8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
Comments on Simulations Watch Case I & II.pdf
1. V3 Overcome Agile Constraint
V2 Task Analytics
V1 Stakeholder Approach
Part I: Meta Based Interpolations
Meta dimensional template for interpolation of virtual objects and portal arrangements;
convert between our ark design to binary using a normalization pattern
As
Recommended
on Linked In
Part II: Run Like an Eagle, Walk like a Dove
1
2. Summary of Comments on PowerPoint Presentation
Page: 1
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:32 PM
On the horizon of the Crossover, Making a Watch Case Window and marking pivots, lifts and Moments of instance assimilation.
3. From our last paper we began to mark the
crossover position to the Energy Star and ONE
System of Plait Glass in Ark Design. We were
led into Manifold Development in the starting
post of project assimilation for road handling.
Car Rollout is a Case. Drift Stabilization is a
Compliance Practice, Bernoulli recommended.
Ψ
Ψ
Wheel 1 Wheel 2
F
I
R
S
T
C
A
S
E
GEL is an anacronym that represents GREEN ENERGY LIFT.
First Position
12/26/2023 Brij Consulting, LLC Jean A. Marshall
2
V1 Stakeholder Approach
(2) Car and road syncopation
(1) Manifold prototyping
(1) T3-M4 7/2/2027
(2) T4-M4 10/12/2029
Prototype Manifold
Car/Road Syncopation
1
4. Page: 2
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:32 PM
The development of the manifold in association both with green energy and the car speed and traction is now a contingency marker on the field of the
project and an associated marker to watch for. The wing stabilization of the car is part of its wave gliding action. This treatment of the secant engineering
road handling requirement is part of its system-based compliance. GEL is an anacronym that represents GREEN ENERGY LIFT.
5. Maths and
Maps
• In our last paper we took
up a first position on our
map in the crossover
relationship. Here we find
our reasoning is enhanced
by the knowledge of
Number Theory and
various phases of the
project lend to us greater
math capabilities to build
and analyze outcomes.
Θ+2
Θ+1
Θ Θ+3
Branching
873.7 x 2 = 1747 – 1753 = -6
Incomplete build
T&M
Stochastic Reasoning
Number Theory
and its underlying
phraseology has
helped us to gain
a reasoning of
various outcomes
of the work, see
next
First Position
Ψ
Ψ
12/26/2023 Brij Consulting, LLC Jean A. Marshall 3
Yield IF 142.4 x 2 = 284.8
V1 Stakeholder Approach
1
6. Page: 3
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:33 PM
Looking for stochastic reasoning, Number Theory gives us design comprehension of statistical inference. It allows us to post markers and associate
relationships from varying interpolations from companies.
7. Number Theory
• The Math of Math is performed
on a specific field and object.
When the object is flat it is
measurable by many forms of
math.
• And so, we make comparisons
with our Stop Gap data
partitioning the data and the
gate defining the theta criteria
for the gates.
• We recall that Number Theory
allows us the use of floating-
point arithmetic and two-and-
three-digit phrases defining the
type of activity that is sponsored
by the mathematical phrase, i.e.
29.5 or leverage.
Number theory (or arithmetic or higher arithmetic in older usage) is a branch of
pure mathematics devoted primarily to the study of the integers and arithmetic
functions. German mathematician Carl Friedrich Gauss (1777–1855) said,
"Mathematics is the queen of the sciences—and number theory is the queen of
mathematics."[1][note 1] Number Theorists study prime numbers as well as the
properties of mathematical objects constructed from integers (for example,
rational numbers), or defined as generalizations of the integers (for example,
algebraic integers).
Integers can be considered either in themselves or as solutions to equations
(Diophantine geometry). Questions in number theory are often best understood
through the study of analytical objects (for example, the Riemann zeta function)
that encode properties of the integers, primes or other number-theoretic objects
in some fashion (analytic number theory). One may also study real numbers in
relation to rational numbers, for example, as approximated by the latter
(Diophantine approximation).
The older term for number theory is arithmetic. By the early twentieth century, it
had been superseded by "number theory".[note 2] (The word "arithmetic" is used
by the general public to mean "elementary calculations"; it has also acquired
other meanings in mathematical logic, as in Peano arithmetic, and computer
science, as in floating-point arithmetic.) The use of the term arithmetic for
number theory regained some ground in the second half of the 20th century,
arguably in part due to French influence.[note 3] In particular, arithmetical is
commonly preferred as an adjective to number-theoretic. Wikipedia
10^2
10^1
10^3
10^4
Our Approach
At the point where car and road
synchronous production occurs
in the project, the original
investment in Magi and Marcus
has squared and delivering
increased demand to the scale
758 Units x 1000 plus
Gate Conversion are
assembling the next two
theta demand gates
12/26/2023 Brij Consulting, LLC Jean A. Marshall 4
V1 Stakeholder Approach
1
8. Page: 4
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:33 PM
Number Theory also assists us with our gate formula, and its relationship to what can be produced in each phase of the project.
