SlideShare a Scribd company logo
1 of 29
Download to read offline
Ark Product
Scorecard
V2 Product Activation
Associative
Principle
Integrity
and
Balance
9/9/2020 Brij Consulting 1
Starts on slide 17
ArkAttributes
 Ark Attributes will respond to
Scorecard Definitions as they are
defined on a Product Line basis.
At present a very standard
definition is applied
 Modeling with Instances and Plan
Years allows for noting how
changes in attributes affect the
interpolation of the project
 The Products must be Bifurcated
to the Scorecard Matrix
NoThruput in Production
9/8/2020 Brij Consulting 2
Merging the
Interpolations
of the
Benchmark
Instance
byYear
Based onThruput
Activities-BMCapitalSpending
Activities-BMCashInvesting
Activities-BMConversion
Activities-BMIncomeSpending
Activities-BMAdjustment
Funding-BMCapitalSpending
Funding-BMCashInvesting
Funding-BMConversion
Funding-BMIncomeSpending
Funding-BMAdjustment
Sum of Year 6 ARK
Sum of Year 5 ARK
Sum of Year 4 ARK
ARK in Years 4,5,6
5,000,000,000,000,000.00 -
10,000,000,000,000,000.00
- - 5,000,000,000,000,000.00
(5,000,000,000,000,000.00)- -
(10,000,000,000,000,000.00)-
(5,000,000,000,000,000.00)
9/8/2020 Brij Consulting 3
Activities and
Funding of
Scorecard
need to be
attributed to
Product Lines
Based onTheoretical Architecture
9/8/2020 Brij Consulting 4
Original matrix
Methods to increaseArkSolvency
 Due to the economies of Scale the Ark becomes insolvent at the norm of time and motion that the world
operates in its quantum binary mode.
 Thus there are two methods used when this occurs, one is known in the world as splitting shares. Thus the
distributive aspect of the enterprise is carried in more shares which build up a greater financial levity and
leveraging capability. This method is not recommended here because the shares would become so tiny as
to not be manageable by tools.
 Instead it is recommended to develop the capability for manifold development of the product. This means
that the product volume can be increased with the design mechanics for scaling in time and motion
according to the increased demand. This is further recommended by the need to create a concept called
time bottling that provides for the continuous operation of “green enabled machines,” and would allow a
more comprehensive method of manifold development to occur.
 One way to think about this manifold theory and green energy solution is in the automobile, where the
manifold must redistribute the fuel to the engine cells. Here we are adjusting the timing of the engine by
redistributing the product on the equitable basis of scalable materials.
9/8/2020 Brij Consulting 5
Methods to
decreaseArk
Indebtedness
Due to the economies of Scale the Ark becomes increasingly indebted in the scheme of
supply chain theory, even operating at the level of the digital portal platform.
IF the crystal plait method is provided for the underlying method of Ark product delivery
the relationship of vendor supplier is changed. There are two methods here…
The first is to subscribe to quantum paper from the Owner of this World. Since this world
is passing away and its inclinations evil, this method is not recommended.
The second is to partner in the Solution with God recognizing that God takes possession of
the whole House and our share is based on His close examination of our Participation and
Methods. Since God supplies a fair and equitable Benefit , we highly recommend it.
Oversight is only Wisdom.
God recommends that you test this relationship in order to discover this.
This is not a reason to halt progress or to stop working through the future of the
arrangement since the mapping of it is teaching us about the Least Squares application of
the SCORECARD and the ability to work with INSTANCES in advanced staging of processes,
a great lesson in engineering. It does say however that time will progress to a New Age of
Advancing Science through the Kingdom of God. What is different about it? See next…
9/8/2020 Brij Consulting 6
We have been told that all people will participate…
TheUse of the
MorningStar
is a property
ofGod
There is no means to
regenerative power without God
and it is not a Binary Solution,
