SlideShare a Scribd company logo
1 of 8
Download to read offline
NAME: MOHAMMAD ADNAN SUJAN
PROFESSIONAL ENGINEER (WA, United State of America - 43263)
BOARD OF ENGINEERS MALAYSIA (BEM 16163)
CONTACT NUMBER: +6017 223 8673
ADDRESS: B17-03A AMPANG PRIMA CONDO JALAN WAWASAN 2/5 B.B. AMPANG 68000 SELANGOR
EMAIL: adnansujan@gmail.com
SUMMARY
Professional and Registered Engineer in Malaysia (BEM 16163) and the USA (43263) with sixteen (16) years
of professional working experience. The scope of works included design in the onshore and offshore (fixed
and mobile) oil and gas production facilities, oil storage and pipeline facilities, design of the electrical power
plants, waste water treatment facility, nuclear waste treatment process facility and manufacturing test and
support in an electronic factory.
INDUSTRY / LOCATION PROJECT PHASES SCOPE of PROJECT
 Onshore
- Power Generation:
USA, Mexico, England,
Thailand and Malaysia
- Water Treatment Plant:
Trinidad and Tobago
- Oil and Gas
(Midstream): Malaysia
and Iraq
 Offshore (Upstream)
- Oil and Gas: Brazil,
Iraq, Iran, Malaysia,
Syria, Vietnam
 Proposal
 Conceptual Engineering
 Front End Engineering
Design
 Detail Design
 Construction and Hook
Up Support
 Pre-commissioning &
Site Testing
Supervision
 EPCC:
- Electrical Power Plants, Onshore
- Nuclear Waste Treatment Plant,
Onshore Washington
- OSX1 FPSO, Offshore Brazil
- Lewek EMAS FPSO, Offshore
Vietnam
- Iraq Pipeline & Oil Terminals
(SEALINE)
 EP:
- Ruby FPSO, Offshore Vietnam
 Proposal/Concept/FEED:
- Offshore Peninsular Malaysia
Cendor Oil Field Development,
(2 Wellhead Platforms + 1 Cendor
FPSO)
- EPCIC North Malay Basin Full Field
Development Floating Storage
Offloading (FSO) Facility
 E:
- PWFU Package, East Piatu
Platform, Offshore Malaysia
- Remote Monitoring & Control Solar
Power, Baram Field, Offshore
Malaysia
- Shell BLI Gantry Upgrade Project
Bagan Luar Penang Malaysia
- PETRONAS Utilities Gebeng Cogen
Expansion Project Gebeng Pahang
Malaysia
DATES COMPANY POSITION, RESPONSIBILITIES, ACCOMPLISHMENTS
October 2015 – February
2016
Foster Wheeler (OPE) Malaysia
Sdn. Bhd.
Lead Electrical Engineer
Client/Projects:
PETRONAS Gas Berhad
PETRONAS Technical Services Sdn
Bhd
Basic Design Engineering, for Utilities
Gebeng (UG) Cogen Expansion
Project Gebeng Pahang Malaysia
Project Scope: Additional of One (1)
Unit of 11kV 56.5MVA 0.8 p.f. 50Hz
Gas Turbine Generator (GTG)
Lead Electrical Engineer
 Developed and completed electrical design basis for the
project
 Developed and completed a GTG, a 11/33kV 56.5MVA
ONAN Generator Step Up (GSUT) power transformer & a
400kVA 11/0.415V Generator Unit Auxiliary (GUAT)
transformer, an 11kV electrical Bus Ducts, 33kV double bus
bar switchgear Is Limiter, Power Cables and Integrated AC
& DC UPS specifications and datasheets
 Developed and completed overall UG plant Single Line
Diagram showing the project scope expansion and
requirements
 Checked and reviewed electrical equipment specifications
and datasheets for 52/65MVA ONAN/ONAF 132/3kV power
Transformers, 132kV and 33KV Gas Insulated Switchgears
for an additional connection to the 132kV Tenaga Nasional
Berhad (TNB) power line
 Developed and completed cable sizing calculations and
cable schedule (Power and Control)
 Developed and completed budgetary electrical Material
Take Off (MTO) for the project
 Provided technical assistance to electrical physical design
deliverables such as cable routing, existing equipment
adequacy check and electrical equipment spare utilization
 Developed and completed electrical Scope of Work for
Detailed Design Engineering, Procurement, Construction
and Commissioning Invitation to Bid (ITB)
 Completed PETRONAS safety management and quality
control exercises such as Hazard & Operability Study
(HAZOP), PETRONAS Electrical safety and operability review
(ELSOR), Mandatory Control Framework (MCF) & Flaw
Identification Exercise (FIE)
 Coordinated and provided technical inputs to other
disciplines
July 2015 – September
2015
Foster Wheeler (OPE) Malaysia
Sdn. Bhd.
Lead Electrical Engineer
Client/Projects:
Shell Malaysia Trading Sdn Bhd
Engineering, procurement and
Construction of BLI Gantry Upgrade
Project Bagan Luar
Penang Malaysia
Project Scope: Upgrading the oil
terminal from top to bottom loading
Lead Electrical Engineer
 Checked and reviewed plant current existing electrical
power system and advised changes to be proposed to
SHELL
 Checked and reviewed plant overall Single Line Diagram
System showing project upgrading scope requirements
 Checked and reviewed electrical equipment specifications
and data sheets for Transformers, Switchgears, Diesel
Engine Generator, Bus Ducts, Power Cables, DC UPS, and
Variable Frequency Drives
 Checked and reviewed electrical power system load lists
 Checked and updated Protection and Metering Diagrams
for 11kV Switchgear
 Checked and updated cable sizing calculations and cable
schedule (Power and Control)
 Provided technical assistance to electrical physical design
deliverables such as cable routing, material take-off,
electrical building and electrical equipment layout.
 Provided technical inputs to other disciplines.
July 2014 – July 2015 Foster Wheeler (OPE) Malaysia
Sdn. Bhd.
Foster Wheeler Upstream Trinidad
Tobago
Senior Electrical Engineer
Senior Electrical Engineer
 Developed plant overall Single Line Diagram System,
Beetham plant and Point Lisas plant
 Developed electrical equipment specifications and data
sheets, Transformers, Switchgears, Diesel Engine
Generator, Bus Ducts, Power Cables, DC UPS, and Variable
Client/Projects:
The National gas Corporation
Trinidad and Tobago Limited/Super
Industrial Services Limited
Project Scope: Engineering,
procurement and Construction of
Beetham Wastewater Recycling
Treatment Plant Project at Beetham
and Point Lisas Trinidad locations
Frequency Drives
 Performed load flow, short circuit and motor starting
calculation utilizing ETAP version 12.7.5
 Updated electrical load lists
 Developed Protection and Metering Diagrams
 Developed overall plant system grounding grids and
calculations
 Developed cable sizing calculations and cable schedule
(Power and Control)
 Provided technical assistance to electrical physical design
deliverables such as cable routing and equipment locations.
 Provided technical inputs to other disciplines.
May 2014-June 2014 Client/Projects:
Hess/ North Malay Basin
Development Project - EPCC Floating,
storage and Offloading (FSO) facility
Project Scope: Technical Bid
Preparation
Lead Electrical Engineer
 Prepared FSO single Line Diagram for the FSO
 Checked and verified conceptual/basic design phase
Electrical Load List
 Prepared Electrical Design Conversion Specification
 Prepared Electrical System Overview
 Prepared Earth Monitoring Block Diagram
 Prepared Generator Oil Consumption Calculation
January 2014 – May 2014 Foster Wheeler (OPE) Malaysia
Sdn. Bhd.
Lead Electrical Engineer
Client/Projects:
PETRONAS Petroleum Management
Unit (PMU) / Nosong-Bongawan
Development Project
Project Scope: Project Management
Service for Provision of Front End
Engineering Design (FEED) of Nosong-
Bongawan North Field Block B310
Sabah Malaysia
Lead Electrical Engineer
 Checked and reviewed project scope, FEED deliverable
requirements
 Checked and reviewed FEED documents from three
selected design engineering Bidders
 Checked Bidders electrical design and calculation against
PETRONAS technical standard (PTS)
 Produced and submitted technical clarification to Bidders
for unclear technical issues and coordinated with Client for
PMU standard advices
 Closed technical issues with Bidders
 Generated and completed technical summary report
summarizing project technical reviews
Lead Electrical Engineer
Client/Projects:
Newfield
East Piatu
Offshore Malaysia
Project Scope: Engineering Detailed
Design for additional of Multi Phase
Flow Meter PM323 East Belumut A
Platform
Lead Electrical Engineer
 Checked and reviewed project scope, existing key single
line diagram and load list
 Checked electrical power capacity and adequacy calculation
 Checked cable schedules, cable sizing and load list reports
 Checked layout drawings
 Reviewed and provided inputs to other engineering
discipline documents and drawings
October June
2011 2013
Leighton Engineering Consultant
Sdn. Bhd.
Senior Electrical Engineer
Client/Projects:
South Oil Company, Iraq
Detailed Design for Crude Oil Export
Facility Reconstruction Project,
Sealine Project
Senior Electrical Engineer
 Developed Electrical Design Basis for the project
 Completed power transformer, diesel engine generator,
electrical House, and navigational aids specifications,
datasheets, and technical bid evaluation
 Completed electrical equipment list for pipeline valve
stations
 Checked and reviewed project scope, key single line
diagrams
 Checked cable schedules, AC & DC distribution board
specification, cable sizing and load list reports
 Checked load flow and short circuit calculations
 Reviewed and provided inputs to other engineering
discipline documents and drawings
March September Feb
2011 2011
DPS Consultant Malaysia Sdn. Bhd.
Senior Electrical Engineer
Client/Projects:
OSX Brazil/ Engineering,
Procurement, Construction and
Commissioning of OSX -1 (FPSO)
Floating, Production, Storage and
Offloading Vessel for Waimea Field
Offshore Brazil
Senior Electrical Engineer
 Engineered and managed the development of FPSO
electrical distribution module, housing power transformers,
switchgears and control panels, heating, ventilation, air
conditioning and fire suppression systems, among others.
 Completed the design of electrical heat tracing system for
the project including its specification, datasheets, cable
schedule, vendor bids technical reviews and vendor
document review and approval for construction
 Revised and completed cable routing system for the
Electrical distribution module
 Supported hook-up, construction yard and commissioning
teams
 Meeting and coordinated with several vendors to finalize
system interconnection and operational requirements for
HVAC, fire suppression Inergen and electrical heat tracing
systems.
 Completed electric motor and electrical equipment
specifications
December
2010
February
2011
DPS Consultant Malaysia Sdn. Bhd.
Senior Electrical Engineer
Client/Projects:
EMAS Offshore Construction/ Lewek
EMAS Floating, Production, Storage
and Offloading (FPSO) Vessel for
Chim Sao Block 12W Offshore
Vietnam
Senior Electrical Engineer
 Completed 6.6kV and 400V Interconnection and Single Line
Diagrams for Marine & Topside load requirements
 Revised and updated cable schedules
 Completed Heat Tracing System for the project
 Reviewed load flow, short circuit, motor starting and
acceleration, and transient stability studies
 Supported Construction Yard and Commissioning teams for
Electrical Issues
 Meeting and coordinated with several vendors to finalize
system interconnection and operational requirements
October
2010
November
2010
DPS Consultant Malaysia Sdn. Bhd.
Senior Electrical Engineer
Client/Projects:
Al Furat Petroleum Company/Nishan
Station Rationalization
and Manifold Upgrade
Senior Electrical Engineer
 Completed power system sizing calculation and
specifications of UPS and Distribution Board
 Completed datasheets of UPS and Distribution Board
 Performed layout drawings and cable routing plan for the
switchgear room modification
 Coordinated with clients closely for system works
improvement
 Updated electrical work progress and attended project
progress meeting
 Involved in meetings with vendors to finalize system
requirements and operation
March 2010 September
2010
DPS Consultant Malaysia Sdn. Bhd.
Senior Electrical Engineer
Senior Electrical Engineer
 Assisted Engineer by checking and completing power
system sizing calculation and specifications.
 Completed design analysis and specification and datasheets
Client/Projects:
Petrofac (Malaysia - PM304) Ltd
Provision Of Front End Engineering &
Design (FEED) For Cendor Phase 2
Development Project Block PM304
for Subsea Cable system
 Performed internal checking for power system sizing
calculations, load flow, short circuit and motor starting
calculations
 Performed Cable Sizing and Uninterruptible Power Supply
system calculations
 Performed layout drawings and cable routing plan for the
switchgear room modification
 Coordinated with clients closely for system works
improvement
 Updated electrical work progress and attended project
progress meeting
 Involved in meetings with vendors to finalize system
requirements and operation
October
2009
February
2010
OPT Consultant Malaysia Sdn. Bhd.
Lead Electrical Engineer
Client/Projects:
PETRONAS Sarawak Operation/OPE
(Malaysia) Sdn Bhd
Baram Remote Monitoring and
Control System – Remote Terminal
Unit Solar Power System Design
Lead Electrical Engineer
 Conducted study to determine RTU solar power system
characteristic and loading requirements
 Coached Engineer to start on system calculation and
drawing requirements and standard calculation procedures
 Assisted Engineer by checking and completing system sizing
calculation and specification
 Updated electrical work progress and attended project
progress meeting
 Meeting with vendor to finalize system requirements and
operation
 Produced marked up drawings to install RTU solar power
system on Baram Platforms
September
2008
September
2009
DPS Consultant Malaysia Sdn. Bhd.
Sales and Proposals Group
Client/Projects:
Petrofac (PM-304) Malaysia Ltd
Cendor Phase-2 Conceptual
Development Plan Block PM304
Proposal Manager
 Managed incoming project enquiries and initiate project
feasibility studies, ensuring project reliability, security and
effective use of resource allocation
 Produced technical recommendations, summary sheets and
execution risks for Company to proceed with the proposal
or to decline
 Produced and strategize a competitive pricing scheme and
capital expenditure per each accepted enquiry, showing
details of project management and execution resource
allocation breakdown
 Prepared and established preliminary project execution
plan, pre-contract procedures and project specific safety
and quality plan per the enquiry.
 Managed and supervise a proposal team of 3 people,
supporting in compiling proposal paperwork, screening pre-
contract documents, preparing supporting information,
planning man/woman-power allocation
 Discussed and respond to all clients’ clarification and
questions either by meeting them, by emails or phone.
 Prepared outgoing correspondences such as Acceptance,
Clarification, Decline, Follow up Letters to clients
 Conducted and chair proposal meeting with director and
completed Meeting Minutes for distribution
Senior Project Engineer
 Prepared and completed Project Execution Plan for the
Cendor Phase 2 Field Development project
 Developed project Master Deliverables Lists for project
schedule inputs and milestone breakdown
 Organized project kick off meeting, prepared minutes of
meeting, action and execution plans
 Completed project control plan and documents handover
from Clients to Project teams.

September
2008
February
2009
DPS Consultant Malaysia Sdn. Bhd.
Package Engineer
MMHE Berhad,
Ruby Princess Floating, Production
Storage and Offloading (FPSO)
Process System Design
Package Engineer – HVAC/UPS System
 Performed Heat Loss Calculation of the Electrical Room for
HVAC design inputs and specification
 Reviewed and approved HVAC System Design Philosophy
and Calculations per IEC, API, ABS and ASHRAE standards
 Assisted, reviewed and approved HVAC system design
drawings and equipment design details
 Witnessed Factory Acceptance Test for HVAC equipment,
Air Handling Units and Power Control Panel
 Performed and checked HVAC control system per the
Electrical room design criteria
 Reviewed and tested Control and operational logic diagram
and cause-effect matrix.
 Reviewed UPS system datasheets and system design per IEC
standards.
November
2007
August
2008
Sime Engineers Sdn. Bhd.
Electrical System Group
Laem Chabang, Thailand
Project: 60MW CCGT Power Plant
Expansion Project
Senior Electrical Engineer
 Coordinated and supervised equipment suppliers and
project construction team for 115KV and 22KV Gas
Insulated switchgears (GIS) installation and erection
 Performed design review and supervised site modification
and commissioning tests of 115KV and 22kV GIS, 6.6KV and
400V Switchgears, 400V Motor Control Centers, Emergency
Diesel Generator (EDG) and Uninterruptible Power Supply
(UPS) System
 Reviewed, witnessed and completed recommendation for
factory acceptance test reports on the EDG control Panel
and 400V Motor Control Centers (MCC)
 Assisted and supervised in 6.6kV and 400V Switchgear
design site modification, testing and commissioning
 Supervised, lead and coordinated electrical team members
for balance of facilities electrical equipment site acceptance
testing and completion of electrical equipment installation,
commissioning and technical issues
July 2002 September
2007
Bechtel National Inc.
Electrical System Group
Richland, Washington
Project: Nuclear Waste Treatment
Plant
(http://www.waste2glass.com)
Responsible for the design and
calculations for the project electrical
power distribution system (13.8kV
and below)
Electrical Engineer
 Prepared and performed short circuit analysis and power
flow calculations
 Prepared and completed Power System Protection
calculations and settings
 Revised and completed underground cables sizes by
performing cable ampacity and temperature limit
calculation
 Performed and completed voltage drop analysis on 13.8KV
feeder cables to confirm adequate cable sizes and rating for
facility power distribution
 Initiated, completed and issued schematic and block
diagrams based on vendor submittals and project
requirements
 Completed and issued one-line diagrams for 5kVA
uninterruptible power supply system (UPS)
 Completed and issued logic diagrams for medium voltage
protection system
 Assisted senior engineer with the relay coordination
calculations
 Completed for checking Drawing Change Notice (DCN) to
revise medium voltage switchgear circuit breaker schematic
drawings to match with vendor submitted drawings
 Updated and revised 208/120V panel schedules based on
the revised load profiles
 Developed interconnection diagrams and completed cable
data information for project mechanical handling
equipment and systems
 Assisted in the revision of facilities 480V load list by
identifying the project approved cable sizes during the
development of schematic and block diagrams
 Completed and issued lighting system design by issuing the
calculations, physical drawings and panel schedules
 Coordinated closely with the construction of any physical
issues and design optimization regarding the safe
installation of lighting fixtures
 Completed preliminary studies and calculation in the LAW
hot in-cell pour cave areas and completed functional
specification and requirement for specialized hot-cell
lighting fixtures to be purchased
 Revised, completed and issued roadway lighting calculation
 Completed checking LAB lighting calculation
 Revised and updated LAW facility lighting and convenience
power receptacle drawings
 Assisted physical designers in the revision of the
aboveground raceway sizes, service levels, optimized
layouts and cable routes
 Maintained cable database information per work process
and submitted progress quantity reports to LAW
management team
May 2001 June 2002 Bechtel Power Corporation
Multi Project Acquisition Group
(MPAG)
Frederick, Maryland
Projects: Combined Cycle Power
Plants
Responsible for the specifications and
procurement of electrical equipment
Electrical Engineer
 Prepared material requisitions, data sheet, and technical
specifications for engineering products of various power
plant design and construction projects around the world
 Provided and support cost estimation, technical calculation
preparation, technical bid evaluation and acquisition of
major equipment and bulk materials through strategic
global supplier agreements and competitive bidding
 Completed the technical reviews and purchases of High
Voltage Power Transformers and Motor Control Centers for
Power Plant Projects in Mexico, Europe, and the United
States
 Attended in-house training and seminars for oil and gas
industry applications.
September
1998
December
2000
Drexel University
Power Research Center,
Department of Engineering
Philadelphia, Pennsylvania
Project: Power Generation and
Distribution Analysis
Responsible for the Northeastern
United States power distribution
studies
Research Assistant
 Conducted research in the area of deregulated power
system reliability and efficiency
 Wrote Matlab program to automate the reliability of power
utility output data in the Automatic Generation Control
(AGC) studies
 Heavily utilized MS office software for statistical,
computational and presentational purposes
 Performed PSS/E simulations for power system Availability
Transfer Capability (ATC) studies
 Published two IEEE conference papers and participated in
IEEE (PES) Summer Meeting 2000 in Seattle, Washington
March 1997 September
1998
VIZ Manufacturing Company
Department of Engineering
Philadelphia, Pennsylvania
Project: Atmospheric Measurement
System for the United States Navy
Responsible for the testing and
trouble shooting
Student Engineer
 Troubleshot, repaired and downloaded a software into GPS
radiosonde circuit boards (about 50 boards/day) using
automatic testing equipment
 Planned, developed and systematized radiosonde repair
procedures for assembly line personnel
 Developed and coordinated testing facility for GPS
radiosonde (Test 5 Radiodsondes at one time)
 Conducted and administered testing using VIZ software
(W9000) on GPS radiosonde ground receivers
 Performed temperature and frequency tests on Voltage
Controlled Oscillator (VCO) in PLL design
EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS
Degree, Certificate, etc., School Major (or Subject) Date
Board of Engineers Malaysia
Professional Engineer License
Institution of Engineers
Malaysia/Board of Engineers
Malaysia
BEM Professional Engineer
Certificate of Attendance Organized by Petro Edge Asia &
Seminar by Azur Offshore Ltd
Introduction to Floating
Production Storage and
Offloading Technology
September 2011
Certificate of Attendance Organized by Comfori Sdn Bhd Technical Report Writing December 2008
Certificate of Attendance Organized by Ideapro-logix &
Seminar by Y.C. Chow
Business Presentation Skills June 2009
Certificate of Attendance Organized by Petro Edge Asia &
Seminar by Jayem Dhingra
EPCIC Contract Management &
Essential Elements of
International Contract Law
December 2008
Washington State (WA) USA
Professional Engineering
License (No. 43263)
IEEE reviews by Pacific
Northwest National Laboratory
(PNNL) Richland WA
Professional Engineering for
Electrical Engineering License/
Registration
January 2007
Engineering in Training (EIT)
Certificate
Bechtel University Electrical Engineering June 2002
Master of Science Drexel University Electrical Engineering June 2001
Bachelor of Science Drexel University Electrical Engineering June 1998
OTHER SIGNIFICANT INFORMATION
PERSONAL: Committee member of IEM Marine and Naval Architecture Technical Division 2015/2016
Submitted a technical paper entitled, Shipboard Power Cable Sizing Methodology in IEM September
2015 Bulletin
Conducted Informal Professional Training Courses, Introduction to Oil and Gas, Introduction to
Floating, Production, Storage and Offloading (FPSO) Vessel Facility Apr. & Jun. & Sept. and Oct. 2015
Conducted IEM professional technical talk – Introduction to FPSO November 2013
Vice Chairman of Ampang Prima Condominium for 2009-2010 & Join Management Body member and
responsible for Electrical and Mechanical System operation and maintenance of the Condominium
2012/2013
Active in Central Washington Soccer League (2002 – 2006)
3
rd
place in soccer tournament for Malaysian Midwest Games 2006 in Madison Wisconsin USA
LANGUAGES Read and Write Bahasa Melayu and English
COMPUTER CAPABILITIES: MICROSTATION, AGI32 Lighting Analysis Software, Dialux Lighting Calculation Software, Microsoft
Offices, Engineering Transient and Analysis Program (ETAP), MATLAB
OTHERS: Completed Six Sigma & Performance Based Leadership training
Completed 24 hours of Power System Protection training by Schweitzer Engineering Laboratory
Pullman WA USA
PROFESSIONAL MEMBERSHIP AND SOCIETIES
 BOARD OF ENGINEERS MALAYSIA (BEM)
 INSTITUTION OF ENGINEERS MALAYSIA (IEM)
 WASHINGTON USA PROFESSIONAL LICENSING BOARD
 MEMBER OF INSTITUTE OF ELECTRICAL & ELECTRONICS ENGINEERS (IEEE)
REFERENCES
M. Firdaus Noordin +6019 770 7971
Azaruddin Ibrahim +6017 361 8844
Abdul Manan Mokhtar +6019 266 4654
Asmizan Ibrahim +6019 228 4045

More Related Content

What's hot

Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta
 
CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1Haris Hakim
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSuthar Vinu
 
Curriculum vitae mukesh pokhriyal electrical
Curriculum vitae mukesh pokhriyal electricalCurriculum vitae mukesh pokhriyal electrical
Curriculum vitae mukesh pokhriyal electricalMukesh Pokhriyal
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBShiva Y Cmath
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs expSudipto Majumder
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated ResumeAnkit Agarwal
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Raushan Kumar
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015Prem Kumar
 

What's hot (20)

PROJECT ENGINEER- ELECTRICAL._L
PROJECT ENGINEER-  ELECTRICAL._LPROJECT ENGINEER-  ELECTRICAL._L
PROJECT ENGINEER- ELECTRICAL._L
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1
 
Ben's CV
Ben's CVBen's CV
Ben's CV
 
Behnam Nikouei resume
Behnam Nikouei resumeBehnam Nikouei resume
Behnam Nikouei resume
 
Sutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineerSutharvinu - Electrical Design engineer
Sutharvinu - Electrical Design engineer
 
Curriculum vitae mukesh pokhriyal electrical
Curriculum vitae mukesh pokhriyal electricalCurriculum vitae mukesh pokhriyal electrical
Curriculum vitae mukesh pokhriyal electrical
 
Engr. Asim Mahmood CV
Engr. Asim Mahmood CVEngr. Asim Mahmood CV
Engr. Asim Mahmood CV
 
Resume-Murugan
Resume-MuruganResume-Murugan
Resume-Murugan
 
A-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KBA-Shiva YC@EPCC- 219KB
A-Shiva YC@EPCC- 219KB
 
Resume electrical & instrumentation engg 10+ yrs exp
Resume  electrical & instrumentation engg 10+ yrs expResume  electrical & instrumentation engg 10+ yrs exp
Resume electrical & instrumentation engg 10+ yrs exp
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
 
jragojo CV
jragojo CVjragojo CV
jragojo CV
 
Ankit updated Resume
Ankit updated  ResumeAnkit updated  Resume
Ankit updated Resume
 
RSR LATEST TRESUME
RSR LATEST TRESUMERSR LATEST TRESUME
RSR LATEST TRESUME
 
khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 
RCPRESUMEOCT2016
RCPRESUMEOCT2016RCPRESUMEOCT2016
RCPRESUMEOCT2016
 
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
 
Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017Gary Marphis Resume Jan 2017
Gary Marphis Resume Jan 2017
 
Prem CV Oct 2015
Prem CV Oct 2015Prem CV Oct 2015
Prem CV Oct 2015
 

Similar to MASP-QA-CV-2016-A

Sam res (houston) O &G
Sam res (houston) O &GSam res (houston) O &G
Sam res (houston) O &GSam Mehta
 
Sam res (houston) o & g
Sam res (houston) o & gSam res (houston) o & g
Sam res (houston) o & gSam Mehta
 
Sam res (houston) o & g
Sam res (houston) o & gSam res (houston) o & g
Sam res (houston) o & gSam Mehta
 
Sam res (houston) oil and gas
Sam res (houston) oil and gasSam res (houston) oil and gas
Sam res (houston) oil and gasSam Mehta
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEvijayabaskar v
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed
 
Dave resume 2016 eng web
Dave resume 2016 eng webDave resume 2016 eng web
Dave resume 2016 eng webDavid Colbourne
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin Jose
 

Similar to MASP-QA-CV-2016-A (20)

EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
Sam res (houston) O &G
Sam res (houston) O &GSam res (houston) O &G
Sam res (houston) O &G
 
Sam res (houston) o & g
Sam res (houston) o & gSam res (houston) o & g
Sam res (houston) o & g
 
Sam res (houston) o & g
Sam res (houston) o & gSam res (houston) o & g
Sam res (houston) o & g
 
Sam res (houston) oil and gas
Sam res (houston) oil and gasSam res (houston) oil and gas
Sam res (houston) oil and gas
 
Ekachai_ResumeRev05
Ekachai_ResumeRev05Ekachai_ResumeRev05
Ekachai_ResumeRev05
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 
CV_Rachmad Arif
CV_Rachmad ArifCV_Rachmad Arif
CV_Rachmad Arif
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Zaheer Ahmed E&I Professional
Zaheer Ahmed E&I ProfessionalZaheer Ahmed E&I Professional
Zaheer Ahmed E&I Professional
 
CV_Susovan
CV_SusovanCV_Susovan
CV_Susovan
 
CV_ susovan
CV_ susovanCV_ susovan
CV_ susovan
 
G K M Jafar_UAE
G K M Jafar_UAEG K M Jafar_UAE
G K M Jafar_UAE
 
Dave resume 2016 eng web
Dave resume 2016 eng webDave resume 2016 eng web
Dave resume 2016 eng web
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 

MASP-QA-CV-2016-A

  • 1. NAME: MOHAMMAD ADNAN SUJAN PROFESSIONAL ENGINEER (WA, United State of America - 43263) BOARD OF ENGINEERS MALAYSIA (BEM 16163) CONTACT NUMBER: +6017 223 8673 ADDRESS: B17-03A AMPANG PRIMA CONDO JALAN WAWASAN 2/5 B.B. AMPANG 68000 SELANGOR EMAIL: adnansujan@gmail.com SUMMARY Professional and Registered Engineer in Malaysia (BEM 16163) and the USA (43263) with sixteen (16) years of professional working experience. The scope of works included design in the onshore and offshore (fixed and mobile) oil and gas production facilities, oil storage and pipeline facilities, design of the electrical power plants, waste water treatment facility, nuclear waste treatment process facility and manufacturing test and support in an electronic factory. INDUSTRY / LOCATION PROJECT PHASES SCOPE of PROJECT  Onshore - Power Generation: USA, Mexico, England, Thailand and Malaysia - Water Treatment Plant: Trinidad and Tobago - Oil and Gas (Midstream): Malaysia and Iraq  Offshore (Upstream) - Oil and Gas: Brazil, Iraq, Iran, Malaysia, Syria, Vietnam  Proposal  Conceptual Engineering  Front End Engineering Design  Detail Design  Construction and Hook Up Support  Pre-commissioning & Site Testing Supervision  EPCC: - Electrical Power Plants, Onshore - Nuclear Waste Treatment Plant, Onshore Washington - OSX1 FPSO, Offshore Brazil - Lewek EMAS FPSO, Offshore Vietnam - Iraq Pipeline & Oil Terminals (SEALINE)  EP: - Ruby FPSO, Offshore Vietnam  Proposal/Concept/FEED: - Offshore Peninsular Malaysia Cendor Oil Field Development, (2 Wellhead Platforms + 1 Cendor FPSO) - EPCIC North Malay Basin Full Field Development Floating Storage Offloading (FSO) Facility  E: - PWFU Package, East Piatu Platform, Offshore Malaysia - Remote Monitoring & Control Solar Power, Baram Field, Offshore Malaysia - Shell BLI Gantry Upgrade Project Bagan Luar Penang Malaysia - PETRONAS Utilities Gebeng Cogen Expansion Project Gebeng Pahang Malaysia
  • 2. DATES COMPANY POSITION, RESPONSIBILITIES, ACCOMPLISHMENTS October 2015 – February 2016 Foster Wheeler (OPE) Malaysia Sdn. Bhd. Lead Electrical Engineer Client/Projects: PETRONAS Gas Berhad PETRONAS Technical Services Sdn Bhd Basic Design Engineering, for Utilities Gebeng (UG) Cogen Expansion Project Gebeng Pahang Malaysia Project Scope: Additional of One (1) Unit of 11kV 56.5MVA 0.8 p.f. 50Hz Gas Turbine Generator (GTG) Lead Electrical Engineer  Developed and completed electrical design basis for the project  Developed and completed a GTG, a 11/33kV 56.5MVA ONAN Generator Step Up (GSUT) power transformer & a 400kVA 11/0.415V Generator Unit Auxiliary (GUAT) transformer, an 11kV electrical Bus Ducts, 33kV double bus bar switchgear Is Limiter, Power Cables and Integrated AC & DC UPS specifications and datasheets  Developed and completed overall UG plant Single Line Diagram showing the project scope expansion and requirements  Checked and reviewed electrical equipment specifications and datasheets for 52/65MVA ONAN/ONAF 132/3kV power Transformers, 132kV and 33KV Gas Insulated Switchgears for an additional connection to the 132kV Tenaga Nasional Berhad (TNB) power line  Developed and completed cable sizing calculations and cable schedule (Power and Control)  Developed and completed budgetary electrical Material Take Off (MTO) for the project  Provided technical assistance to electrical physical design deliverables such as cable routing, existing equipment adequacy check and electrical equipment spare utilization  Developed and completed electrical Scope of Work for Detailed Design Engineering, Procurement, Construction and Commissioning Invitation to Bid (ITB)  Completed PETRONAS safety management and quality control exercises such as Hazard & Operability Study (HAZOP), PETRONAS Electrical safety and operability review (ELSOR), Mandatory Control Framework (MCF) & Flaw Identification Exercise (FIE)  Coordinated and provided technical inputs to other disciplines July 2015 – September 2015 Foster Wheeler (OPE) Malaysia Sdn. Bhd. Lead Electrical Engineer Client/Projects: Shell Malaysia Trading Sdn Bhd Engineering, procurement and Construction of BLI Gantry Upgrade Project Bagan Luar Penang Malaysia Project Scope: Upgrading the oil terminal from top to bottom loading Lead Electrical Engineer  Checked and reviewed plant current existing electrical power system and advised changes to be proposed to SHELL  Checked and reviewed plant overall Single Line Diagram System showing project upgrading scope requirements  Checked and reviewed electrical equipment specifications and data sheets for Transformers, Switchgears, Diesel Engine Generator, Bus Ducts, Power Cables, DC UPS, and Variable Frequency Drives  Checked and reviewed electrical power system load lists  Checked and updated Protection and Metering Diagrams for 11kV Switchgear  Checked and updated cable sizing calculations and cable schedule (Power and Control)  Provided technical assistance to electrical physical design deliverables such as cable routing, material take-off, electrical building and electrical equipment layout.  Provided technical inputs to other disciplines. July 2014 – July 2015 Foster Wheeler (OPE) Malaysia Sdn. Bhd. Foster Wheeler Upstream Trinidad Tobago Senior Electrical Engineer Senior Electrical Engineer  Developed plant overall Single Line Diagram System, Beetham plant and Point Lisas plant  Developed electrical equipment specifications and data sheets, Transformers, Switchgears, Diesel Engine Generator, Bus Ducts, Power Cables, DC UPS, and Variable
  • 3. Client/Projects: The National gas Corporation Trinidad and Tobago Limited/Super Industrial Services Limited Project Scope: Engineering, procurement and Construction of Beetham Wastewater Recycling Treatment Plant Project at Beetham and Point Lisas Trinidad locations Frequency Drives  Performed load flow, short circuit and motor starting calculation utilizing ETAP version 12.7.5  Updated electrical load lists  Developed Protection and Metering Diagrams  Developed overall plant system grounding grids and calculations  Developed cable sizing calculations and cable schedule (Power and Control)  Provided technical assistance to electrical physical design deliverables such as cable routing and equipment locations.  Provided technical inputs to other disciplines. May 2014-June 2014 Client/Projects: Hess/ North Malay Basin Development Project - EPCC Floating, storage and Offloading (FSO) facility Project Scope: Technical Bid Preparation Lead Electrical Engineer  Prepared FSO single Line Diagram for the FSO  Checked and verified conceptual/basic design phase Electrical Load List  Prepared Electrical Design Conversion Specification  Prepared Electrical System Overview  Prepared Earth Monitoring Block Diagram  Prepared Generator Oil Consumption Calculation January 2014 – May 2014 Foster Wheeler (OPE) Malaysia Sdn. Bhd. Lead Electrical Engineer Client/Projects: PETRONAS Petroleum Management Unit (PMU) / Nosong-Bongawan Development Project Project Scope: Project Management Service for Provision of Front End Engineering Design (FEED) of Nosong- Bongawan North Field Block B310 Sabah Malaysia Lead Electrical Engineer  Checked and reviewed project scope, FEED deliverable requirements  Checked and reviewed FEED documents from three selected design engineering Bidders  Checked Bidders electrical design and calculation against PETRONAS technical standard (PTS)  Produced and submitted technical clarification to Bidders for unclear technical issues and coordinated with Client for PMU standard advices  Closed technical issues with Bidders  Generated and completed technical summary report summarizing project technical reviews Lead Electrical Engineer Client/Projects: Newfield East Piatu Offshore Malaysia Project Scope: Engineering Detailed Design for additional of Multi Phase Flow Meter PM323 East Belumut A Platform Lead Electrical Engineer  Checked and reviewed project scope, existing key single line diagram and load list  Checked electrical power capacity and adequacy calculation  Checked cable schedules, cable sizing and load list reports  Checked layout drawings  Reviewed and provided inputs to other engineering discipline documents and drawings
  • 4. October June 2011 2013 Leighton Engineering Consultant Sdn. Bhd. Senior Electrical Engineer Client/Projects: South Oil Company, Iraq Detailed Design for Crude Oil Export Facility Reconstruction Project, Sealine Project Senior Electrical Engineer  Developed Electrical Design Basis for the project  Completed power transformer, diesel engine generator, electrical House, and navigational aids specifications, datasheets, and technical bid evaluation  Completed electrical equipment list for pipeline valve stations  Checked and reviewed project scope, key single line diagrams  Checked cable schedules, AC & DC distribution board specification, cable sizing and load list reports  Checked load flow and short circuit calculations  Reviewed and provided inputs to other engineering discipline documents and drawings March September Feb 2011 2011 DPS Consultant Malaysia Sdn. Bhd. Senior Electrical Engineer Client/Projects: OSX Brazil/ Engineering, Procurement, Construction and Commissioning of OSX -1 (FPSO) Floating, Production, Storage and Offloading Vessel for Waimea Field Offshore Brazil Senior Electrical Engineer  Engineered and managed the development of FPSO electrical distribution module, housing power transformers, switchgears and control panels, heating, ventilation, air conditioning and fire suppression systems, among others.  Completed the design of electrical heat tracing system for the project including its specification, datasheets, cable schedule, vendor bids technical reviews and vendor document review and approval for construction  Revised and completed cable routing system for the Electrical distribution module  Supported hook-up, construction yard and commissioning teams  Meeting and coordinated with several vendors to finalize system interconnection and operational requirements for HVAC, fire suppression Inergen and electrical heat tracing systems.  Completed electric motor and electrical equipment specifications December 2010 February 2011 DPS Consultant Malaysia Sdn. Bhd. Senior Electrical Engineer Client/Projects: EMAS Offshore Construction/ Lewek EMAS Floating, Production, Storage and Offloading (FPSO) Vessel for Chim Sao Block 12W Offshore Vietnam Senior Electrical Engineer  Completed 6.6kV and 400V Interconnection and Single Line Diagrams for Marine & Topside load requirements  Revised and updated cable schedules  Completed Heat Tracing System for the project  Reviewed load flow, short circuit, motor starting and acceleration, and transient stability studies  Supported Construction Yard and Commissioning teams for Electrical Issues  Meeting and coordinated with several vendors to finalize system interconnection and operational requirements October 2010 November 2010 DPS Consultant Malaysia Sdn. Bhd. Senior Electrical Engineer Client/Projects: Al Furat Petroleum Company/Nishan Station Rationalization and Manifold Upgrade Senior Electrical Engineer  Completed power system sizing calculation and specifications of UPS and Distribution Board  Completed datasheets of UPS and Distribution Board  Performed layout drawings and cable routing plan for the switchgear room modification  Coordinated with clients closely for system works improvement  Updated electrical work progress and attended project progress meeting  Involved in meetings with vendors to finalize system requirements and operation March 2010 September 2010 DPS Consultant Malaysia Sdn. Bhd. Senior Electrical Engineer Senior Electrical Engineer  Assisted Engineer by checking and completing power system sizing calculation and specifications.  Completed design analysis and specification and datasheets
  • 5. Client/Projects: Petrofac (Malaysia - PM304) Ltd Provision Of Front End Engineering & Design (FEED) For Cendor Phase 2 Development Project Block PM304 for Subsea Cable system  Performed internal checking for power system sizing calculations, load flow, short circuit and motor starting calculations  Performed Cable Sizing and Uninterruptible Power Supply system calculations  Performed layout drawings and cable routing plan for the switchgear room modification  Coordinated with clients closely for system works improvement  Updated electrical work progress and attended project progress meeting  Involved in meetings with vendors to finalize system requirements and operation October 2009 February 2010 OPT Consultant Malaysia Sdn. Bhd. Lead Electrical Engineer Client/Projects: PETRONAS Sarawak Operation/OPE (Malaysia) Sdn Bhd Baram Remote Monitoring and Control System – Remote Terminal Unit Solar Power System Design Lead Electrical Engineer  Conducted study to determine RTU solar power system characteristic and loading requirements  Coached Engineer to start on system calculation and drawing requirements and standard calculation procedures  Assisted Engineer by checking and completing system sizing calculation and specification  Updated electrical work progress and attended project progress meeting  Meeting with vendor to finalize system requirements and operation  Produced marked up drawings to install RTU solar power system on Baram Platforms September 2008 September 2009 DPS Consultant Malaysia Sdn. Bhd. Sales and Proposals Group Client/Projects: Petrofac (PM-304) Malaysia Ltd Cendor Phase-2 Conceptual Development Plan Block PM304 Proposal Manager  Managed incoming project enquiries and initiate project feasibility studies, ensuring project reliability, security and effective use of resource allocation  Produced technical recommendations, summary sheets and execution risks for Company to proceed with the proposal or to decline  Produced and strategize a competitive pricing scheme and capital expenditure per each accepted enquiry, showing details of project management and execution resource allocation breakdown  Prepared and established preliminary project execution plan, pre-contract procedures and project specific safety and quality plan per the enquiry.  Managed and supervise a proposal team of 3 people, supporting in compiling proposal paperwork, screening pre- contract documents, preparing supporting information, planning man/woman-power allocation  Discussed and respond to all clients’ clarification and questions either by meeting them, by emails or phone.  Prepared outgoing correspondences such as Acceptance, Clarification, Decline, Follow up Letters to clients  Conducted and chair proposal meeting with director and completed Meeting Minutes for distribution Senior Project Engineer  Prepared and completed Project Execution Plan for the Cendor Phase 2 Field Development project  Developed project Master Deliverables Lists for project schedule inputs and milestone breakdown  Organized project kick off meeting, prepared minutes of meeting, action and execution plans  Completed project control plan and documents handover from Clients to Project teams. 
  • 6. September 2008 February 2009 DPS Consultant Malaysia Sdn. Bhd. Package Engineer MMHE Berhad, Ruby Princess Floating, Production Storage and Offloading (FPSO) Process System Design Package Engineer – HVAC/UPS System  Performed Heat Loss Calculation of the Electrical Room for HVAC design inputs and specification  Reviewed and approved HVAC System Design Philosophy and Calculations per IEC, API, ABS and ASHRAE standards  Assisted, reviewed and approved HVAC system design drawings and equipment design details  Witnessed Factory Acceptance Test for HVAC equipment, Air Handling Units and Power Control Panel  Performed and checked HVAC control system per the Electrical room design criteria  Reviewed and tested Control and operational logic diagram and cause-effect matrix.  