SDS Application Development
Project Starter Kit
Mario Umali, MPM
CSU-LA
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
HCS - Data Migration to
CarePortal
Project
Overview
Indicate brief description of Dev Project
SDS Framework outline the activities performed at each stage of a software development project:
Phase 1 - Project Identification
Phase 2 - Requirement Analysis
Phase 3 - Establish PMO
Phase 4 - Project Scoping
Phase 5 - Design and Development
Phase 6 - Testing/Modification/Revision
Phase 7 - Pilot
Phase 8 - Deployment
Phase 9 - Post Implementation
Phase 10 - Project Closure
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
HCS - Data Migration to
CarePortal
Project
Overview
Indicate brief description of Dev Project
Phase 1 - Project Identification
Brief description/overview of project coming from project sponsor… this should be filled
out by the Project Sponsor/Representative
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
HCS - Data Migration to
CarePortal
Project
Overview
Indicate brief description of Dev Project
Phase 2 – Requirement Analysis
Project Sponsor to define needed information, function, behavior, performance and
processes.
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
HCS - Data Migration to
CarePortal
Project
Overview
Indicate brief description of Dev Project
Phase 3 – Establish PMO
SDS and Project Sponsor to define and establish Project Management Team,
communication standards, escalation process and reporting structure. A separate
deck will be provided to the project sponsor thru SDS assigned Project Manager
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
HCS - Data Migration to
CarePortal
Project
Overview
Indicate brief description of Dev Project
Phase 4 – Project Scoping
SDS Project Manager to work hand in hand Project Sponsor to provide a detailed
project scope.
Project Scoping is further divided in two Phases:
1. Basic Scoping – an initial Project Scoping document which is included in this
document will be provided by SDS to the Project Sponsor
2. Detailed Scoping – will be conducted by SDS Project Manager after reviewing Basic
Scoping Document
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
HCS - Data Migration to
CarePortal
Project
Overview
Indicate brief description of Dev Project
Phase 5 – Design and Development
SDS Project Manager will work with SDS Dev Team to begin with the design and
development of the Project
Phase 6 – Testing/Modification/Revision
Initial version release will be provided and facilitated by SDS Project Manager which
will work together with the Project Sponsor’s Team to perform and document testing,
identify modification/revision needed.
Phase 7 – Pilot
Depending on the size of the project as well as Project Sponsor’s and business
requirement a Pilot or soft launch will be scheduled and perform to ensure proper
transition
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
HCS - Data Migration to
CarePortal
Project
Overview
Indicate brief description of Dev Project
Phase 8 – Deployment
Once Testing and Pilot has been conducted deployment to production will be
performed. In depth deployment details will be outlined and included on the project
plan.
Phase 9 – Post Implementation
After successful application deployment a post implementation review will be
conducted by SDS Project Manager together with Project Sponsors
Phase 10 – Project Closure
SDS Project Manager will provide all project documentation for final review with the
Project Sponsor. Project Document will be achieved by SDS PMO for future reference.
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
Project
Overview
Indicate brief description of Dev Project
Phase 4A – Basic Project Scoping
Company Name
Address
Project Name
Project Sponsor
Department
Contact Info
Email
Phone Numbers
Fax Number
Project Duration (in days/hours)
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
Project
Overview
Indicate brief description of Dev Project
Phase 4A – Basic Project Scoping
Business Requirements: (pls enumerate below)
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
Project
Overview
Indicate brief description of Dev Project
Phase 4A – Basic Project Scoping
Application Model: (please select which ever is/are applicable for the project)
Hosted (Cloud base)
On Premise (In house Server)
Centralize Database
Localize Database
Single User
Multiple User
Single Location
Multi-Location
Stand alone Application
Integrated to other existing Application
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
Project
Overview
Indicate brief description of Dev Project
Phase 4A – Basic Project Scoping
Process Model: pls define the existing process model , where a pictorial top-down
representation of the major business processes that interact with the system is
diagrammed and decomposed into manageable functions and sub-functions
until no further breakdown is feasible; if there will be a process improvement
that needs to be incorporated with the system/application development kindly
provide the process details as well; some expected output for this are:
• Work Flow Diagram
• Process Flow Model
• User Event Diagram
• Decision Trees
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
Project
Overview
Indicate brief description of Dev Project
Phase 4A – Basic Project Scoping
Logical Data Model : pls define data that supports the processes and business
rules, how it is logically modelled; identify entities, their relationships and
dependencies to other entities as well as attributes with their business
definitions; some expected output for this are:
• Entity Relationship Diagram
• Logical Data Dependency Diagram
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
Project
Overview
Indicate brief description of Dev Project
Phase 4A – Basic Project Scoping
Functional Specification : please define interfaces, processes and data are
merged to describe systematically how the end-user will use the application,
and how data will be retrieved, processed and stored; please list down system
features of the system that will specifically satisfy a user need, or with which
the user will directly interact; some expected output for this are:
• Process Association and Grouping
• Logical Organization
• Work Flow Clustering
• Expressing Logic: Pseudo Code, Structured English, Object Oriented
Logic
• User wish list
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
Project
Overview
Indicate brief description of Dev Project
Phase 4A – Basic Project Scoping
Technical Specification : please define or identify the technical constraints or
conditions under which the system must perform such as but not limited to:
• Accessibility
• Encryption
• Company Technology Guidelines/Requirements
• System Operations and Maintenance
• Data Protection and Integrity
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
Project
Overview
Indicate brief description of Dev Project
Phase 4A – Basic Project Scoping
Operational Specification : please define or identify the requirements that define
those “behind the scenes” functions that are needed to keep the system
operational over time such as but not limited to:
• System Performance and responsiveness
• Data Archival
• Audit and Controls
• System Administration
• Business Continuity
Any use, copying, distribution in any means without the written
consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited
Project Partners Details
Project Manager Mario Umali
Project Phase NA
Document Tyep Dev ASM Kit
Project
Overview
Indicate brief description of Dev Project
Phase 4A – Basic Project Scoping
Transition Requirements : please define or identify the requirements that define
those aspect that must be addressed in order for the system to be successfully
implemented in the production environment and to avoid work flow disruption
during transition, such as but not limited to:
• Data Conversion
• Release Validation
• System/Technical/User documentation
• Training
• Mechanics or deployment standard procedure
• Logistics
Thank you. Mario Umali
mario@SDSolutions.com.ph
+63 (917) 529 4267
+63 (2) 655 7406

