  1. 1. Software Project Management Yasmeen Gul
  2. 2. 1)Design2) Document your Design3) Do it twice.4)Plan control & testing5)Involve user
  3. 3.  1) Finding and fixing a software problem after delivery costs 100 times more than finding and fixing the problem in early design phases. - when one big Automobile companies implements a recall for post delivery defect the cost of repair can be many orders of magnitude greater then the cost of fixing the defect during the engineering or production stage
  4. 4. 2) You can compress software developmentschedules 25% of nominal, but no more.Addition of people requires more managementoverhead and training of people.
  5. 5.  3)For every $1 you spend on development, you will spend $2 on maintenance.  Successful products will have much higher ratios of “maintenance to development”…..  Successful S/W product in commercial product domain such as orical,microsoft application ,Unix operating system are very long lived &can result in much higher ratios of maintenance cost to development cost .
  6. 6.  4)Software development and maintenance costs are primarily a function of the number of source lines of code.  Generally true. Component-based development may dilute this as might reuse - but not in common use in the past.
  7. 7.  5)Variations among people account for the biggest differences in software productivity. Always try to hire good people. But we cannot always to that. Balance is critical. Don‟t want all team members trying to self-actualize and become heroes. Build the „team concept.‟ While there is no “I” in „team”, there is an implicit “we.”
  8. 8.  6)The overall ratio of software to hardware costs is still growing. In 1955 it was 15:85; in 1985, 85:15. The fact that S/W represent 85% of the cost of most system is not so much a statement about S/W productivity as it is about the level of functionality being allocated to S/W in system solution .
  9. 9.  7) Only about 15% of software development effort is devoted to programming. Many activities beside the coding are necessary for the s/w project success like testing ,planning ,project control ,change management are equally important consideration that consume roughly 85% of resource
  10. 10.  8)S/W system & products cost 3 time as much per SLOC as individual S/W programs .S/W- system products (system of systems ) cost 9 time as much A real fact: the more software you build, the more expensive it is per source line
  11. 11.  9) Walkthroughs catch 60% of the errors. Usually good for catching stylistic things; sometimes errors, but usually do not represent the deep analysis necessary to catch significant shortcomings. Major problems, such as performance…are not caught.
  12. 12.  10)80% of the contribution comes from 20% of contributors.

×