SlideShare a Scribd company logo
1 of 1
20
21
22
23
24
9
10
11
12
13
14
15
16
up
1
2
3
4
6
8
5
7
19
18
17
RECEPTION
LOBBY
RECEPTIONRECEPTION
52" LCD screen
wall mounted
46" LCD screen
wall mounted
19
20
21
22
23
24
9
10
18
11
12
13
14
15
16
17
up
1
2
3
4
5
6
7
8
VOID
FEMALE
WC
MALE WC
FIRE EXIT CORRIDOR
DISABLED
WC
CHEMICAL
RISER
BAR
KITCHEN
ESCAPE
STAIRS
DISABLED
REFUGE
ESCAPE
STAIRS
DISABLED
REFUGE
RISER
STAFF WC
30FD SC
D.12ex
30FD SC
D.11ex
30FD SC
D.09 ex
30FD SC
D.02ex
30FD SC
D.01ex
D.13 ex
DISHWASHING
30FD SC
D.03ex
30FD SC
D.04r
CHAIRCupboard
30FD SC
D.06new
D.14ex
D.16
D.17ex
30FD
D.15 ex
30FD SC
30FD
4234
2200
2020
950
1200
3240
5232
1200
30FD SC
30FD
D.05 new
OFFICE
Cold Room
Drink
Storage
Dry Good Storage
DOOR D.15A
repositioned and
made single swing
FREEZER
30SC
D.19
30SC
D.20
EXISTING DRAINAGE
CONNECTION WITHIN
VOID
EXISTING
foul
EXISTING
foul
FLOOR
DRAIN
FLOOR
DRAIN
GREASE
TRAP
FOUL
FOUL
exist
FOUL
FOUL
FLOOR
DRAIN
FOUL
existing
foul drain
is to be
capped off
FLOOR
DRAIN
FOUL
EXISTING
foul
EXISTING
foul
EXISTING
foul
EXISTING
foul
EXISTING
foul
4690
500
NEW
FOUL
existing
foul drain
is to be
capped off
EXISTING
foul
FOUL
EXISTING
foul
CLNRS
MOP
SINK
D.08ex
REFUSE
30FD SC
D.10new 30FD SC
2800
rampup150mm
ramp up 150mm
rampup150mm
rampup150mm
Drink
Storage
30FD SC
D.21new
Existing risers
REVISION DATE ITEM
CONSTRUCTION
DATE
March 2012
COSMO, Victoria sq. Belfast
DRAWN
PROJECT
PROJECT
TITLE
NUMBER
shown
SCALE
REVISION
CHECKED
INFORMATION ONLY
APPLICATION FOR LOCAL AUTHORITY
TENDER
TO THE CURRENT HEALTH AND SAFETY AT WORKS CONDITIONS AND LOCAL
12. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE OTHER RELEVANT
11. IN THE EVENT THAT DRAWING INFORMATION IS NOT THE SAME, AND IF THE
AND ARE NOT TO BE SCALED FROM THE THE DRAWINGS.
7. ALL FINISHES ARE TO BE CARRIED OUT TO A HIGH STANDARD.
8. ANY DIMENSIONS ARE TO BE TAKEN FROM THE SETTING OUT PLAN ONLY
THE PROPOSED PLAN IS TO BE READ AS CORRECT.
THAT ANY BUILDING IS CARRIED OUT UNDER THE LOCAL AUTHORITY
13. COPYRIGHT OF BLENHEIM DESIGN. NOT TO BE REPRODUCED
DESIGNER AND OR SUPERVISING OFFICER ARE UNAVAILABLE FOR COMMENT,
AND CONSTRUCTION DETAILS AND OFFER ALTERNATIVES TO THE DESIGNER
10. THE CONTRACTOR IS TO CHECK AND APPRAISE ALL DESIGN SHOP FITTING
9. IT IS THE CONTRACTORS RESPONSIBILITY TO UNDER TAKE AND ENSURE
FOR APPROVAL.
CONSULTANTS DRAWINGS.
AUTHORITY REGULATIONS.
REQUIREMENTS.
MANUFACTURERS RECOMMENDATIONS.
DETAILS ARE REQUIRED TO BE APPROVED BY BLENHEIM DESIGN PRIOR TO
BEFORE PROCEEDING WITH ANY WORK.
ARE TO BE CLASS 1 OR EQUIVALENT).
6. CONTRACTOR TO PROVIDE A WORKING ENVIRONMENT WHICH CONFORMS
5. ALL SPECIFIED ITEMS ARE TO BE INSTALLED IN ACCORDANCE WITH THE
4. ALL REQUESTED DRAWINGS SHOWING FIXINGS AND CONSTRUCTION
AND SPECIFICATIONS AND REPORT ANY DISCREPANCIES TO BLENHEIM DESIGN
2. CONTRACTOR MUST VERIFY ALL SITE DIMENSIONS, DRAWINGS, DETAILS
REGULATIONS IN THE APPLICABLE COUNTRY (IN A RESTAURANT ALL FINISHES
1. ALL FINISHES ARE TO CONFORM TO THE REQUIRED CURRENT BUILDING
COMMENCEMENT OF WORK.
GENERAL NOTES
BUILDERS WORKS DRAWING
MM
03-01BD 1230
BLENHEIM
DESIGN...
6 St Peters Place
Brighton
BN1 4SA
t: 01273 380001
info@blenheimdesign.com
PROPOSED FIRST FLOOR PLAN
scale 1:100
L
FG
Maintained Emergency light
Ceiling Mounted Smoke Detector
Ceiling mounted Heat Detector
Fire Door keep clear sign located on
direction of opening side door
Keep Door Locked Sign located on direction
of opening side door
Automatic fire and smoke detection system
to be installed as L1 system
Emergency Push pad with sign
Wall mounted Fire blanket in container
2Kg wall mounted Carbon Dioxide Fire
Extinguisher
9 litre wall mounted water fire extinguisher
Manual Fire alarm call point location / break
glass
B
FD 30 SC
L
FG
PP
EL
Half hour fire door including intumescent
smoke seal strips and positive overhead door
closures, fire stops and sign: 'fire door keep
shut'
Vision panel in door comprising FR glass and
hw beads in intrumescent paste Minimum
size of vision panel 250mm dia.
Emergency exit sign indicating direction of
means of escape, slim line LED edge lit fittings
Fire alarm sounder
Visual Fire Alarm beacon within Disabled WC.
Life systems contractor to ensure strict
compliance to local and national criteria at
design stage. The keys and symbols on this
layout should be noted and modified if
required.
FIRE PROTECTION
CO
W
CO
W
ALL MECHANICAL AND PLUMBING SERVICES
INFORMATION BY APPOINTED MECHANICAL CONTRACTOR
VP
INTRODUCTION.
THE ACCOMPANYING DRAWING PACKAGE OUTLINES THE DESIGN GUIDELINES TO BE
UTILISED FOR THE PROPOSED FIT-OUT TO UNIT MSU02, LEVELS 02 AND 03 AT THE
VICTORIA SQUARE SHOPPING CENTRE, BELFAST. IT IS INTENDED THAT THE STANDARDS
SET BY THIS PACKAGE WILL BE INTERPRETED AND ADAPTED TO SUIT THE INTERIOR OF
THE UNIT IN ACCORDANCE WITH THE LAYOUTS AND SHOPFRONT PLANS PROVIDED.
IT SHALL BE THE MAIN FIT-OUT CONTRACTORS RESPONSIBILITY TO THOROUGHLY
SURVEY THE SITE AND REPORT ANY DISCREPANCIES TO THE APPOINTED PROJECT
MANAGER AND THE CLIENT PRIOR TO THE MANUFACTURE OF FIT-OUT
COMPONENTS.
SHOPFITTING CONTRACTOR IS TO ENSURE THAT ALL MATERIALS AND PRODUCTS
USED THROUGHOUT THE PROPOSED WORKS COMPLY WITH THE CURRENT
TECHNICAL BOOKLET UNDER THE NI REGULATIONS.
PRODUCTS ARE USED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS.
PRIOR TO COMMENCING WORK THE APPOINTED STRUCTURAL ENGINEER SHALL
THOROUGHLY INSPECT AND CHECK THE SITE CONDITIONS AND STRUCTURAL STATE
