SlideShare a Scribd company logo
1 of 54
Download to read offline
Simulations Project
Glass Systems| Brij Consulting, LLC |
Jean A. Marshall
Marking the Contingent Outcome
V3 Overcome Agile Constraint
V2 Task Analytics
V1 Stakeholder Approach
Part I: Root Beginnings
Part II: Crossover to Energy Star
1
Summary of Comments on Simulations Project
Page: 1
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:45 PM
This paper is highlighted as the agile tasking simulations marking of contingent outcomes, essential to notes of the financial plan and to assessing the
means to report on it..
How does Stop Gap Data change the Outcome?
How do we mark the field with pivots and lifts to
test for the non-compliant case?
How do we associate contingencies that arise
from production lagging on new technology?
49/7
Slide 3
Ψ
2
1
Page: 2
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:46 PM
We took a deeper look at how advancing fields change the outcome. And particularly what are the root beginnings of the Simulation Model before
crossing over to the Energy Star. Once we crossover LIFT and LIFE certifications protect the arrangement for the personal performance and the group or
company performance of utilizing plait glass in advanced Ark Design.
Stop Gap
• Leveraging and stop gap
measures at the gates help to
deliver a relational condition
that reapplies conditions that
would otherwise drag down
the outcome during its initial
drive towards LIFT
certification.
• Notice that graphically it puts
a stopper around the baseline.
This is particularly necessary
up to the delivery of the
second variegated lens
arrangement where most of
the contingencies are noticed.
How does Stop Gap Data change the Outcome?
Ω
x
pb
L
x2= 1.92 form
Θ+2
π
Y-i
Θ+2
Θ+1
11/13/2023 Brij Consulting, LLC Jean Marshall
The theta indicator
is representative of
the lens power
requirement The
Stop Gap table
itself has a
10.435057 which is
useful as the first
theta at the initial
gate.
Θ
V1 Stakeholder Approach
(309.4/3) = 103.133 – 103.05471 = .078623 x 2 = .157246
.157246-.1573641 = .0001181 interior square
Stop Gap equivalence @ 45
Degrees using Y varying +/- 3*
*per machine tool book, slide 14
45 deg. Slide 14
3
1
Page: 3
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:47 PM
The real purpose of the stop gap measures is to put a square around the trading center of the system that allows it to have its root beginnings without
impacting the project plan. These starting trades require some packaging and very little in terms of build mechanics.
Gap Approach
to First Industry
How do we mark the field with pivots and lifts to
test for the non-compliant case? Gap Case Commutations
Sample
Enterprise
x
Load, Insertion, Force and Torque
=LIFT, see also ^Build Equation
Yield on cost from supply chain 30.943 x 2= 61.886 + 30.0 = 918.886
α
Market Metric Sim Part II
WATCH FOR CERTIFICATION, Entry into Simulations
Y-i
Pre-Certification Composition = Green Trade
Green Trade has Binary Implications
11/13/2023
4
Brij
Consulting,
LLC
Jean
Marshall
Benchmark alphas from “Scope”
Circuit
Returning to
the Gate
334
Pre-Certification Composition = Testing
V1 Stakeholder Approach
1
Page: 4
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:47 PM
The First Industry in Gap Trading is Green Energy Trade which increases its value by increasing its means of motivating application science and in the use
of wireless power. The second and related industry is the beginning of glass componentization which increases the use of wireless energy in common use.
Both of these trades proceed before the energy star comes into compliant use, and it is the crossover means to solid state glass engineering. Within this
crossover period the means to LIFT and LIFE certifications is secured.
Gap Approach to Contingencies
• A starting approach to
contingencies would
be a watch for gate
lagging and system
stall-outs due to no
product or no tooling.
• A “no assignment”
message would be
assignable to the
operator, but “no
tasking” needs a
report, if required.
How do we associate contingencies that arise
from production lagging on new technology?
Green Trade typically has no Gate # but goes to Market
11/13/2023
Brij
Consulting,
LLC
Jean
Marshall
5
V1 Stakeholder Approach
LIFT Tik
Stop Gap data
works with Time
& Motion Motion.
See Slide 11
App III, V
See 409
1
Page: 5
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:47 PM
Contingencies come about and need to be reported as people are waiting for gate technologies to enable glass products to emerge.
Green Energy
• When applying the
system method to
green energy trades
the trade is
assembled and sent
to the market with
no margin recorded,
fee only
• Green Energy (LIFT)
packaged in its
useful container is
sold and the sale is
recorded as a
product, Gate
L1
11/13/2023 Brij Consulting, LLC Jean Marshall 6
Ancient
observances
are as difficult
as future ones
requiring
Divine help
Θ+1
Θ+1
Θ
Pre-Certification Composition = Green Trade
Fee Simple assembly GET = .244 + .013424 Excise
Price GEL = 984.307 + .83008 Excise
V1 Stakeholder Approach
LIFT Asby = Assembly, Excise is Gate Cost
Media Asby = Curtain Call Certification
If we have a LIFT ticket at the second gate, we
should be able to package GEL using secant wheel
1
Page: 6
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:48 PM
It is necessary to quit margin two ways (notably) since the green energy trade has no build significance within the simulations model. This model is GET
and has a small cost for packaging and excise. The GEL or Green Energy Lift package that comes later is sold as a product once certified, and this comes
after the Energy Star crossover.
Typical Watch Window
• Sim conversation
indicates process
attention recorded for
playback along with
simulation activities
• The usual response is to
assign follow-up for
resolution
• Problem resolution is
the goal
11/13/2023 Brij Consulting, LLC Jean Marshall 7
SIM
Glass in Ark Systems
is a conveyance by
God whose Morning
Star operates the
earth and its peoples
requires moral
asby’s, assemblies.
Use of Sims
Use of Sims becomes more complex with the use of Product Media,
Build Media and Story Media to Stream
V1 Stakeholder Approach
Ψ
Use of SYM
Use of Sym. field marking
may be ‘like’ football
Ψ
SYM
Conversion Emphasis
1
Page: 7
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:49 PM
The Beginning of the Best Practices methodology starts with the inception of the simulations modeling and many different applications develop from it.
This is the System of systems to which the oversight of many conditions must prevail.
Glass Startup
Brij
Consulting,
LLC
Jean
Marshall
• Use of Gap Data will stop the earning
process until compliance testing and
Lift Certification can occur
• So that no matter how many tests are
run, the Plan is not impacted by testing
arrangements
11/13/2023 8
Pre-Certification Composition = Testing
V2 Task Analytics
No The Simulation Model does not
use a sandbox technique
Gap Case
Commutations
(marginal)
^Later in remote building, sandbox method is used
Stop
Lift Tik
Iterative Leveraging
^^This compilation is not related to Appendix I
1
Page: 8
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:49 PM
Using the beginning template for Magi and Marcus ENG and their first use of Intellectual Property we use a marginal approach to obtaining testing and
arrangements until certifications can occur.
Glass Startup
Brij
Consulting,
LLC
Jean
Marshall
• Based on Secant Testing with 1W
Packaging
• Gap Case Commutations are pre-
simulation startup operations or
initial Lift Certified
componentization products
• No one can be licensed in system
without having pre-qualifying
experience
• The Simulation Model is qualified
with Best Practices using the
testing technique
11/13/2023 9
Pre-Certification Composition = Testing
V2 Task Analytics
63.205 -61.886= 1.319 -1.237 = .82 x2 = 1.64 Costing
Writing Gap Case Commutations
consists of determining if there is
build and packaging, and what the
cost is at the gate
Stop
No Conversion
No Yield
45 deg. Slide 14
Gap data is too short-ended to
supply Field Markers or Test
Modeling for the Build Plan itself
1
Page: 9
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:50 PM
Gap testing can be used with 1W Packaging and produce the product media packaging necessary for the beginning of the glass industry. Since
everything has not reached is plait able and scalable design state, the ends of everything are not useful yet for building or delivery of synthesis in a
solution-based process of packaging and delivery.
Building the Simulation Model
• Several Techniques exist which include:
• Build with Production Book and Storyboard information in the various