9. Binary to Ark Theoretical Pattern
The Binary platform works financially until the
scale of the project exceeds the Scorecard Metrics
Digital
Phase Time to assemble the System Infrastructure
Financials
Portfolio
Scorecard
Glass
Treatments
Forward
Statements
The Deciduous
nature of the work
is local production,
learning the glass
trade
Θ
Ψ
LIFT and LIFE Certification is not required until the Crossover
Initial period of localized glass
production is at the level of green
energy trade and product media
10^1
Position
Statement
12/26/2023 Brij Consulting, LLC Jean A. Marshall 5
V1 Stakeholder Approach
1
10. Page: 5
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:34 PM
We began our binary to ark transition with our original BRIJIT Scorecard and Metrics Model for pricing and planning. The complex staging of the Glass Plan
makes it both highly achievable and intensely dedicated.
11. From Binary to Ark Design
• Crossover from a data centric to a
motion centric and designable world
• Continuous motion moves to a true
designable spectrum that has its
testing in simulations
• Once contiguous and continuous all
mathematical resources will converge
and respond to tool acclimations
• Partner assimilation allows for
community based Intellectual
Property Assemblies
Partner
Assimilation
I will write on them the name of my God and the name of the city
of my God, the new Jerusalem, which is coming down out of
heaven from my God; and I will also write on them my new name.
Rev 3:12
Field Markers
Next paper
12/26/2023 Brij Consulting, LLC Jean A. Marshall 6
1.63
+6.2
+6.2 Yield reclassed as Receivable
V1 Stakeholder Approach
1
12. Page: 6
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:34 PM
Our original Path driven Plan had a receivable sitting as a contra-liability and was reclassed to gain the full scope of the assets. The continuous bridge of
the project raised up a transom rate of 1.63 shown on the old table before the reclass.
13. Valuing the Agile Delivery
Man does not live by Bread alone. But by whatever distributive property God assigns.
502
504
507,509
Econometric Internal
Margin and Markers
19 but now those who have been created in this world which is supplied both with an unfailing
table and an inexhaustible pasture,[f] have become corrupt in their ways. 20 So I considered my
world, and behold, it was lost, and my earth, and behold, it was in peril because of the devices of
those who[g] had come into it. 21 And I saw and spared some[h] with great difficulty and saved for
myself one grape out of a cluster, and one plant out of a great forest.[i] 2Esdras (Before Glass)
What do we
gain by marking
the field?
PV = 13.8
EV = 13.5
BAC = 27.2
BAC
PV
EV
12/26/2023
Brij Consulting, LLC Jean A. Marshall
7
507 + 27.2 = 534.2 Value Add
If we can mark the field, we don’t
need to guess at our position
Asset Margin +5.9 = 540.1
V1 Stakeholder Approach
1
14. Page: 7
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:35 PM
The idea of distributive properties is built into the nature of glass, and its work is primarily the building of assets since virtual machines can be subscription
based. This is highly distributive to an equity-based portfolio.
15. Testing and Digital
• Testing builds the incumbency tooling and
component work to generate a conditional
payback (135 x 2 = 270 – 289.33 = 19.33 –
19.2 = .13) or iterative value. It is the low
alpha product rather than the value-added
that comes from full production.
• It is also true of assembling a by-product of
industrial physics rather than generation of
a virtual machine. If this were happening
the 270 would double to 540 and result in
asset turns. Notice the high-end Alpha.
Low end technology
is assisted by green
engineering and
glass components
Digital
Layers
increase
packaging
of content
Green
Motivation
BAC
12/26/2023
Brij Consulting, LLC Jean A. Marshall
8
V1 Stakeholder Approach
1
16. Page: 8
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:36 PM
The dynamic plait of material which is glass composition has layers packaged within it demonstrating the ability to be motivated in an industrial setting to
composition for material based on forms and mix process of glass delivery systems.
17. 12/26/2023 Brij Consulting, LLC Jean A. Marshall 9
The Time and Motion
difference to the
Forward is the Material
The Use of the Time and
Motion Calculator finds
conversion as a
difference to the margin
as transparently as the
Forward is written. It is
written at Fair Market
Value
Perfect at Time and Motion
Jean A. Marshall View 5h
We have a meta dimensional
theory that can be used for
interpolation of virtual objects
and portal arrangements that
needs a normalization pattern
for binary that in our papers is
associated with ark design. So,
we will include this topic in our
next paper. Linked In Comment
Final
Θ
Θ+1 Θ+2
Θ+2
Θξ
Part I: Meta Based Interpolations FROM META TO GLASS
10^2
10^1
10^3
10^4
From Slide 4 Number Theory
Θξ
Θ
Θ+1
Θ+2
Θ+3
Θ+3
411 Roi
V1 Stakeholder Approach
1
18. Page: 9
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:36 PM
The Full-Scale Glass Plan has various theta-based relationship to the dynamic structure of gates and lens requirements. We have taken the Meta based
Portfolio which we developed and used it to attribute a glass composition to an emulated company (hyD) that works with Hybrid Materials.