More Related Content

What's hot

MS_Practicum_Research_Paper_Glenn_Fuller_IP_110309
MS_Practicum_Research_Paper_Glenn_Fuller_IP_110309MS_Practicum_Research_Paper_Glenn_Fuller_IP_110309
MS_Practicum_Research_Paper_Glenn_Fuller_IP_110309
Glenn Fuller
 
wp-01070-hardware-software-coverification-fpga
wp-01070-hardware-software-coverification-fpgawp-01070-hardware-software-coverification-fpga
wp-01070-hardware-software-coverification-fpga
Gautam Kavipurapu
 
DineshYadav(dotNet)
DineshYadav(dotNet)DineshYadav(dotNet)
DineshYadav(dotNet)
Dinesh Yadav
 
Intro to Software Engineering - Software Design
Intro to Software Engineering - Software DesignIntro to Software Engineering - Software Design
Intro to Software Engineering - Software Design
Radu_Negulescu
 
02 architectures in_context
02 architectures in_context02 architectures in_context
02 architectures in_context
Majong DevJfu
 
Enterprise Java Platform Migration Assessment
Enterprise Java Platform Migration AssessmentEnterprise Java Platform Migration Assessment
Enterprise Java Platform Migration Assessment
C2B2 Consulting
 

What's hot (20)