compilations used for the Magi and Marcus Emulation (Training Book)
• Build with Emulations supplied by the Morning Star (Actual Practice)
• Compliance Testing and Best Practices using an oversight board (Both)
11/13/2023 Brij Consulting, LLC Jean Marshall 10
Using Qualified Metrics and Standards all
SOX requirements can be met with a
comparison and test parameters
V3 Overcome Agile Constraint
Recommending
Green Energy and Glass trade
They shall beat their swords into
plowshares, and their spears into pruning
hooks; One nation shall not raise the
sword against another,
nor shall they train for war again.
Micah, Chapter 4
1
Page: 10
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:50 PM
Several Methods are used to build Templates for the Simulation Model all of which conform to Sarbanes Oxley Internal Control Methods. Those who can
not comply with Sarbanes Oxley requirements are set outside of the system for remediation. We have demonstrated to us that Green Energy and Glass
Trade may be the secret to the promises found in the Book of Micah, a biblical resource shown on a stamp from the Nation of Israel, and referred to the
test of the nations.
Part II Crossover
11/13/2023 Brij Consulting, LLC Jean Marshall 11
1. Recording of
Intellectual
Property
2. Compilations of
Productions and
Forward- Facing
Statements
3. Delivery of
competent
standards
L2
Storyboard
1
2
3
3
1
Build Conversion
Interior margin
Early production
3
2
St. Paul
“Men of Athens… God has set a day
for judging the world with justice by
the man he has appointed, and he
proved to everyone who this is by
raising him from the dead.” Acts 17
See 409 slide 5
Θ+2
Θ+1
Θ Θ+3
Θ+1 Our symbolic notation
PART II CROSSOVER
1
Page: 11
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:50 PM
In Part II of our paper, we will work to cross this threshold and see how the Energy Star takes hold and produces a level playing field for companies to
operate using the new forms of engineering and delivery methods. We have mapped three topical requirements regarding Intellectual Property,
Compilations of Forward Facing Reports, Delivery of Competent Standards, and noteworthy lifts and ratios
Layers and Levels
11/13/2023 Brij Consulting, LLC Jean Marshall 12
Gap
Testing
Compliance
Testing
Best
Practices
LIFT and LIFE
Certification
Product
Media
Product
Design
Architectural
Design
Stakeholders Partners Affiliates
Packaging
and
Encryption
Ark Media
Multi-
Agency
Lens
Production
Story Boards
Financial
Compilations
Standards and
Performance
Measures
System
Infrastructures
Energy Star
Working
Systems
Ops
STRABO &
Gate Delivery
Prototype
Production
Book
Green
Energy
• The Gate Method has everything to do with the
level of compliance a system story is producing
I II
^y = Build Equation
The Way of Wisdom
1Wisdom has built her house; she has carved
out her seven pillars. 2She has prepared her
meat and mixed her wine; she has also set her
table.… Proverbs 9:1
Dif. Here 1.6378 – 1.629932 = .007868 x 2= .015736
7- degree Gap
See slide 16
IP
PART II CROSSOVER
1
Page: 12
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:51 PM
We developed the Map for the various consequential infrastructure mechanics and the operations requirements proposed to date. The importance of
Simulations to the System can not be over-rated as a Multi-Agency Requirement for a system of systems set of protocols for the Extended 50 year plan
and agile performance development. Note that Guidance I and Guidance II will assign a Best Practice Developer to the task.
Tool and Tooling Concepts
Brij
Consulting,
LLC
Jean
Marshall
• A Tool is a stand -
alone device (a lens
is always a tool,)
whereas the head
on a Cad Cam
Machine for cutting
or shaping is
tooling, considered
part of the machine
• All of these various
components can be
wheel or secant
enabled, so that Trig
is often used.
11/13/2023 13
See slide 3
Θ Gate Strength of Lens
PART II CROSSOVER
1
Page: 13
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:51 PM
It was noteworthy how we began to find gap equivalence to the Trig Tables from tables in tool guides from the 1950’s. Since we need to estimate until
the tools are in place, this was very helpful. The Stop Gap data is within the 45 degree radiance expected.
What is Benchmarking?
• From Baseline to Benchmark better requirements
may prevail because we define the Practices that
make them happen
• Setting the Benchmark for Daily Cash Change may
look like raising prices, but it may in fact entail a
product upgrade, a new market and a whole new
look at service delivery
• Establish the right brand: LIFE Certification with
the Morning Star
• Gain Recovery of Cash Flow from Binary Model,
see slide 16
11/13/2023 Brij Consulting, LLC Jean Marshall 14
People will move to build and test
PART II CROSSOVER
1
Page: 14
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:52 PM
Cash Flow will become the natural outgrowth of the Ark Design, but in Binary mode we are forced to recover a positional loss carried forward into Ark
mode of delivery. We recover as a gain as shown later. The Idea of the Benchmark and the Baseline is shown in order to visually note the concept.
Mapping the
Outcome
Brij
Consulting,
LLC
Jean
Marshall
11/13/2023 15
PART II CROSSOVER
• Between Instances
• Benchmark vs. Baseline
See Slide 17
for details
See App I = R x 1.20
1
Page: 15
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:52 PM
Using two instances of the Magi and Marcus ENG testing and delivery model we find a way to develop the Benchmark and Baseline and measure our
starting position for the Crossover.
Good Field
Position
Brij
Consulting,
LLC
Jean
Marshall
11/13/2023 16
PART II CROSSOVER
^
^Magi and Marcus purchased their Science Building for $26 mil.
Financial Implications of
Two Instance Comparison
^
Difference to the
crossover metric shows
that labor has been
added… See Side C next
• Payback crossover exceeds
Production R (95.4)
• Interior Margin relative to
market standard (.0050778)
• Interpolated data strongly
correlated to calculations
• Gain Recovery of Cash Flow of
Prior Period in Binary Model
From Slide 11
1
Page: 16
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:52 PM
We manage to develop some positional references to the field of the cloud-star to indicate its crossover characteristics and relationship to the Phase II of
the project. We do this using two highly developed Production Instances compiled within the project. We find good correlation and metrics between
what we calculate within intrinsic data and its statistical and graphical composition
Part III: Foiling
the Glass Car
• We need to apply a stabilizing
wind sail to the glass car to foil
the wave and turn tendency.
• Can we program its delivery?
11/13/2023
Brij Consulting, LLC Jean Marshall
17
Watch for Next…
Side C
See 409 slide 5
1
Page: 17
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:53 PM
The Morning Star’s Foundational Approach to solving the Glass Crossover requirements show that a bridged and gated system is responsible of good
stability in conveyances. However, we will use a Foil approach with the glass car and need to apply a wing stabilizer. The tendency to turn in wave
motion can be perilous even riding on a land wave of green and blue energy. Some ingenuity will be applied… coming up next.
LIFT Commutations
Brij Consulting, LLC Jean Marshall
11/13/2023 18
L3
L1
Ring Commutations are
highly correspondent on L2
Projects and Lens works
L3
L1
L1
Green Energy
LIFT Assignment
LIFT Commutations are for the associative delivery of task related
and financial engineering of outcomes to be reported around
definitive Project Markers. The original properties of Magi and
Marcus Engineering are part of the larger Community Partnership
Arrangement, retaining all rights.
It appears that the 88 units of SA
primarily lens went into Build Cases
Commutations
Cost corrected by
P Rate and Ring
Attribution
We have found deeper
information not generally
available by splicing and
looking for the LIFT variables
^y = Build Equation
63.205 -61.886= 1.319 -1.237 = .82+. 0114 = .8314
22 of the Lens were put into the
Packaging
Appendix I
From Slide 15
From Slide 16
.027303
1
Page: 18
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:53 PM
In an earlier paper we used LIFT and other Commutations to find the interior facts operative in the matrix solution. Here we have calculated the three
primary Lift Facts for the Simulation and also traced our 88 units back to the Build Case. 22 of the Lens were put into the Packaging arrangements which
sponsor IP for the process statement here.
Brij Consulting, LLC Jean Marshall
11/13/2023 19
Organization Start-ups
assign accountability (and
are Simulation Partners)
Product Media Startups
Glass Product Startups