19. Normative Data
12/26/2023 Brij Consulting, LLC Jean A. Marshall 10
1.62 x 10^2
Scrum is used
as a Standard Load
Company is testing for
prototype of new
material (Benchmark)
Vs. old material
(baseline) hybrid case
HYBMAT Division of
TECHCO
Cash Conversion
Prototype Case
Emulation Company
V2 Task Analytics
1
20. Page: 10
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:37 PM
We use both our normative properties and our standard scrum load to begin their (hyD) prototyping of new materials. In order to produce the Portfolio
and Scorecard Method of reporting it is necessary to use a similar work to our BRIJIT planner.
21. Hybmat Division Financials
12/26/2023 Brij Consulting, LLC Jean A. Marshall 11
We need to back into a similar
data model for Hybmat Division as
the Normative Case in our Model
Portfolio
Equity Conversion
Ratio Analysis
Financial Plan
HYBMAT Division
of TECHCO
Emulation Company
V2 Task Analytics
^
^Gate Transition is missing from period 3
Cash Flow requirement moving to Continuous Plan
^
$1.665 B
1
22. Page: 11
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:37 PM
The ratio based on the Planning is different than the Prototyping and should not confuse the viewer. The Portfolio demonstrates a high rate of
confidence in the Plan however there is a roadblock ahead.
23. Associated Binary Scorecard
12/26/2023 Brij Consulting, LLC Jean A. Marshall 12
ROI HOLD
Lead Time 4.102 + .153 = 4.255
Data Normalization Graph for Hybmat
Equity Adjusted
Due to the difficult process of gaining
material associated with the product, the
company put the old process on hold
waiting for glass and simulations.
Normative Portal Data
HYBMAT Division
of TECHCO
Emulation Company
Thruput Range
Hi Risk
App II
Product Basis
42.55 x 2 = 85.1 – 82 = 3.1 Build Conversion
See Slide 13
V2 Task Analytics
1
24. Page: 12
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:38 PM
The roadblock in the ordinary build scenario is that the material is high risk associated branding and not being delivered with reliable results. Hedging is
therefore not the answer to reserve requirements. The company decided to wait for the arrival of new glass materials that are thoroughly tested through
a prototyping process and delivered back with a production book that is reliably portrayed to work within new glass systems.
25. Changing
Binary
means
More layers provide ample opportunity for
menu driven solutions to new instance
arrangements of product complexity.
HYBMAT Division
of TECHCO
Emulation Company
Thruput Range
1155
Can we interpolate its dimensions?
1155
1126
1179 x x
153
/
1.62 x 10^2
Data Raw First Pass
Θ
Θ+1
Value Added is a
source of funding
lowering the Scope
Asset Margin +5.9 = 540.1 +.695 P-Value
Area =
See App II
V2 Task Analytics
Prototype
Manifold
Car/Road
Syncopation
1
26. Page: 13
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:38 PM
The requirement to convert hyD data to the Task and Phase norms of the Plan was successful and allows us to correlate back to the Original Plan. The P
perimeter and the P-Value Metric are two different conversations however the difference is the standard (695 – 400 = 295) Leverage. When we are
finished with configuring this scenario, we will work on the rest of the configurative phases for hyD. They are a branch partner. Here we can see that the
demand for the manifold is at a certain task level (T3-M4 prototype). And we also note that car and road syncopation is due at T4-M4. We will describe
their tasks and their work at the demand level of the task in the next paper.
27. 1. Why are there sliding decimal places? A. Dialing Numbers B. Distributing Metrics C. Digital Computing
2. What do the coupling and tripling of the digits accomplish? A. Number Theory Convention B. Parsnip C. Analytic Verification
3. Do the digits have a preset characteristic assigned to them? Give an example A. 29.5 Leverage B. 40.9 Gain/Loss C. Sqrt of 2
4. What happens when the numbers are compiled as opposed to using a calculator? A. string accuracy B. validity C. short phrase
5. What do the theta configurations represent? A. Manifolds B. Lens powers C. Gates
6. How does the stop gap data assist the process? A. Failsafe B. Field Correction D. Normalization
7. What does the data mining process achieve? A. Matrix Data B. Standard development C. Gold Filaments
8. What happens after the crossover period that is not present before those events? A. Compliance Testing B. Mu Sic C. Certification
9. Where are bottlenecks likely to occur? A. at the Gate B. at certain validation markers C. at the starting position
10. What in your own opinion is the best benefit of Ark Design? We suggest SB: i,k AB: a,c
• Some Benefits: a. flexible formats and increased selectivity b. replication c. benefits of being a producer d. career acceleration e.