MS_Practicum_Research_Paper_Glenn_Fuller_IP_110309
MS_Practicum_Research_Paper_Glenn_Fuller_IP_110309MS_Practicum_Research_Paper_Glenn_Fuller_IP_110309
MS_Practicum_Research_Paper_Glenn_Fuller_IP_110309
 
software project management Assumption about conventional model
software project management Assumption about conventional modelsoftware project management Assumption about conventional model
software project management Assumption about conventional model
 
Scaling Agile at Dell: Real-life Problems - and Solutions
Scaling Agile at Dell: Real-life Problems - and SolutionsScaling Agile at Dell: Real-life Problems - and Solutions
Scaling Agile at Dell: Real-life Problems - and Solutions
 
Software Project Planning II
Software Project Planning IISoftware Project Planning II
Software Project Planning II
 
An Introduction to Agile Software Development
An Introduction to Agile Software DevelopmentAn Introduction to Agile Software Development
An Introduction to Agile Software Development
 
HOW TO BECOME A RELEASE MANAGER IN 2021
HOW TO BECOME A RELEASE MANAGER IN 2021HOW TO BECOME A RELEASE MANAGER IN 2021
HOW TO BECOME A RELEASE MANAGER IN 2021
 
wp-01070-hardware-software-coverification-fpga
wp-01070-hardware-software-coverification-fpgawp-01070-hardware-software-coverification-fpga
wp-01070-hardware-software-coverification-fpga
 
DineshYadav(dotNet)
DineshYadav(dotNet)DineshYadav(dotNet)
DineshYadav(dotNet)
 
Sdlc
SdlcSdlc
Sdlc
 
LUXproject functionality overview R11.8
LUXproject functionality overview R11.8LUXproject functionality overview R11.8
LUXproject functionality overview R11.8
 
Ccna 4 Chapter 2 V4.0 Answers
Ccna 4 Chapter 2 V4.0 AnswersCcna 4 Chapter 2 V4.0 Answers
Ccna 4 Chapter 2 V4.0 Answers
 
Sdlc
SdlcSdlc
Sdlc
 
Intro to Software Engineering - Software Design
Intro to Software Engineering - Software DesignIntro to Software Engineering - Software Design
Intro to Software Engineering - Software Design
 
02 architectures in_context
02 architectures in_context02 architectures in_context
02 architectures in_context
 
software
softwaresoftware
software
 
Enterprise Java Platform Migration Assessment
Enterprise Java Platform Migration AssessmentEnterprise Java Platform Migration Assessment
Enterprise Java Platform Migration Assessment
 
The process of software architecting
The process of software architectingThe process of software architecting
The process of software architecting
 
Why use trace cloud to manage your requirements (includes audio)
Why use trace cloud to manage your requirements (includes audio)Why use trace cloud to manage your requirements (includes audio)
Why use trace cloud to manage your requirements (includes audio)
 
WSI32 - IBM WebSphere Performance Fundamentals
WSI32 - IBM WebSphere Performance FundamentalsWSI32 - IBM WebSphere Performance Fundamentals
WSI32 - IBM WebSphere Performance Fundamentals
 
Accelerating rtl reuse
Accelerating rtl reuseAccelerating rtl reuse
Accelerating rtl reuse
 

Viewers also liked

Git Workshop : Getting Started
Git Workshop : Getting StartedGit Workshop : Getting Started
Git Workshop : Getting Started
Wildan Maulana
 
2013 Social Admissions Report
 2013 Social Admissions Report   2013 Social Admissions Report
2013 Social Admissions Report
Uversity, Inc.
 
component based softwrae engineering Cbse
component based softwrae engineering Cbsecomponent based softwrae engineering Cbse
component based softwrae engineering Cbse
Sravs Dals
 

Viewers also liked (20)

SDS Page Lecture
SDS Page LectureSDS Page Lecture
SDS Page Lecture
 
Poly-acrylamide Gel Electrophoresis
Poly-acrylamide Gel ElectrophoresisPoly-acrylamide Gel Electrophoresis
Poly-acrylamide Gel Electrophoresis
 
Php development with Docker
Php development with DockerPhp development with Docker
Php development with Docker
 
