 7 21 16
Steve Vogt 7 21 16Steve Vogt 7 21 16
Steve Vogt 7 21 16
 
Elpidio-Reyes
Elpidio-ReyesElpidio-Reyes
Elpidio-Reyes
 
Tandler Resume August 2015
Tandler Resume August 2015Tandler Resume August 2015
Tandler Resume August 2015
 
Kimmi Y Resume 052015
Kimmi Y Resume 052015Kimmi Y Resume 052015
Kimmi Y Resume 052015
 
It specialist (best) CV template
It specialist (best) CV templateIt specialist (best) CV template
It specialist (best) CV template
 

Viewers also liked

дошкольное образование. новые подходы
дошкольное образование. новые подходыдошкольное образование. новые подходы
дошкольное образование. новые подходыLiudmilaT
 
JCNC2013 Case Fastems Esa Karppi
JCNC2013 Case Fastems Esa KarppiJCNC2013 Case Fastems Esa Karppi
JCNC2013 Case Fastems Esa KarppiAmbientia
 
Dangers of internet
Dangers of internetDangers of internet
Dangers of internetgafsa123
 

Viewers also liked (7)

Kuis komputer AKPER PEMKAB MUNA
Kuis komputer  AKPER PEMKAB MUNA Kuis komputer  AKPER PEMKAB MUNA
Kuis komputer AKPER PEMKAB MUNA
 
Luka dan penyembuhan AKPER PEMKAB MUNA
Luka dan penyembuhan  AKPER PEMKAB MUNA Luka dan penyembuhan  AKPER PEMKAB MUNA
Luka dan penyembuhan AKPER PEMKAB MUNA
 
дошкольное образование. новые подходы
дошкольное образование. новые подходыдошкольное образование. новые подходы
дошкольное образование. новые подходы
 
Konjungtivitis
KonjungtivitisKonjungtivitis
Konjungtivitis
 
JCNC2013 Case Fastems Esa Karppi
JCNC2013 Case Fastems Esa KarppiJCNC2013 Case Fastems Esa Karppi
JCNC2013 Case Fastems Esa Karppi
 
Dangers of internet
Dangers of internetDangers of internet
Dangers of internet
 
Makalah gastroenterohepatologi
Makalah gastroenterohepatologiMakalah gastroenterohepatologi
Makalah gastroenterohepatologi
 

Similar to OPS_Mgr

NedFowlerResume(2015)
NedFowlerResume(2015)NedFowlerResume(2015)
NedFowlerResume(2015)Ned Fowler
 
EDWARD HOCKWATER resume wo graphic
EDWARD HOCKWATER     resume wo graphicEDWARD HOCKWATER     resume wo graphic
EDWARD HOCKWATER resume wo graphicEd Hockwater
 
Tom steele resume
Tom steele resumeTom steele resume
Tom steele resumeTom Steele
 
Tom Steele Resume_PM 0326
Tom Steele Resume_PM 0326Tom Steele Resume_PM 0326
Tom Steele Resume_PM 0326Tom Steele
 
Senior Ops Manager
Senior Ops ManagerSenior Ops Manager
Senior Ops Managerjtk419
 
PAUL OTERO - Resume - 111014WD
PAUL OTERO - Resume - 111014WDPAUL OTERO - Resume - 111014WD
PAUL OTERO - Resume - 111014WDPaul Otero
 
Coombs Mark Resume 10 1 12
Coombs Mark Resume 10 1 12Coombs Mark Resume 10 1 12
Coombs Mark Resume 10 1 12mcoombs57
 
J. keith hubbard medical plant manager
J.  keith hubbard   medical plant managerJ.  keith hubbard   medical plant manager
J. keith hubbard medical plant managerJ. Keith Hubbard
 
Raphael tasho tashev
Raphael tasho tashevRaphael tasho tashev
Raphael tasho tashevtashevraphael
 
Curt Sherrod - Resume
Curt Sherrod - ResumeCurt Sherrod - Resume
Curt Sherrod - Resumecsherrod
 
Wieland Charles Resume 11.05.16
Wieland Charles Resume  11.05.16Wieland Charles Resume  11.05.16
Wieland Charles Resume 11.05.16Charles Wieland
 
Cosmini resume_7July2016
Cosmini resume_7July2016Cosmini resume_7July2016
Cosmini resume_7July2016Doug Cosmini
 
