SlideShare a Scribd company logo
1 of 1
Download to read offline
FB
FB
FB
REV No.DRAWING NO.
DATE:
DRAWN:
SCALE: 1:50 @ A1
SPB
31st MARCH 2015
REV DATE DESCRIPTION
PROJECT TITLE:
DRAWING TITLE:
THIRD FLOOR
UNDERFLOOR HEATING LAYOUT
10-13 RUSHWORTH STREET
LONDON
SE1 0RB
DJR Underfloor heating Ltd
Contracts Tel No 07721 735772
E mail design@warmadesigns.co.uk
STATUS
W1125 - 02
FOR CONSTRUCTION
Copyright - This drawing is the copyright of Warmadesigns Ltd and may not be copied or reproduced
completely or partially in any form without the written permission of Warmadesigns Ltd.
DRAWING NOTES:
THE PIPEWORK SIZE IS GENERIC AND NOT THAT OF A PARTICULAR MANUFACTURERS
RANGE, UNLESS SPECIFIED.
PRESSURE TESTING SHOULD BE CARRIED AFTER LAYING THE PIPEWORK. ALL UFH PIPE
TO FLOOR FIXING / SCREEDING. PRESSURE TEST SHOULD BE LEFT UNTIL CONNECTION TO
THE UNDERFLOOR HEATING PIPEWORK SHOULD NOT BE LAID BELOW A ROOM TEMPERATURE
OF 0`C. WE WOULD ALSO NOT RECOMMNED THAT SCREEDS ARE LAID WHERE THE ROOM
TEMPERATURE IS BELOW 5 degC.
CURING TIMES OF ALL SCREEDS SHOULD BE ON THE RECOMMENDATIONS OF THE SCREEDER.
ONCE THE CURING PERIOD HAS BEEN ACHIEVED, THE FLOW WATER SHOULD BE SET
AT APPROX 25 degC AND RAISED 5`C EVERY OTHER DAY UNTIL THE DESIGN FLOW
TEMPERATURE IS REACHED.. THIS PROCESS THEN SHOULD BE REPEATED BY REDUCING
THE FLOW TEMPERATURE BACK DOWN TO 25`C.
IF TIMBER FLOORING IS TO BE LAID UPON HEATED SCREEDS, THESCREED MUST BE CURED
AND CONDITIONED PREVIOUSLY TO MANUFACTURER'S SPECIFICATIONS. IT IS NOT
RECOMMENDED TO LAY NATURAL WOOD FLOOR COVERINGS THAT MAY HAVE A MOSITURE
CONTENT EXCEEDING 8-9% (BY VOLUME) AS THE RISK OF WARPING AND SHRINKAGE
DAMAGE WILL BECOME UNACCEPTABLE.
IF CARPET IS TO BE USED AS THE FINAL FLOOR COVERING IT IS IMPORTANT THAT
THE THERMAL RESISTANCE OF THE UNDERLAY DOES NOT EXCEEDA TOG RATING OF 1 - 1.5.
ANYTHING ABOVE THIS RATING WILL AFFECT THE HEAT OUTPUT FROM THE UNDERFLOOR
FAILURE TO COMPLY WITH THESE INSTRUCTIONS COULD RESULT IN THE DESIGN NOT
BEING MET OR EVEN DAMAGE TO THE FLOOR COVERINGS
FLOW RATES AND PRESSURE DROPS ON DRAWING GIVEN PRIOR TO INSTALLATION OF
SYSTEM ARE BASED UPON STANDARD DESIGNS AND CIBSE GUIDELINES..
AIR TEMPERATURE THERMOSTATS ARE TO BE POSITIONED APPROXIMATELY 1.6M FFL,
AND SHOULD AVOID DIRECT SUNLIGHT IF POSSIBLE..POSITIONS ON DRAWINGS ARE ONLY
ALL HOLES TO BE CUT PRIOR TO START OF UFH INSTALLATION. ALL HOLES TO BE
CUT ACCORDING TO DIMENSIONS SHOWN ON SCHEDULE, AND 50MM (OR THICKNESS OF
INSULATION) FROM BASE OF WALL.
THE TEST HAS BEEN COMPLETED.
SHOULD NOT EXCEED 1 BAR (AIR) OR BETWEEN 3 AND 4 BAR (WATER) PRIOR
PIPEWORK:
SCREED FLOORS:
WE WOULD RECOMMEND THAT SCREEDS SHOULD BE COVERED IF HEAVY EQUIPMENT IS
TO BE USED, SUCH AS MOBILE TOWERS, OR VEHICLED TRAFFIC.
WOODEN FLOORS:
CARPETS AND UNDERLAYS:
HEATING SYSTEM.. CONFIRMATION FROM THE MANUCTURER / INSTALLER SHOULD IS
RECOMMENDED.
UNDERFLOOR HEATING :
ALL UNDERFLOOR CIRCUITS ARE INDICATIVE LAYOUTS AND WILL BE SUBJECT TO SITE
CONDITIONS. IT IS HIGHLY RECOMMENDED THAT SHOULD FIXINGS BE REQUIRED WITHIN THE
SCREED, THAT THEY ARE MARKED OUT PRIOR TO THE UNDERFLOOR HEATING.