Information Design Web Planning Mockup
Information Design Web Planning MockupInformation Design Web Planning Mockup
Information Design Web Planning Mockup
 
Engine lab software hybrid cloud specialists
Engine lab software hybrid cloud specialistsEngine lab software hybrid cloud specialists
Engine lab software hybrid cloud specialists
 
NTR Lab - bespoke software development in Russia
NTR Lab - bespoke software development in RussiaNTR Lab - bespoke software development in Russia
NTR Lab - bespoke software development in Russia
 
Especialidade de inclusão 5
Especialidade de inclusão 5Especialidade de inclusão 5
Especialidade de inclusão 5
 
Introduction To Git Workshop
Introduction To Git WorkshopIntroduction To Git Workshop
Introduction To Git Workshop
 
Docker for Developers - PNWPHP 2016 Workshop
Docker for Developers - PNWPHP 2016 WorkshopDocker for Developers - PNWPHP 2016 Workshop
Docker for Developers - PNWPHP 2016 Workshop
 
Docker for PHP Developers - ZendCon 2016
Docker for PHP Developers - ZendCon 2016Docker for PHP Developers - ZendCon 2016
Docker for PHP Developers - ZendCon 2016
 
Git Workshop : Getting Started
Git Workshop : Getting StartedGit Workshop : Getting Started
Git Workshop : Getting Started
 
Microservices without Servers
Microservices without ServersMicroservices without Servers
Microservices without Servers
 
Spm file33
Spm file33Spm file33
Spm file33
 
Computer-free Website Development Demo - WordPressDC Jan 2015
 Computer-free Website Development Demo - WordPressDC Jan 2015 Computer-free Website Development Demo - WordPressDC Jan 2015
Computer-free Website Development Demo - WordPressDC Jan 2015
 
MockupBuilder
MockupBuilderMockupBuilder
MockupBuilder
 
2013 Social Admissions Report
 2013 Social Admissions Report   2013 Social Admissions Report
2013 Social Admissions Report
 
component based softwrae engineering Cbse
component based softwrae engineering Cbsecomponent based softwrae engineering Cbse
component based softwrae engineering Cbse
 
Docker & PHP - Practical use case
Docker & PHP - Practical use caseDocker & PHP - Practical use case
Docker & PHP - Practical use case
 
An introduction to contianers and Docker for PHP developers
An introduction to contianers and Docker for PHP developersAn introduction to contianers and Docker for PHP developers
An introduction to contianers and Docker for PHP developers
 
The App Evolution
The App Evolution The App Evolution
The App Evolution
 

Similar to SDS App Dev Project Starter Kit

Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docxScope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
kenjordan97598
 
CPIN 269 Final Documentation
CPIN 269 Final DocumentationCPIN 269 Final Documentation
CPIN 269 Final Documentation
Jennifer Cordes
 
Cleaned example 1
Cleaned example 1Cleaned example 1
Cleaned example 1
Bruce Carr
 
SathishKumar Natarajan
SathishKumar NatarajanSathishKumar Natarajan
SathishKumar Natarajan
Sathish Kumar
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
jessiehampson
 

Similar to SDS App Dev Project Starter Kit (20)

Technical Webinar: By the (Play) Book: The Agile Practice at OutSystems
Technical Webinar: By the (Play) Book: The Agile Practice at OutSystemsTechnical Webinar: By the (Play) Book: The Agile Practice at OutSystems
Technical Webinar: By the (Play) Book: The Agile Practice at OutSystems
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal
 
SAP sample
SAP sampleSAP sample
SAP sample
 
2011 NASA Open Source Summit - Forge.mil
2011 NASA Open Source Summit - Forge.mil2011 NASA Open Source Summit - Forge.mil
2011 NASA Open Source Summit - Forge.mil
 
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docxScope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
Scope Scope StatementProject TitleProject SponserObjectiveMobile t.docx
 
CPIN 269 Final Documentation
CPIN 269 Final DocumentationCPIN 269 Final Documentation
CPIN 269 Final Documentation
 