although the Lord can configure
it in a binary capacity
The Soul is God’s Instrument
through which Salt and Light
are delivered
9/8/2020 Brij Consulting 7
Bifurcating the
Product
Sum of Year 4
Sum of Year 5adj
Sum of Year 6
(8,000,000,000,000,000)
(6,000,000,000,000,000)
(4,000,000,000,000,000)
(2,000,000,000,000,000)
-
2,000,000,000,000,000
4,000,000,000,000,000
6,000,000,000,000,000
8,000,000,000,000,000
BMCapitalSpending
BMCashInvesting
BMConversion
BMIncomeSpending
BMAdjustment
Activities
Funding
ARK INYEAR 6 NORM OF OPERATIONS
6,000,000,000,000,000 -
8,000,000,000,000,000
4,000,000,000,000,000 -
6,000,000,000,000,000
2,000,000,000,000,000 -
4,000,000,000,000,000
- - 2,000,000,000,000,000
(2,000,000,000,000,000)- -
(4,000,000,000,000,000)-
(2,000,000,000,000,000)
(6,000,000,000,000,000)-
(4,000,000,000,000,000)
(8,000,000,000,000,000)-
(6,000,000,000,000,000)
bifurcation - the place where
something divides into two
branches forking, furcation - the
place where something divides
into branches
The Economic Interest is Bifurcated onValue-Added while the Nominal Interest is on the Net Gain
9/8/2020 Brij Consulting 8
Plait Portal Products:Summary
9/8/2020 Brij Consulting 9
Re-plait with Foil
5109.8786Value Add
/28.855 Orig. Equity
=177.08
1762.4
/177.08
=9.9525
Conversion Test
=.10152 %
good result
Tested on Scorecard
Conversion Basis
All figures are
aggregated for
consistency in
calculations
Funds flow
PlaitSubstructure Products:Summary
9/8/2020 Brij Consulting 10
Re-plait with Foil
4555.46 Net Gain
/28.855 Original Equity
=157.87
1762.4Yr3 Equity
/157.87
=11.163
ConversionTest
=.29% good result
Tested on Scorecard
Conversion Gain
All figures are aggregated
for consistency in
calculations
Funds flow
Foil the Plait
 Using our Product Mix from
slide 4 we foiled the data to
obtain a Plait Summary of
Sales and Asset Figures for the
Metric and KPI assignment in
the Scorecard Arrangement.
 Foiling is an arrangement that
builds the undervalue of the
plait and is not logical in the
sense of the overlying figures
 It is similar to using a pencil
system to reapportion data
into tiers or layers, except that
the underlying mix is now
represented in these plait
figures and should show up
metrically.
Since these items have never
been sold or made before we
use a foil plait arrangement to
apportion the underlying metric
basis (See Foil Tables V2 Section)
9/8/2020 Brij Consulting 11Important metrics restated
Middle step
Using different PlaitArrangements to Foil
Ark Adjustment
ARK Year 4
ARK Year 5
ARK Year 6
Capital
Spending
Cash
Investing
Conversion Income
Spending
Distributing the data into
the flattest and most solid
arrangements possible
Solid Plait for Portal
Scope Product Foil
Activities - Capital Spending
Activities - Cash Investing
Activities - Conversion
Activities - Income Spending
FUNDING
Flat Plait for Substructure
Product Foil
9/8/2020 Brij Consulting 12
Solid Plait
Flat Plait
SalesCube by Product
9/8/2020 Brij Consulting 13
Virtual Glass can be reapplied to each product, called Glass Out
Distribute Products toScorecard
Portal Scope Product
Scorecard Distribution
Substructure Product
Scorecard Distribution
9/8/2020 Brij Consulting 14
NoThruput, building Portal & Ark Cost Benefit Next
Cost Benefit
with Products
9/8/2020 Brij Consulting 15
-
5,000,000,000,000
10,000,000,000,000
15,000,000,000,000
Land
Ark
Building
Wall
Foundation
Frame
COST BENEFIT PRODUCT CUBE
EQUIPMENT 30,276,756,517,930
64,442,888,724,473 (64,777,437,114,529)
EQUIPMENT
FINANCIAL 371,051,152,199
334,548,390,056 1,601,963,842,449
7,497,278,026,445 8,174,525,301,417
8,971,635,330,808 FINANCIAL
QUALITY METRIC 404,119,274,839
1,891,300,214,794 2,062,145,942,017
2,263,228,836,967 QUALITY METRIC
COST METRIC (1,707,767,167)
(3,770,441,134) (64,734,023)
(2,033,991,169) COST METRIC
Minor change since first publication
Not applied at the product
metric level (yet) using
standard matrix
Funds flow
Equity by Product
9/8/2020 Brij Consulting 16
Re-plait for Scorecard
V2Scorecard
Metrics, KPI’s
andScrum
Attribution…
next: putting
metrics to work
In ourV2 version of this document we will lay in the Scorecard