INSTALLATION.
BUILDERS WORK:
CONTROLS:
INDICATIVE AND EXACT MARKING OUT SHOULD BE CARRIED OUT ON SITE.
ALL FITTING AND WIRING SHOULD BE THE RESPONSIBILITY OF THE SITE ELECTRICIAN.
ALL WIRING DIAGRAMS ARE CORRECT AT TIME OF DRAWING ISSUE, BUT IT IS THE
RESPONSIBILITY OF THE ELECTRICIAN TO MAKE SURE ALL ITEMS ARE CORRECTLY INSTALLED.
Design Tel No 07770 454539
Required depth from wall inc. mounting bracket - 170mm. Overall height of unit, excluding
MANIFOLD SET F
MANIFOLD SET
FLOW
TEMP C
FLOW RATE
l/s
PRESSURE
DROP kpa MANIFOLD SET HANDING
LEFT
35 25 0.07 23
PIPE
PORT CIRCUIT SIZE p LENGTH
FLOW
RATE
THERMO
STAT
No No mm mm m l/m
1 17 150 90 1.5 T21
2 17 150 80 1.5 T21
3 17 200 85 1.5 T19
4 17 200 80 1.0 T20
MANIFOLD SET E
MANIFOLD SET
FLOW
TEMP C
FLOW RATE
l/s
PRESSURE
DROP kpa MANIFOLD SET HANDING
LEFT
35 25 0.11 23
PIPE
PORT CIRCUIT SIZE CENTRE LENGTH
FLOW
RATE
THERMO
STAT
No No mm mm m l/m
1 17 200/150 150 1.3 T15
2 17 200/150 100 0.7 T15
3 17 250 35 1.3 T16
4 17 200 90 2.4 T17
5 17 200 130 1.0 T18
CONTROL ITEMS:
15 No DANFOSS RET2000 DIGITAL THERMOSTATS
17 No GIACOMINI R473 ACTUATORS
5 No DANFOSS 240v FH-WC WIRING CENTRES
MANIFOLD SET H
P
FLOW
TEMP C
FLOW RATE
l/s
PRESSURE
DROP kpa MANIFOLD SET HANDING
LEFT
35 25 0.03 5
PIPE
PORT CIRCUIT SIZE p LENGTH
FLOW
RATE
THERMO
STAT
No No mm mm m l/m
1 17 200 30 0.4 T26
2 17 200 70 0.8 T26
MANIFOLD SET G
MANIFOLD SET
FLOW
TEMP C
FLOW RATE
l/s
PRESSURE
DROP kpa MANIFOLD SET HANDING
LEFT
35 25 0.10 22
PIPE
PORT CIRCUIT SIZE CENTRE LENGTH
FLOW
RATE
THERMO
STAT
No No mm mm m l/m
1 17 200 60 1.0 T22
2 17 200 120 2.4 T23
3 17 250 40 1.2 T24
4 17 200/150 100 0.7 T25
5 17 200/150 140 1.3 T25
Manifold set G
Manifold set H
Manifold set F
Manifold set J
Manifold set E
1
2
N
L
TA
TWA TWA TWA
ELECTRONICS
L B L P
N L
MAINS SUPPLY
DOUBLE POLE
FUSED SPUR
240/220 3AMP
L
N
E
ECODAN
IT IS THE DUTY OF THE ELECTRICAL CONTRACTOR TO ENSURE THAT
THE WIRING IS CORRECT AND ALL FITTING.IS NOT THE RESPONSIBILITY
OF DJR LTD
DANFOSS FHWC CONTROL UNIT
RET2000
TA
TA
TA
1
2
N
L
TA
TA
TA
TA
1
2
N
L
TA
TA
TA
TA
1
2
N
L
TA
TA
TA
TA
1
2
N
L
TA
TA
TA
TA
1
2
N
L
TA
TA
TA
TA
MAINS PUMP
VOLT FREE
COMNONC L N
RET2000
COMNONC L N
L N E
KITCHEN AND LIVING ROOM
IF BUILDERS HOLES ARE REQUIRED THEN THESE SHALL BE HIGHLIGHTED WITHIN DRAWING
INSULATION BY OTHERS
WALL
FLOOR COVERING
BORDER INSULATION
SCREED BY OTHERS
UFH PIPEWORK BY DJR LTD
SUB FLOOR
VAPOUR BARRIER BY OTHERS
SOLID FLOOR TACKER SYSTEM
BY OTHERS
MANIFOLD SET J
MANIFOLD SET
FLOW
TEMP C
FLOW RATE
l/s
PRESSURE
DROP kpa MANIFOLD SET HANDING
LEFT
35 25 0.02 3
PIPE
PORT CIRCUIT SIZE p LENGTH
FLOW
RATE
THERMO
STAT
No No mm mm m l/m
1 17 200 70 0.8 T27
2 17 200 30 0.4 T27
Green hatched areas, pipework to be insulated
275
A 14/4/15 FLOW RATES ADDED AND MANIFOLDS ET CHANGED
B
825
12
775
11
725
10
675
9
625
8
575
7
525
6
475
5
425
4
375
3
325
2
LENGTH
MANIFOLD SIZE
R553 DISTRIBUTION MANIFOLD - 6 Port manifold shown as an example
Supply
(22mm)
Return
(22mm)
Ports numbered LEFT to RIGHT
600mmFROMTOPOFINSULATION
B 13/5/15 PIPEWORK CENTRES REVISED
Pipework thrown at glazed areas
Pipework thrown at glazed areas