Indonesia Truck Entry Project Proposal (1) [Autosaved].pptx
Indonesia Truck Entry Project Proposal (1) [Autosaved].pptxIndonesia Truck Entry Project Proposal (1) [Autosaved].pptx
Indonesia Truck Entry Project Proposal (1) [Autosaved].pptx
 
Software Development: Fixed Price Model Features
Software Development: Fixed Price Model FeaturesSoftware Development: Fixed Price Model Features
Software Development: Fixed Price Model Features
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodology
 
Cleaned example 1
Cleaned example 1Cleaned example 1
Cleaned example 1
 
Report
ReportReport
Report
 
Himanshu Bhatia Resume
Himanshu Bhatia ResumeHimanshu Bhatia Resume
Himanshu Bhatia Resume
 
PROPOSAL_FINAL
PROPOSAL_FINALPROPOSAL_FINAL
PROPOSAL_FINAL
 
Dhiraj_Kalra
Dhiraj_KalraDhiraj_Kalra
Dhiraj_Kalra
 
Developing software/App requirements specification
Developing software/App requirements specificationDeveloping software/App requirements specification
Developing software/App requirements specification
 
Developing software and/or App requirements specification
Developing software and/or App requirements specificationDeveloping software and/or App requirements specification
Developing software and/or App requirements specification
 
SathishKumar Natarajan
SathishKumar NatarajanSathishKumar Natarajan
SathishKumar Natarajan
 
CV_AmalMandal
CV_AmalMandalCV_AmalMandal
CV_AmalMandal
 
Tony_CV New
Tony_CV NewTony_CV New
Tony_CV New
 
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docxVoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
VoIP Implementation WBSTask NameDurationStart DateEnd DatePredeces.docx
 