OF THE AREA IN ORDER TO ASSESS ITS CAPABILITY OF ACCEPTING ANY EXTRA
LOADINGS IMPOSED BY THE NEW WORKS.
WORK SHALL ONLY COMMENCE ONCE A SATISFACTORY REPORT HAS BEEN ISSUED
TO THE CLIENT.
CONTRACTOR SHALL ENSURE THAT ALL BUILDING AND FIT OUT WORKS ARE CARRIED
OUT IN COMPLETE COMPLIANCE WITH THE CURRENT BUILDING REGULATIONS (NI)
INCLUDING ALL AMENDMENTS AND ADDENDUMS, AND TO THE SATISFACTION OF
THE LOCAL BUILDING INSPECTOR.
THE CONTRACTOR SHALL ENSURE THAT ALL WORKS ARE CARRIED OUT TO THE
COMPLETE SATISFACTION OF THE LOCAL AUTHORITY PLANNING OFFICERS WITH
REGARD TO EXTERIOR FINISHES, SIGNAGE AND ANY CHANGE OF USE ISSUES WHICH
MAY BE RELEVANT TO THE PROJECT.
SHOPFITTING CONTRACTOR SHALL ENSURE THAT AT ALL TIMES THE FIT-OUT WORKS
WILL BE CARRIED OUT TO THE APPROVAL OF THE LOCAL FIRE OFFICER AND THAT THE
SITE LANDLORDS STIPULATIONS WILL ALSO BE MET.
HEALTH AND SAFETY
THE DESIGN DRAWINGS AND SCHEDULES WITHIN THIS DESIGN PACKAGE HAVE BEEN
PREPARED AND ASSESSED BY BLENHEIM DESIGN CONSULTANTS AND ARE DEEMED FIT
FOR PURPOSE WHEN IMPLEMENTED AS PART OF THE FIT-OUT OF UNIT MSU02, LEVELS
02 AND 03 AT THE VICTORIA SQUARE SHOPPING CENTRE, BELFAST.
ANY VARIATION OR INTERPRETATION OF THE OUTLINE DESIGNS CONTAINED WITHIN
THIS PACKAGE BY THIRD PARTY DESIGNERS, SHOULD THIS BE TO SUIT PARTICULAR SITE
CIRCUMSTANCES OR METHODS OF CONSTRUCTION, WILL BE THE SPECIFIC
RESPONSIBILITY OF THAT DESIGNER.
VENTILATION
RETAIL AREA TO BE VENTILATED TO COMPLY WITH THE STIPULATIONS OF TECHNICAL
BOOKLET K, SECTION 3 OF THE CURRENT NI BUILDING REGULATIONS
AIR CONDITIONING CASSETTES, DUCTWORK AND VENTS TO BE POSITIONED AS
SPECIALIST CONTRACTORS DETAILS. FINAL DESIGN OF A.C. EQUIPMENT WILL DEPEND
ON SITE CONDITIONS. SEE SEPARATE CONTRACTORS DRAWINGS FOR DETAILS AND
SPEC.
VENTILATION TO PUBLIC TOILET AREAS TO ACHIEVE 3 AIR CHANGES PER HR
CONTINUOUSLY.
STAFF TOILETS TO ACHIEVE 3 AIR CHANGES PER HR WITH 20 MIN. OVERUN
CONTOLLED BY LIGHT SWITCH.
ALL OF THE ABOVE WORKS ARE TO BE CARRIED OUT IN ACCORDANCE WITH THE
NORTHERN IRELAND LATEST CODES OF PRACTICE AND TO THE SATISFACTION OF THE
LOCAL AUTHORITY.
LIGHTING
ALL BACK OF THE HOUSE LIGHTING (KITCHEN, STORE ROOMS, CORRIDOR, OFFICE,
STAFF ROOMS ETC) WILL HAVE LOW ENERGY LIGHT FITTINGS.
SOME RESTAURANT LIGHTING (INSIDE THE NEW PENDANTS AND BACK OF THE BAR +
FLOOR LAMPS) ARE TO BE LED AND LOW ENERGY LIGHT BULBS)
SEE DRAWING 04-01 FOR DETAILS.
DRAINAGE.
ALL EXISTING LANDLORDS DRAINAGE SYSTEMS TO BE THOROUGHLY INSPECTED
PRIOR TO COMMENCMENT OF WORKS.
ANY NEW DRAINAGE FACILITIES TO BE CONNECTED INTO EXISTING MAINS
DRAINAGE INSTALLATION.
ABOVE GROUND DRAINAGE PIPEWORK GENERALLY SHALL BE UPVC
CONSTRUCTION MIN. 50MM DIA. OR AS APPROPRIATE TO FACILTY AND LOCATION.
TOILET DRAINAGE PIPEWORK TO BE MIN 100MM DIA.
ALL BASINS AND OUTFLOWS FROM EQUIPMENT TO BE FITTED WITH 75MM DEEP SEAL
BOTTLETRAPS. GREASE TRAPS TO BE FITTED TO KITCHEN OUTFLOWS WHERE
APPROPRIATE. ALL TRAPS ARE TO BE REMOVABLE AND ACCESSIBLE FOR CLEANING.
ALL WASTE PIPE RUNS ARE TO BE PROVIDED WITH ACCESSIBLE RODDING EYES TO
ENABLE EACH RUN TO BE RODDED INDIVIDUALLY.
ALL PIPES TO BE LAID TO MIN. 1 IN 40 FALL
INSTALLATION TO COMPLY WITH THE STIPULATIONS OF DOCUMENT 'H' OF THE
CURRENT BUILDING REGULATIONS.
CONTRACTOR TO READ ALL OF THE ABOVE STIPULATIONS IN CONJUNCTION WITH
THE PROJECT MANAGERS CONTRACT DOCUMENT AND THE LANDLORDS
SHOPFITTING GUIDLINES.
GENERAL FIT-OUT.
PROJECT COMPRISES COMPLETE FIT-OUT OF UNIT MSU02, COSMO RESTAURANT.
FIT-OUT WORKS WILL COMPRISE THE FOLLOWING:-
1. INSTALLATION OF NEW FASCIA SIGNAGE AND TO EXISTING SHOPFRONT
OPENINGS. ALL TO COMPLY WITH LANDLORDS REQUIREMENTS
2. INSTALLATION OF NEW SHOPFRONT FINISHES TO THE EXISTING SHOPFRONT
3. INSTALLATION OF NEW BUFFET STYLE SERVERY AND BACK BAR EQUIPMENT TO
POSITION SHOWN. ALL TO CLIENTS SPECIFICATIONS
4. INSTALLATION OF NEW KITCHEN EQUIPMENT AND STORAGE FACILITIES TO
CLIENTS SPECIFICATION
5. INSTALLATION OF NEW FLOOR FINISHES TO SHOWN AREAS (DRW 05-01).
6. EXISTING CEILING AND LIGHTING ALTERATION TO LAYOUTS (DRW 04-01)
7. AMENDMENTS TO THE EXISTING HVAC EQUIPMENT AND AIR EXTRACTION
FACILITIES AS REQUIRED TO ACCOMODATE NEW LAYOUT.
8. INSTALLATION OF NEW FURNITURE AND FITTINGS TO LAYOUTS SHOWN.
9. AMENDMENTS TO THE EXISTING ELECTRICAL AND DATA INSTALLATION TO
ACCOMODATE THE NEW RESTAURANT LAYOUTS AND EQUIPMENT
10. DECORATION OF ALL AREAS AS PER SCHEDULES PROVIDED
11. ALTERATION TO THE EXISTING EMERGENCY LIGHTING, SPRINKLERS, SMOKE
DETECTION AND FIRE ALARM SYSTEMS TO SUIT NEW RESTAURANT LAYOUT. ALL
LINKED TO EXISTING SYSTEMS WITHIN THE BUILDING.
FLOORS
WHERE REQUIRED ALL NEW FLOOR FINISHES TO ACHIEVE CLASS 1 SURFACE SPREAD
OF FLAME.
WALLS / PARTITIONS
WHERE REQUIRED, NEW PARTITION CONSTRUCTION GENERALLY TO BE MINIMUM
HALF HOUR FIRE RESISTANT. PLASTERBOARD OVER METAL STUDWORK.
WALL FINISHES GENERALLY TO PROVIDE CLASS 1 SURFACE SPREAD OF FLAME
RATING IN PUBLIC AREAS AND CLASS 0 TO DEDICATED ESCAPE ROUTES.
CEILINGS
CEILINGS TO BE AS LAYOUTS PROVIDED. SEE DRW 04-01 FOR FURTHER DETAILS.
CEILING MUST PROVIDE CLASS 1 SURFACE SPREAD OF FLAME RATING IN PUBLIC
AREAS AND CLASS 0 TO DEDICATED ESCAPE ROUTES.
ELECTRICAL
ELECTRICAL INSTALLATION SHALL BE CARRIED OUT IN ACCORDANCE WITH THE 17TH
EDITION OF THE IIE WIRING REGULATIONS
THE INSTALLATION SHALL BE INSPECTED, TESTED AND CERTIFIED IN ACCORDANCE
WITH NI BUILDING REGULATIONS AND COPIES OF THE CERTIFICATES ISSUED TO THE
CLIENT AND THE LOCAL BUILDING CONTROL AUTHORITY.