J. Keith Hubbard Resume - Manufacturing and Supply Chain Leadership
J. Keith Hubbard Resume -  Manufacturing and Supply Chain LeadershipJ. Keith Hubbard Resume -  Manufacturing and Supply Chain Leadership
J. Keith Hubbard Resume - Manufacturing and Supply Chain LeadershipJ. Keith Hubbard
 

Similar to OPS_Mgr (20)

MARTY_PATE
MARTY_PATEMARTY_PATE
MARTY_PATE
 
NedFowlerResume(2015)
NedFowlerResume(2015)NedFowlerResume(2015)
NedFowlerResume(2015)
 
EDWARD HOCKWATER resume wo graphic
EDWARD HOCKWATER     resume wo graphicEDWARD HOCKWATER     resume wo graphic
EDWARD HOCKWATER resume wo graphic
 
Tom steele resume
Tom steele resumeTom steele resume
Tom steele resume
 
Tom Steele Resume_PM 0326
Tom Steele Resume_PM 0326Tom Steele Resume_PM 0326
Tom Steele Resume_PM 0326
 
Senior Ops Manager
Senior Ops ManagerSenior Ops Manager
Senior Ops Manager
 
PAUL OTERO - Resume - 111014WD
PAUL OTERO - Resume - 111014WDPAUL OTERO - Resume - 111014WD
PAUL OTERO - Resume - 111014WD
 
Coombs Mark Resume 10 1 12
Coombs Mark Resume 10 1 12Coombs Mark Resume 10 1 12
Coombs Mark Resume 10 1 12
 
J. keith hubbard medical plant manager
J.  keith hubbard   medical plant managerJ.  keith hubbard   medical plant manager
J. keith hubbard medical plant manager
 
Raphael tasho tashev
Raphael tasho tashevRaphael tasho tashev
Raphael tasho tashev
 
Curt Sherrod - Resume
Curt Sherrod - ResumeCurt Sherrod - Resume
Curt Sherrod - Resume
 
Resume
ResumeResume
Resume
 
Wieland Charles Resume 11.05.16
Wieland Charles Resume  11.05.16Wieland Charles Resume  11.05.16
Wieland Charles Resume 11.05.16
 
Michael Oczowinski Resume
Michael Oczowinski ResumeMichael Oczowinski Resume
Michael Oczowinski Resume
 
Harrin resume' 2016
Harrin resume' 2016Harrin resume' 2016
Harrin resume' 2016
 
DWADAMS RESUME2
DWADAMS RESUME2DWADAMS RESUME2
DWADAMS RESUME2
 
Cosmini resume_7July2016
Cosmini resume_7July2016Cosmini resume_7July2016
Cosmini resume_7July2016
 
Fennig James(5)
Fennig James(5)Fennig James(5)
Fennig James(5)
 
J. Keith Hubbard Resume - Manufacturing and Supply Chain Leadership
J. Keith Hubbard Resume -  Manufacturing and Supply Chain LeadershipJ. Keith Hubbard Resume -  Manufacturing and Supply Chain Leadership
J. Keith Hubbard Resume - Manufacturing and Supply Chain Leadership
 
