SlideShare a Scribd company logo
1 of 1
Download to read offline
N.T.S.
P E R S P E C T I V E S K E T C H - CORRIDOR1
-
DRAWING, FIXED FINISHES AND FF & E
REFERENCES ZONE - 01
PS30.06.16- DETAILED DESIGN SUBMISSION
TENDER SUBMISSION - DRAWINGS
RE-ISSUED WITH NO AMENDMENTSPS13.10.16-
LIFT LOBBY AND CORRIDOR
1st TO 9th LEVEL
PERSPECTIVE SKETCH - CORRIDOR
NTS MP TENDER SUBMISSION
ZN03 GLC 401 -
Drawing No.
Drawing Title:
Project Name:
Revision
Client:
NOTES:
THE COPYRIGHT OF THIS DRAWING REMAINS WITH LWDG AND MAY NOT
BE REPRODUCED WITHOUT PRIOR WRITTEN CONSENT.
ALL PROPOSED WORKS TO BE CARRIED OUT IN ACCORDANCE WITH
LWDG'S 'FIXED FINISHES , FF & E AND TECHNICAL SPECIFICATIONS AND
SCHEDULES FOR INTERIOR WORKS.
ALL CONSULTANTS , SPECIALISTS , SUPPLIERS , MANUFACTURERS , ETC.
MUST REFER TO GENERAL LAYOUT PLANS FOR ACTUAL LOCATIONS OF
GUEST ROOMS , SUITES , APARTMENTS , ETC. AND ESPECIALLY THE
'HANDING' OF THE DIFFERENT TYPES.
ALL CONSULTANTS AS LISTED BELOW SHOULD CO-ORDINATE THEIR
DESIGNS IN ACCORDANCE WITH LWD DESIGN DRAWINGS.
- STRUCTURAL DESIGN.
- MEP SERVICES.
- LIGHTING.
- KITCHEN.
- AUDIO VISUAL.
- I.T.
- ACOUSTIC.
- LIFE AND SAFETY
READ THIS DRAWING IN CONJUNCTION WITH ALL CONSULTANT'S AND
SPECIALIST'S DRAWINGS , DETAILS , SCHEDULES AND SPECIFICATIONS.
IT IS THE RESPONSIBILITY OF THE LOCAL CONSULTANT / LEAD ARCHITECT
TO ENSURE THAT THE DESIGN COMPLIES WITH LOCAL REGULATIONS OR
INTERANATIONAL STANDARDS AS REQUIRED.
FIT OUT CONTRACTOR MUST PREPARE FULL SHOP DRAWINGS AND
MATERIALS SUBMITTALS WITH SPECIFIC REFERENCE TO SITE CONDITIONS
FOR LWDG APPROVAL PRIOR TO MANUFACTURE INSTALLATION AND
SHOULD BE CO-ORDINATED WITH ALL CONSULTANTS INVOLVED.
FIGURED DIMENSIONS ARE TO BE USED IN PREFERENCE TO SCALES.
ALL DIMENSIONS MUST BE CHECKED AGAINST SITE SIZES BEFORE
COMMENCING WORK.
FIT OUT CONTRACTOR MUST APPLY FIRE RETARDANT LACQUER TO ALL
MILLWORKS AND VENEERED PANELS WITH A PRODUCT WHICH IS
COMPLIANT TO ALL CIVIL DEFENSE REQUIREMENTS FOR SURFACE SPREAD
OF FLAME. CONTRACTOR MUST SUBMIT APPROVED CERTIFICATES ON
COMPLETION OF THE WORKS ON SITE.
Block Wall Structural Wall
Existing Wall Stud Wall
WALL LEGEND :
Zone Reference
Elevation Reference
Reference to
Elevation Drawing.
Zone Reference
Drawing No.
Detail No.
Reference to
Detail Drawing.
DETAIL
Zone Reference
Reference to
Door Schedule.
Index Reference
Reference to F.F & E
Specification.
LEGEND :
Index Reference
Reference to Finishes
Specification.
Drawing No.
Door no.
Door Type
02.001
001
D1
.01
01.001
01.001
1
A
LOCATION PLAN
NumberRoom No.Project No. Zone No.
4633
BASED ON ARCHITECTURE ISSUE
BASED ON MEP ISSUE
BASED ON LIGHTING CONSULTANT ISSUE
BASED ON KITCHEN CONSULTANT ISSUE
03.05.2016
DD.MM.YYYY
DD.MM.YYYY
DD.MM.YYYY
Ex Wall / Demolish
Consultant:
descriptiondate namerev.
Status:Drawn By:Scale:
GRAND HYATT HOTEL
DUBAI, UAE
GRAND HYATT HOTEL