More Related Content

What's hot

Kalahari Safaris Operations Base
Kalahari Safaris Operations BaseKalahari Safaris Operations Base
Kalahari Safaris Operations BaseGrant Hepburn
 
Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Shin Kameyama
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksMaja Myall
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
Joinsun wall switch socket catalog
Joinsun wall switch socket catalogJoinsun wall switch socket catalog
Joinsun wall switch socket catalogAnna lu
 
Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15Sean Roper
 
NMohamed_PortfolioExtract
NMohamed_PortfolioExtractNMohamed_PortfolioExtract
NMohamed_PortfolioExtractNazima Mohamed
 
I-35 & Lindsey Bridge_A_Piers & Caps
I-35 & Lindsey Bridge_A_Piers & CapsI-35 & Lindsey Bridge_A_Piers & Caps
I-35 & Lindsey Bridge_A_Piers & CapsChristopher Vaughn
 

What's hot (15)

Kalahari Safaris Operations Base
Kalahari Safaris Operations BaseKalahari Safaris Operations Base
Kalahari Safaris Operations Base
 
Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders Works
 
15-106 3
15-106 315-106 3
15-106 3
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
working drawings
working drawingsworking drawings
working drawings
 
KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
 
CHECK LIST FOR ( HVAC ) WORK & SHOP DRAWING
CHECK LIST FOR ( HVAC ) WORK & SHOP DRAWINGCHECK LIST FOR ( HVAC ) WORK & SHOP DRAWING
CHECK LIST FOR ( HVAC ) WORK & SHOP DRAWING
 
18785-00
18785-0018785-00
18785-00
 
Joinsun wall switch socket catalog
Joinsun wall switch socket catalogJoinsun wall switch socket catalog
Joinsun wall switch socket catalog
 
Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15
 
NMohamed_PortfolioExtract
NMohamed_PortfolioExtractNMohamed_PortfolioExtract
NMohamed_PortfolioExtract
 