attributes and demonstrate how the changes in thru put and other
resource requirements impact the outcome
9/8/2020 Brij Consulting 17
9/8/2020 Brij Consulting 18
Solid Plait
Glass out Calculation changed later
Re-scale
shown in
product foil
9/8/2020 Brij Consulting 19
Flat Plait
 In order to properly
apportion the product
it was necessary to
develop a foil
arrangement and then
rescale it again using a
top-down and
bottom-up approach.
All problems of Attrition are being caused by Scale
problems and the need to apportion economic benefits
Product
Apportionment
 It is necessary to apportionGlass in
and Glass out, also to rescale and
to reapply green materials to
infrastructure products. These
arguments are necessary for the
Scorecard application
 It is also important to remember
that these two products are
‘utility’ to the rest including the
Substructure.
9/8/2020 Brij Consulting 20
Solid Plait
Product
Apportionment
Substructure
9/8/2020 Brij Consulting 21
 Notice that there is a
different distribution on
the Internal vs. External
Products
 GlassOut Calculation
is especially
important in
attributing equity
Burden
Project Lag andScale Problems
9/8/2020 Brij Consulting 22
Problems of scale
shown in foil, net=
units
Slow clock
Our Model does not separate Digital from Ark Scale Instances
Realized gains
Yr. 6
9/1/2020 23
BALANCED SCORECARD
The Ark Instances and the Digital Instances run separate requirements and can not be merged.
The demand for virtual glass only
increases as the need for hands-on
customer participation increases
CUSTOMER PERSPECTIVE
Defining a product from sketch mode
and assimilation is definitively a
learning and growth curve.
LEARNING/GROWTH
PERSPECTIVE
The need to map and to record
instances by tier, level and scale
causes a large system burden.
FINANCIAL PERSPECTIVE
The ability to use imaging in both
recording and maintaining products at
multiple levels in flat spectra would
greatly increase performance.
INTERNAL PROCESS
PERSPECTIVE
Brij Consulting
Virtual Glass Benefit
Nth particle storage Stone with Seven Eyes
Crystal Plait Performance
Revelation 2:28
And I will give him the
morning star.
9/8/2020 Brij Consulting 24
The “New Stone”
promised in the
Book of Daniel, and
representing the
requirement
needed to perfect
Creation, is the
lasting fulfillment
of this requirement
Clock speed differential
PERFORMANCE
REQUIREMENTS
9/9/2020 Brij Consulting 25
Seek ye first the Kingdom of God and His righteousness,
and all these things will be added unto you…
9/9/2020 Brij Consulting 26
YEAR 4
YEAR 5
YEAR 6
YEAR 7
YEAR 8
-
1,000,000,000,000,000
2,000,000,000,000,000
3,000,000,000,000,000
4,000,000,000,000,000
5,000,000,000,000,000
6,000,000,000,000,000
SalesbyProductLine
Land
Ark
Building
Ebitda
Land
Ark
Building
Assets
Land
Ark
Building
Equity
Land
Ark
Building
Portal Products
YEAR 4
YEA…
YEAR 8
-
1,000,000,000,000,000
2,000,000,000,000,000
3,000,000,000,000,000
4,000,000,000,000,000
5,000,000,000,000,000
6,000,000,000,000,000
Substructure Products
No one ever built a mountain in a day
No really good design comes about
through the work of only one person
V3Scorecard
Metrics, KPI’s
andScrum
Attribution…
next: how do
we assign the
metrics
In ourV3 version of this document we will assign the metrics to the
Roles and deliver some thru put, but it becomes difficult to emulate
via one person with only scanty tools.
9/9/2020 Brij Consulting 27
Be aware that there are too
many instances required
There are 42,000.,000 jobs assigned
in this one model in year 6 payroll
9/9/2020 Brij Consulting 28
The Difference between
Utility Products and
Customer Products is that
utilities generally have tiny
points that build large, and
customer products have big
points that build small.
Because we have not
actually built any of these,
we do not have them fully
costed in detail, notice the
margins
When Labor is applied to real
and advancing work society
benefits in all its dependent
industries and institutions and
lifts the social burden as well.
Working on metrics…
https://www.slideshare.net/M
arshallja/presentations
8/22/2020 Brij Consulting 29
Putting people to work on worthwhile projects
with excellent tools is a priestly and kingly work