ALL SWITCHES AND SWITCH GEAR SHALL BE INSTALLED IN ACCESSIBLE POSITIONS TO
COMPLY WITH THE REQUIREMENTS OF TECHNICAL BOOKLET R SECTION 5, NI
REGULATIONS.
THE INSTALLATION SHALL BE CARRIED IN ACCORDANCE WITH THE CLIENTS
FUNCTIONAL BRIEF AND THE LAYOUTS
PROPOSED ENTRANCE LEVEL FLOOR PLAN
scale 1:100
EL
EL
EL
NOTE:
CONTRACTOR TO BE RESPONSIBLE FOR LOCATING
AND PROTECTING ANY EXISTING SERVICES WHICH
MAY BE WITHIN ANY PART OF THE STRUCTURE
AFFECTED BY THE PROPOSALS.
CONTRACTOR TO BE RESPONSIBLE FOR
CONTACTING ALL PUBLIC UTILITIES AND
UNDERGROUND SERVICE PROVIDERS PRIOR TO
WORK COMMENCING, TO ENSURE THAT EXISTING
SERVICES ARE NOT DAMAGED AND THAT HE IS
AWARE OF THE LOCATION AND DEPTH OF ANY
SERVICE/UTILITY WITHIN OR ADJACENT TO THE
SITE.
ONE LAYER OF 12.5mm WALLBOARD EACH SIDE OF
70MM GYPROC STUDS TO PROVIDE 1/2 hr FIRE
RESISTANCE PARTITION DUTY : MEDIUM TO BS 5234
PARTS 1 & 2 1992. INSTALLED FROM STRUCTURAL
FLOOR TO SLAB
KEY TO WALL & FLOOR CONSTRUCTION
EL
EL
EL
EL
EL
EL
EL
EL
ELEL
EL
EL
EL
EL
EL
EL
B
CO
W
CO
W
FGFG
FGFG
FGFG
EL
EL
VP
VP
FG
VP
EL
EL
B
COCO
B
COCO
B
COCO
landlords door
landlords door
landlords door
landlords door
EL
EL
EL
EL
EL
EL
EL
FGFG
VP
FGFG
EL
EL
EL
EL
CO
W
CO
W
CO
W
CO
W
CO
W
CO
W
EXISTING DOOR
OPENING TO BE
CLOSED
EXISTING PARTITION
TO BE DEMOLISHED.
EXISTING PARTITION
AND FALSE COLUMN
TO BE REMOVED
EXISTING DOOR
OPENING TO BE
CLOSED B
COCO
Restaurant seated + 10 waiting customers
TOTAL NUMBER OF OCCUPANCY + 28 STAFF
FEMALE/DISABLED
Ambulant Disabled customers:
The Scheme has been designed to comply with Part R section 6
Toilet accomodation
Clear Means of escape width required for 220 persons
WHB's
1500mm
Urinals WC's
N/A 5 5
OCCUPANCY LEVELS
Area
Means of Escape Capacity for COSMO RESTAURANT
Ocupancy rates are based upon current Building Regulations
Whole demise in total 1025 sq m
Total
Restaurant and public toilet area
Staff and kitchen area
796 sq m
229 sq m
300
MALE 3 2 3
272
One fully disabled toilet is situated on the first floor which can be reached by lift
EXISTING LANDLORDS WALLS
1 HR FR
EXISTING DOOR AND
ASSOCIATED
FITTINGS ARE TO BE
REMOVED
CO
W
CO
W
CO
W
CO
W
CO
W
CO
W
EXISTING WALL IS TO BE REMOVED AND
NEW LOW WALL CONSTRUCTED USING
100X50mm GOOD QUALITY SOFTWOOD
TIMBER AT 500MM CENTRES. STAIR SIDE OF
THE WALL IS TO RECEIVE 12.5MM
PLASTERBOARD, TAPED AND SKIMED
READY TO RECEIVE FINAL WALL FINISH,
WHILST COUNTER SIDE OF THE WALL IS TO
RECEIVE 20MM MARBLE CONGLOMERATE.
LOW WALL IS TO BE CAPPED OFF WITH
20MM MARBLE. WALL HEIGHT 1100MM FFL
K
A 23-03-12 FEATURE WALL AMENDED IN THE RECEPTION
FD 30 SC
landlords door
EL
NEW LOW WALL
CONSTRUCTED USING
100X50mm GOOD QUALITY
SOFTWOOD TIMBER AT 500MM
CENTRES WITH 12.5MM
PLASTERBOARD ON EACH
SIDE, TAPED AND SKIMED
READY TO RECEIVE FINAL
WALL FINISH, LOW WALL IS TO
BE CAPPED OFF WITH 20MM
MARBLE. WALL HEIGHT 1100MM
FFL
FG
VP
FG
VP
EXISTING HALF HOUR FIRE RESISTING WALL
CONSTRUCTION. ONE LAYER OF 12.5 PLASTERBOARD
EACH SIDE OF 75MM METAL FRAME PARTITIONING.
TAPED AND FULLY PLASTERED
B 21-06-12 AMENDEMENTS MADE TO SUIT CLIENTS
REQUIREMENTS & BELFAST BUILDING CONTROL
EL
VP
VP
VP
C 26-06-12 BOH AMENDED
PLASTERBOARD PARTITIONING TO BE REMOVED
B
COCO
EL
LL
EMERGENCY LIGHTING SHOULD BE INSTALLED
TO COMPLY WITH PART E & BS 5266-1 1999,
BS 5266 - 7: 1999 (BS EN 1838: 1999) OR
CP 1007:1955
PORTABLE FIRE FIGHTING EQUIPMENT TO
BSEN3 STANDARD
D 28-06-12 servery area amended and notes changed
B
CO
W
CO
W
E 02-07-12 TENDER
CO
W
CO
W
F 18-07-12 BREAK GLASS ADDED AT LOBBY DOOR AND
FIRE SYSTEM SHALL BE INSTALLED AND MAINTAINED IN
COMPLIANCE WITH BS 5839 PART 1 202
CONTRACTOR TO ALLOW FOR
75MM DIA TRENCH TO BE CUT OUT
IN THE FLOOR TO ALLOW FOR
THREE PHASE POWER SUPPLY
CABLE DIA.25MM, AS PER DRW
06-01
PASSENGER LIFT IS TO BE RESTORED
TO GOOD WORKING ORDER
THE MAIN CONTRACTOR MUST SUPPLY AND
INSTALL ANSUL - FIRE SUPPRESSION SYSTEM
TO ALL CANOPIES IN KITCHEN AND COOKING
AREAS.
MAIN CONTRACTOR TO REACTIVATE AND
RECONECT THE FIRE ALARM TO THE VICTORIA
SQUARE SHOPPING CENTRE SYSTEM, AND TO
MAKE SURE THAT THE NEW SYSTEM COMPLYES
WITH THE VICTORIA SQUARE CENTRE FIRE
ALARM LATEST REQUIREMENTS.
COSMO RESTAURANT HOT WATER CAPACITY
REQUIREMENT IS 650 LITRE.
ON HANDOVER DATE, THE MAIN CONTRACTOR
MUST PROVIDE FULL TESTING CERTIFICATE OF
ALL EXISTING, REFURBISHED AND NEW M&E
SYSTEMS, WATER PRESSURE, GAS, CHLORINE
TESTING FOR PIPEWORKS, DRAINEGE
PRESSURE TEST.
EXTRA NOTES ADDED
G 01-08-12 NEW DRINK STORE ADDED BY THE BAR
EXISTING WALL IS TO BE
STRENGTHENED. ALLOW FOR
LINING THE WALL WITH
18-25MM PLY.
ALLOW FOR FULL
HEIGHT GLASS SET INSIDE A
STEEL CHANNEL AS PER
DRAWING
12mm TOUGHENED GLASS
PANELS SET INSIDE A METAL
CHANNEL, TOP & BOTTOM
FIXED.CORNER IS TO APPEAR
FRAMELES, UV BOND.
FULL HEIGHT 12mm
TOUGHENED GLASS PANELS
SET INSIDE A METAL CHANNEL,
TOP & BOTTOM FIXED.CORNER
IS TO APPEAR FRAMELESS, UV
BOND.
H 07-08-12 Glass panel at counter 6 made full height
ALLOW FOR PUMPING WASTE
FROM THE NEW THE HAND
WASH SINK THROUGH THE
FULL HEIGHT WALL
I 22-08-12 Kitchen door rearanged to suit Cosmo requirements
NEW DRAINAGE RUN
615
area lowered to suit building control requirements
J 04-09-12 drainage highlighted in blue and whb in the staff
All ceiling voids above MF ceiling, exceeding 800mm in
depth are to be fitted with smoke detectors.
FGFG
B
COCO
K 05-09-12 door 18 moved to suit Cosmo kitchen Requirements
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT

More Related Content

What's hot

4624-ZN01-MUR-401-Perspective Sketch
4624-ZN01-MUR-401-Perspective Sketch4624-ZN01-MUR-401-Perspective Sketch
4624-ZN01-MUR-401-Perspective SketchBHARAT CHOPRA
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15Antoinette Pope
 
Binder 161004 - 6500 san pablo ave, oakland (1)
Binder  161004 - 6500 san pablo ave, oakland (1)Binder  161004 - 6500 san pablo ave, oakland (1)
Binder 161004 - 6500 san pablo ave, oakland (1)E'ville Eye
 
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016Brooke Leigh
 
4633-ZN03-GLC-401-Perspective Sketch - Corridor
4633-ZN03-GLC-401-Perspective Sketch  - Corridor4633-ZN03-GLC-401-Perspective Sketch  - Corridor
4633-ZN03-GLC-401-Perspective Sketch - CorridorBHARAT CHOPRA
 
W1125 B THIRD FLOOR
W1125 B THIRD FLOORW1125 B THIRD FLOOR
W1125 B THIRD FLOORSimon Brooks
 
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Ian de Mink
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawingsGirish Ravikumar
 
Summary Presentation UpdateRev20
Summary Presentation UpdateRev20Summary Presentation UpdateRev20
Summary Presentation UpdateRev20Mohammed Khaled
 
Graceland Gardens Development
Graceland Gardens DevelopmentGraceland Gardens Development
Graceland Gardens DevelopmentCraigFensham
 

What's hot (20)

Plan addendum sheets
Plan addendum  sheetsPlan addendum  sheets
Plan addendum sheets
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
4624-ZN01-MUR-401-Perspective Sketch
4624-ZN01-MUR-401-Perspective Sketch4624-ZN01-MUR-401-Perspective Sketch
4624-ZN01-MUR-401-Perspective Sketch
 
Drafting and Design
Drafting and DesignDrafting and Design
Drafting and Design
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15
 
Binder 161004 - 6500 san pablo ave, oakland (1)
Binder  161004 - 6500 san pablo ave, oakland (1)Binder  161004 - 6500 san pablo ave, oakland (1)
Binder 161004 - 6500 san pablo ave, oakland (1)
 
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
BEHRMANN_BROOKE MEDICAL OFFICES ID 312 FALL 2016
 
15-106 3
15-106 315-106 3
15-106 3
 
House Dhanilal Submission
House Dhanilal SubmissionHouse Dhanilal Submission
House Dhanilal Submission
 
4633-ZN03-GLC-401-Perspective Sketch - Corridor
4633-ZN03-GLC-401-Perspective Sketch  - Corridor4633-ZN03-GLC-401-Perspective Sketch  - Corridor
4633-ZN03-GLC-401-Perspective Sketch - Corridor
 
Plan addendum sheets
Plan addendum sheetsPlan addendum sheets
Plan addendum sheets
 
W1125 B THIRD FLOOR
W1125 B THIRD FLOORW1125 B THIRD FLOOR
W1125 B THIRD FLOOR
 
Punch point
Punch pointPunch point
Punch point
 
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
 
Lowe's Carmel, IN
Lowe's   Carmel, INLowe's   Carmel, IN
Lowe's Carmel, IN
 
Summary Presentation UpdateRev20
Summary Presentation UpdateRev20Summary Presentation UpdateRev20
Summary Presentation UpdateRev20
 
Graceland Gardens Development
Graceland Gardens DevelopmentGraceland Gardens Development
Graceland Gardens Development
 
Gem residences
Gem residencesGem residences
Gem residences
 

Viewers also liked

Energias Renovables
Energias RenovablesEnergias Renovables
Energias Renovablespablertidri
 
Middot unit
Middot unitMiddot unit
Middot unitjoedver
 
Summary sor v3
Summary sor v3Summary sor v3
Summary sor v3Simon Teo
 
Informe del módulo: Gerencia de Proyectos de Tecnología Educativa
Informe del módulo: Gerencia de Proyectos de Tecnología EducativaInforme del módulo: Gerencia de Proyectos de Tecnología Educativa
Informe del módulo: Gerencia de Proyectos de Tecnología Educativalufeva66
 
Uuzf erasmus ss
Uuzf erasmus ssUuzf erasmus ss
Uuzf erasmus sshartech
 
quale valutazione * lezioni dalla sperimentazione ministeriale VSQ
quale valutazione * lezioni dalla sperimentazione ministeriale VSQquale valutazione * lezioni dalla sperimentazione ministeriale VSQ
quale valutazione * lezioni dalla sperimentazione ministeriale VSQFondazione Giovanni Agnelli
 
Mensageiro da-paz 1288-1994_007
Mensageiro da-paz 1288-1994_007Mensageiro da-paz 1288-1994_007
Mensageiro da-paz 1288-1994_007Daladier Lima
 