More Related Content

What's hot

BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksMaja Myall
 
SECTIONAL_DRAWING_SECTION_HH
SECTIONAL_DRAWING_SECTION_HHSECTIONAL_DRAWING_SECTION_HH
SECTIONAL_DRAWING_SECTION_HHamroz S.K
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CARichard Clark
 
Project Charter Completed
Project Charter CompletedProject Charter Completed
Project Charter CompletedDonny Olson
 
BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2
BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2
BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2MAHENDRAN Mahalingam
 
Project management plan
Project management planProject management plan
Project management planDonny Olson
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignmentashleyyeap
 
MSD-B223-MDL-MS-GF-ENT-DR-D01-701.0_R0-MAIN DOOR
MSD-B223-MDL-MS-GF-ENT-DR-D01-701.0_R0-MAIN DOORMSD-B223-MDL-MS-GF-ENT-DR-D01-701.0_R0-MAIN DOOR
MSD-B223-MDL-MS-GF-ENT-DR-D01-701.0_R0-MAIN DOORHari Prasad
 

What's hot (13)

Forge Water House
Forge Water HouseForge Water House
Forge Water House
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders Works
 
SECTIONAL_DRAWING_SECTION_HH
SECTIONAL_DRAWING_SECTION_HHSECTIONAL_DRAWING_SECTION_HH
SECTIONAL_DRAWING_SECTION_HH
 
6320 restrooms
6320 restrooms6320 restrooms
6320 restrooms
 
Farmers PDC Chino CA
Farmers PDC Chino CAFarmers PDC Chino CA
Farmers PDC Chino CA
 
Plan addendum sheets
Plan addendum sheetsPlan addendum sheets
Plan addendum sheets
 
Project Charter Completed
Project Charter CompletedProject Charter Completed
Project Charter Completed
 
BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2
BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2
BASEMENT FIRE PROTECTION LAYOUT-SECTOR-2
 
Project management plan
Project management planProject management plan
Project management plan
 
working res
working resworking res
working res
 
Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
MSD-B223-MDL-MS-GF-ENT-DR-D01-701.0_R0-MAIN DOOR
MSD-B223-MDL-MS-GF-ENT-DR-D01-701.0_R0-MAIN DOORMSD-B223-MDL-MS-GF-ENT-DR-D01-701.0_R0-MAIN DOOR
MSD-B223-MDL-MS-GF-ENT-DR-D01-701.0_R0-MAIN DOOR
 

Similar to 4633-ZN03-GLC-401-Perspective Sketch - Corridor

Architectural_plans-1.pdf
Architectural_plans-1.pdfArchitectural_plans-1.pdf
Architectural_plans-1.pdfSunnySmith10
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309Altamash Khan
 
Working drawing of the civil engineering building, Faculty of Engineering, Ta...
Working drawing of the civil engineering building, Faculty of Engineering, Ta...Working drawing of the civil engineering building, Faculty of Engineering, Ta...
Working drawing of the civil engineering building, Faculty of Engineering, Ta...Ahmed El Ashry
 
Final Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaFinal Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaNIZAM ISMAIL
 
15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan15RDM01-Academy Demo Plan
15RDM01-Academy Demo PlanKevin Stober
 