Portfolio 2016
Portfolio 2016Portfolio 2016
Portfolio 2016
 
Lesoma Farm Houses
Lesoma Farm HousesLesoma Farm Houses
Lesoma Farm Houses
 
I-35 & Lindsey Bridge_A_Piers & Caps
I-35 & Lindsey Bridge_A_Piers & CapsI-35 & Lindsey Bridge_A_Piers & Caps
I-35 & Lindsey Bridge_A_Piers & Caps
 

Viewers also liked

Business analysis | Gabrielle Rusignuolo
Business analysis | Gabrielle RusignuoloBusiness analysis | Gabrielle Rusignuolo
Business analysis | Gabrielle RusignuoloGabrielle Rusignuolo
 
Which country is the biggest terrorist in the world, (support your answer by ...
Which country is the biggest terrorist in the world, (support your answer by ...Which country is the biggest terrorist in the world, (support your answer by ...
Which country is the biggest terrorist in the world, (support your answer by ...moz4
 
Magazine cover build up
Magazine cover build upMagazine cover build up
Magazine cover build upDanHall1996
 
Infographic: The next generation of Middle East Hotels
Infographic: The next generation of Middle East HotelsInfographic: The next generation of Middle East Hotels
Infographic: The next generation of Middle East HotelsIconsulthotels
 
Bridge Financing Platform
Bridge Financing PlatformBridge Financing Platform
Bridge Financing PlatformLove Funding
 
5 Facts to Know About Same Day ACH
5 Facts to Know About Same Day ACH5 Facts to Know About Same Day ACH
5 Facts to Know About Same Day ACHCSI Solutions
 

Viewers also liked (9)

GEMA
GEMAGEMA
GEMA
 
Business analysis | Gabrielle Rusignuolo
Business analysis | Gabrielle RusignuoloBusiness analysis | Gabrielle Rusignuolo
Business analysis | Gabrielle Rusignuolo
 
Which country is the biggest terrorist in the world, (support your answer by ...
Which country is the biggest terrorist in the world, (support your answer by ...Which country is the biggest terrorist in the world, (support your answer by ...
Which country is the biggest terrorist in the world, (support your answer by ...
 
Magazine cover build up
Magazine cover build upMagazine cover build up
Magazine cover build up
 
U3 aa3 geometria
U3 aa3 geometriaU3 aa3 geometria
U3 aa3 geometria
 
Infographic: The next generation of Middle East Hotels
Infographic: The next generation of Middle East HotelsInfographic: The next generation of Middle East Hotels
Infographic: The next generation of Middle East Hotels
 
Bridge Financing Platform
Bridge Financing PlatformBridge Financing Platform
Bridge Financing Platform
 
5 Facts to Know About Same Day ACH
5 Facts to Know About Same Day ACH5 Facts to Know About Same Day ACH
5 Facts to Know About Same Day ACH
 
Rectal prolapse
Rectal prolapseRectal prolapse
Rectal prolapse
 

Similar to W1125 B THIRD FLOOR

Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush LodgeGrant Hepburn
 
Service ariston kelapa gading 0813-8024-0365
Service ariston kelapa gading 0813-8024-0365Service ariston kelapa gading 0813-8024-0365
Service ariston kelapa gading 0813-8024-0365komporariston
 
Instalasi water heater 081313462267
Instalasi water heater 081313462267Instalasi water heater 081313462267
Instalasi water heater 081313462267pasangwaterheater
 
Service ariston serpong 0813-8024-0365
Service ariston serpong 0813-8024-0365Service ariston serpong 0813-8024-0365
Service ariston serpong 0813-8024-0365komporariston
 
PSG WPSR Generator Refurbishment
PSG WPSR Generator RefurbishmentPSG WPSR Generator Refurbishment
PSG WPSR Generator RefurbishmentJamie Emmart
 
0102070018-21+24.PDF
0102070018-21+24.PDF0102070018-21+24.PDF
0102070018-21+24.PDFJamie Emmart
 
Ap 23 7900 001 (package air conditioning units) 2011 1206
Ap 23 7900 001 (package air conditioning units) 2011 1206Ap 23 7900 001 (package air conditioning units) 2011 1206
Ap 23 7900 001 (package air conditioning units) 2011 1206Dr. Haider alsenisal
 
ADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfDeniseMathre1
 

Similar to W1125 B THIRD FLOOR (20)