Hakikat metode pendidikan islam
Hakikat metode pendidikan islamHakikat metode pendidikan islam
Hakikat metode pendidikan islamMiftahul Fikriyah
 
Tecnologia de la informacion y las comunicacciones
Tecnologia de la informacion y las comunicaccionesTecnologia de la informacion y las comunicacciones
Tecnologia de la informacion y las comunicaccionesmarlontorresperez
 

Viewers also liked (16)

Energias Renovables
Energias RenovablesEnergias Renovables
Energias Renovables
 
Apartamento en Venta. Bosque Medina, Bogotá (Código: 89-M1222649)
Apartamento en Venta. Bosque Medina, Bogotá (Código: 89-M1222649)Apartamento en Venta. Bosque Medina, Bogotá (Código: 89-M1222649)
Apartamento en Venta. Bosque Medina, Bogotá (Código: 89-M1222649)
 
Roger schank
Roger schankRoger schank
Roger schank
 
Middot unit
Middot unitMiddot unit
Middot unit
 
Summary sor v3
Summary sor v3Summary sor v3
Summary sor v3
 
Informe del módulo: Gerencia de Proyectos de Tecnología Educativa
Informe del módulo: Gerencia de Proyectos de Tecnología EducativaInforme del módulo: Gerencia de Proyectos de Tecnología Educativa
Informe del módulo: Gerencia de Proyectos de Tecnología Educativa
 
Uuzf erasmus ss
Uuzf erasmus ssUuzf erasmus ss
Uuzf erasmus ss
 
Jornal crateús
Jornal crateúsJornal crateús
Jornal crateús
 
Open House
Open HouseOpen House
Open House
 
quale valutazione * lezioni dalla sperimentazione ministeriale VSQ
quale valutazione * lezioni dalla sperimentazione ministeriale VSQquale valutazione * lezioni dalla sperimentazione ministeriale VSQ
quale valutazione * lezioni dalla sperimentazione ministeriale VSQ
 
Jornada de hipertensión
Jornada de hipertensiónJornada de hipertensión
Jornada de hipertensión
 
El ciclo de gestion
El ciclo de gestionEl ciclo de gestion
El ciclo de gestion
 
Shag74
Shag74Shag74
Shag74
 
Mensageiro da-paz 1288-1994_007
Mensageiro da-paz 1288-1994_007Mensageiro da-paz 1288-1994_007
Mensageiro da-paz 1288-1994_007
 
Hakikat metode pendidikan islam
Hakikat metode pendidikan islamHakikat metode pendidikan islam
Hakikat metode pendidikan islam
 
Tecnologia de la informacion y las comunicacciones
Tecnologia de la informacion y las comunicaccionesTecnologia de la informacion y las comunicacciones
Tecnologia de la informacion y las comunicacciones
 

Similar to BD1230 Plans REV K.-03-01 Builders Works

NMohamed_PortfolioExtract
NMohamed_PortfolioExtractNMohamed_PortfolioExtract
NMohamed_PortfolioExtractNazima Mohamed
 
Sample CAD DWG_ROTHMAN_Nicole Eng
Sample CAD DWG_ROTHMAN_Nicole EngSample CAD DWG_ROTHMAN_Nicole Eng
Sample CAD DWG_ROTHMAN_Nicole EngNicole Eng
 
05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdfJovenalTuplano
 
15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan15RDM01-Academy Demo Plan
15RDM01-Academy Demo PlanKevin Stober
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309Altamash Khan
 
specif-dust-extraction-system.pdf
specif-dust-extraction-system.pdfspecif-dust-extraction-system.pdf
specif-dust-extraction-system.pdfSergioPereira229337
 
BD 1232 rev E 07-01 Licensing
BD 1232 rev E  07-01 LicensingBD 1232 rev E  07-01 Licensing
BD 1232 rev E 07-01 LicensingMaja Myall
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingMaja Myall
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINELee Yung Anchor
 
DW143-Ductwork-Leakage-Testing.pdf
DW143-Ductwork-Leakage-Testing.pdfDW143-Ductwork-Leakage-Testing.pdf
DW143-Ductwork-Leakage-Testing.pdfwrsconsultoria1
 
Architectural_plans-1.pdf
Architectural_plans-1.pdfArchitectural_plans-1.pdf
Architectural_plans-1.pdfSunnySmith10
 
ADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfDeniseMathre1
 

Similar to BD1230 Plans REV K.-03-01 Builders Works (20)

NMohamed_PortfolioExtract
NMohamed_PortfolioExtractNMohamed_PortfolioExtract
NMohamed_PortfolioExtract
 
Sample CAD DWG_ROTHMAN_Nicole Eng
Sample CAD DWG_ROTHMAN_Nicole EngSample CAD DWG_ROTHMAN_Nicole Eng
Sample CAD DWG_ROTHMAN_Nicole Eng
 
05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf05.18.2015 PLBG GUNER RESIDENCE.pdf
05.18.2015 PLBG GUNER RESIDENCE.pdf
 
POWER SYSTEM.pdf
POWER SYSTEM.pdfPOWER SYSTEM.pdf
POWER SYSTEM.pdf
 
15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
 
specif-dust-extraction-system.pdf
specif-dust-extraction-system.pdfspecif-dust-extraction-system.pdf
specif-dust-extraction-system.pdf
 
BD 1232 rev E 07-01 Licensing
BD 1232 rev E  07-01 LicensingBD 1232 rev E  07-01 Licensing
BD 1232 rev E 07-01 Licensing
 
IS252_PAA
IS252_PAAIS252_PAA
IS252_PAA
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
15-0478_WD_B
15-0478_WD_B15-0478_WD_B
15-0478_WD_B
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 Building
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE
 
DW143-Ductwork-Leakage-Testing.pdf
DW143-Ductwork-Leakage-Testing.pdfDW143-Ductwork-Leakage-Testing.pdf
DW143-Ductwork-Leakage-Testing.pdf
 
Architectural_plans-1.pdf
Architectural_plans-1.pdfArchitectural_plans-1.pdf
Architectural_plans-1.pdf
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
 
ADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdf
 

BD1230 Plans REV K.-03-01 Builders Works

  • 1. 20 21 22 23 24 9 10 11 12 13 14 15 16 up 1 2 3 4 6 8 5 7 19 18 17 RECEPTION LOBBY RECEPTIONRECEPTION 52" LCD screen wall mounted 46" LCD screen wall mounted 19 20 21 22 23 24 9 10 18 11 12 13 14 15 16 17 up 1 2 3 4 5 6 7 8 VOID FEMALE WC MALE WC FIRE EXIT CORRIDOR DISABLED WC CHEMICAL RISER BAR KITCHEN ESCAPE STAIRS DISABLED REFUGE ESCAPE STAIRS DISABLED REFUGE RISER STAFF WC 30FD SC D.12ex 30FD SC D.11ex 30FD SC D.09 ex 30FD SC D.02ex 30FD SC D.01ex D.13 ex DISHWASHING 30FD SC D.03ex 30FD SC D.04r CHAIRCupboard 30FD SC D.06new D.14ex D.16 D.17ex 30FD D.15 ex 30FD SC 30FD 4234 2200 2020 950 1200 3240 5232 1200 30FD SC 30FD D.05 new OFFICE Cold Room Drink Storage Dry Good Storage DOOR D.15A repositioned and made single swing FREEZER 30SC D.19 30SC D.20 EXISTING DRAINAGE CONNECTION WITHIN VOID EXISTING foul EXISTING foul FLOOR DRAIN FLOOR DRAIN GREASE TRAP FOUL FOUL exist FOUL FOUL FLOOR DRAIN FOUL existing foul drain is to be capped off FLOOR DRAIN FOUL EXISTING foul EXISTING foul EXISTING foul EXISTING foul EXISTING foul 4690 500 NEW FOUL existing foul drain is to be capped off EXISTING foul FOUL EXISTING foul CLNRS MOP SINK D.08ex REFUSE 30FD SC D.10new 30FD SC 2800 rampup150mm ramp up 150mm rampup150mm rampup150mm Drink Storage 30FD SC D.21new Existing risers REVISION DATE ITEM CONSTRUCTION DATE March 2012 COSMO, Victoria sq. Belfast DRAWN PROJECT PROJECT TITLE NUMBER shown SCALE REVISION CHECKED INFORMATION ONLY APPLICATION FOR LOCAL AUTHORITY TENDER TO THE CURRENT HEALTH AND SAFETY AT WORKS CONDITIONS AND LOCAL 12. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE OTHER RELEVANT 11. IN THE EVENT THAT DRAWING INFORMATION IS NOT THE SAME, AND IF THE AND ARE NOT TO BE SCALED FROM THE THE DRAWINGS. 7. ALL FINISHES ARE TO BE CARRIED OUT TO A HIGH STANDARD. 8. ANY DIMENSIONS ARE TO BE TAKEN FROM THE SETTING OUT PLAN ONLY THE PROPOSED PLAN IS TO BE READ AS CORRECT. THAT ANY BUILDING IS CARRIED OUT UNDER THE LOCAL AUTHORITY 13. COPYRIGHT OF BLENHEIM DESIGN. NOT TO BE REPRODUCED DESIGNER AND OR SUPERVISING OFFICER ARE UNAVAILABLE FOR COMMENT, AND CONSTRUCTION DETAILS AND OFFER ALTERNATIVES TO THE DESIGNER 10. THE CONTRACTOR IS TO CHECK AND APPRAISE ALL DESIGN SHOP FITTING 9. IT IS THE CONTRACTORS RESPONSIBILITY TO UNDER TAKE AND ENSURE FOR APPROVAL. CONSULTANTS DRAWINGS. AUTHORITY REGULATIONS. REQUIREMENTS. MANUFACTURERS RECOMMENDATIONS. DETAILS ARE REQUIRED TO BE APPROVED BY BLENHEIM DESIGN PRIOR TO BEFORE PROCEEDING WITH ANY WORK. ARE TO BE CLASS 1 OR EQUIVALENT). 6. CONTRACTOR TO PROVIDE A WORKING ENVIRONMENT WHICH CONFORMS 5. ALL SPECIFIED ITEMS ARE TO BE INSTALLED IN ACCORDANCE WITH THE 4. ALL REQUESTED DRAWINGS SHOWING FIXINGS AND CONSTRUCTION AND SPECIFICATIONS AND REPORT ANY DISCREPANCIES TO BLENHEIM DESIGN 2. CONTRACTOR MUST VERIFY ALL SITE DIMENSIONS, DRAWINGS, DETAILS REGULATIONS IN THE APPLICABLE COUNTRY (IN A RESTAURANT ALL FINISHES 1. ALL FINISHES ARE TO CONFORM TO THE REQUIRED CURRENT BUILDING COMMENCEMENT OF WORK. GENERAL NOTES BUILDERS WORKS DRAWING MM 03-01BD 1230 BLENHEIM DESIGN... 6 St Peters Place Brighton BN1 4SA t: 01273 380001 info@blenheimdesign.com PROPOSED FIRST FLOOR PLAN scale 1:100 L FG Maintained Emergency light Ceiling Mounted Smoke Detector Ceiling mounted Heat Detector Fire Door keep clear sign located on direction of opening side door Keep Door Locked Sign located on direction of opening side door Automatic fire and smoke detection system to be installed as L1 system Emergency Push pad with sign Wall mounted Fire blanket in container 2Kg wall mounted Carbon Dioxide Fire Extinguisher 9 litre wall mounted water fire extinguisher Manual Fire alarm call point location / break glass B FD 30 SC L FG PP EL Half hour fire door including intumescent smoke seal strips and positive overhead door closures, fire stops and sign: 'fire door keep shut' Vision panel in door comprising FR glass and hw beads in intrumescent paste Minimum size of vision panel 250mm dia. Emergency exit sign indicating direction of means of escape, slim line LED edge lit fittings Fire alarm sounder Visual Fire Alarm beacon within Disabled WC. Life systems contractor to ensure strict compliance to local and national criteria at design stage. The keys and symbols on this layout should be noted and modified if required. FIRE PROTECTION CO W CO W ALL MECHANICAL AND PLUMBING SERVICES INFORMATION BY APPOINTED MECHANICAL CONTRACTOR VP INTRODUCTION. THE ACCOMPANYING DRAWING PACKAGE OUTLINES THE DESIGN GUIDELINES TO BE UTILISED FOR THE PROPOSED FIT-OUT TO UNIT MSU02, LEVELS 02 AND 03 AT THE VICTORIA SQUARE SHOPPING CENTRE, BELFAST. IT IS INTENDED THAT THE STANDARDS SET BY THIS PACKAGE WILL BE INTERPRETED AND ADAPTED TO SUIT THE INTERIOR OF THE UNIT IN ACCORDANCE WITH THE LAYOUTS AND SHOPFRONT PLANS PROVIDED. IT SHALL BE THE MAIN FIT-OUT CONTRACTORS RESPONSIBILITY TO THOROUGHLY SURVEY THE SITE AND REPORT ANY DISCREPANCIES TO THE APPOINTED PROJECT MANAGER AND THE CLIENT PRIOR TO THE MANUFACTURE OF FIT-OUT COMPONENTS. SHOPFITTING CONTRACTOR IS TO ENSURE THAT ALL MATERIALS AND PRODUCTS USED THROUGHOUT THE PROPOSED WORKS COMPLY WITH THE CURRENT TECHNICAL BOOKLET UNDER THE NI REGULATIONS. PRODUCTS ARE USED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS. PRIOR TO COMMENCING WORK THE APPOINTED STRUCTURAL ENGINEER SHALL THOROUGHLY INSPECT