More Related Content

Similar to Ark product scorecard v2 Product Activation

Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfBrij Consulting, LLC
 
CALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdfCALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdfBrij Consulting, LLC
 
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfSupply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfBrij Consulting, LLC
 
Glass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfGlass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfBrij Consulting, LLC
 
Glass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdfGlass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdfBrij Consulting, LLC
 
Ark Reclamation of Legacy: V1 Equating the Build
Ark Reclamation of Legacy: V1 Equating the BuildArk Reclamation of Legacy: V1 Equating the Build
Ark Reclamation of Legacy: V1 Equating the BuildBrij Consulting, LLC
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfBrij Consulting, LLC
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
 
The Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production ScaleThe Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production ScaleBrij Consulting, LLC
 
The Uniquely Refinable Digital- Digital Assimilation v1
The Uniquely Refinable Digital-  Digital  Assimilation v1The Uniquely Refinable Digital-  Digital  Assimilation v1
The Uniquely Refinable Digital- Digital Assimilation v1Brij Consulting, LLC
 
Dimensional Building v2 Digital Strength in Z Properties
Dimensional Building v2 Digital Strength in Z PropertiesDimensional Building v2 Digital Strength in Z Properties
Dimensional Building v2 Digital Strength in Z PropertiesBrij Consulting, LLC
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfBrij Consulting, LLC
 
Real 'E' State, Your Cloud Based Assets
Real 'E' State, Your Cloud Based AssetsReal 'E' State, Your Cloud Based Assets
Real 'E' State, Your Cloud Based AssetsBrij Consulting, LLC
 
The Uniquely Refinable Digital: Digital Wings v2
The Uniquely Refinable Digital: Digital Wings v2The Uniquely Refinable Digital: Digital Wings v2
The Uniquely Refinable Digital: Digital Wings v2Brij Consulting, LLC
 
Supply Side Portfolio V1 The Timing of Green.pdf
Supply Side Portfolio V1 The Timing of Green.pdfSupply Side Portfolio V1 The Timing of Green.pdf
Supply Side Portfolio V1 The Timing of Green.pdfBrij Consulting, LLC
 
Showing ROI for Your Analytic Project
Showing ROI for Your Analytic ProjectShowing ROI for Your Analytic Project
Showing ROI for Your Analytic ProjectDATAVERSITY
 
Unique value of digital assets Part II: Measurement
Unique value of digital assets Part II:  MeasurementUnique value of digital assets Part II:  Measurement
Unique value of digital assets Part II: MeasurementBrij Consulting, LLC
 

Similar to Ark product scorecard v2 Product Activation (20)

Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
 
CALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdfCALENDAR CARTOGRAPHY V1, V2, V3.pdf
CALENDAR CARTOGRAPHY V1, V2, V3.pdf
 
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdfSupply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
Supply Side Portfolio V1, V2, V3 Timing, Investments, and Custom Engineering.pdf
 