streaming education f. long life g. wireless power h. home shopping replication (product media) i. restoration of roads and homes j. tax
free consultation and opportunity k. Morning Star Oversight
• Advanced Benefits: a. portals and simulations, b. streaming media, c. confluent design and building, d. city assimilation
11. Specific Crossover Questions…
a. What is the significance of 409 to the project? A. secant wheel differential B. incremental gain/loss C. Manifold test
b. What is the Bernoulli Manifold? A. A time device B. a kinetic to green converter C. a device sponsoring hydrofoil lift
Subjects:
Number Theory
Simulations
Ark Design
12/26/2023 Brij Consulting, LLC Jean A. Marshall 14
V2 Task Analytics
1
28. Page: 14
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:39 PM
Taking our test helps to prepare you for the next level of adaptive thinking in glass. Glass is a step up from the meta world. The give-away question #10
where all answers are correct, supplies a two for two plus core in combination as requiring 20 questions x 5 points is 100%. There is a bonus question on
the solutions page.
29. What is Time and Motion-Motion?
Get into the details
with a deeper dive
Financials
Load
Statement
and
Production
Data
Mining
Glass
Treatments
Forward
Statements
12/26/2023 Brij Consulting, LLC Jean A. Marshall 15
Part II: Run Like an Eagle, Walk like a Dove
Θ
Θ+2
What design requirements operate at this
level? How do we devise the deeper set of
tasks to make the operative model happen?
Can our HyD Company build a
new glass concept car?
SEE
NEXT!
In T4 we ascribe the car and road syncopation
Simulations
Come to a higher
scale with Simulations
See
App I
See App II
Toyota Concept Car Design
V3 Overcome Agile Constraint
Time and Motion-Motion runs the timing of the Car and also lifts and operates the car along with the Energy Star.
They need an
approved design
A subsequent walk of all T&MM events
resets the requirements
A mobile conveyance platform is required with defined tasks and specifications
1
30. Page: 15
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:39 PM
In Part II we will begin to task the operative level of building a glass car. And we will use the Watch Window to mark the field of endeavor and get a better
idea of the marking of conversion prospects. Time and Motion-Motion runs the timing of the Car and also lifts and operates the car along with the Energy
Star. So, it works in conjunction with multiple aspects of car and home media and motion management. With Simulations they can begin with a pre-
approved car design( and continue to componentize to) specifications. While our questions are more than rhetorical, a long view is necessary to the
knowledge requirement. A new Practice requires Best Practice development.
31. Statements
• Our Task data and our Area data
reconciled statistically with High
Probability metrics of transition
and distribution
• We transition our branch
company from the hybrid state
to full glass treatment in the ark
mode of operations
• We build an investment for
installation companies (residuals
are 3.1x investment)
12/27/2023 Brij Consulting, LLC Jean A. Marshall
Branch Build
AREA FINANCIAL
FMVg-BINy = hyD ∆
Tasking
Area Dif. x 1000
Thruput x 1000
7.5%
V3 Overcome Agile Constraint
Div = 10
Θ=
Least Squares External
Impact Factor
Stat based
/
Thruput
16
1
32. Page: 16
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:40 PM
It is unique to the understanding of glass capability that building with glass has both distributive qualities and transitional qualities that enable the
operative mode of glass to complete a scalable and plait-able product. Likewise, the compatible software approach for recording its standards and
reporting mechanics should also be transitive and distributive between tasking and reporting mechanics. The Area of the Project helps to define its
graphical relationship. The 1:1 relationship between the transitive and distributive metrics is highly probable at the Ark Rate. Data mining (tasking) and
area reconciliation are pulling in facts from this paper to create a regression predicting the Y value. Notice that hyD Division takes the Branch Position on
the Forward.
33. Making Sense of Earnback
12/26/2023 Brij Consulting, LLC Jean A. Marshall 17
• There is an excellent proof of the Interior Margin in reviewing the impact of
the statistical relationship between methods of reporting and the outcome
of tasking, which is a clock form of foiling.
• Earn-back is in the cycle of payments whereby certain gains are earned
back and help to cover cost of capital but not generally all in the same
period. In the Ark Mode of Production everything is delivered, paid and
recovered simultaneously. (Multiple R Correlation is greater than Strabo*.)
Statistical
versus
Financial
We believe that by
proving a dimensional
capability in building
with Ark Design we
have proven the
Morning Star capability
V3 Overcome Agile Constraint
* IM 509
1
34. Page: 17
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:40 PM
Earnback is a property exhibited in binary systems that comes in piecemeal to the gains requirement and does help in order to produce an upgrade in the
capital equipment category; And/or to produce a working capital extension of service. In the Ark Mode of Production everything is delivered, paid and
recovered simultaneously. HyD has achieved a financial strength based on their manufacturing performance.