AND CHECK THE SITE CONDITIONS AND STRUCTURAL STATE OF THE AREA IN ORDER TO ASSESS ITS CAPABILITY OF ACCEPTING ANY EXTRA LOADINGS IMPOSED BY THE NEW WORKS. WORK SHALL ONLY COMMENCE ONCE A SATISFACTORY REPORT HAS BEEN ISSUED TO THE CLIENT. CONTRACTOR SHALL ENSURE THAT ALL BUILDING AND FIT OUT WORKS ARE CARRIED OUT IN COMPLETE COMPLIANCE WITH THE CURRENT BUILDING REGULATIONS (NI) INCLUDING ALL AMENDMENTS AND ADDENDUMS, AND TO THE SATISFACTION OF THE LOCAL BUILDING INSPECTOR. THE CONTRACTOR SHALL ENSURE THAT ALL WORKS ARE CARRIED OUT TO THE COMPLETE SATISFACTION OF THE LOCAL AUTHORITY PLANNING OFFICERS WITH REGARD TO EXTERIOR FINISHES, SIGNAGE AND ANY CHANGE OF USE ISSUES WHICH MAY BE RELEVANT TO THE PROJECT. SHOPFITTING CONTRACTOR SHALL ENSURE THAT AT ALL TIMES THE FIT-OUT WORKS WILL BE CARRIED OUT TO THE APPROVAL OF THE LOCAL FIRE OFFICER AND THAT THE SITE LANDLORDS STIPULATIONS WILL ALSO BE MET. HEALTH AND SAFETY THE DESIGN DRAWINGS AND SCHEDULES WITHIN THIS DESIGN PACKAGE HAVE BEEN PREPARED AND ASSESSED BY BLENHEIM DESIGN CONSULTANTS AND ARE DEEMED FIT FOR PURPOSE WHEN IMPLEMENTED AS PART OF THE FIT-OUT OF UNIT MSU02, LEVELS 02 AND 03 AT THE VICTORIA SQUARE SHOPPING CENTRE, BELFAST. ANY VARIATION OR INTERPRETATION OF THE OUTLINE DESIGNS CONTAINED WITHIN THIS PACKAGE BY THIRD PARTY DESIGNERS, SHOULD THIS BE TO SUIT PARTICULAR SITE CIRCUMSTANCES OR METHODS OF CONSTRUCTION, WILL BE THE SPECIFIC RESPONSIBILITY OF THAT DESIGNER. VENTILATION RETAIL AREA TO BE VENTILATED TO COMPLY WITH THE STIPULATIONS OF TECHNICAL BOOKLET K, SECTION 3 OF THE CURRENT NI BUILDING REGULATIONS AIR CONDITIONING CASSETTES, DUCTWORK AND VENTS TO BE POSITIONED AS SPECIALIST CONTRACTORS DETAILS. FINAL DESIGN OF A.C. EQUIPMENT WILL DEPEND ON SITE CONDITIONS. SEE SEPARATE CONTRACTORS DRAWINGS FOR DETAILS AND SPEC. VENTILATION TO PUBLIC TOILET AREAS TO ACHIEVE 3 AIR CHANGES PER HR CONTINUOUSLY. STAFF TOILETS TO ACHIEVE 3 AIR CHANGES PER HR WITH 20 MIN. OVERUN CONTOLLED BY LIGHT SWITCH. ALL OF THE ABOVE WORKS ARE TO BE CARRIED OUT IN ACCORDANCE WITH THE NORTHERN IRELAND LATEST CODES OF PRACTICE AND TO THE SATISFACTION OF THE LOCAL AUTHORITY. LIGHTING ALL BACK OF THE HOUSE LIGHTING (KITCHEN, STORE ROOMS, CORRIDOR, OFFICE, STAFF ROOMS ETC) WILL HAVE LOW ENERGY LIGHT FITTINGS. SOME RESTAURANT LIGHTING (INSIDE THE NEW PENDANTS AND BACK OF THE BAR + FLOOR LAMPS) ARE TO BE LED AND LOW ENERGY LIGHT BULBS) SEE DRAWING 04-01 FOR DETAILS. DRAINAGE. ALL EXISTING LANDLORDS DRAINAGE SYSTEMS TO BE THOROUGHLY INSPECTED PRIOR TO COMMENCMENT OF WORKS. ANY NEW DRAINAGE FACILITIES TO BE CONNECTED INTO EXISTING MAINS DRAINAGE INSTALLATION. ABOVE GROUND DRAINAGE PIPEWORK GENERALLY SHALL BE UPVC CONSTRUCTION MIN. 50MM DIA. OR AS APPROPRIATE TO FACILTY AND LOCATION. TOILET DRAINAGE PIPEWORK TO BE MIN 100MM DIA. ALL BASINS AND OUTFLOWS FROM EQUIPMENT TO BE FITTED WITH 75MM DEEP SEAL BOTTLETRAPS. GREASE TRAPS TO BE FITTED TO KITCHEN OUTFLOWS WHERE APPROPRIATE. ALL TRAPS ARE TO BE REMOVABLE AND ACCESSIBLE FOR CLEANING. ALL WASTE PIPE RUNS ARE TO BE PROVIDED WITH ACCESSIBLE RODDING EYES TO ENABLE EACH RUN TO BE RODDED INDIVIDUALLY. ALL PIPES TO BE LAID TO MIN. 1 IN 40 FALL INSTALLATION TO COMPLY WITH THE STIPULATIONS OF DOCUMENT 'H' OF THE CURRENT BUILDING REGULATIONS. CONTRACTOR TO READ ALL OF THE ABOVE STIPULATIONS IN CONJUNCTION WITH THE PROJECT MANAGERS CONTRACT DOCUMENT AND THE LANDLORDS SHOPFITTING GUIDLINES. GENERAL FIT-OUT. PROJECT COMPRISES COMPLETE FIT-OUT OF UNIT MSU02, COSMO RESTAURANT. FIT-OUT WORKS WILL COMPRISE THE FOLLOWING:- 1. INSTALLATION OF NEW FASCIA SIGNAGE AND TO EXISTING SHOPFRONT OPENINGS. ALL TO COMPLY WITH LANDLORDS REQUIREMENTS 2. INSTALLATION OF NEW SHOPFRONT FINISHES TO THE EXISTING SHOPFRONT 3. INSTALLATION OF NEW BUFFET STYLE SERVERY AND BACK BAR EQUIPMENT TO POSITION SHOWN. ALL TO CLIENTS SPECIFICATIONS 4. INSTALLATION OF NEW KITCHEN EQUIPMENT AND STORAGE FACILITIES TO CLIENTS SPECIFICATION 5. INSTALLATION OF NEW FLOOR FINISHES TO SHOWN AREAS (DRW 05-01). 6. EXISTING CEILING AND LIGHTING ALTERATION TO LAYOUTS (DRW 04-01) 7. AMENDMENTS TO THE EXISTING HVAC EQUIPMENT AND AIR EXTRACTION FACILITIES AS REQUIRED TO ACCOMODATE NEW LAYOUT. 8. INSTALLATION OF NEW FURNITURE AND FITTINGS TO LAYOUTS SHOWN. 9. AMENDMENTS TO THE EXISTING ELECTRICAL AND DATA INSTALLATION TO ACCOMODATE THE NEW RESTAURANT LAYOUTS AND EQUIPMENT 10. DECORATION OF ALL AREAS AS PER SCHEDULES PROVIDED 11. ALTERATION TO THE EXISTING EMERGENCY LIGHTING, SPRINKLERS, SMOKE DETECTION AND FIRE ALARM SYSTEMS TO SUIT NEW RESTAURANT LAYOUT. ALL LINKED TO EXISTING SYSTEMS WITHIN THE BUILDING. FLOORS WHERE REQUIRED ALL NEW FLOOR FINISHES TO ACHIEVE CLASS 1 SURFACE SPREAD OF FLAME. WALLS / PARTITIONS WHERE REQUIRED, NEW PARTITION CONSTRUCTION GENERALLY TO BE MINIMUM HALF HOUR FIRE RESISTANT. PLASTERBOARD OVER METAL STUDWORK. WALL FINISHES GENERALLY TO PROVIDE CLASS 1 SURFACE SPREAD OF FLAME RATING IN PUBLIC AREAS AND CLASS 0 TO DEDICATED ESCAPE ROUTES. CEILINGS CEILINGS TO BE AS LAYOUTS PROVIDED. SEE DRW 04-01 FOR FURTHER DETAILS. CEILING MUST PROVIDE CLASS 1 SURFACE SPREAD OF FLAME RATING IN PUBLIC AREAS AND CLASS 0 TO DEDICATED ESCAPE ROUTES. ELECTRICAL ELECTRICAL INSTALLATION SHALL BE CARRIED OUT IN ACCORDANCE WITH THE 17TH EDITION OF THE IIE WIRING REGULATIONS THE INSTALLATION SHALL BE INSPECTED, TESTED AND CERTIFIED IN ACCORDANCE WITH NI BUILDING REGULATIONS AND COPIES OF THE CERTIFICATES ISSUED TO THE CLIENT