15-0478_WD_B
15-0478_WD_B15-0478_WD_B
15-0478_WD_B
 
Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
20150811-Allied Telecom
20150811-Allied Telecom20150811-Allied Telecom
20150811-Allied Telecom
 
STAINES AP-PLANS PHDD C2-A0 HVAC MECH
STAINES AP-PLANS PHDD C2-A0 HVAC  MECHSTAINES AP-PLANS PHDD C2-A0 HVAC  MECH
STAINES AP-PLANS PHDD C2-A0 HVAC MECH
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Service ariston kelapa gading 0813-8024-0365
Service ariston kelapa gading 0813-8024-0365Service ariston kelapa gading 0813-8024-0365
Service ariston kelapa gading 0813-8024-0365
 
Instalasi water heater 081313462267
Instalasi water heater 081313462267Instalasi water heater 081313462267
Instalasi water heater 081313462267
 
Service ariston serpong 0813-8024-0365
Service ariston serpong 0813-8024-0365Service ariston serpong 0813-8024-0365
Service ariston serpong 0813-8024-0365
 
Working drawings sample
Working drawings sampleWorking drawings sample
Working drawings sample
 
Diagrama Calisto T1
Diagrama Calisto T1Diagrama Calisto T1
Diagrama Calisto T1
 
Ptc magmeter manual
Ptc magmeter manualPtc magmeter manual
Ptc magmeter manual
 
Process Piping.pdf
Process Piping.pdfProcess Piping.pdf
Process Piping.pdf
 
Modelo 1
Modelo 1Modelo 1
Modelo 1
 
PSG WPSR Generator Refurbishment
PSG WPSR Generator RefurbishmentPSG WPSR Generator Refurbishment
PSG WPSR Generator Refurbishment
 
0102070018-21+24.PDF
0102070018-21+24.PDF0102070018-21+24.PDF
0102070018-21+24.PDF
 
Thermopack ppt
Thermopack pptThermopack ppt
Thermopack ppt
 
Ap 23 7900 001 (package air conditioning units) 2011 1206
Ap 23 7900 001 (package air conditioning units) 2011 1206Ap 23 7900 001 (package air conditioning units) 2011 1206
Ap 23 7900 001 (package air conditioning units) 2011 1206
 
ADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdfADU Plan 5 - 1200 sqft (1).pdf
ADU Plan 5 - 1200 sqft (1).pdf
 
Distributor ariston tangerang 082113812149
Distributor ariston tangerang 082113812149Distributor ariston tangerang 082113812149
Distributor ariston tangerang 082113812149
 