01 architectural cycle 2 interactive
01 architectural   cycle 2 interactive01 architectural   cycle 2 interactive
01 architectural cycle 2 interactivesergencad sergencad
 
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEduardo H. Pare
 
ALPHA BIM_SẢN PHẦM KHÓA HỌC REVIT KẾT CẤU NHÀ CAO TẦNG
ALPHA BIM_SẢN PHẦM KHÓA HỌC REVIT KẾT CẤU NHÀ CAO TẦNGALPHA BIM_SẢN PHẦM KHÓA HỌC REVIT KẾT CẤU NHÀ CAO TẦNG
ALPHA BIM_SẢN PHẦM KHÓA HỌC REVIT KẾT CẤU NHÀ CAO TẦNGDangLeQuan1
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar Sheikh
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
Charlottes vineyard 14 b detailed area plan
Charlottes vineyard 14 b detailed area planCharlottes vineyard 14 b detailed area plan
Charlottes vineyard 14 b detailed area planEllenbrook
 

Similar to 4633-ZN03-GLC-401-Perspective Sketch - Corridor (20)

lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
 
lot106_plans.pdf
lot106_plans.pdflot106_plans.pdf
lot106_plans.pdf
 
Architectural_plans-1.pdf
Architectural_plans-1.pdfArchitectural_plans-1.pdf
Architectural_plans-1.pdf
 
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
HA1522_TN20&21_Pennyworth_Option 01_DD_Final set_160309
 
Working drawing of the civil engineering building, Faculty of Engineering, Ta...
Working drawing of the civil engineering building, Faculty of Engineering, Ta...Working drawing of the civil engineering building, Faculty of Engineering, Ta...
Working drawing of the civil engineering building, Faculty of Engineering, Ta...
 
Final Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur IndiaFinal Docket For VH ,AT Kolhapur India
Final Docket For VH ,AT Kolhapur India
 
house plans
house planshouse plans
house plans
 
15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan15RDM01-Academy Demo Plan
15RDM01-Academy Demo Plan
 
IS252_PAA
IS252_PAAIS252_PAA
IS252_PAA
 
01 architectural cycle 2 interactive
01 architectural   cycle 2 interactive01 architectural   cycle 2 interactive
01 architectural cycle 2 interactive
 
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTIONEDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
EDUARDO H. PARE 10 METHODS TO AVOID WATER LEAKAGES ON BUILDING CONSTRUCTION
 
General structural notes
General structural notesGeneral structural notes
General structural notes
 
Yee s2&s2
Yee s2&s2Yee s2&s2
Yee s2&s2
 
ALPHA BIM_SẢN PHẦM KHÓA HỌC REVIT KẾT CẤU NHÀ CAO TẦNG
ALPHA BIM_SẢN PHẦM KHÓA HỌC REVIT KẾT CẤU NHÀ CAO TẦNGALPHA BIM_SẢN PHẦM KHÓA HỌC REVIT KẾT CẤU NHÀ CAO TẦNG
ALPHA BIM_SẢN PHẦM KHÓA HỌC REVIT KẾT CẤU NHÀ CAO TẦNG
 
Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
20 01 00
20 01 0020 01 00
20 01 00
 
Mazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-ConstructionMazhar SheikhMECH ENGR-CV- 2016-Construction
Mazhar SheikhMECH ENGR-CV- 2016-Construction
 
KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
Charlottes vineyard 14 b detailed area plan
Charlottes vineyard 14 b detailed area planCharlottes vineyard 14 b detailed area plan
Charlottes vineyard 14 b detailed area plan
 