Linn gerald 3
Linn gerald 3Linn gerald 3
Linn gerald 3
 

OPS_Mgr

  • 1. MATT SILK 34810 N. 139th St., Scottsdale, AZ, 85262 Cell (602) 502-0575 E-mail: s4matt.s@gmail.com OBJECTIVE / INTRODUCTION To obtain a position in Operations Manager / General Manager which will best utilize my skill sets to increasing company production, customer satisfaction, safety, quality and improving the bottom line. Major strengths include: strong work ethics, organization, self-starter, energetic, detailed, strong leadership, multitasking and I meet deadlines. Managerial experienced in large-scale environments in United States, Ireland and Mexico. BUSINESS EXPERIENCE 2007 to Present Aksarben Companies, Inc; Phoenix, AZ (General Contractor) Operations Manager Manage daily operations for a general contractor consisting of Industrial, Facility, Manufacturing, Medical, Dental and Office tenant improvements. Duties include managing profit and loss, supervision of Project Managers, construction budgets; cost controls, Safety/OSHA compliance, construction budgets, purchasing, accounts receivable and accounts payable. Generate AIA contracts, subcontracts, master vendor agreements, spreadsheets and inventory control. Set up detailed project budgets in Sage Master Builder. Chair weekly Project Managers meetings. Run P & L reports on projects, along with quarterly and year-end reports. E-Verify all new employees and keep employee files. • Re-organized all document controls to capture some $200,000 in change orders lost per year. • Set –up custom company cost controls to monitor all project budgets. By doing so we were able to correct labor or material issues before a problem arose. • Author company safety manual, policies, roles and responsibilities. 2003 to 2007 Dean, Gilbert, AZ General Manager/Operations Manager Manage daily operations for masonry, landscape pavers, structural steel and miscellaneous iron company. Duties included managing profit and loss, supervision of Estimators, Project Managers, shop & field, purchasing, safety, fleet vehicle/heavy equipment purchase, construction budgets and inventory control. Create company polices, safety manual, cost controls and roles & responsibilities. Space planning for entire office, shop and yard. In charge of hiring, training, annual reviews, discipline and termination of employees. Perform annual company P & L reports with budget forecasting for upcoming year. Chair weekly Project Managers, Estimators and production meetings to review project’s status and performance. Oversee company safety/OSHA compliance. Generate quarterly and year-end P & L reports. Track P & L on projects and PM/Estimator production. • Installed new (custom) labor, material, overhead, field and shop cost control systems. Made adjustments in production and material purchased to increase company profits by 25%. • Designed and supervised the new 40,000 sq ft facility for the relocation of office staff, shop fabrication and fleet maintenance. This included (15) hooded welding stations, (2) industrial paint booths, saw/machine shop, fleet maintenance area; inventory storage, yard storage, raw and finished material storage. • Increased revenue dollars form $9MM to $65MM and profit from 6% to 25%. This was accomplished by becoming more efficient through cost controls. 1
  • 2. 1993 to 2003 Performance Contracting Inc. Tempe, AZ Division Manager Manager of the technology department for cleanrooms and design build projects for Intel, Motorola, Microchip, ST Microelectronics, Raytheon, etc with project values from $250K to over $18MM. Duties included profit and loss, supervision of Project Managers, Project Engineers, Estimators, Superintendents and safety/OSHA compliance. Responsible for hiring, annual reviews and terminations of employees within my division. Manage RFP’s, estimating, bidding, construction budgets, contract negotiation, project management, subcontract negotiation, purchasing, schedules, spreadsheet, inventory control, project controls, RFI’s, change order processing, customer relations and project close out. • Increased original projected margins on the following directly managed projects: Intel Fab 6, Intel Fab 12, Intel Fab 14 (Ireland), Intel Fab 22, Motorola MOS 12, ST Microelectronics, Raytheon (DB), ATMI (DB), Photronics (DB), ADE Phase Shift (DB) and Microchip. A full project list is available upon request. • Senior Project Manager/Estimator of architectural finishes for Intel Fab 12 with a field crew of 150, a value of over $18MM and a scheduled duration of four years. • Chosen to assist in a successful start-up of architectural finishes for Intel Fab 14 in Leixlip, Ireland. • Five time Eagle award winner out of 330 Area Managers, Project Managers and Estimators for outstanding performance in customer satisfaction and company profits. EDUCATION OSHA-30, OSHA-10, SSTA, Dust Control Certification Dale Carnegie Graduate- Class #84, Chandler AZ. Diploma PCG College for Branch Management, Lenexa, KS. Diploma PCG College for Estimating, Palm Springs, CA. Diploma PCG College for Project Management, Tempe, AZ. PMP Certification Westinghouse ASD Estimating/Construction Course, Wayne, MI. Certificate Technical Construction Course, Detroit, MI. Certificate AutoCAD Course, architectural and structural design, Phoenix, AZ. Diploma. Academy of Drafting/ITT Tech, Tempe, AZ. Majors: Architectural, Structural, and Civil/Topographical. Associates Degree. COMPUTER SKILLS Expert in Microsoft Office: Word, Excel and Project. Advanced in Sage Master Builder, Timberline, QuickBooks, Fabtrol, Boeing SSPN/Maximo, Expedition, Outlook, Internet, E-Verify and spreadsheets. PERSONAL Married for 23 years to my lovely wife Bonnie and have two adult children Chelsea and Dillon. Thank you for your time and consideration for a position with your company. Respectfully Matt Silk 2