35. Build Dependency
• The initial 6L (T3) portion of the Phase I, of the
project is highly dependent on prototype testing
and green energy development.
• The 18L (T4) portion of Phase I, can begin the
componentization and build process. The company
should take advantage of this planning stage.
• It is apparent in the analysis of the company and
this phase of the plan that ring data helps to split
out the dependencies on certain infrastructure and
develop requirements around this. We are noting
this here.
12/26/2023 Brij Consulting, LLC Jean A. Marshall 18
Normative Data
BASED ON ORIGINAL DATA
Exceeding both
form and
dependency on
binary methods
8TH
See App II
V3 Overcome Agile Constraint
1
36. Page: 18
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:40 PM
The T4 or 18 Layer Glass Cube notes that this technology is resting on the advancement of the portal window.
37. Scorecard
Method
Brij
Consulting,
LLC
Jean
A.
Marshall
• The Scorecard Method is
not able to catch up with
Reserve requirement and
all of the parts of the gain
attribution and recovery of
value added are too slow
to manage the sizeable
nature of the project.
• The project safety is in
question except in the
glass system
• Banking Methods are ill
equipped to handle the
increased material
requirements
12/26/2023 19
Uses a Least Squares Method
See Slide 20
/1000
The graphical and relational ‘go’ metrics fit the overall project
Uses a Graphical Regression Method
V3 Overcome Agile Constraint
1
38. Page: 19
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:41 PM
Scorecard on an interim basis and at the lowest project levels is very amenable to the process of reporting. It can be quite cumbersome at higher levels of
funding, and it is discrete, not continuous in its treatment. It does however help to outline graphically the scope and area of the project. We believe that
it is important to define the graphic depiction of the project for the sake of supplying the quantifiable view of decision-making.
40. Page: 20
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:41 PM
The energy star crossover leads into secant engineering and specifically into Time and Motion-Motion assemblies. Secants are utilized according to a
utility design already enabled through the Morning Star that allow for the various forms of engineering and mechanics that motivate light and sound and
build very new and solid state configured items.
41. Motion Secant
Engineering
Brij
Consulting,
LLC
Jean
A.
Marshall
• Analog to digital transfer
may be the first means to
reducing the debt
requirement for the
advanced objects of T&MM
• The second means to enable
the project without
encumbering its funds is the
energy star supplied to it
• And the third means is star
composition which extends
the bridge of it.
12/26/2023 21
Lens Relationship
V3 Overcome Agile Constraint
Analog to digital
conversion amplifies the
rate of return on assets;
this is because glass is
scalable and plait.
1
42. Page: 21
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:41 PM
Note that the Production Book contains the Secant Engineering details and gate foiling of the product lowers the debt requirement and increases the
means to payback, producing a well distributed portfolio. Notice that the Lens relationship and secant engineering work together to exceed the bounds
of the arrangement under ordinary binary methods.
43. • GO is not safe without competent testing and Board Certification
• The Morning Star demands both LIFT & LIFE certification, but T&MM
demands more strenuous engineering tests.
• The T&MM Standards must be developed with coverage of the
complete operating area of the moving and movable object
• All costs to complete the certification will be covered and the
individuals certified as qualified testers and to master building
qualifications in T&MM engineering.
• Foil arguments must contain their LIFT and LIFE certification.
Brij Consulting, LLC Jean A. Marshall
22 12/26/2023
Parallel Attribution
PROOF OF AREA IS
OBTAINED THRU
PARALLELISM
Appendix II
See App II
AREA
Compare “Go” Regressions to Least Squares Method of Scorecard, Slide 17
Deduct Scrum
V3 Overcome Agile Constraint
Θ
Thruput
1
44. Page: 22
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:42 PM
Compliance with the Morning Star is the only safe “GO” composition requiring certifications. People are reimbursed for their part in the certifications
process and sponsor skill set certifications for their own benefit.
45. Brij Consulting, LLC Jean A. Marshall
Do you have a winning hand? This
is not SECANT ENGINEERING
Rolled up like a Scroll
EOMW
1
46. Page: 23
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:42 PM
God does not use satellites, God uses stars. Thus, the Morning Star will not certify non-compliant works, and they will not be part of the world according to
the merits of Glass in Ark Mode of Design. EOMW or End of Material World is an activity that is still a hybrid formation that is used to bring about the
complete changeover of the material world to the glass world. God has His New Creation sponsored with a multi-verse technique putting evil away and
forever.
47. 12/26/2023 Brij Consulting, LLC Jean A. Marshall 24
Appendix I
From Simulations Project: Marking the Field
Field Asby vs.
Field Marking
1
48. Page: 24
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:43 PM
From our last paper we began to mark the field and begin to develop this watch window on the simulations progress.