4633-ZN03-GLC-401-Perspective Sketch - Corridor

  • 1. N.T.S. P E R S P E C T I V E S K E T C H - CORRIDOR1 - DRAWING, FIXED FINISHES AND FF & E REFERENCES ZONE - 01 PS30.06.16- DETAILED DESIGN SUBMISSION TENDER SUBMISSION - DRAWINGS RE-ISSUED WITH NO AMENDMENTSPS13.10.16- LIFT LOBBY AND CORRIDOR 1st TO 9th LEVEL PERSPECTIVE SKETCH - CORRIDOR NTS MP TENDER SUBMISSION ZN03 GLC 401 - Drawing No. Drawing Title: Project Name: Revision Client: NOTES: THE COPYRIGHT OF THIS DRAWING REMAINS WITH LWDG AND MAY NOT BE REPRODUCED WITHOUT PRIOR WRITTEN CONSENT. ALL PROPOSED WORKS TO BE CARRIED OUT IN ACCORDANCE WITH LWDG'S 'FIXED FINISHES , FF & E AND TECHNICAL SPECIFICATIONS AND SCHEDULES FOR INTERIOR WORKS. ALL CONSULTANTS , SPECIALISTS , SUPPLIERS , MANUFACTURERS , ETC. MUST REFER TO GENERAL LAYOUT PLANS FOR ACTUAL LOCATIONS OF GUEST ROOMS , SUITES , APARTMENTS , ETC. AND ESPECIALLY THE 'HANDING' OF THE DIFFERENT TYPES. ALL CONSULTANTS AS LISTED BELOW SHOULD CO-ORDINATE THEIR DESIGNS IN ACCORDANCE WITH LWD DESIGN DRAWINGS. - STRUCTURAL DESIGN. - MEP SERVICES. - LIGHTING. - KITCHEN. - AUDIO VISUAL. - I.T. - ACOUSTIC. - LIFE AND SAFETY READ THIS DRAWING IN CONJUNCTION WITH ALL CONSULTANT'S AND SPECIALIST'S DRAWINGS , DETAILS , SCHEDULES AND SPECIFICATIONS. IT IS THE RESPONSIBILITY OF THE LOCAL CONSULTANT / LEAD ARCHITECT TO ENSURE THAT THE DESIGN COMPLIES WITH LOCAL REGULATIONS OR INTERANATIONAL STANDARDS AS REQUIRED. FIT OUT CONTRACTOR MUST PREPARE FULL SHOP DRAWINGS AND MATERIALS SUBMITTALS WITH SPECIFIC REFERENCE TO SITE CONDITIONS FOR LWDG APPROVAL PRIOR TO MANUFACTURE INSTALLATION AND SHOULD BE CO-ORDINATED WITH ALL CONSULTANTS INVOLVED. FIGURED DIMENSIONS ARE TO BE USED IN PREFERENCE TO SCALES. ALL DIMENSIONS MUST BE CHECKED AGAINST SITE SIZES BEFORE COMMENCING WORK. FIT OUT CONTRACTOR MUST APPLY FIRE RETARDANT LACQUER TO ALL MILLWORKS AND VENEERED PANELS WITH A PRODUCT WHICH IS COMPLIANT TO ALL CIVIL DEFENSE REQUIREMENTS FOR SURFACE SPREAD OF FLAME. CONTRACTOR MUST SUBMIT APPROVED CERTIFICATES ON COMPLETION OF THE WORKS ON SITE. Block Wall Structural Wall Existing Wall Stud Wall WALL LEGEND : Zone Reference Elevation Reference Reference to Elevation Drawing. Zone Reference Drawing No. Detail No. Reference to Detail Drawing. DETAIL Zone Reference Reference to Door Schedule. Index Reference Reference to F.F & E Specification. LEGEND : Index Reference Reference to Finishes Specification. Drawing No. Door no. Door Type 02.001 001 D1 .01 01.001 01.001 1 A LOCATION PLAN NumberRoom No.Project No. Zone No. 4633 BASED ON ARCHITECTURE ISSUE BASED ON MEP ISSUE BASED ON LIGHTING CONSULTANT ISSUE BASED ON KITCHEN CONSULTANT ISSUE 03.05.2016 DD.MM.YYYY DD.MM.YYYY DD.MM.YYYY Ex Wall / Demolish Consultant: descriptiondate namerev. Status:Drawn By:Scale: GRAND HYATT HOTEL DUBAI, UAE GRAND HYATT HOTEL