W1125 B THIRD FLOOR

  • 1. FB FB FB REV No.DRAWING NO. DATE: DRAWN: SCALE: 1:50 @ A1 SPB 31st MARCH 2015 REV DATE DESCRIPTION PROJECT TITLE: DRAWING TITLE: THIRD FLOOR UNDERFLOOR HEATING LAYOUT 10-13 RUSHWORTH STREET LONDON SE1 0RB DJR Underfloor heating Ltd Contracts Tel No 07721 735772 E mail design@warmadesigns.co.uk STATUS W1125 - 02 FOR CONSTRUCTION Copyright - This drawing is the copyright of Warmadesigns Ltd and may not be copied or reproduced completely or partially in any form without the written permission of Warmadesigns Ltd. DRAWING NOTES: THE PIPEWORK SIZE IS GENERIC AND NOT THAT OF A PARTICULAR MANUFACTURERS RANGE, UNLESS SPECIFIED. PRESSURE TESTING SHOULD BE CARRIED AFTER LAYING THE PIPEWORK. ALL UFH PIPE TO FLOOR FIXING / SCREEDING. PRESSURE TEST SHOULD BE LEFT UNTIL CONNECTION TO THE UNDERFLOOR HEATING PIPEWORK SHOULD NOT BE LAID BELOW A ROOM TEMPERATURE OF 0`C. WE WOULD ALSO NOT RECOMMNED THAT SCREEDS ARE LAID WHERE THE ROOM TEMPERATURE IS BELOW 5 degC. CURING TIMES OF ALL SCREEDS SHOULD BE ON THE RECOMMENDATIONS OF THE SCREEDER. ONCE THE CURING PERIOD HAS BEEN ACHIEVED, THE FLOW WATER SHOULD BE SET AT APPROX 25 degC AND RAISED 5`C EVERY OTHER DAY UNTIL THE DESIGN FLOW TEMPERATURE IS REACHED.. THIS PROCESS THEN SHOULD BE REPEATED BY REDUCING THE FLOW TEMPERATURE BACK DOWN TO 25`C. IF TIMBER FLOORING IS TO BE LAID UPON HEATED SCREEDS, THESCREED MUST BE CURED AND CONDITIONED PREVIOUSLY TO MANUFACTURER'S SPECIFICATIONS. IT IS NOT RECOMMENDED TO LAY NATURAL WOOD FLOOR COVERINGS THAT MAY HAVE A MOSITURE CONTENT EXCEEDING 8-9% (BY VOLUME) AS THE RISK OF WARPING AND SHRINKAGE DAMAGE WILL BECOME UNACCEPTABLE. IF CARPET IS TO BE USED AS THE FINAL FLOOR COVERING IT IS IMPORTANT THAT THE THERMAL RESISTANCE OF THE UNDERLAY DOES NOT EXCEEDA TOG RATING OF 1 - 1.5. ANYTHING ABOVE THIS RATING WILL AFFECT THE HEAT OUTPUT FROM THE UNDERFLOOR FAILURE TO COMPLY WITH THESE INSTRUCTIONS COULD RESULT IN THE DESIGN NOT BEING MET OR EVEN DAMAGE TO THE FLOOR COVERINGS FLOW RATES AND PRESSURE DROPS ON DRAWING GIVEN PRIOR TO INSTALLATION OF SYSTEM ARE BASED UPON STANDARD DESIGNS AND CIBSE GUIDELINES.. AIR TEMPERATURE THERMOSTATS ARE TO BE POSITIONED APPROXIMATELY 1.6M FFL, AND SHOULD AVOID DIRECT SUNLIGHT IF POSSIBLE..POSITIONS ON DRAWINGS ARE ONLY ALL HOLES TO BE CUT PRIOR TO START OF UFH INSTALLATION. ALL HOLES TO BE CUT ACCORDING TO DIMENSIONS SHOWN ON SCHEDULE, AND 50MM (OR THICKNESS OF INSULATION) FROM BASE OF WALL. THE TEST HAS BEEN COMPLETED. SHOULD NOT EXCEED 1 BAR (AIR) OR BETWEEN 3 AND 4 BAR (WATER) PRIOR PIPEWORK: SCREED FLOORS: WE WOULD RECOMMEND THAT SCREEDS SHOULD BE COVERED IF HEAVY EQUIPMENT IS TO BE USED, SUCH AS MOBILE TOWERS, OR VEHICLED TRAFFIC. WOODEN FLOORS: CARPETS AND UNDERLAYS: HEATING SYSTEM.. CONFIRMATION FROM THE MANUCTURER / INSTALLER SHOULD IS RECOMMENDED. UNDERFLOOR HEATING : ALL UNDERFLOOR CIRCUITS ARE INDICATIVE LAYOUTS AND WILL BE SUBJECT TO SITE CONDITIONS. IT IS HIGHLY RECOMMENDED THAT SHOULD FIXINGS BE REQUIRED WITHIN THE SCREED, THAT THEY ARE MARKED OUT PRIOR TO THE UNDERFLOOR HEATING. INSTALLATION. BUILDERS