2. Objectives of MRL
Manufacturing Status & Risk Evaluation
Production Readiness
Manufacturing Management
Production Capability
3. MRL
An assessment of manufacturing readiness
A structured evaluation of
Technology
Component
Manufacturing process
Weapon system or subsystem
4. MRL - Purpose
is performed to:
Define current level of manufacturing maturity
Identify maturity shortfalls and associated costs and risks
Provide the basis for manufacturing maturation and risk
management
5. MRL – for Whom
A document provides best practices
assessments of manufacturing readiness.
Acquisition program managers & managers
Technology development projects
Pre-systems acquisition
Technology demonstration projects
intending to transition directly to the acquisition community
People - involved in conducting the assessments.
6. Considerations in acquisition strategies
An analysis of the capabilities
Requirements for
efficient manufacture
Use of advanced
manufacturing technology
processes, and systems
Practicable, the use of contract solicitations
Methods to encourage investment
7. MRL – Knowledge
demonstrated control of the manufacturing process
the collection of statistical process control data
demonstrated control and capability of other critical
processes
8. MRL – Assessment
is performed to:
Define current level of
manufacturing maturity
Identify maturity shortfalls and associated costs and risks
Provide the basis for manufacturing maturation and risk
management (planning, identification, analysis,
mitigation, implementation, and tracking)
9. MRL
MRL 1: Basic Manufacturing Implications Identified
MRL 2: Manufacturing Concepts Identified
MRL 3: Manufacturing Proof of Concept Developed
MRL 4: Capability to produce the technology in a
laboratory environment
MRL 5: Capability to produce prototype components in a
production
relevant environment
10. MRL
MRL 6: Capability to produce a prototype system or subsystem in a
production relevant environment
MRL 7: Capability to produce systems, subsystems, or components in a
production representative environment
MRL 8: Pilot line capability demonstrated; Ready to begin Low Rate Initial
Production
MRL 9: Low rate production demonstrated; Capability in place to begin
Full Rate Production
MRL 10: Full Rate Production demonstrated and lean production practices
in place