49. Details
12/26/2023 Brij Consulting, LLC Jean A. Marshall 25
Appendix II
See slide 13
AREA
Digital start to components pushes up to the Ark Rate
Ark Rate supplies high end Alpha of .534 + clock
See Slide 15
8TH
See slide 13
First Data
1
50. Page: 25
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:43 PM
The statistical analysis of our re-assimilated data shows a high correlation to the figures throughout the project. They have ring strength through P to
splice and branch to achieve their goal.
51. Best Case
Configuration
Brij Consulting, LLC Jean A. Marshall 12/27/2023 26
In our next paper we will
determine how branch partners
work into the scope of the project
and how the hyD Division will
accomplish its goal of an operable
glass car model. We believe that
the operable parameters will be
achieved through partnering.
Appendix III
Benchmark
711
9753.458 x 2 = 19506.916 x 10
Payback = 195443 Forward
EV = 13.5
Portal
Definition
1
52. Page: 26
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:44 PM
It is expected that hyD will achieve the required test parameters for this build (according to the Best Case scenario) because of their planning phase and
because there is sufficient strength in the Glass Plan to enable their performance through partnering.
53. Partner Investments
y = -15,411,230,860.11020ln(x) +
32,523,480,785.48410
R² = 0.15180
y = 906,677,539,722.99600ln(x) -
235,989,460,005.27100
R² = 0.22145
-
10,000,000,000
20,000,000,000
30,000,000,000
40,000,000,000
50,000,000,000
60,000,000,000
70,000,000,000
(500,000,000,000)
-
500,000,000,000
1,000,000,000,000
1,500,000,000,000
2,000,000,000,000
2,500,000,000,000
3,000,000,000,000
3,500,000,000,000
ARK GLASS COMMUNITY
12/27/2023 Brij Consulting, LLC, Jean Marshall 27
^Oversight Committee LOC (Morningstar)
m
513,292,157,466
From “Converge III”
Payoff is 1000 x
1,223,425,910
Whse. Fee>>Affil. Discount
Whse. Fee>>Affil. Discount
Whse IP + Conversion
Gate
Encryption
Charges
Magi & Marcus invest in hyD as the initial
car development company and then
reinvest in the architectural industry
1
54. Page: 27
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:44 PM
Partner notes are revealing about business relationships and metric requirements. Note that the warehouse charge is a unitary conversion metric of 378 x
2 = 756. The affiliates do not pay for it.
55. 1. Why are there sliding decimal places? A. Dialing Numbers B. Distributing Metrics C. Digital Computing
2. What do the coupling and tripling of the digits accomplish? A. Number Theory Convention B. Parsnip C. Analytic Verification
3. Do the digits have a preset characteristic assigned to them? Give an example A. 29.5 Leverage B. 40.9 Gain/Loss C. Sqrt of 2
4. What happens when the numbers are compiled as opposed to using a calculator? A. string accuracy B. validity C. short phrase
5. What do the theta configurations represent? A. Manifolds B. Lens powers C. Gates
6. How does the stop gap data assist the process? A. Failsafe B. Field Correction D. Normalization
7. What does the data mining process achieve? A. Matrix Data B. Standard development C. Gold Filaments
8. What happens after the crossover period that is not present before those events? A. Compliance Testing B. Mu Sic C. Certification
9. Where are bottlenecks likely to occur? A. at the Gate B. at certain validation markers C. at the starting position
10. What in your own opinion is the best benefit of Ark Design? We suggest SB: i,k AB: a,c (There are four bonus points here)
• Some Benefits: a. flexible formats and increased selectivity b. replication c. benefits of being a producer d. career acceleration e.
streaming education f. long life g. wireless power h. home shopping i. restoration of roads and homes j. tax free consultation and
opportunity k. Morning Star Oversight
• Advanced Benefits: a. portals and simulations, b. streaming media, c. confluent design and building, d. city assimilation
11. Specific Crossover Questions…
a. What is the significance of 409 to the project? A. secant wheel differential B. incremental gain/loss C. Manifold test
b. What is the Bernoulli Manifold? A. A time device B. a kinetic to green converter C. a device sponsoring hydrofoil lift
Subjects:
Number Theory
Simulations
Ark Design
12/26/2023 Brij Consulting, LLC Jean A. Marshall 28
Bonus Question: Here the
Earned Value + Planned
Value + Exterior Margin
a. Value Added b. Alpha + Conversion c. Carriage Burden
Knowing the answer is not the same as knowing why
Beforeyield After Conversion
Yield is 2 x Conversion
Light Burden
1
56. Page: 28
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:45 PM
A total of 20 points is 100%, but the test is made to help the viewer to visualize the glass process. The Infrastructure of this Glass System creates a
dimensional view and process.