From “Calendar Cartography”
1
2
3
4
5
6
7
8
9
10
1
2
3 4
5
6
7
8
9
10
7
Pushback on dates available
through agile assimilations
Appendix II
10
Starting Series
1
Page: 19
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:54 PM
Organizational Start-ups are assembled around dates in our product mapping to highlight the need for these Partner groups to start early on the Glass
Path. In order to assign accountability organizations are attributed to the start-up path tasking. Project Startups have immediate buy-in to assemble
around the significance of the model. Green-Energy Trading supplies capital. But the earn-back on projects helps to pay investors back for the
unprovided portion.
Motion Theory Corresponds to the Basis
y = -1.6378x2 + 66.562x + 184.7
R² = 0.285
y = 0.514x2 - 43.526x + 907.07
R² = 0.8361
(1,000.00000)
-
1,000.00000
2,000.00000
(10.00000) - 10.00000 20.00000 30.00000 40.00000 50.00000
Inertial Momentum
Facts FA RAC Poly. (Facts) Poly. (FA)
The Corner of Mu Sic is
exceptionally comparable
to the base mechanic
Load Statement
9.09716-9.0707
½ Pi
Details for
Process notes
11/13/2023 Brij Consulting, LLC Jean Marshall 20
19.42
Tr
s1
713.52-710.46= 3.06
From “Partners in T Pluribus Unum”
Not Table associated, localized.
Dif. here = .001872 see slide 13
1
Page: 20
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:54 PM
The Motion Theory Trig Function helps to assimilate packaging and other delivery within the system on a localized basis without the Table association
that comes with the Energy Star
11/13/2023 Brij Consulting, LLC Jean Marshall 21 21
1
Page: 21
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:54 PM
The Storyboard should be updated for the new concept machine prototypes (we will do this in a future paper) and helps to make many arguments
established with clarity. Also included are any new secants or events. We can only keep completed tasks on the engineering storyboard or these will
impact the simulations model. Thus, production notes should gather more of the interim assessments necessary here. The Production Book is reviewed
along with prototyping material, and contains processes required to produce products or outcomes necessary to fulfill the glass path. The mechanical
state may be labeled pre-plait pre-green for its compositional engineering standards applications. The simulations process modeling may require its
demonstration.
Vector Union Plait Wall
• Used for Agreement in the Economics of the Plait
Glass Equation
• Used to composition General Use Properties
11/13/2023 Brij Consulting, LLC Jean Marshall 22
See slide 19
“Interpolative Scope”
409.32-405.09=4.22+.112=4.332
e
2.76-2.40=.36/6=6e
Clock foil x 3 =335 x 3 = 1005
Original data
Proofs
t
See 409 slide 11
1
Page: 22
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:55 PM
Another instance of the 409 metric was found in the Vector Union Plait Wall that may prove useful here.
Project Assembly
11/13/2023
23
1
Page: 23
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:55 PM
Our Scrum Valuation and Metric Delivery of the Load related well to our project and enabled us to see the wall migration with the double down effect. The
Glass Table development in hinging on many system development teams.
Brij Consulting, LLC Jean Marshall
11/13/2023 24
1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope
determination of Glass and STRABO serialization for Agile
2. Glass Impact: Streaming the Engineering of Components, Solid State
Assemblage, Table Design Outcomes
3. Cascading in Green: The theories and concepts related to the Green Wall
and the starting compositing of green energy and wall migrations.
4. SSE: The Remote End: How Solid-State Engineering is Performance mined
and delivered remotely
5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency
6. Simulations in Diminishing Scale: The use of Ring and Lens
7. Simulations: Synergy Modifications: Mitigation in Risk Analysis
8. Simulations: Marking the Contingent Outcome: Marking Pivots and Lifts
SSE
CASCADE
IMPACT
SCOPE
CLOUD-STAR
Brij Consulting, LLC | SlideShare
Part I: City Scale
Part II: Remote Scale
Part III: Confluent Scale
SIMULATIONS
P a p e rs i n D e s ign Se ri e s
Part I & Part II
1
Page: 24
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:56 PM
Papers in the design series focus on simulations and specifically Part I: City Scale, Part II: Remote Scale and Part III: Confluent Scale. We will begin to
highlight the vector requirements for tasking in our current model and the need for lens facets for scale differentiation. Then in Part II define simulations
reporting. In Part III we begin to move past forms and mix to the confluent modeling of the Ark Science of Glass in the Advancing Age to come. We
continued our Simulations Project with mitigation of Risk in the crossover period through the use of Gap Data.
Brij Consulting, LLC Jean Marshall
11/13/2023 25
P a p e rs i n T e s t Se ri es
1. The Car and Road Test: Simulating Glass Cars and Candle stone Roads
Brij Consulting, LLC | SlideShare
V3 Glass Package
V2 Synergy Modifications
V1 Digital Testing
Strabo
Tying projects back to the Strabo Omega
allows for Simulations Cloud to orchestrate
outcomes
Part I,
From Slide 13
2. Home and Foundation Test: Simulating Glass Instances of Candle stone
and Thread in Componentizations utilizing a legacy form of Glass
3. Glass Big Push: Legacy Glass gives way to Solid State Engineering,
Instancing and Building with remote synchronization Parts I, and II/III
Of Pillars and Pipes, Portals and Plaits
Part I:
Part II Simulations Marking
1
Page: 25
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:57 PM
We look at testing of glass and various forms and methods to begin plan phases (not specific engineering dogma.) We begin with Model O as a sample of
car and road synchronous behavior. Then we will consider testing home and foundation and green energy and candle stone surfaces. We want to look for
the means to tie back into STRABO and Simulations Model for Agile playback. The Third testing paper will close the gap between legacy glass and solid-
state assimilations which develop into remote planning and building tools. In the Second Part of the Third Test Paper, Glass Big Push, we examine the
types of events or changes that impact the Simulation of the Project Performance.
1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
11/13/2023
Brij Consulting, LLC Jean Marshall
26
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning
study of Secants and Wheels for the “cube-ified glass” engineering of
Imaging, sound and motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and
view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP
Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at
basic product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance
(Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for
Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for
Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to
raise up a Digital Portal Production System using appliances gained through
Plait Object and Gate driven configurations that work with Digital Mechanics.
Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the
engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building
and delivery of product, learning to specify material, looking for union of
Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian
Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to
depict …Motivated by sound it creates a means by sound to cascade light for
safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard,
and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards
(Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking
old vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for-
wave-and-lens-assimilationpdf
Roadmap: #47 & #48 & #49
Dimensional Building in Ark Design
Glass Cars and New Product Roadmap
Calendar Cartography
Building with Glass #50
New
Remote Theory
Ark Model
Motion Projects
Building
1
Page: 26
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:15:00 PM
The Learning Series
Simulations Project
Glass Systems| Brij Consulting, LLC |
Jean A. Marshall
Marking the Contingent Outcome
11/13/2023 Brij Consulting, LLC Jean Marshall 27
Part III: Foiling the Glass Car
1
Page: 27
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:15:01 PM
This paper is highlighted as the agile tasking simulations marking of contingent outcomes, essential to notes of the financial plan and to assessing the
means to report on it.. We continue with Lift Data to crossover to the Energy Star. And after working on Benchmarking the System delivery with instances
we will continue with Part III to foil the glass car with a wing for stabilization.

More Related Content

Similar to Simulating glass systems for energy efficiency

comments for simulations part I.pdf
comments for simulations part I.pdfcomments for simulations part I.pdf
comments for simulations part I.pdfJeanMarshall8
 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfJeanMarshall8
 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfJeanMarshall8
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfBrij Consulting, LLC
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfBrij Consulting, LLC
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfBrij Consulting, LLC
 
Comments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfComments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfBrij Consulting, LLC
 
Simulations Part III.pdf
Simulations Part III.pdfSimulations Part III.pdf
Simulations Part III.pdfJeanMarshall8
 
Comments for Simulations Part III.pdf
Comments for Simulations Part III.pdfComments for Simulations Part III.pdf
Comments for Simulations Part III.pdfJeanMarshall8
 
Simulations Part III.pdf
Simulations Part III.pdfSimulations Part III.pdf
Simulations Part III.pdfJeanMarshall8
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfBrij Consulting, LLC
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionBrij Consulting, LLC
 
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceInstancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceBrij Consulting, LLC
 
Portal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part IIIPortal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part IIIBrij Consulting, LLC
 
Instancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversInstancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversBrij Consulting, LLC
 
Comments for Simulations Part II.pdf
Comments for Simulations Part II.pdfComments for Simulations Part II.pdf
Comments for Simulations Part II.pdfJeanMarshall8
 
Awe k2 midterms
Awe k2 midtermsAwe k2 midterms
Awe k2 midtermsKaren Tay
 

Similar to Simulating glass systems for energy efficiency (20)

comments for simulations part I.pdf
comments for simulations part I.pdfcomments for simulations part I.pdf
comments for simulations part I.pdf
 
Simulations Partners.pdf
Simulations Partners.pdfSimulations Partners.pdf
Simulations Partners.pdf
 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdf
 
Simulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdfSimulations in Ark Design Mode.pdf
Simulations in Ark Design Mode.pdf
 
Simulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdfSimulations Partners w-Addendum.pdf
Simulations Partners w-Addendum.pdf
 
Glass Big Push Part II (III).pdf
Glass Big Push  Part II  (III).pdfGlass Big Push  Part II  (III).pdf
Glass Big Push Part II (III).pdf
 
Comments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdfComments Scorecard Reconfigured -SPO.pdf
Comments Scorecard Reconfigured -SPO.pdf
 
Comments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdfComments on Simulations Partners Addendum.pdf
Comments on Simulations Partners Addendum.pdf
 
Comments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdfComments on Simulations Analytics.pdf
Comments on Simulations Analytics.pdf
 
Simulations Part III.pdf
Simulations Part III.pdfSimulations Part III.pdf
Simulations Part III.pdf
 
Comments for Simulations Part III.pdf
Comments for Simulations Part III.pdfComments for Simulations Part III.pdf
Comments for Simulations Part III.pdf
 
Simulations Part III.pdf
Simulations Part III.pdfSimulations Part III.pdf
Simulations Part III.pdf
 
Comments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdfComments for Home and Foundation Testing.pdf
Comments for Home and Foundation Testing.pdf
 
Instancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of FunctionInstancing at the Gate v3 Observation of Function
Instancing at the Gate v3 Observation of Function
 
Instancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the InstanceInstancing at the Gate v2 Building the Instance
Instancing at the Gate v2 Building the Instance
 
The Glass Wave: V1 Digital Plait
The Glass Wave: V1 Digital Plait The Glass Wave: V1 Digital Plait
The Glass Wave: V1 Digital Plait
 
Portal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part IIIPortal Prosperity: An Overview Part I, Part II and Part III
Portal Prosperity: An Overview Part I, Part II and Part III
 
Instancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and DriversInstancing at the Gate v1 The Load with Mark Up and Drivers
Instancing at the Gate v1 The Load with Mark Up and Drivers
 
Comments for Simulations Part II.pdf
Comments for Simulations Part II.pdfComments for Simulations Part II.pdf
Comments for Simulations Part II.pdf
 
Awe k2 midterms
Awe k2 midtermsAwe k2 midterms
Awe k2 midterms
 

More from Brij Consulting, LLC

Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfBrij Consulting, LLC
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfBrij Consulting, LLC
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfBrij Consulting, LLC
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfBrij Consulting, LLC
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandBrij Consulting, LLC
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfBrij Consulting, LLC
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfBrij Consulting, LLC
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdfBrij Consulting, LLC
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfBrij Consulting, LLC
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfBrij Consulting, LLC
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdfBrij Consulting, LLC
 
Simulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfSimulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfBrij Consulting, LLC
 
Summary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfSummary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfBrij Consulting, LLC
 

More from Brij Consulting, LLC (17)

Step into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdfStep into the World of Glass, Part I.pdf
Step into the World of Glass, Part I.pdf
 
Comments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdfComments on Step Into the World of Glass Building Part I.pdf
Comments on Step Into the World of Glass Building Part I.pdf
 
Square Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdfSquare Pi Key to the Investment, SPO.pdf
Square Pi Key to the Investment, SPO.pdf
 
Comments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdfComments on Square Pi- Key to the Investment.pdf
Comments on Square Pi- Key to the Investment.pdf
 
Scorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-DemandScorecard Reconfigured Scale-Port-Demand
Scorecard Reconfigured Scale-Port-Demand
 
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdfComments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
Comments on SCORECARD GEARBOX and NEW APPLICATIONS.pdf
 
Scorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdfScorecard Gearbox and New Applications.pdf
Scorecard Gearbox and New Applications.pdf
 
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI,  Graphic Interpolation.pdfWork sample1 Scorecard, Power BI,  Graphic Interpolation.pdf
Work sample1 Scorecard, Power BI, Graphic Interpolation.pdf
 
Simulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdfSimulation Watch Window Parts I,II,III.pdf
Simulation Watch Window Parts I,II,III.pdf
 
Comments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdfComments on Simulation Watch Parts I,II,III.pdf
Comments on Simulation Watch Parts I,II,III.pdf
 
Simulation Watch Window.pdf
Simulation Watch Window.pdfSimulation Watch Window.pdf
Simulation Watch Window.pdf
 
Comments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdfComments on Simulations Watch Case I & II.pdf
Comments on Simulations Watch Case I & II.pdf
 
Simulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdfSimulation Watch Window Part I.pdf
Simulation Watch Window Part I.pdf
 
Comments on Simulations Watch Case Part I.pdf
Comments on  Simulations Watch Case Part I.pdfComments on  Simulations Watch Case Part I.pdf
Comments on Simulations Watch Case Part I.pdf
 
Simulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdfSimulations Analytics Mitigating Plan Conditions.pdf
Simulations Analytics Mitigating Plan Conditions.pdf
 
Summary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdfSummary of Comments on Glass Big Push.pdf
Summary of Comments on Glass Big Push.pdf
 
Glass Big Push Part I.pdf
Glass Big Push  Part I.pdfGlass Big Push  Part I.pdf
Glass Big Push Part I.pdf
 

Recently uploaded

NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadAyesha Khan
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 

Recently uploaded (20)

NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in IslamabadIslamabad Escorts | Call 03274100048 | Escort Service in Islamabad
Islamabad Escorts | Call 03274100048 | Escort Service in Islamabad
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 

Simulating glass systems for energy efficiency

  • 1. Simulations Project Glass Systems| Brij Consulting, LLC | Jean A. Marshall Marking the Contingent Outcome V3 Overcome Agile Constraint V2 Task Analytics V1 Stakeholder Approach Part I: Root Beginnings Part II: Crossover to Energy Star 1
  • 2. Summary of Comments on Simulations Project Page: 1 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:45 PM This paper is highlighted as the agile tasking simulations marking of contingent outcomes, essential to notes of the financial plan and to assessing the means to report on it..
  • 3. How does Stop Gap Data change the Outcome? How do we mark the field with pivots and lifts to test for the non-compliant case? How do we associate contingencies that arise from production lagging on new technology? 49/7 Slide 3 Ψ 2 1
  • 4. Page: 2 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:46 PM We took a deeper look at how advancing fields change the outcome. And particularly what are the root beginnings of the Simulation Model before crossing over to the Energy Star. Once we crossover LIFT and LIFE certifications protect the arrangement for the personal performance and the group or company performance of utilizing plait glass in advanced Ark Design.
  • 5. Stop Gap • Leveraging and stop gap measures at the gates help to deliver a relational condition that reapplies conditions that would otherwise drag down the outcome during its initial drive towards LIFT certification. • Notice that graphically it puts a stopper around the baseline. This is particularly necessary up to the delivery of the second variegated lens arrangement where most of the contingencies are noticed. How does Stop Gap Data change the Outcome? Ω x pb L x2= 1.92 form Θ+2 π Y-i Θ+2 Θ+1 11/13/2023 Brij Consulting, LLC Jean Marshall The theta indicator is representative of the lens power requirement The Stop Gap table itself has a 10.435057 which is useful as the first theta at the initial gate. Θ V1 Stakeholder Approach (309.4/3) = 103.133 – 103.05471 = .078623 x 2 = .157246 .157246-.1573641 = .0001181 interior square Stop Gap equivalence @ 45 Degrees using Y varying +/- 3* *per machine tool book, slide 14 45 deg. Slide 14 3 1
  • 6. Page: 3 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:47 PM The real purpose of the stop gap measures is to put a square around the trading center of the system that allows it to have its root beginnings without impacting the project plan. These starting trades require some packaging and very little in terms of build mechanics.
  • 7. Gap Approach to First Industry How do we mark the field with pivots and lifts to test for the non-compliant case? Gap Case Commutations Sample Enterprise x Load, Insertion, Force and Torque =LIFT, see also ^Build Equation Yield on cost from supply chain 30.943 x 2= 61.886 + 30.0 = 918.886 α Market Metric Sim Part II WATCH FOR CERTIFICATION, Entry into Simulations Y-i Pre-Certification Composition = Green Trade Green Trade has Binary Implications 11/13/2023 4 Brij Consulting, LLC Jean Marshall Benchmark alphas from “Scope” Circuit Returning to the Gate 334 Pre-Certification Composition = Testing V1 Stakeholder Approach 1
  • 8. Page: 4 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:47 PM The First Industry in Gap Trading is Green Energy Trade which increases its value by increasing its means of motivating application science and in the use of wireless power. The second and related industry is the beginning of glass componentization which increases the use of wireless energy in common use. Both of these trades proceed before the energy star comes into compliant use, and it is the crossover means to solid state glass engineering. Within this crossover period the means to LIFT and LIFE certifications is secured.
  • 9. Gap Approach to Contingencies • A starting approach to contingencies would be a watch for gate lagging and system stall-outs due to no product or no tooling. • A “no assignment” message would be assignable to the operator, but “no tasking” needs a report, if required. How do we associate contingencies that arise from production lagging on new technology? Green Trade typically has no Gate # but goes to Market 11/13/2023 Brij Consulting, LLC Jean Marshall 5 V1 Stakeholder Approach LIFT Tik Stop Gap data works with Time & Motion Motion. See Slide 11 App III, V See 409 1
  • 10. Page: 5 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:47 PM Contingencies come about and need to be reported as people are waiting for gate technologies to enable glass products to emerge.
  • 11. Green Energy • When applying the system method to green energy trades the trade is assembled and sent to the market with no margin recorded, fee only • Green Energy (LIFT) packaged in its useful container is sold and the sale is recorded as a product, Gate L1 11/13/2023 Brij Consulting, LLC Jean Marshall 6 Ancient observances are as difficult as future ones requiring Divine help Θ+1 Θ+1 Θ Pre-Certification Composition = Green Trade Fee Simple assembly GET = .244 + .013424 Excise Price GEL = 984.307 + .83008 Excise V1 Stakeholder Approach LIFT Asby = Assembly, Excise is Gate Cost Media Asby = Curtain Call Certification If we have a LIFT ticket at the second gate, we should be able to package GEL using secant wheel 1
  • 12. Page: 6 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:48 PM It is necessary to quit margin two ways (notably) since the green energy trade has no build significance within the simulations model. This model is GET and has a small cost for packaging and excise. The GEL or Green Energy Lift package that comes later is sold as a product once certified, and this comes after the Energy Star crossover.
  • 13. Typical Watch Window • Sim conversation indicates process attention recorded for playback along with simulation activities • The usual response is to assign follow-up for resolution • Problem resolution is the goal 11/13/2023 Brij Consulting, LLC Jean Marshall 7 SIM Glass in Ark Systems is a conveyance by God whose Morning Star operates the earth and its peoples requires moral asby’s, assemblies. Use of Sims Use of Sims becomes more complex with the use of Product Media, Build Media and Story Media to Stream V1 Stakeholder Approach Ψ Use of SYM Use of Sym. field marking may be ‘like’ football Ψ SYM Conversion Emphasis 1
  • 14. Page: 7 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:49 PM The Beginning of the Best Practices methodology starts with the inception of the simulations modeling and many different applications develop from it. This is the System of systems to which the oversight of many conditions must prevail.
  • 15. Glass Startup Brij Consulting, LLC Jean Marshall • Use of Gap Data will stop the earning process until compliance testing and Lift Certification can occur • So that no matter how many tests are run, the Plan is not impacted by testing arrangements 11/13/2023 8 Pre-Certification Composition = Testing V2 Task Analytics No The Simulation Model does not use a sandbox technique Gap Case Commutations (marginal) ^Later in remote building, sandbox method is used Stop Lift Tik Iterative Leveraging ^^This compilation is not related to Appendix I 1
  • 16. Page: 8 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:49 PM Using the beginning template for Magi and Marcus ENG and their first use of Intellectual Property we use a marginal approach to obtaining testing and arrangements until certifications can occur.
  • 17. Glass Startup Brij Consulting, LLC Jean Marshall • Based on Secant Testing with 1W Packaging • Gap Case Commutations are pre- simulation startup operations or initial Lift Certified componentization products • No one can be licensed in system without having pre-qualifying experience • The Simulation Model is qualified with Best Practices using the testing technique 11/13/2023 9 Pre-Certification Composition = Testing V2 Task Analytics 63.205 -61.886= 1.319 -1.237 = .82 x2 = 1.64 Costing Writing Gap Case Commutations consists of determining if there is build and packaging, and what the cost is at the gate Stop No Conversion No Yield 45 deg. Slide 14 Gap data is too short-ended to supply Field Markers or Test Modeling for the Build Plan itself 1
  • 18. Page: 9 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:50 PM Gap testing can be used with 1W Packaging and produce the product media packaging necessary for the beginning of the glass industry. Since everything has not reached is plait able and scalable design state, the ends of everything are not useful yet for building or delivery of synthesis in a solution-based process of packaging and delivery.
  • 19. Building the Simulation Model • Several Techniques exist which include: • Build with Production Book and Storyboard information in the various compilations used for the Magi and Marcus Emulation (Training Book) • Build with Emulations supplied by the Morning Star (Actual Practice) • Compliance Testing and Best Practices using an oversight board (Both) 11/13/2023 Brij Consulting, LLC Jean Marshall 10 Using Qualified Metrics and Standards all SOX requirements can be met with a comparison and test parameters V3 Overcome Agile Constraint Recommending Green Energy and Glass trade They shall beat their swords into plowshares, and their spears into pruning hooks; One nation shall not raise the sword against another, nor shall they train for war again. Micah, Chapter 4 1
  • 20. Page: 10 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:50 PM Several Methods are used to build Templates for the Simulation Model all of which conform to Sarbanes Oxley Internal Control Methods. Those who can not comply with Sarbanes Oxley requirements are set outside of the system for remediation. We have demonstrated to us that Green Energy and Glass Trade may be the secret to the promises found in the Book of Micah, a biblical resource shown on a stamp from the Nation of Israel, and referred to the test of the nations.
  • 21. Part II Crossover 11/13/2023 Brij Consulting, LLC Jean Marshall 11 1. Recording of Intellectual Property 2. Compilations of Productions and Forward- Facing Statements 3. Delivery of competent standards L2 Storyboard 1 2 3 3 1 Build Conversion Interior margin Early production 3 2 St. Paul “Men of Athens… God has set a day for judging the world with justice by the man he has appointed, and he proved to everyone who this is by raising him from the dead.” Acts 17 See 409 slide 5 Θ+2 Θ+1 Θ Θ+3 Θ+1 Our symbolic notation PART II CROSSOVER 1
  • 22. Page: 11 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:50 PM In Part II of our paper, we will work to cross this threshold and see how the Energy Star takes hold and produces a level playing field for companies to operate using the new forms of engineering and delivery methods. We have mapped three topical requirements regarding Intellectual Property, Compilations of Forward Facing Reports, Delivery of Competent Standards, and noteworthy lifts and ratios
  • 23. Layers and Levels 11/13/2023 Brij Consulting, LLC Jean Marshall 12 Gap Testing Compliance Testing Best Practices LIFT and LIFE Certification Product Media Product Design Architectural Design Stakeholders Partners Affiliates Packaging and Encryption Ark Media Multi- Agency Lens Production Story Boards Financial Compilations Standards and Performance Measures System Infrastructures Energy Star Working Systems Ops STRABO & Gate Delivery Prototype Production Book Green Energy • The Gate Method has everything to do with the level of compliance a system story is producing I II ^y = Build Equation The Way of Wisdom 1Wisdom has built her house; she has carved out her seven pillars. 2She has prepared her meat and mixed her wine; she has also set her table.… Proverbs 9:1 Dif. Here 1.6378 – 1.629932 = .007868 x 2= .015736 7- degree Gap See slide 16 IP PART II CROSSOVER 1
  • 24. Page: 12 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:51 PM We developed the Map for the various consequential infrastructure mechanics and the operations requirements proposed to date. The importance of Simulations to the System can not be over-rated as a Multi-Agency Requirement for a system of systems set of protocols for the Extended 50 year plan and agile performance development. Note that Guidance I and Guidance II will assign a Best Practice Developer to the task.
  • 25. Tool and Tooling Concepts Brij Consulting, LLC Jean Marshall • A Tool is a stand - alone device (a lens is always a tool,) whereas the head on a Cad Cam Machine for cutting or shaping is tooling, considered part of the machine • All of these various components can be wheel or secant enabled, so that Trig is often used. 11/13/2023 13 See slide 3 Θ Gate Strength of Lens PART II CROSSOVER 1
  • 26. Page: 13 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:51 PM It was noteworthy how we began to find gap equivalence to the Trig Tables from tables in tool guides from the 1950’s. Since we need to estimate until the tools are in place, this was very helpful. The Stop Gap data is within the 45 degree radiance expected.
  • 27. What is Benchmarking? • From Baseline to Benchmark better requirements may prevail because we define the Practices that make them happen • Setting the Benchmark for Daily Cash Change may look like raising prices, but it may in fact entail a product upgrade, a new market and a whole new look at service delivery • Establish the right brand: LIFE Certification with the Morning Star • Gain Recovery of Cash Flow from Binary Model, see slide 16 11/13/2023 Brij Consulting, LLC Jean Marshall 14 People will move to build and test PART II CROSSOVER 1
  • 28. Page: 14 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:52 PM Cash Flow will become the natural outgrowth of the Ark Design, but in Binary mode we are forced to recover a positional loss carried forward into Ark mode of delivery. We recover as a gain as shown later. The Idea of the Benchmark and the Baseline is shown in order to visually note the concept.
  • 29. Mapping the Outcome Brij Consulting, LLC Jean Marshall 11/13/2023 15 PART II CROSSOVER • Between Instances • Benchmark vs. Baseline See Slide 17 for details See App I = R x 1.20 1
  • 30. Page: 15 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:52 PM Using two instances of the Magi and Marcus ENG testing and delivery model we find a way to develop the Benchmark and Baseline and measure our starting position for the Crossover.
  • 31. Good Field Position Brij Consulting, LLC Jean Marshall 11/13/2023 16 PART II CROSSOVER ^ ^Magi and Marcus purchased their Science Building for $26 mil. Financial Implications of Two Instance Comparison ^ Difference to the crossover metric shows that labor has been added… See Side C next • Payback crossover exceeds Production R (95.4) • Interior Margin relative to market standard (.0050778) • Interpolated data strongly correlated to calculations • Gain Recovery of Cash Flow of Prior Period in Binary Model From Slide 11 1
  • 32. Page: 16 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:52 PM We manage to develop some positional references to the field of the cloud-star to indicate its crossover characteristics and relationship to the Phase II of the project. We do this using two highly developed Production Instances compiled within the project. We find good correlation and metrics between what we calculate within intrinsic data and its statistical and graphical composition
  • 33. Part III: Foiling the Glass Car • We need to apply a stabilizing wind sail to the glass car to foil the wave and turn tendency. • Can we program its delivery? 11/13/2023 Brij Consulting, LLC Jean Marshall 17 Watch for Next… Side C See 409 slide 5 1
  • 34. Page: 17 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:53 PM The Morning Star’s Foundational Approach to solving the Glass Crossover requirements show that a bridged and gated system is responsible of good stability in conveyances. However, we will use a Foil approach with the glass car and need to apply a wing stabilizer. The tendency to turn in wave motion can be perilous even riding on a land wave of green and blue energy. Some ingenuity will be applied… coming up next.
  • 35. LIFT Commutations Brij Consulting, LLC Jean Marshall 11/13/2023 18 L3 L1 Ring Commutations are highly correspondent on L2 Projects and Lens works L3 L1 L1 Green Energy LIFT Assignment LIFT Commutations are for the associative delivery of task related and financial engineering of outcomes to be reported around definitive Project Markers. The original properties of Magi and Marcus Engineering are part of the larger Community Partnership Arrangement, retaining all rights. It appears that the 88 units of SA primarily lens went into Build Cases Commutations Cost corrected by P Rate and Ring Attribution We have found deeper information not generally available by splicing and looking for the LIFT variables ^y = Build Equation 63.205 -61.886= 1.319 -1.237 = .82+. 0114 = .8314 22 of the Lens were put into the Packaging Appendix I From Slide 15 From Slide 16 .027303 1
  • 36. Page: 18 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:53 PM In an earlier paper we used LIFT and other Commutations to find the interior facts operative in the matrix solution. Here we have calculated the three primary Lift Facts for the Simulation and also traced our 88 units back to the Build Case. 22 of the Lens were put into the Packaging arrangements which sponsor IP for the process statement here.
  • 37. Brij Consulting, LLC Jean Marshall 11/13/2023 19 Organization Start-ups assign accountability (and are Simulation Partners) Product Media Startups Glass Product Startups From “Calendar Cartography” 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 7 Pushback on dates available through agile assimilations Appendix II 10 Starting Series 1
  • 38. Page: 19 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:54 PM Organizational Start-ups are assembled around dates in our product mapping to highlight the need for these Partner groups to start early on the Glass Path. In order to assign accountability organizations are attributed to the start-up path tasking. Project Startups have immediate buy-in to assemble around the significance of the model. Green-Energy Trading supplies capital. But the earn-back on projects helps to pay investors back for the unprovided portion.
  • 39. Motion Theory Corresponds to the Basis y = -1.6378x2 + 66.562x + 184.7 R² = 0.285 y = 0.514x2 - 43.526x + 907.07 R² = 0.8361 (1,000.00000) - 1,000.00000 2,000.00000 (10.00000) - 10.00000 20.00000 30.00000 40.00000 50.00000 Inertial Momentum Facts FA RAC Poly. (Facts) Poly. (FA) The Corner of Mu Sic is exceptionally comparable to the base mechanic Load Statement 9.09716-9.0707 ½ Pi Details for Process notes 11/13/2023 Brij Consulting, LLC Jean Marshall 20 19.42 Tr s1 713.52-710.46= 3.06 From “Partners in T Pluribus Unum” Not Table associated, localized. Dif. here = .001872 see slide 13 1
  • 40. Page: 20 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:54 PM The Motion Theory Trig Function helps to assimilate packaging and other delivery within the system on a localized basis without the Table association that comes with the Energy Star
  • 41. 11/13/2023 Brij Consulting, LLC Jean Marshall 21 21 1
  • 42. Page: 21 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:54 PM The Storyboard should be updated for the new concept machine prototypes (we will do this in a future paper) and helps to make many arguments established with clarity. Also included are any new secants or events. We can only keep completed tasks on the engineering storyboard or these will impact the simulations model. Thus, production notes should gather more of the interim assessments necessary here. The Production Book is reviewed along with prototyping material, and contains processes required to produce products or outcomes necessary to fulfill the glass path. The mechanical state may be labeled pre-plait pre-green for its compositional engineering standards applications. The simulations process modeling may require its demonstration.
  • 43. Vector Union Plait Wall • Used for Agreement in the Economics of the Plait Glass Equation • Used to composition General Use Properties 11/13/2023 Brij Consulting, LLC Jean Marshall 22 See slide 19 “Interpolative Scope” 409.32-405.09=4.22+.112=4.332 e 2.76-2.40=.36/6=6e Clock foil x 3 =335 x 3 = 1005 Original data Proofs t See 409 slide 11 1
  • 44. Page: 22 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:55 PM Another instance of the 409 metric was found in the Vector Union Plait Wall that may prove useful here.
  • 46. Page: 23 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:55 PM Our Scrum Valuation and Metric Delivery of the Load related well to our project and enabled us to see the wall migration with the double down effect. The Glass Table development in hinging on many system development teams.
  • 47. Brij Consulting, LLC Jean Marshall 11/13/2023 24 1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope determination of Glass and STRABO serialization for Agile 2. Glass Impact: Streaming the Engineering of Components, Solid State Assemblage, Table Design Outcomes 3. Cascading in Green: The theories and concepts related to the Green Wall and the starting compositing of green energy and wall migrations. 4. SSE: The Remote End: How Solid-State Engineering is Performance mined and delivered remotely 5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency 6. Simulations in Diminishing Scale: The use of Ring and Lens 7. Simulations: Synergy Modifications: Mitigation in Risk Analysis 8. Simulations: Marking the Contingent Outcome: Marking Pivots and Lifts SSE CASCADE IMPACT SCOPE CLOUD-STAR Brij Consulting, LLC | SlideShare Part I: City Scale Part II: Remote Scale Part III: Confluent Scale SIMULATIONS P a p e rs i n D e s ign Se ri e s Part I & Part II 1
  • 48. Page: 24 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:56 PM Papers in the design series focus on simulations and specifically Part I: City Scale, Part II: Remote Scale and Part III: Confluent Scale. We will begin to highlight the vector requirements for tasking in our current model and the need for lens facets for scale differentiation. Then in Part II define simulations reporting. In Part III we begin to move past forms and mix to the confluent modeling of the Ark Science of Glass in the Advancing Age to come. We continued our Simulations Project with mitigation of Risk in the crossover period through the use of Gap Data.
  • 49. Brij Consulting, LLC Jean Marshall 11/13/2023 25 P a p e rs i n T e s t Se ri es 1. The Car and Road Test: Simulating Glass Cars and Candle stone Roads Brij Consulting, LLC | SlideShare V3 Glass Package V2 Synergy Modifications V1 Digital Testing Strabo Tying projects back to the Strabo Omega allows for Simulations Cloud to orchestrate outcomes Part I, From Slide 13 2. Home and Foundation Test: Simulating Glass Instances of Candle stone and Thread in Componentizations utilizing a legacy form of Glass 3. Glass Big Push: Legacy Glass gives way to Solid State Engineering, Instancing and Building with remote synchronization Parts I, and II/III Of Pillars and Pipes, Portals and Plaits Part I: Part II Simulations Marking 1
  • 50. Page: 25 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:14:57 PM We look at testing of glass and various forms and methods to begin plan phases (not specific engineering dogma.) We begin with Model O as a sample of car and road synchronous behavior. Then we will consider testing home and foundation and green energy and candle stone surfaces. We want to look for the means to tie back into STRABO and Simulations Model for Agile playback. The Third testing paper will close the gap between legacy glass and solid- state assimilations which develop into remote planning and building tools. In the Second Part of the Third Test Paper, Glass Big Push, we examine the types of events or changes that impact the Simulation of the Project Performance.
  • 51. 1. Portal Prosperity: An overview of Glass Theory and Ark Design develops property reconcilement for Conveyance 2. Crossover Conveyance: Beginning with Remote Signature, threading the advancing fingerprint with a glass path and integral site management, moving into SIMULATIONS in Real Time 3. Converge- The Remote Build: Tasks to consider the process of converging to the Remote Build Site and what considerations are given to producing a remote service or build out of a productive requirement, introducing sandbox theory. Phase I only considers the Kitchen Tech. Phase II is involved in whole home Media and Tech in Glass. Phase III develops the land and its attributes. This is three separate papers. 11/13/2023 Brij Consulting, LLC Jean Marshall 26 1. Studying T&MM: the requirement for certification of mobility for competent conveyances 2. Portal Projects: the evidence, timing and intelligent use of portals 3. Calling it Green: Components of Green Energy, short review: Calling it Green requires new uses of potential and ^studies in wave glass and graphical relationships can raise up a green energy fluency that will lead to energy self-sufficiency 4. Dimensions in Multivariant Fabrications: Determining Forms and Contents of Green Energy and Blue Wave Cascade; relating elements to current science and future requirements 5. Wave and Lens Assimilation: The means to compile and to build in Glass Systems is described. The use of secant math. 6. Math Solutions for Wave and Lens Assimilations: See also Commentary for Math Solutions 7. Supply Side Portfolio: Timing and Model of Glass and Green events to fulfill path… Does the Tan Line help? 8. Partners in T Pluribus Unum: Measuring with Diacritical Marks 1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic requirement for Media to write and produce in Ark Science and Dimensional Systems, Introduction of the Story “Eru finds a Golden Pen.” 2. Ark Media: The Dialogue of the Story and the Construction of Storyboards, Mix and Remix specifications, beginning crosswalk and encryptions 3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and the use of Secants to Build tooling 4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to include Ark encryptions and design considerations 5. The Glass House: Magi and Marcus Engineering plans to invest in a Plait Glass facility for building and research in remote Ark Science. Start of Tooling and Secant Design for the Construction Industry 6. The Remote Build: Planning a Theoretical Production for untried Architecture 7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads into the Write Process 8. Bridging the Instance: Now operating multiple instances must bridge the operations, learn about deciduous models and deliberate the outcome of operations for the 2022 Plan of Magi and Marcus 9. Architectural Builds and Designs: Looking into Delivery Mechanics and the Products themselves 10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System assists with Land Products. See Number Theory 11. Continuous Modeling: Moving away from the Contiguous Model to a strategy of seamless integration of methods and modes of operation. See Number Theory. 12. The Glass Warehouse: From Start to Finish the streamlined operations of the Marcus and Magi Engineering remote architectural process 13. Branch- Sound and Image Construction: Characterizing the branch capability of new applications, appliances and mode[ls] of operations 1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning study of Secants and Wheels for the “cube-ified glass” engineering of Imaging, sound and motion characteristics. 2. The New Stone: Simulations and Re-instancing to package, confect and view glass media 3. Dimensional Building: Dimensional Arrays, Z strength, Product Media, Interdimensional Matrices. 4. The Dynamic Instance: Product Media Discussed 5. The Glass Build: Base Build and Modules Assembled, considering impact of dimensional systems 6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP Defined, Logos 7. Art of the Science: What can be made? Assimilation discussed, look at basic product ideas 8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance (Dialogue paper) 9. Imposition of Value Engineering: Establishing and Justifying the Load for Pipe Transit 10. The Digital Plait Position: Engineering Design of the Load and Thruput 11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for Operational Loads 12. Engineering Objects: The Purpose of this Paper is to Consider the means to raise up a Digital Portal Production System using appliances gained through Plait Object and Gate driven configurations that work with Digital Mechanics. Six-Layer Glass and Appliances 13. Instancing at the Gate: Use of Gates and Instances, bridging of the engineering process 14. Interpolative Scope: Use of a Demand and Production Scope for building and delivery of product, learning to specify material, looking for union of Vector 15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian Analysis 16. The Glass Wall: This is a very difficult staging of advanced engineering to depict …Motivated by sound it creates a means by sound to cascade light for safe and wireless power 17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard, and load value of Scrum 18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards (Dialogue paper) 19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes bottleneck (Dialogue paper) 20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking old vs. new (Dialogue paper) Motion Projects-8 Remote Theory-5 Ark Model-13 Digital-20 Go to https://www.slideshare.net/Marshallja/presentations https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for- wave-and-lens-assimilationpdf Roadmap: #47 & #48 & #49 Dimensional Building in Ark Design Glass Cars and New Product Roadmap Calendar Cartography Building with Glass #50 New Remote Theory Ark Model Motion Projects Building 1
  • 52. Page: 26 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:15:00 PM The Learning Series
  • 53. Simulations Project Glass Systems| Brij Consulting, LLC | Jean A. Marshall Marking the Contingent Outcome 11/13/2023 Brij Consulting, LLC Jean Marshall 27 Part III: Foiling the Glass Car 1
  • 54. Page: 27 Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 11/13/2023 10:15:01 PM This paper is highlighted as the agile tasking simulations marking of contingent outcomes, essential to notes of the financial plan and to assessing the means to report on it.. We continue with Lift Data to crossover to the Energy Star. And after working on Benchmarking the System delivery with instances we will continue with Part III to foil the glass car with a wing for stabilization.