AND THE LOCAL BUILDING CONTROL AUTHORITY. ALL SWITCHES AND SWITCH GEAR SHALL BE INSTALLED IN ACCESSIBLE POSITIONS TO COMPLY WITH THE REQUIREMENTS OF TECHNICAL BOOKLET R SECTION 5, NI REGULATIONS. THE INSTALLATION SHALL BE CARRIED IN ACCORDANCE WITH THE CLIENTS FUNCTIONAL BRIEF AND THE LAYOUTS PROPOSED ENTRANCE LEVEL FLOOR PLAN scale 1:100 EL EL EL NOTE: CONTRACTOR TO BE RESPONSIBLE FOR LOCATING AND PROTECTING ANY EXISTING SERVICES WHICH MAY BE WITHIN ANY PART OF THE STRUCTURE AFFECTED BY THE PROPOSALS. CONTRACTOR TO BE RESPONSIBLE FOR CONTACTING ALL PUBLIC UTILITIES AND UNDERGROUND SERVICE PROVIDERS PRIOR TO WORK COMMENCING, TO ENSURE THAT EXISTING SERVICES ARE NOT DAMAGED AND THAT HE IS AWARE OF THE LOCATION AND DEPTH OF ANY SERVICE/UTILITY WITHIN OR ADJACENT TO THE SITE. ONE LAYER OF 12.5mm WALLBOARD EACH SIDE OF 70MM GYPROC STUDS TO PROVIDE 1/2 hr FIRE RESISTANCE PARTITION DUTY : MEDIUM TO BS 5234 PARTS 1 & 2 1992. INSTALLED FROM STRUCTURAL FLOOR TO SLAB KEY TO WALL & FLOOR CONSTRUCTION EL EL EL EL EL EL EL EL ELEL EL EL EL EL EL EL B CO W CO W FGFG FGFG FGFG EL EL VP VP FG VP EL EL B COCO B COCO B COCO landlords door landlords door landlords door landlords door EL EL EL EL EL EL EL FGFG VP FGFG EL EL EL EL CO W CO W CO W CO W CO W CO W EXISTING DOOR OPENING TO BE CLOSED EXISTING PARTITION TO BE DEMOLISHED. EXISTING PARTITION AND FALSE COLUMN TO BE REMOVED EXISTING DOOR OPENING TO BE CLOSED B COCO Restaurant seated + 10 waiting customers TOTAL NUMBER OF OCCUPANCY + 28 STAFF FEMALE/DISABLED Ambulant Disabled customers: The Scheme has been designed to comply with Part R section 6 Toilet accomodation Clear Means of escape width required for 220 persons WHB's 1500mm Urinals WC's N/A 5 5 OCCUPANCY LEVELS Area Means of Escape Capacity for COSMO RESTAURANT Ocupancy rates are based upon current Building Regulations Whole demise in total 1025 sq m Total Restaurant and public toilet area Staff and kitchen area 796 sq m 229 sq m 300 MALE 3 2 3 272 One fully disabled toilet is situated on the first floor which can be reached by lift EXISTING LANDLORDS WALLS 1 HR FR EXISTING DOOR AND ASSOCIATED FITTINGS ARE TO BE REMOVED CO W CO W CO W CO W CO W CO W EXISTING WALL IS TO BE REMOVED AND NEW LOW WALL CONSTRUCTED USING 100X50mm GOOD QUALITY SOFTWOOD TIMBER AT 500MM CENTRES. STAIR SIDE OF THE WALL IS TO RECEIVE 12.5MM PLASTERBOARD, TAPED AND SKIMED READY TO RECEIVE FINAL WALL FINISH, WHILST COUNTER SIDE OF THE WALL IS TO RECEIVE 20MM MARBLE CONGLOMERATE. LOW WALL IS TO BE CAPPED OFF WITH 20MM MARBLE. WALL HEIGHT 1100MM FFL K A 23-03-12 FEATURE WALL AMENDED IN THE RECEPTION FD 30 SC landlords door EL NEW LOW WALL CONSTRUCTED USING 100X50mm GOOD QUALITY SOFTWOOD TIMBER AT 500MM CENTRES WITH 12.5MM PLASTERBOARD ON EACH SIDE, TAPED AND SKIMED READY TO RECEIVE FINAL WALL FINISH, LOW WALL IS TO BE CAPPED OFF WITH 20MM MARBLE. WALL HEIGHT 1100MM FFL FG VP FG VP EXISTING HALF HOUR FIRE RESISTING WALL CONSTRUCTION. ONE LAYER OF 12.5 PLASTERBOARD EACH SIDE OF 75MM METAL FRAME PARTITIONING. TAPED AND FULLY PLASTERED B 21-06-12 AMENDEMENTS MADE TO SUIT CLIENTS REQUIREMENTS & BELFAST BUILDING CONTROL EL VP VP VP C 26-06-12 BOH AMENDED PLASTERBOARD PARTITIONING TO BE REMOVED B COCO EL LL EMERGENCY LIGHTING SHOULD BE INSTALLED TO COMPLY WITH PART E & BS 5266-1 1999, BS 5266 - 7: 1999 (BS EN 1838: 1999) OR CP 1007:1955 PORTABLE FIRE FIGHTING EQUIPMENT TO BSEN3 STANDARD D 28-06-12 servery area amended and notes changed B CO W CO W E 02-07-12 TENDER CO W CO W F 18-07-12 BREAK GLASS ADDED AT LOBBY DOOR AND FIRE SYSTEM SHALL BE INSTALLED AND MAINTAINED IN COMPLIANCE WITH BS 5839 PART 1 202 CONTRACTOR TO ALLOW FOR 75MM DIA TRENCH TO BE CUT OUT IN THE FLOOR TO ALLOW FOR THREE PHASE POWER SUPPLY CABLE DIA.25MM, AS PER DRW 06-01 PASSENGER LIFT IS TO BE RESTORED TO GOOD WORKING ORDER THE MAIN CONTRACTOR MUST SUPPLY AND INSTALL ANSUL - FIRE SUPPRESSION SYSTEM TO ALL CANOPIES IN KITCHEN AND COOKING AREAS. MAIN CONTRACTOR TO REACTIVATE AND RECONECT THE FIRE ALARM TO THE VICTORIA SQUARE SHOPPING CENTRE SYSTEM, AND TO MAKE SURE THAT THE NEW SYSTEM COMPLYES WITH THE VICTORIA SQUARE CENTRE FIRE ALARM LATEST REQUIREMENTS. COSMO RESTAURANT HOT WATER CAPACITY REQUIREMENT IS 650 LITRE. ON HANDOVER DATE, THE MAIN CONTRACTOR MUST PROVIDE FULL TESTING CERTIFICATE OF ALL EXISTING, REFURBISHED AND NEW M&E SYSTEMS, WATER PRESSURE, GAS, CHLORINE TESTING FOR PIPEWORKS, DRAINEGE PRESSURE TEST. EXTRA NOTES ADDED G 01-08-12 NEW DRINK STORE ADDED BY THE BAR EXISTING WALL IS TO BE STRENGTHENED. ALLOW FOR LINING THE WALL WITH 18-25MM PLY. ALLOW FOR FULL HEIGHT GLASS SET INSIDE A STEEL CHANNEL AS PER DRAWING 12mm TOUGHENED GLASS PANELS SET INSIDE A METAL CHANNEL, TOP & BOTTOM FIXED.CORNER IS TO APPEAR FRAMELES, UV BOND. FULL HEIGHT 12mm TOUGHENED GLASS PANELS SET INSIDE A METAL CHANNEL, TOP & BOTTOM FIXED.CORNER IS TO APPEAR FRAMELESS, UV BOND. H 07-08-12 Glass panel at counter 6 made full height ALLOW FOR PUMPING WASTE FROM THE NEW THE HAND WASH SINK THROUGH THE FULL HEIGHT WALL I 22-08-12 Kitchen door rearanged to suit Cosmo requirements NEW DRAINAGE RUN 615 area lowered to suit building control requirements J 04-09-12 drainage highlighted in blue and whb in the staff All ceiling voids above MF ceiling, exceeding 800mm in depth are to be fitted with smoke detectors. FGFG B COCO K 05-09-12 door 18 moved to suit Cosmo kitchen Requirements PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT