Manufacturing Readiness Level
Objectives of MRL
 Manufacturing Status & Risk Evaluation
 Production Readiness
 Manufacturing Management
 Production Capability
MRL
 An assessment of manufacturing readiness
 A structured evaluation of
 Technology
 Component
 Manufacturing process
 Weapon system or subsystem
MRL - Purpose
is performed to:
 Define current level of manufacturing maturity
 Identify maturity shortfalls and associated costs and risks
 Provide the basis for manufacturing maturation and risk
management
MRL – for Whom
 A document provides best practices
 assessments of manufacturing readiness.
 Acquisition program managers & managers
 Technology development projects
 Pre-systems acquisition
 Technology demonstration projects
 intending to transition directly to the acquisition community
 People - involved in conducting the assessments.
Considerations in acquisition strategies
 An analysis of the capabilities
 Requirements for
efficient manufacture
 Use of advanced
manufacturing technology
processes, and systems
 Practicable, the use of contract solicitations
 Methods to encourage investment
MRL – Knowledge
 demonstrated control of the manufacturing process
 the collection of statistical process control data
 demonstrated control and capability of other critical
processes
MRL – Assessment
is performed to:
 Define current level of
manufacturing maturity
 Identify maturity shortfalls and associated costs and risks
 Provide the basis for manufacturing maturation and risk
management (planning, identification, analysis,
mitigation, implementation, and tracking)
MRL
MRL 1: Basic Manufacturing Implications Identified
MRL 2: Manufacturing Concepts Identified
MRL 3: Manufacturing Proof of Concept Developed
MRL 4: Capability to produce the technology in a
laboratory environment
MRL 5: Capability to produce prototype components in a
production
relevant environment
MRL
MRL 6: Capability to produce a prototype system or subsystem in a
production relevant environment
MRL 7: Capability to produce systems, subsystems, or components in a
production representative environment
MRL 8: Pilot line capability demonstrated; Ready to begin Low Rate Initial
Production
MRL 9: Low rate production demonstrated; Capability in place to begin
Full Rate Production
MRL 10: Full Rate Production demonstrated and lean production practices
in place
Learning to be continued...

More Related Content

What's hot

Use of bio coagulant in wastewater treatment_Kanoj Neeraj_2013
Use of bio coagulant in wastewater treatment_Kanoj Neeraj_2013Use of bio coagulant in wastewater treatment_Kanoj Neeraj_2013
Use of bio coagulant in wastewater treatment_Kanoj Neeraj_2013India Water Portal
 
Industrial Waste Management
Industrial Waste ManagementIndustrial Waste Management
Industrial Waste ManagementAlok Ranjan
 
Iso 9000 2000 Internal Audits
Iso 9000 2000 Internal AuditsIso 9000 2000 Internal Audits
Iso 9000 2000 Internal Auditsahmad bassiouny
 
Seminar on GREEN MANUFACTURING
Seminar on GREEN MANUFACTURINGSeminar on GREEN MANUFACTURING
Seminar on GREEN MANUFACTURINGMilind Pelagade
 
Green manufacturing
Green manufacturingGreen manufacturing
Green manufacturingsalman jafar
 
13 benefits of adopting ISO 14001
13 benefits of adopting ISO 1400113 benefits of adopting ISO 14001
13 benefits of adopting ISO 14001Genesys Training
 
Recovery And Recycling of Municipal Solid Waste
Recovery And Recycling of Municipal Solid WasteRecovery And Recycling of Municipal Solid Waste
Recovery And Recycling of Municipal Solid WasteAnkit Jain
 
Audit Competence
Audit CompetenceAudit Competence
Audit Competencespschandel
 
common effluent treatment plant
common effluent treatment plantcommon effluent treatment plant
common effluent treatment plantJay Kumar
 
Cleaner Production Management
Cleaner Production Management Cleaner Production Management
Cleaner Production Management Ambika Thakur
 
Innovation in Facilities Management
Innovation in Facilities ManagementInnovation in Facilities Management
Innovation in Facilities Managementchrisdpayne
 
MSW to Energy Using Thermal Conversion Process
MSW to Energy Using Thermal Conversion ProcessMSW to Energy Using Thermal Conversion Process
MSW to Energy Using Thermal Conversion ProcessMd Tanvir Alam
 
Scaling Strategies with Stirred Single-Use Bioreactors from Bench to Clinical...
Scaling Strategies with Stirred Single-Use Bioreactors from Bench to Clinical...Scaling Strategies with Stirred Single-Use Bioreactors from Bench to Clinical...
Scaling Strategies with Stirred Single-Use Bioreactors from Bench to Clinical...MilliporeSigma
 
Life Cycle Assessment
 Life  Cycle Assessment   Life  Cycle Assessment
Life Cycle Assessment AMIT BUNDELA
 

What's hot (20)

Use of bio coagulant in wastewater treatment_Kanoj Neeraj_2013
Use of bio coagulant in wastewater treatment_Kanoj Neeraj_2013Use of bio coagulant in wastewater treatment_Kanoj Neeraj_2013
Use of bio coagulant in wastewater treatment_Kanoj Neeraj_2013
 
Industrial Waste Management
Industrial Waste ManagementIndustrial Waste Management
Industrial Waste Management
 
Iso 9000 2000 Internal Audits
Iso 9000 2000 Internal AuditsIso 9000 2000 Internal Audits
Iso 9000 2000 Internal Audits
 
Seminar on GREEN MANUFACTURING
Seminar on GREEN MANUFACTURINGSeminar on GREEN MANUFACTURING
Seminar on GREEN MANUFACTURING
 
Green manufacturing
Green manufacturingGreen manufacturing
Green manufacturing
 
Iso 14001
Iso 14001Iso 14001
Iso 14001
 
13 benefits of adopting ISO 14001
13 benefits of adopting ISO 1400113 benefits of adopting ISO 14001
13 benefits of adopting ISO 14001
 
Green manufacturing
Green manufacturing Green manufacturing
Green manufacturing
 
Recovery And Recycling of Municipal Solid Waste
Recovery And Recycling of Municipal Solid WasteRecovery And Recycling of Municipal Solid Waste
Recovery And Recycling of Municipal Solid Waste
 
Audit Competence
Audit CompetenceAudit Competence
Audit Competence
 
common effluent treatment plant
common effluent treatment plantcommon effluent treatment plant
common effluent treatment plant
 
Cleaner Production Management
Cleaner Production Management Cleaner Production Management
Cleaner Production Management
 
Innovation in Facilities Management
Innovation in Facilities ManagementInnovation in Facilities Management
Innovation in Facilities Management
 
Effluent treatment process
Effluent treatment processEffluent treatment process
Effluent treatment process
 
Source reduction of wastes - Municipal Solid Wastes
Source reduction of wastes - Municipal Solid WastesSource reduction of wastes - Municipal Solid Wastes
Source reduction of wastes - Municipal Solid Wastes
 
MSW to Energy Using Thermal Conversion Process
MSW to Energy Using Thermal Conversion ProcessMSW to Energy Using Thermal Conversion Process
MSW to Energy Using Thermal Conversion Process
 
Scaling Strategies with Stirred Single-Use Bioreactors from Bench to Clinical...
Scaling Strategies with Stirred Single-Use Bioreactors from Bench to Clinical...Scaling Strategies with Stirred Single-Use Bioreactors from Bench to Clinical...
Scaling Strategies with Stirred Single-Use Bioreactors from Bench to Clinical...
 
Life Cycle Assessment
 Life  Cycle Assessment   Life  Cycle Assessment
Life Cycle Assessment
 
Impact of robotics on occupational safety and health
Impact of robotics on occupational safety and healthImpact of robotics on occupational safety and health
Impact of robotics on occupational safety and health
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 

Similar to MRL - 1.pptx

Failure Mode Effect Analysis in Engineering Failures
Failure Mode Effect Analysis in Engineering FailuresFailure Mode Effect Analysis in Engineering Failures
Failure Mode Effect Analysis in Engineering FailuresPadmanabhan Krishnan
 
Quality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short ReviewQuality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short ReviewIRJET Journal
 
A Comprehensive Overview Of Techniquess For Measuring System Readiness Final ...
A Comprehensive Overview Of Techniquess For Measuring System Readiness Final ...A Comprehensive Overview Of Techniquess For Measuring System Readiness Final ...
A Comprehensive Overview Of Techniquess For Measuring System Readiness Final ...jbci
 
Model Risk Management: Using an infinitely scalable stress testing platform f...
Model Risk Management: Using an infinitely scalable stress testing platform f...Model Risk Management: Using an infinitely scalable stress testing platform f...
Model Risk Management: Using an infinitely scalable stress testing platform f...QuantUniversity
 
Quality by Design Course Preview
Quality by Design Course PreviewQuality by Design Course Preview
Quality by Design Course PreviewInvensis Learning
 
Petronas Project Oversight and Corporate Governance System Requirements
Petronas Project Oversight and Corporate Governance System RequirementsPetronas Project Oversight and Corporate Governance System Requirements
Petronas Project Oversight and Corporate Governance System RequirementsDarren Surin, BSc, MBA, PMP, ITIL
 
Petronas Project Governance and Management Systems deal
Petronas Project Governance and Management Systems dealPetronas Project Governance and Management Systems deal
Petronas Project Governance and Management Systems dealD. Ong
 
Sslean Validation 20070622
Sslean Validation 20070622Sslean Validation 20070622
Sslean Validation 20070622jancrielaard
 
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideOverview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideProPharma Group
 
PythonQuants conference - QuantUniversity presentation - Stress Testing in th...
PythonQuants conference - QuantUniversity presentation - Stress Testing in th...PythonQuants conference - QuantUniversity presentation - Stress Testing in th...
PythonQuants conference - QuantUniversity presentation - Stress Testing in th...QuantUniversity
 
9.process improvement chapter 9
9.process improvement chapter 99.process improvement chapter 9
9.process improvement chapter 9Warui Maina
 
Pwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learnedPwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learnedAvi Kumar
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect AnalysisNafis Ahmad
 
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo
 
ProductCamp Amsterdam Session 9 Rudy Katchow
ProductCamp Amsterdam Session 9 Rudy KatchowProductCamp Amsterdam Session 9 Rudy Katchow
ProductCamp Amsterdam Session 9 Rudy KatchowProductCamp Amsterdam
 

Similar to MRL - 1.pptx (20)

SEI CMMI presentation
SEI CMMI presentationSEI CMMI presentation
SEI CMMI presentation
 
Failure Mode Effect Analysis in Engineering Failures
Failure Mode Effect Analysis in Engineering FailuresFailure Mode Effect Analysis in Engineering Failures
Failure Mode Effect Analysis in Engineering Failures
 
Quality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short ReviewQuality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short Review
 
A Comprehensive Overview Of Techniquess For Measuring System Readiness Final ...
A Comprehensive Overview Of Techniquess For Measuring System Readiness Final ...A Comprehensive Overview Of Techniquess For Measuring System Readiness Final ...
A Comprehensive Overview Of Techniquess For Measuring System Readiness Final ...
 
t map brief
t map brieft map brief
t map brief
 
Model Risk Management: Using an infinitely scalable stress testing platform f...
Model Risk Management: Using an infinitely scalable stress testing platform f...Model Risk Management: Using an infinitely scalable stress testing platform f...
Model Risk Management: Using an infinitely scalable stress testing platform f...
 
Quality by Design Course Preview
Quality by Design Course PreviewQuality by Design Course Preview
Quality by Design Course Preview
 
Petronas Project Oversight and Corporate Governance System Requirements
Petronas Project Oversight and Corporate Governance System RequirementsPetronas Project Oversight and Corporate Governance System Requirements
Petronas Project Oversight and Corporate Governance System Requirements
 
Petronas Project Governance and Management Systems deal
Petronas Project Governance and Management Systems dealPetronas Project Governance and Management Systems deal
Petronas Project Governance and Management Systems deal
 
30420130403005
3042013040300530420130403005
30420130403005
 
Sslean Validation 20070622
Sslean Validation 20070622Sslean Validation 20070622
Sslean Validation 20070622
 
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideOverview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
 
PythonQuants conference - QuantUniversity presentation - Stress Testing in th...
PythonQuants conference - QuantUniversity presentation - Stress Testing in th...PythonQuants conference - QuantUniversity presentation - Stress Testing in th...
PythonQuants conference - QuantUniversity presentation - Stress Testing in th...
 
9.process improvement chapter 9
9.process improvement chapter 99.process improvement chapter 9
9.process improvement chapter 9
 
Pwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learnedPwc systems-implementation-lessons-learned
Pwc systems-implementation-lessons-learned
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
Analytical Risk-based and Specification-based Testing - Bui Duy Tam
Analytical Risk-based and Specification-based Testing - Bui Duy TamAnalytical Risk-based and Specification-based Testing - Bui Duy Tam
Analytical Risk-based and Specification-based Testing - Bui Duy Tam
 
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
 
ProductCamp Amsterdam Session 9 Rudy Katchow
ProductCamp Amsterdam Session 9 Rudy KatchowProductCamp Amsterdam Session 9 Rudy Katchow
ProductCamp Amsterdam Session 9 Rudy Katchow
 

Recently uploaded

OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 

Recently uploaded (20)

9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 

MRL - 1.pptx

  • 2. Objectives of MRL  Manufacturing Status & Risk Evaluation  Production Readiness  Manufacturing Management  Production Capability
  • 3. MRL  An assessment of manufacturing readiness  A structured evaluation of  Technology  Component  Manufacturing process  Weapon system or subsystem
  • 4. MRL - Purpose is performed to:  Define current level of manufacturing maturity  Identify maturity shortfalls and associated costs and risks  Provide the basis for manufacturing maturation and risk management
  • 5. MRL – for Whom  A document provides best practices  assessments of manufacturing readiness.  Acquisition program managers & managers  Technology development projects  Pre-systems acquisition  Technology demonstration projects  intending to transition directly to the acquisition community  People - involved in conducting the assessments.
  • 6. Considerations in acquisition strategies  An analysis of the capabilities  Requirements for efficient manufacture  Use of advanced manufacturing technology processes, and systems  Practicable, the use of contract solicitations  Methods to encourage investment
  • 7. MRL – Knowledge  demonstrated control of the manufacturing process  the collection of statistical process control data  demonstrated control and capability of other critical processes
  • 8. MRL – Assessment is performed to:  Define current level of manufacturing maturity  Identify maturity shortfalls and associated costs and risks  Provide the basis for manufacturing maturation and risk management (planning, identification, analysis, mitigation, implementation, and tracking)
  • 9. MRL MRL 1: Basic Manufacturing Implications Identified MRL 2: Manufacturing Concepts Identified MRL 3: Manufacturing Proof of Concept Developed MRL 4: Capability to produce the technology in a laboratory environment MRL 5: Capability to produce prototype components in a production relevant environment
  • 10. MRL MRL 6: Capability to produce a prototype system or subsystem in a production relevant environment MRL 7: Capability to produce systems, subsystems, or components in a production representative environment MRL 8: Pilot line capability demonstrated; Ready to begin Low Rate Initial Production MRL 9: Low rate production demonstrated; Capability in place to begin Full Rate Production MRL 10: Full Rate Production demonstrated and lean production practices in place
  • 11. Learning to be continued...