Reviewed UPS system datasheets and system design per IEC standards. November 2007 August 2008 Sime Engineers Sdn. Bhd. Electrical System Group Laem Chabang, Thailand Project: 60MW CCGT Power Plant Expansion Project Senior Electrical Engineer  Coordinated and supervised equipment suppliers and project construction team for 115KV and 22KV Gas Insulated switchgears (GIS) installation and erection  Performed design review and supervised site modification and commissioning tests of 115KV and 22kV GIS, 6.6KV and 400V Switchgears, 400V Motor Control Centers, Emergency Diesel Generator (EDG) and Uninterruptible Power Supply (UPS) System  Reviewed, witnessed and completed recommendation for factory acceptance test reports on the EDG control Panel and 400V Motor Control Centers (MCC)  Assisted and supervised in 6.6kV and 400V Switchgear design site modification, testing and commissioning  Supervised, lead and coordinated electrical team members for balance of facilities electrical equipment site acceptance testing and completion of electrical equipment installation, commissioning and technical issues July 2002 September 2007 Bechtel National Inc. Electrical System Group Richland, Washington Project: Nuclear Waste Treatment Plant (http://www.waste2glass.com) Responsible for the design and calculations for the project electrical power distribution system (13.8kV and below) Electrical Engineer  Prepared and performed short circuit analysis and power flow calculations  Prepared and completed Power System Protection calculations and settings  Revised and completed underground cables sizes by performing cable ampacity and temperature limit calculation  Performed and completed voltage drop analysis on 13.8KV feeder cables to confirm adequate cable sizes and rating for facility power distribution  Initiated, completed and issued schematic and block diagrams based on vendor submittals and project requirements  Completed and issued one-line diagrams for 5kVA uninterruptible power supply system (UPS)  Completed and issued logic diagrams for medium voltage protection system  Assisted senior engineer with the relay coordination calculations  Completed for checking Drawing Change Notice (DCN) to revise medium voltage switchgear circuit breaker schematic drawings to match with vendor submitted drawings  Updated and revised 208/120V panel schedules based on the revised load profiles  Developed interconnection diagrams and completed cable data information for project mechanical handling equipment and systems
  • 7.  Assisted in the revision of facilities 480V load list by identifying the project approved cable sizes during the development of schematic and block diagrams  Completed and issued lighting system design by issuing the calculations, physical drawings and panel schedules  Coordinated closely with the construction of any physical issues and design optimization regarding the safe installation of lighting fixtures  Completed preliminary studies and calculation in the LAW hot in-cell pour cave areas and completed functional specification and requirement for specialized hot-cell lighting fixtures to be purchased  Revised, completed and issued roadway lighting calculation  Completed checking LAB lighting calculation  Revised and updated LAW facility lighting and convenience power receptacle drawings  Assisted physical designers in the revision of the aboveground raceway sizes, service levels, optimized layouts and cable routes  Maintained cable database information per work process and submitted progress quantity reports to LAW management team May 2001 June 2002 Bechtel Power Corporation Multi Project Acquisition Group (MPAG) Frederick, Maryland Projects: Combined Cycle Power Plants Responsible for the specifications and procurement of electrical equipment Electrical Engineer  Prepared material requisitions, data sheet, and technical specifications for engineering products of various power plant design and construction projects around the world  Provided and support cost estimation, technical calculation preparation, technical bid evaluation and acquisition of major equipment and bulk materials through strategic global supplier agreements and competitive bidding  Completed the technical reviews and purchases of High Voltage Power Transformers and Motor Control Centers for Power Plant Projects in Mexico, Europe, and the United States  Attended in-house training and seminars for oil and gas industry applications. September 1998 December 2000 Drexel University Power Research Center, Department of Engineering Philadelphia, Pennsylvania Project: Power Generation and Distribution Analysis Responsible for the Northeastern United States power distribution studies Research Assistant  Conducted research in the area of deregulated power system reliability and efficiency  Wrote Matlab program to automate the reliability of power utility output data in the Automatic Generation Control (AGC) studies  Heavily utilized MS office software for statistical, computational and presentational purposes  Performed PSS/E simulations for power system Availability Transfer Capability (ATC) studies  Published two IEEE conference papers and participated in IEEE (PES) Summer Meeting 2000 in Seattle, Washington March 1997 September 1998 VIZ Manufacturing Company Department of Engineering Philadelphia, Pennsylvania Project: Atmospheric Measurement System for the United States Navy Responsible for the testing and trouble shooting Student Engineer  Troubleshot, repaired and downloaded a software into GPS radiosonde circuit boards (about 50 boards/day) using automatic testing equipment  Planned, developed and systematized radiosonde repair procedures for assembly line personnel  Developed and coordinated testing facility for GPS radiosonde (Test 5 Radiodsondes at one time)  Conducted and administered testing using VIZ software (W9000) on GPS radiosonde ground receivers  Performed temperature and frequency tests on Voltage Controlled Oscillator (VCO) in PLL design
  • 8. EDUCATION AND PERSONAL DEVELOPMENT PROGRAMS Degree, Certificate, etc., School Major (or Subject) Date Board of Engineers Malaysia Professional Engineer License Institution of Engineers Malaysia/Board of Engineers Malaysia BEM Professional Engineer Certificate of Attendance Organized by Petro Edge Asia & Seminar by Azur Offshore Ltd Introduction to Floating Production Storage and Offloading Technology September 2011 Certificate of Attendance Organized by Comfori Sdn Bhd Technical Report Writing December 2008 Certificate of Attendance Organized by Ideapro-logix & Seminar by Y.C. Chow Business Presentation Skills June 2009 Certificate of Attendance Organized by Petro Edge Asia & Seminar by Jayem Dhingra EPCIC Contract Management & Essential Elements of International Contract Law December 2008 Washington State (WA) USA Professional Engineering License (No. 43263) IEEE reviews by Pacific Northwest National Laboratory (PNNL) Richland WA Professional Engineering for Electrical Engineering License/ Registration January 2007 Engineering in Training (EIT) Certificate Bechtel University Electrical Engineering June 2002 Master of Science Drexel University Electrical Engineering June 2001 Bachelor of Science Drexel University Electrical Engineering June 1998 OTHER SIGNIFICANT INFORMATION PERSONAL: Committee member of IEM Marine and Naval Architecture Technical Division 2015/2016 Submitted a technical paper entitled, Shipboard Power Cable Sizing Methodology in IEM September 2015 Bulletin Conducted Informal Professional Training Courses, Introduction to Oil and Gas, Introduction to Floating, Production, Storage and Offloading (FPSO) Vessel Facility Apr. & Jun. & Sept. and Oct. 2015 Conducted IEM professional technical talk – Introduction to FPSO November 2013 Vice Chairman of Ampang Prima Condominium for 2009-2010 & Join Management Body member and responsible for Electrical and Mechanical System operation and maintenance of the Condominium 2012/2013 Active in Central Washington Soccer League (2002 – 2006) 3 rd place in soccer tournament for Malaysian Midwest Games 2006 in Madison Wisconsin USA LANGUAGES Read and Write Bahasa Melayu and English COMPUTER CAPABILITIES: MICROSTATION, AGI32 Lighting Analysis Software, Dialux Lighting Calculation Software, Microsoft Offices, Engineering Transient and Analysis Program (ETAP), MATLAB OTHERS: Completed Six Sigma & Performance Based Leadership training Completed 24 hours of Power System Protection training by Schweitzer Engineering Laboratory Pullman WA USA PROFESSIONAL MEMBERSHIP AND SOCIETIES  BOARD OF ENGINEERS MALAYSIA (BEM)  INSTITUTION OF ENGINEERS MALAYSIA (IEM)  WASHINGTON USA PROFESSIONAL LICENSING BOARD  MEMBER OF INSTITUTE OF ELECTRICAL & ELECTRONICS ENGINEERS (IEEE) REFERENCES M. Firdaus Noordin +6019 770 7971 Azaruddin Ibrahim +6017 361 8844 Abdul Manan Mokhtar +6019 266 4654 Asmizan Ibrahim +6019 228 4045