WORK: CONTROLS: INDICATIVE AND EXACT MARKING OUT SHOULD BE CARRIED OUT ON SITE. ALL FITTING AND WIRING SHOULD BE THE RESPONSIBILITY OF THE SITE ELECTRICIAN. ALL WIRING DIAGRAMS ARE CORRECT AT TIME OF DRAWING ISSUE, BUT IT IS THE RESPONSIBILITY OF THE ELECTRICIAN TO MAKE SURE ALL ITEMS ARE CORRECTLY INSTALLED. Design Tel No 07770 454539 Required depth from wall inc. mounting bracket - 170mm. Overall height of unit, excluding MANIFOLD SET F MANIFOLD SET FLOW TEMP C FLOW RATE l/s PRESSURE DROP kpa MANIFOLD SET HANDING LEFT 35 25 0.07 23 PIPE PORT CIRCUIT SIZE p LENGTH FLOW RATE THERMO STAT No No mm mm m l/m 1 17 150 90 1.5 T21 2 17 150 80 1.5 T21 3 17 200 85 1.5 T19 4 17 200 80 1.0 T20 MANIFOLD SET E MANIFOLD SET FLOW TEMP C FLOW RATE l/s PRESSURE DROP kpa MANIFOLD SET HANDING LEFT 35 25 0.11 23 PIPE PORT CIRCUIT SIZE CENTRE LENGTH FLOW RATE THERMO STAT No No mm mm m l/m 1 17 200/150 150 1.3 T15 2 17 200/150 100 0.7 T15 3 17 250 35 1.3 T16 4 17 200 90 2.4 T17 5 17 200 130 1.0 T18 CONTROL ITEMS: 15 No DANFOSS RET2000 DIGITAL THERMOSTATS 17 No GIACOMINI R473 ACTUATORS 5 No DANFOSS 240v FH-WC WIRING CENTRES MANIFOLD SET H P FLOW TEMP C FLOW RATE l/s PRESSURE DROP kpa MANIFOLD SET HANDING LEFT 35 25 0.03 5 PIPE PORT CIRCUIT SIZE p LENGTH FLOW RATE THERMO STAT No No mm mm m l/m 1 17 200 30 0.4 T26 2 17 200 70 0.8 T26 MANIFOLD SET G MANIFOLD SET FLOW TEMP C FLOW RATE l/s PRESSURE DROP kpa MANIFOLD SET HANDING LEFT 35 25 0.10 22 PIPE PORT CIRCUIT SIZE CENTRE LENGTH FLOW RATE THERMO STAT No No mm mm m l/m 1 17 200 60 1.0 T22 2 17 200 120 2.4 T23 3 17 250 40 1.2 T24 4 17 200/150 100 0.7 T25 5 17 200/150 140 1.3 T25 Manifold set G Manifold set H Manifold set F Manifold set J Manifold set E 1 2 N L TA TWA TWA TWA ELECTRONICS L B L P N L MAINS SUPPLY DOUBLE POLE FUSED SPUR 240/220 3AMP L N E ECODAN IT IS THE DUTY OF THE ELECTRICAL CONTRACTOR TO ENSURE THAT THE WIRING IS CORRECT AND ALL FITTING.IS NOT THE RESPONSIBILITY OF DJR LTD DANFOSS FHWC CONTROL UNIT RET2000 TA TA TA 1 2 N L TA TA TA TA 1 2 N L TA TA TA TA 1 2 N L TA TA TA TA 1 2 N L TA TA TA TA 1 2 N L TA TA TA TA MAINS PUMP VOLT FREE COMNONC L N RET2000 COMNONC L N L N E KITCHEN AND LIVING ROOM IF BUILDERS HOLES ARE REQUIRED THEN THESE SHALL BE HIGHLIGHTED WITHIN DRAWING INSULATION BY OTHERS WALL FLOOR COVERING BORDER INSULATION SCREED BY OTHERS UFH PIPEWORK BY DJR LTD SUB FLOOR VAPOUR BARRIER BY OTHERS SOLID FLOOR TACKER SYSTEM BY OTHERS MANIFOLD SET J MANIFOLD SET FLOW TEMP C FLOW RATE l/s PRESSURE DROP kpa MANIFOLD SET HANDING LEFT 35 25 0.02 3 PIPE PORT CIRCUIT SIZE p LENGTH FLOW RATE THERMO STAT No No mm mm m l/m 1 17 200 70 0.8 T27 2 17 200 30 0.4 T27 Green hatched areas, pipework to be insulated 275 A 14/4/15 FLOW RATES ADDED AND MANIFOLDS ET CHANGED B 825 12 775 11 725 10 675 9 625 8 575 7 525 6 475 5 425 4 375 3 325 2 LENGTH MANIFOLD SIZE R553 DISTRIBUTION MANIFOLD - 6 Port manifold shown as an example Supply (22mm) Return (22mm) Ports numbered LEFT to RIGHT 600mmFROMTOPOFINSULATION B 13/5/15 PIPEWORK CENTRES REVISED Pipework thrown at glazed areas Pipework thrown at glazed areas