Glass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdfGlass Cars and New Ark Product Map V1 Architectural Contents.pdf
Glass Cars and New Ark Product Map V1 Architectural Contents.pdf
 
Glass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdfGlass Cars and New Ark Product Map V1, V2, V3.pdf
Glass Cars and New Ark Product Map V1, V2, V3.pdf
 
Ark Reclamation of Legacy: V1 Equating the Build
Ark Reclamation of Legacy: V1 Equating the BuildArk Reclamation of Legacy: V1 Equating the Build
Ark Reclamation of Legacy: V1 Equating the Build
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
 
The Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production ScaleThe Glass Wave V2 Ark Mode and Production Scale
The Glass Wave V2 Ark Mode and Production Scale
 
Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdf
 
The Uniquely Refinable Digital- Digital Assimilation v1
The Uniquely Refinable Digital-  Digital  Assimilation v1The Uniquely Refinable Digital-  Digital  Assimilation v1
The Uniquely Refinable Digital- Digital Assimilation v1
 
Dimensional Building v2 Digital Strength in Z Properties
Dimensional Building v2 Digital Strength in Z PropertiesDimensional Building v2 Digital Strength in Z Properties
Dimensional Building v2 Digital Strength in Z Properties
 
Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
 
Real 'E' State, Your Cloud Based Assets
Real 'E' State, Your Cloud Based AssetsReal 'E' State, Your Cloud Based Assets
Real 'E' State, Your Cloud Based Assets
 
The Uniquely Refinable Digital: Digital Wings v2
The Uniquely Refinable Digital: Digital Wings v2The Uniquely Refinable Digital: Digital Wings v2
The Uniquely Refinable Digital: Digital Wings v2
 
Supply Side Portfolio V1 The Timing of Green.pdf
Supply Side Portfolio V1 The Timing of Green.pdfSupply Side Portfolio V1 The Timing of Green.pdf
Supply Side Portfolio V1 The Timing of Green.pdf
 
Showing ROI for Your Analytic Project
Showing ROI for Your Analytic ProjectShowing ROI for Your Analytic Project
Showing ROI for Your Analytic Project
 
Unique value of digital assets Part II: Measurement
Unique value of digital assets Part II:  MeasurementUnique value of digital assets Part II:  Measurement
Unique value of digital assets Part II: Measurement
 

More from Brij Consulting, LLC

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfBrij Consulting, LLC
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandBrij Consulting, LLC
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdfBrij Consulting, LLC
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfComments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfBrij Consulting, LLC
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfBrij Consulting, LLC
 

More from Brij Consulting, LLC (20)

Comments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdfComments on Step Into the World of Glass (All Parts).pdf
Comments on Step Into the World of Glass (All Parts).pdf
 
Step into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdfStep into the World of Glass (All Parts).pdf
Step into the World of Glass (All Parts).pdf
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
 
Comments on Simulations Partners.pdf
Comments on Simulations Partners.pdfComments on Simulations Partners.pdf
Comments on Simulations Partners.pdf
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdf
 
Comments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdfComments on Simulations Project Parts I through III.pdf
Comments on Simulations Project Parts I through III.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdfComments on Simulations Project Parts I & II Marking Contingencies.pdf
Comments on Simulations Project Parts I & II Marking Contingencies.pdf
 
Simulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdfSimulations Project Marking Contingencies.pdf
Simulations Project Marking Contingencies.pdf
 

Recently uploaded

Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckHajeJanKamps
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 

Recently uploaded (20)

Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deckPitch Deck Teardown: NOQX's $200k Pre-seed deck
Pitch Deck Teardown: NOQX's $200k Pre-seed deck
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 