57. Brij Consulting, LLC Jean A. Marshall
12/27/2023 29
1. The Scope of Glass Projects: Benchmarking and IF Factor for the scope
determination of Glass and STRABO serialization for Agile
2. Glass Impact: Streaming the Engineering of Components, Solid State
Assemblage, Table Design Outcomes
3. Cascading in Green: The theories and concepts related to the Green Wall and
the starting compositing of green energy and wall migrations.
4. SSE: The Remote End: How Solid-State Engineering is Performance mined and
delivered remotely
5. Cloud-Star Evolution: Where Cloud and Star Evolve to Fluency
6. Simulations in Diminishing Scale: The use of Ring and Lens
7. Simulations: Synergy Modifications: Mitigation in Risk Analysis
8. Simulations: Marking the Contingent Outcome: Marking Pivots and Lifts
9. Simulations: Making a Watch Case Window: Fielding the Position
10. Simulations: Branching with Partners: Partner Branching for Remote Position
SSE
CASCADE
IMPACT
SCOPE
CLOUD-STAR
Brij Consulting, LLC | SlideShare
Part I: City Scale
Part II: Remote Scale
Part III: Confluent Scale
SIMULATIONS
P a p e rs i n D e s ign Se ri e s
Part I, II, III
Part I, II
1
58. Page: 29
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:47 PM
Papers in the design series focus on simulations and specifically Part I: City Scale, Part II: Remote Scale and Part III: Confluent Scale. We will begin to
highlight the vector requirements for tasking in our current model and the need for lens facets for scale differentiation. Then in Part II define simulations
reporting. In Part III we begin to move past forms and mix to the confluent modeling of the Ark Science of Glass in the Advancing Age to come. We
continued our Simulations Project with mitigation of Risk in the crossover period through the use of Gap Data.
59. Brij Consulting, LLC Jean A. Marshall
12/27/2023 30
P a p e rs i n T e s t Se ri es
1. The Car and Road Test: Simulating Glass Cars and Candle stone Roads
Brij Consulting, LLC | SlideShare
V3 Glass Package
V2 Synergy Modifications
V1 Digital Testing
Strabo
Tying projects back to the Strabo Omega
allows for Simulations Cloud to orchestrate
outcomes
Part I,
From Slide 13
2. Home and Foundation Test: Simulating Glass Instances of Candle stone
and Thread in Componentizations utilizing a legacy form of Glass
3. Glass Big Push: Legacy Glass gives way to Solid State Engineering,
Instancing and Building with remote synchronization Parts I, and II/III
Of Pillars and Pipes, Portals and Plaits
Part I:
Part II Simulations Marking
1
60. Page: 30
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:47 PM
We look at testing of glass and various forms and methods to begin plan phases (not specific engineering dogma.) We begin with Model O as a sample of
car and road synchronous behavior. Then we will consider testing home and foundation and green energy and candle stone surfaces. We want to look for
the means to tie back into STRABO and Simulations Model for Agile playback. The Third testing paper will close the gap between legacy glass and solid-
state assimilations which develop into remote planning and building tools. In the Second Part of the Third Test Paper, Glass Big Push, we examine the
types of events or changes that impact the Simulation of the Project Performance.
61. 1. Portal Prosperity: An overview of Glass Theory and Ark
Design develops property reconcilement for Conveyance
2. Crossover Conveyance: Beginning with Remote Signature,
threading the advancing fingerprint with a glass path and
integral site management, moving into SIMULATIONS in
Real Time
3. Converge- The Remote Build: Tasks to consider the
process of converging to the Remote Build Site and what
considerations are given to producing a remote service or
build out of a productive requirement, introducing sandbox
theory. Phase I only considers the Kitchen Tech. Phase II
is involved in whole home Media and Tech in Glass.
Phase III develops the land and its attributes. This is three
separate papers.
12/26/2023
Brij Consulting, LLC Jean A. Marshall
31
1. Studying T&MM: the requirement for certification of mobility
for competent conveyances
2. Portal Projects: the evidence, timing and intelligent use of
portals
3. Calling it Green: Components of Green Energy, short
review: Calling it Green requires new uses of potential and
^studies in wave glass and graphical relationships can raise up
a green energy fluency that will lead to energy self-sufficiency
4. Dimensions in Multivariant Fabrications: Determining Forms
and Contents of Green Energy and Blue Wave Cascade;
relating elements to current science and future requirements
5. Wave and Lens Assimilation: The means to compile and to
build in Glass Systems is described. The use of secant math.
6. Math Solutions for Wave and Lens Assimilations: See also
Commentary for Math Solutions
7. Supply Side Portfolio: Timing and Model of Glass and Green
events to fulfill path… Does the Tan Line help?
8. Partners in T Pluribus Unum: Measuring with Diacritical
Marks
1. Portfolio Wheels: Study of Secants and Wheels in the Dynamic
requirement for Media to write and produce in Ark Science and
Dimensional Systems, Introduction of the Story “Eru finds a Golden
Pen.”