SDS App Dev Project Starter Kit

  • 1. SDS Application Development Project Starter Kit Mario Umali, MPM CSU-LA
  • 2. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit HCS - Data Migration to CarePortal Project Overview Indicate brief description of Dev Project SDS Framework outline the activities performed at each stage of a software development project: Phase 1 - Project Identification Phase 2 - Requirement Analysis Phase 3 - Establish PMO Phase 4 - Project Scoping Phase 5 - Design and Development Phase 6 - Testing/Modification/Revision Phase 7 - Pilot Phase 8 - Deployment Phase 9 - Post Implementation Phase 10 - Project Closure
  • 3. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit HCS - Data Migration to CarePortal Project Overview Indicate brief description of Dev Project Phase 1 - Project Identification Brief description/overview of project coming from project sponsor… this should be filled out by the Project Sponsor/Representative
  • 4. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit HCS - Data Migration to CarePortal Project Overview Indicate brief description of Dev Project Phase 2 – Requirement Analysis Project Sponsor to define needed information, function, behavior, performance and processes.
  • 5. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit HCS - Data Migration to CarePortal Project Overview Indicate brief description of Dev Project Phase 3 – Establish PMO SDS and Project Sponsor to define and establish Project Management Team, communication standards, escalation process and reporting structure. A separate deck will be provided to the project sponsor thru SDS assigned Project Manager
  • 6. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit HCS - Data Migration to CarePortal Project Overview Indicate brief description of Dev Project Phase 4 – Project Scoping SDS Project Manager to work hand in hand Project Sponsor to provide a detailed project scope. Project Scoping is further divided in two Phases: 1. Basic Scoping – an initial Project Scoping document which is included in this document will be provided by SDS to the Project Sponsor 2. Detailed Scoping – will be conducted by SDS Project Manager after reviewing Basic Scoping Document
  • 7. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit HCS - Data Migration to CarePortal Project Overview Indicate brief description of Dev Project Phase 5 – Design and Development SDS Project Manager will work with SDS Dev Team to begin with the design and development of the Project Phase 6 – Testing/Modification/Revision Initial version release will be provided and facilitated by SDS Project Manager which will work together with the Project Sponsor’s Team to perform and document testing, identify modification/revision needed. Phase 7 – Pilot Depending on the size of the project as well as Project Sponsor’s and business requirement a Pilot or soft launch will be scheduled and perform to ensure proper transition
  • 8. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit HCS - Data Migration to CarePortal Project Overview Indicate brief description of Dev Project Phase 8 – Deployment Once Testing and Pilot has been conducted deployment to production will be performed. In depth deployment details will be outlined and included on the project plan. Phase 9 – Post Implementation After successful application deployment a post implementation review will be conducted by SDS Project Manager together with Project Sponsors Phase 10 – Project Closure SDS Project Manager will provide all project documentation for final review with the Project Sponsor. Project Document will be achieved by SDS PMO for future reference.
  • 9. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit Project Overview Indicate brief description of Dev Project Phase 4A – Basic Project Scoping Company Name Address Project Name Project Sponsor Department Contact Info Email Phone Numbers Fax Number Project Duration (in days/hours)
  • 10. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit Project Overview Indicate brief description of Dev Project Phase 4A – Basic Project Scoping Business Requirements: (pls enumerate below)
  • 11. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit Project Overview Indicate brief description of Dev Project Phase 4A – Basic Project Scoping Application Model: (please select which ever is/are applicable for the project) Hosted (Cloud base) On Premise (In house Server) Centralize Database Localize Database Single User Multiple User Single Location Multi-Location Stand alone Application Integrated to other existing Application
  • 12. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit Project Overview Indicate brief description of Dev Project Phase 4A – Basic Project Scoping Process Model: pls define the existing process model , where a pictorial top-down representation of the major business processes that interact with the system is diagrammed and decomposed into manageable functions and sub-functions until no further breakdown is feasible; if there will be a process improvement that needs to be incorporated with the system/application development kindly provide the process details as well; some expected output for this are: • Work Flow Diagram • Process Flow Model • User Event Diagram • Decision Trees
  • 13. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit Project Overview Indicate brief description of Dev Project Phase 4A – Basic Project Scoping Logical Data Model : pls define data that supports the processes and business rules, how it is logically modelled; identify entities, their relationships and dependencies to other entities as well as attributes with their business definitions; some expected output for this are: • Entity Relationship Diagram • Logical Data Dependency Diagram
  • 14. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit Project Overview Indicate brief description of Dev Project Phase 4A – Basic Project Scoping Functional Specification : please define interfaces, processes and data are merged to describe systematically how the end-user will use the application, and how data will be retrieved, processed and stored; please list down system features of the system that will specifically satisfy a user need, or with which the user will directly interact; some expected output for this are: • Process Association and Grouping • Logical Organization • Work Flow Clustering • Expressing Logic: Pseudo Code, Structured English, Object Oriented Logic • User wish list
  • 15. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit Project Overview Indicate brief description of Dev Project Phase 4A – Basic Project Scoping Technical Specification : please define or identify the technical constraints or conditions under which the system must perform such as but not limited to: • Accessibility • Encryption • Company Technology Guidelines/Requirements • System Operations and Maintenance • Data Protection and Integrity
  • 16. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit Project Overview Indicate brief description of Dev Project Phase 4A – Basic Project Scoping Operational Specification : please define or identify the requirements that define those “behind the scenes” functions that are needed to keep the system operational over time such as but not limited to: • System Performance and responsiveness • Data Archival • Audit and Controls • System Administration • Business Continuity
  • 17. Any use, copying, distribution in any means without the written consent of SDSolutions I.T. Outsourcing, Inc. is strictly prohibited Project Partners Details Project Manager Mario Umali Project Phase NA Document Tyep Dev ASM Kit Project Overview Indicate brief description of Dev Project Phase 4A – Basic Project Scoping Transition Requirements : please define or identify the requirements that define those aspect that must be addressed in order for the system to be successfully implemented in the production environment and to avoid work flow disruption during transition, such as but not limited to: • Data Conversion • Release Validation • System/Technical/User documentation • Training • Mechanics or deployment standard procedure • Logistics
  • 18. Thank you. Mario Umali mario@SDSolutions.com.ph +63 (917) 529 4267 +63 (2) 655 7406