Ark product scorecard v2 Product Activation

  • 1. Ark Product Scorecard V2 Product Activation Associative Principle Integrity and Balance 9/9/2020 Brij Consulting 1 Starts on slide 17
  • 2. ArkAttributes  Ark Attributes will respond to Scorecard Definitions as they are defined on a Product Line basis. At present a very standard definition is applied  Modeling with Instances and Plan Years allows for noting how changes in attributes affect the interpolation of the project  The Products must be Bifurcated to the Scorecard Matrix NoThruput in Production 9/8/2020 Brij Consulting 2
  • 3. Merging the Interpolations of the Benchmark Instance byYear Based onThruput Activities-BMCapitalSpending Activities-BMCashInvesting Activities-BMConversion Activities-BMIncomeSpending Activities-BMAdjustment Funding-BMCapitalSpending Funding-BMCashInvesting Funding-BMConversion Funding-BMIncomeSpending Funding-BMAdjustment Sum of Year 6 ARK Sum of Year 5 ARK Sum of Year 4 ARK ARK in Years 4,5,6 5,000,000,000,000,000.00 - 10,000,000,000,000,000.00 - - 5,000,000,000,000,000.00 (5,000,000,000,000,000.00)- - (10,000,000,000,000,000.00)- (5,000,000,000,000,000.00) 9/8/2020 Brij Consulting 3
  • 4. Activities and Funding of Scorecard need to be attributed to Product Lines Based onTheoretical Architecture 9/8/2020 Brij Consulting 4 Original matrix
  • 5. Methods to increaseArkSolvency  Due to the economies of Scale the Ark becomes insolvent at the norm of time and motion that the world operates in its quantum binary mode.  Thus there are two methods used when this occurs, one is known in the world as splitting shares. Thus the distributive aspect of the enterprise is carried in more shares which build up a greater financial levity and leveraging capability. This method is not recommended here because the shares would become so tiny as to not be manageable by tools.  Instead it is recommended to develop the capability for manifold development of the product. This means that the product volume can be increased with the design mechanics for scaling in time and motion according to the increased demand. This is further recommended by the need to create a concept called time bottling that provides for the continuous operation of “green enabled machines,” and would allow a more comprehensive method of manifold development to occur.  One way to think about this manifold theory and green energy solution is in the automobile, where the manifold must redistribute the fuel to the engine cells. Here we are adjusting the timing of the engine by redistributing the product on the equitable basis of scalable materials. 9/8/2020 Brij Consulting 5
  • 6. Methods to decreaseArk Indebtedness Due to the economies of Scale the Ark becomes increasingly indebted in the scheme of supply chain theory, even operating at the level of the digital portal platform. IF the crystal plait method is provided for the underlying method of Ark product delivery the relationship of vendor supplier is changed. There are two methods here… The first is to subscribe to quantum paper from the Owner of this World. Since this world is passing away and its inclinations evil, this method is not recommended. The second is to partner in the Solution with God recognizing that God takes possession of the whole House and our share is based on His close examination of our Participation and Methods. Since God supplies a fair and equitable Benefit , we highly recommend it. Oversight is only Wisdom. God recommends that you test this relationship in order to discover this. This is not a reason to halt progress or to stop working through the future of the arrangement since the mapping of it is teaching us about the Least Squares application of the SCORECARD and the ability to work with INSTANCES in advanced staging of processes, a great lesson in engineering. It does say however that time will progress to a New Age of Advancing Science through the Kingdom of God. What is different about it? See next… 9/8/2020 Brij Consulting 6 We have been told that all people will participate…
  • 7. TheUse of the MorningStar is a property ofGod There is no means to regenerative power without God and it is not a Binary Solution, although the Lord can configure it in a binary capacity The Soul is God’s Instrument through which Salt and Light are delivered 9/8/2020 Brij Consulting 7