2. Ark Media: The Dialogue of the Story and the Construction of
Storyboards, Mix and Remix specifications, beginning crosswalk and
encryptions
3. Builds and Simulations: Discuss Matrix Trees, Migratory Patterns and
the use of Secants to Build tooling
4. The Corner of Mu Sic: an update of our Digital Paper on Mu Sic to
include Ark encryptions and design considerations
5. The Glass House: Magi and Marcus Engineering plans to invest in a
Plait Glass facility for building and research in remote Ark Science.
Start of Tooling and Secant Design for the Construction Industry
6. The Remote Build: Planning a Theoretical Production for untried
Architecture
7. Glass Mix Z-Form: Production Walk-Thru Glass Mix and Forms, leads
into the Write Process
8. Bridging the Instance: Now operating multiple instances must bridge
the operations, learn about deciduous models and deliberate the
outcome of operations for the 2022 Plan of Magi and Marcus
9. Architectural Builds and Designs: Looking into Delivery Mechanics and
the Products themselves
10. Pipes and Plaits in Ark Mode Design: How the Plait Pipe System
assists with Land Products. See Number Theory
11. Continuous Modeling: Moving away from the Contiguous Model to a
strategy of seamless integration of methods and modes of operation.
See Number Theory.
12. The Glass Warehouse: From Start to Finish the streamlined operations
of the Marcus and Magi Engineering remote architectural process
13. Branch- Sound and Image Construction: Characterizing the branch
capability of new applications, appliances and mode[ls] of operations
1. Ark in Glass: Changing the Schema for Ark Mode crossover, beginning
study of Secants and Wheels for the “cube-ified glass” engineering of
Imaging, sound and motion characteristics.
2. The New Stone: Simulations and Re-instancing to package, confect and
view glass media
3. Dimensional Building: Dimensional Arrays, Z strength, Product Media,
Interdimensional Matrices.
4. The Dynamic Instance: Product Media Discussed
5. The Glass Build: Base Build and Modules Assembled, considering impact of
dimensional systems
6. Glass in the Making: Costing and Loading, Assembly and Assimilation, IP
Defined, Logos
7. Art of the Science: What can be made? Assimilation discussed, look at
basic product ideas
8. Digital Glass Production: Pipe Transit and RIK Declare, Batch Appliance
(Dialogue paper)
9. Imposition of Value Engineering: Establishing and Justifying the Load for
Pipe Transit
10. The Digital Plait Position: Engineering Design of the Load and Thruput
11. ^Mu Sic in the Advancing Age: Use of Fingerprint and Encryption for
Operational Loads
12. Engineering Objects: The Purpose of this Paper is to Consider the means to
raise up a Digital Portal Production System using appliances gained through
Plait Object and Gate driven configurations that work with Digital Mechanics.
Six-Layer Glass and Appliances
13. Instancing at the Gate: Use of Gates and Instances, bridging of the
engineering process
14. Interpolative Scope: Use of a Demand and Production Scope for building
and delivery of product, learning to specify material, looking for union of
Vector
15. Functional Glass: Fitness for Function and Moral Intelligence, Bayesian
Analysis
16. The Glass Wall: This is a very difficult staging of advanced engineering to
depict …Motivated by sound it creates a means by sound to cascade light for
safe and wireless power
17. The Glass Wave: Learning to Plait Gates, Reconcile Metrics to Scorecard,
and load value of Scrum
18. Scrum Costing w/notes (Book It Daniel): establishing scrum standards
(Dialogue paper)
19. Gate Plait Green (Mark It Mark): first scalable plait arrangement overcomes
bottleneck (Dialogue paper)
20. Scorecard Integration (Map It Ralph): A review of mappings to date, marking
old vs. new (Dialogue paper)
Motion Projects-8
Remote Theory-5
Ark Model-13 Digital-20
Go to https://www.slideshare.net/Marshallja/presentations
https://www.slideshare.net/Marshallja/commentary-for-math-solutions-for-
wave-and-lens-assimilationpdf
Roadmap: #47 & #48 & #49
Dimensional Building in Ark Design
Glass Cars and New Product Roadmap
Calendar Cartography
Building with Glass #50
New
Remote Theory
Ark Model
Motion Projects
Building
1
62. Page: 31
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:50 PM
The Learning Series
63. Simulations Project
Glass Systems| Brij Consulting, LLC |
Jean A. Marshall
Branching with Partners
12/27/2023 Brij Consulting, LLC Jean A. Marshall 32
Part I: Cloud Star Branching
This glass concept
overcame all scale, mass
and hybrid conditions.
135.4
1
64. Page: 32
Number: 1 Author: Presenter Notes Subject: Presentation Notes Date: 12/27/2023 4:23:51 PM
Next on the horizon of the Crossover, Branching with Partners and marking pivots, lifts and Moments of instance assimilation.