  • 8. Bifurcating the Product Sum of Year 4 Sum of Year 5adj Sum of Year 6 (8,000,000,000,000,000) (6,000,000,000,000,000) (4,000,000,000,000,000) (2,000,000,000,000,000) - 2,000,000,000,000,000 4,000,000,000,000,000 6,000,000,000,000,000 8,000,000,000,000,000 BMCapitalSpending BMCashInvesting BMConversion BMIncomeSpending BMAdjustment Activities Funding ARK INYEAR 6 NORM OF OPERATIONS 6,000,000,000,000,000 - 8,000,000,000,000,000 4,000,000,000,000,000 - 6,000,000,000,000,000 2,000,000,000,000,000 - 4,000,000,000,000,000 - - 2,000,000,000,000,000 (2,000,000,000,000,000)- - (4,000,000,000,000,000)- (2,000,000,000,000,000) (6,000,000,000,000,000)- (4,000,000,000,000,000) (8,000,000,000,000,000)- (6,000,000,000,000,000) bifurcation - the place where something divides into two branches forking, furcation - the place where something divides into branches The Economic Interest is Bifurcated onValue-Added while the Nominal Interest is on the Net Gain 9/8/2020 Brij Consulting 8
  • 9. Plait Portal Products:Summary 9/8/2020 Brij Consulting 9 Re-plait with Foil 5109.8786Value Add /28.855 Orig. Equity =177.08 1762.4 /177.08 =9.9525 Conversion Test =.10152 % good result Tested on Scorecard Conversion Basis All figures are aggregated for consistency in calculations Funds flow
  • 10. PlaitSubstructure Products:Summary 9/8/2020 Brij Consulting 10 Re-plait with Foil 4555.46 Net Gain /28.855 Original Equity =157.87 1762.4Yr3 Equity /157.87 =11.163 ConversionTest =.29% good result Tested on Scorecard Conversion Gain All figures are aggregated for consistency in calculations Funds flow
  • 11. Foil the Plait  Using our Product Mix from slide 4 we foiled the data to obtain a Plait Summary of Sales and Asset Figures for the Metric and KPI assignment in the Scorecard Arrangement.  Foiling is an arrangement that builds the undervalue of the plait and is not logical in the sense of the overlying figures  It is similar to using a pencil system to reapportion data into tiers or layers, except that the underlying mix is now represented in these plait figures and should show up metrically. Since these items have never been sold or made before we use a foil plait arrangement to apportion the underlying metric basis (See Foil Tables V2 Section) 9/8/2020 Brij Consulting 11Important metrics restated Middle step
  • 12. Using different PlaitArrangements to Foil Ark Adjustment ARK Year 4 ARK Year 5 ARK Year 6 Capital Spending Cash Investing Conversion Income Spending Distributing the data into the flattest and most solid arrangements possible Solid Plait for Portal Scope Product Foil Activities - Capital Spending Activities - Cash Investing Activities - Conversion Activities - Income Spending FUNDING Flat Plait for Substructure Product Foil 9/8/2020 Brij Consulting 12 Solid Plait Flat Plait
  • 13. SalesCube by Product 9/8/2020 Brij Consulting 13 Virtual Glass can be reapplied to each product, called Glass Out
  • 14. Distribute Products toScorecard Portal Scope Product Scorecard Distribution Substructure Product Scorecard Distribution 9/8/2020 Brij Consulting 14 NoThruput, building Portal & Ark Cost Benefit Next
  • 15. Cost Benefit with Products 9/8/2020 Brij Consulting 15 - 5,000,000,000,000 10,000,000,000,000 15,000,000,000,000 Land Ark Building Wall Foundation Frame COST BENEFIT PRODUCT CUBE EQUIPMENT 30,276,756,517,930 64,442,888,724,473 (64,777,437,114,529) EQUIPMENT FINANCIAL 371,051,152,199 334,548,390,056 1,601,963,842,449 7,497,278,026,445 8,174,525,301,417 8,971,635,330,808 FINANCIAL QUALITY METRIC 404,119,274,839 1,891,300,214,794 2,062,145,942,017 2,263,228,836,967 QUALITY METRIC COST METRIC (1,707,767,167) (3,770,441,134) (64,734,023) (2,033,991,169) COST METRIC Minor change since first publication Not applied at the product metric level (yet) using standard matrix Funds flow
  • 16. Equity by Product 9/8/2020 Brij Consulting 16 Re-plait for Scorecard
  • 17. V2Scorecard Metrics, KPI’s andScrum Attribution… next: putting metrics to work In ourV2 version of this document we will lay in the Scorecard attributes and demonstrate how the changes in thru put and other resource requirements impact the outcome 9/8/2020 Brij Consulting 17
  • 18. 9/8/2020 Brij Consulting 18 Solid Plait Glass out Calculation changed later Re-scale shown in product foil
  • 19. 9/8/2020 Brij Consulting 19 Flat Plait  In order to properly apportion the product it was necessary to develop a foil arrangement and then rescale it again using a top-down and bottom-up approach. All problems of Attrition are being caused by Scale problems and the need to apportion economic benefits
  • 20. Product Apportionment  It is necessary to apportionGlass in and Glass out, also to rescale and to reapply green materials to infrastructure products. These arguments are necessary for the Scorecard application  It is also important to remember that these two products are ‘utility’ to the rest including the Substructure. 9/8/2020 Brij Consulting 20 Solid Plait
  • 21. Product Apportionment Substructure 9/8/2020 Brij Consulting 21  Notice that there is a different distribution on the Internal vs. External Products  GlassOut Calculation is especially important in attributing equity Burden
  • 22. Project Lag andScale Problems 9/8/2020 Brij Consulting 22 Problems of scale shown in foil, net= units Slow clock Our Model does not separate Digital from Ark Scale Instances Realized gains Yr. 6
  • 23. 9/1/2020 23 BALANCED SCORECARD The Ark Instances and the Digital Instances run separate requirements and can not be merged. The demand for virtual glass only increases as the need for hands-on customer participation increases CUSTOMER PERSPECTIVE Defining a product from sketch mode and assimilation is definitively a learning and growth curve. LEARNING/GROWTH PERSPECTIVE The need to map and to record instances by tier, level and scale causes a large system burden. FINANCIAL PERSPECTIVE The ability to use imaging in both recording and maintaining products at multiple levels in flat spectra would greatly increase performance. INTERNAL PROCESS PERSPECTIVE Brij Consulting Virtual Glass Benefit Nth particle storage Stone with Seven Eyes Crystal Plait Performance Revelation 2:28 And I will give him the morning star.
  • 24. 9/8/2020 Brij Consulting 24 The “New Stone” promised in the Book of Daniel, and representing the requirement needed to perfect Creation, is the lasting fulfillment of this requirement Clock speed differential
  • 25. PERFORMANCE REQUIREMENTS 9/9/2020 Brij Consulting 25 Seek ye first the Kingdom of God and His righteousness, and all these things will be added unto you…
  • 26. 9/9/2020 Brij Consulting 26 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 - 1,000,000,000,000,000 2,000,000,000,000,000 3,000,000,000,000,000 4,000,000,000,000,000 5,000,000,000,000,000 6,000,000,000,000,000 SalesbyProductLine Land Ark Building Ebitda Land Ark Building Assets Land Ark Building Equity Land Ark Building Portal Products YEAR 4 YEA… YEAR 8 - 1,000,000,000,000,000 2,000,000,000,000,000 3,000,000,000,000,000 4,000,000,000,000,000 5,000,000,000,000,000 6,000,000,000,000,000 Substructure Products No one ever built a mountain in a day No really good design comes about through the work of only one person
  • 27. V3Scorecard Metrics, KPI’s andScrum Attribution… next: how do we assign the metrics In ourV3 version of this document we will assign the metrics to the Roles and deliver some thru put, but it becomes difficult to emulate via one person with only scanty tools. 9/9/2020 Brij Consulting 27 Be aware that there are too many instances required There are 42,000.,000 jobs assigned in this one model in year 6 payroll
  • 28. 9/9/2020 Brij Consulting 28 The Difference between Utility Products and Customer Products is that utilities generally have tiny points that build large, and customer products have big points that build small. Because we have not actually built any of these, we do not have them fully costed in detail, notice the margins When Labor is applied to real and advancing work society benefits in all its dependent industries and institutions and lifts the social burden as well. Working on metrics…
  • 29. https://www.slideshare.net/M arshallja/presentations 8/22/2020 Brij Consulting 29 Putting people to work on worthwhile projects with excellent tools is a priestly and kingly work