Small Modular Reactor Overview

              Tom Clements
   Alliance for Nuclear Accountability
  June 29, 2012 – Know Nukes Summit
Claims about SMRs
• Smaller than 300 MW
• Cheaper than larger reactors
• Constructed faster than larger reactors
• Module approach means flexibilty
• Safer, with passive cooling and underground
• Smaller emergency zone
• Fewer operators
• Fabricate at one center - export and receive spent
  modules and spent fuel
• “Plug and play”
SMR Designs
• Babcock & Wilcox – mPower, 125 MW water-cooled, uranium fuel, 4+years
• Holtec International – SMURF, 140 MW, water cooled, uranium fuel and
  possibly MOX, 10 years
• Gen4 Energy (Hyperion) – Hyperion Power Module, 25 MW, lead-bismuth
  cooled, uranium nitride fuel
• Westinghouse – 200 MW, uranium fuel similar to AP1000
• NuScale – 45 MW, water cooled, uranium fuel
• GE-Hitachi PRISM - 311 MW, sodium-cooled, uranium and plutonium fuel
• General Atomics – EM2, 240 MW, gas-cooled, used LWR fuel, Pu
• TerraPower Traveling Wave – 300 MW, liquid metal, used LWR fuel, Pu
• AREVA HTGR
Load ‘em up, roll ‘em out, irradiate ‘em, bring
   ‘em back for dumping – it’s all so easy
DOE “winners & losers” solicitation –
awards handout to 2 vendors in September

“Obama Administration Announces $450 Million to
  Design and Commercialize U.S. Small Modular
  Nuclear Reactors” – March 22, 2012
  “A total of $450 million will be made available to support first-of-its kind engineering, design
  certification and licensing for up to two SMR designs over five years, subject to congressional
  appropriations. Manufacturing these reactors domestically will offer the United States important
  export opportunities and will advance our competitive edge in the global clean energy race. Small
  modular reactors, which are approximately one-third the size of current nuclear plants, have
  compact, scalable designs that are expected to offer a host of safety, construction and economic
  benefits.”

  “SMRs can be made in factories and transported to sites where they would be ready to “plug and
  play” upon arrival, reducing both capital costs and construction times. The smaller size also makes
  SMRs ideal for small electric grids and for locations that cannot support large reactors, offering
  utilities the flexibility to scale production as demand changes. “
Contenders for the bailout
B&W – TVA: mPower at Clinch River site
  - sell electricity at a “special” price to DOE’s Oak Ridge Lab


Westinghouse – Ameren Missouri/Missouri
 Electric Alliance
  - at Callaway PWR site near Jefferson City, MO


NuScale, Holtec? – DOE’s Savannah River Site,
 Aiken, SC
LETTER OF INTENT FOR THE BABCOCK & WILCOX
    (B&W) MPOWER PROJECT REACTOR AT TVA’s CLINCH
               RIVER SITE – February 2010

•   Phased approach
•   TVA will perform an economic and technical suitability eyaluation of its Clinch River site for
    provisional lead plant implementation of a-single unit BCW mPower
    reactor.
•   TVA will analyze the previous environmental studies of the Clinch River site and
    support an initial scoping study for an Early Site Permit (ESP) application to the
    NRC that encompasses the construction and operation of the B&W mPower
    reactor
•   TVA will work together with B&W to develop the scoping for a Phase 2 submittal
    of either a) a COLA for B&W mPower at the Clinch River site as described in
    10CFR52, or b) separate Construction and Operating license applications for
    B&W mPower at the Clinch River site as described in 1 0CFR Part 50.
•   TVA will participate in the B&W mPower Design-Centered Working Group
    (DCWG) with the objective of supporting preparation of a DCD for submittal to
    the NRC.
mPower’s take on advantages
•   125 MWe Nominal Output per Module and 60-Year Plant Life
•    NSSS Forging Diameter Allows Domestic Forgings and
•   Unrestricted Rail Shipment
•   Standard Fuel (less than 5% U 235 )
•   Long Fuel Cycle, 4+ Year Core Life
•   Spent Fuel Storage on Site for Life of Plant
•   Conventional/Off-the-Shelf Balance of Plant Systems and
    Components
•   Accommodate Air-Cooled Condensers as well as Water-
•   Cooled Condensers
•   Flexible Grid Interface (50 Hz or 60 Hz)
•   Digital Instrumentation and Controls Compliant with NRC
    Regulations
“Clinch River SMR”
Why go for a 6 pack when you can get
             a 12 pack?
mPower licensing timeline,
           according to the NRC
• B&W application for design – end of
  2013/early 2014

• TVA application for construction permit for
  Clinch River project – 2015

• No schedule for license issuance or
  rulemaking – several yeasr afte applications
SMR at Savannah River Site – associated
  with spent fuel reprocessing complex and
         transmutation (fast reactor)
conclusions
• Vendors are after the DOE bailout
• Plans only exist on paper
• DOE says they won’t fund construction, so
  where is the money?
• No economy shown
• Might produce more waste per kwh
• Dangers in transport and locating reactors in
  vulnerable locations, where does waste go?
• Who can intervene in B&W, TVA licenses?

More Related Content

More from MATRRorg (6)

David Lochbaum High Level Nuclear Waste-20120630
David Lochbaum High Level Nuclear Waste-20120630David Lochbaum High Level Nuclear Waste-20120630
David Lochbaum High Level Nuclear Waste-20120630
 
Kathleen Ferris Nuclear Issues in TN Pt. 2
Kathleen Ferris Nuclear Issues in TN Pt. 2Kathleen Ferris Nuclear Issues in TN Pt. 2
Kathleen Ferris Nuclear Issues in TN Pt. 2
 
Tom Clements Tritium Production 6.2012
Tom Clements Tritium Production 6.2012Tom Clements Tritium Production 6.2012
Tom Clements Tritium Production 6.2012
 
Tom Clements MOX Plutonium briefing 6.29.2012
Tom Clements MOX Plutonium briefing 6.29.2012Tom Clements MOX Plutonium briefing 6.29.2012
Tom Clements MOX Plutonium briefing 6.29.2012
 
David Lochbaum Got Water-20120629
David Lochbaum Got Water-20120629David Lochbaum Got Water-20120629
David Lochbaum Got Water-20120629
 
Atomic Radiation Is More Harmful To Women and Children_Mary Olson_NIRS
Atomic Radiation Is More Harmful To Women and Children_Mary Olson_NIRSAtomic Radiation Is More Harmful To Women and Children_Mary Olson_NIRS
Atomic Radiation Is More Harmful To Women and Children_Mary Olson_NIRS
 

Recently uploaded

Recently uploaded (20)

Demystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John StaveleyDemystifying gRPC in .Net by John Staveley
Demystifying gRPC in .Net by John Staveley
 
Optimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through ObservabilityOptimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through Observability
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
 
Overview of Hyperledger Foundation
Overview of Hyperledger FoundationOverview of Hyperledger Foundation
Overview of Hyperledger Foundation
 
The Metaverse: Are We There Yet?
The  Metaverse:    Are   We  There  Yet?The  Metaverse:    Are   We  There  Yet?
The Metaverse: Are We There Yet?
 
AI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří KarpíšekAI revolution and Salesforce, Jiří Karpíšek
AI revolution and Salesforce, Jiří Karpíšek
 
TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024TopCryptoSupers 12thReport OrionX May2024
TopCryptoSupers 12thReport OrionX May2024
 
Syngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdf
 
AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101AI presentation and introduction - Retrieval Augmented Generation RAG 101
AI presentation and introduction - Retrieval Augmented Generation RAG 101
 
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
Integrating Telephony Systems with Salesforce: Insights and Considerations, B...
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
 
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
1111 ChatGPT Prompts PDF Free Download - Prompts for ChatGPT
 
Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024
 
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdfIntroduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
Introduction to FDO and How It works Applications _ Richard at FIDO Alliance.pdf
 
What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024What's New in Teams Calling, Meetings and Devices April 2024
What's New in Teams Calling, Meetings and Devices April 2024
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
Powerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara LaskowskaPowerful Start- the Key to Project Success, Barbara Laskowska
Powerful Start- the Key to Project Success, Barbara Laskowska
 
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties ReimaginedEasier, Faster, and More Powerful – Notes Document Properties Reimagined
Easier, Faster, and More Powerful – Notes Document Properties Reimagined
 

Tom Clements Small Modular Reactor Overview for tva meeting 6.26.2012

  • 1. Small Modular Reactor Overview Tom Clements Alliance for Nuclear Accountability June 29, 2012 – Know Nukes Summit
  • 2. Claims about SMRs • Smaller than 300 MW • Cheaper than larger reactors • Constructed faster than larger reactors • Module approach means flexibilty • Safer, with passive cooling and underground • Smaller emergency zone • Fewer operators • Fabricate at one center - export and receive spent modules and spent fuel • “Plug and play”
  • 3. SMR Designs • Babcock & Wilcox – mPower, 125 MW water-cooled, uranium fuel, 4+years • Holtec International – SMURF, 140 MW, water cooled, uranium fuel and possibly MOX, 10 years • Gen4 Energy (Hyperion) – Hyperion Power Module, 25 MW, lead-bismuth cooled, uranium nitride fuel • Westinghouse – 200 MW, uranium fuel similar to AP1000 • NuScale – 45 MW, water cooled, uranium fuel • GE-Hitachi PRISM - 311 MW, sodium-cooled, uranium and plutonium fuel • General Atomics – EM2, 240 MW, gas-cooled, used LWR fuel, Pu • TerraPower Traveling Wave – 300 MW, liquid metal, used LWR fuel, Pu • AREVA HTGR
  • 4. Load ‘em up, roll ‘em out, irradiate ‘em, bring ‘em back for dumping – it’s all so easy
  • 5. DOE “winners & losers” solicitation – awards handout to 2 vendors in September “Obama Administration Announces $450 Million to Design and Commercialize U.S. Small Modular Nuclear Reactors” – March 22, 2012 “A total of $450 million will be made available to support first-of-its kind engineering, design certification and licensing for up to two SMR designs over five years, subject to congressional appropriations. Manufacturing these reactors domestically will offer the United States important export opportunities and will advance our competitive edge in the global clean energy race. Small modular reactors, which are approximately one-third the size of current nuclear plants, have compact, scalable designs that are expected to offer a host of safety, construction and economic benefits.” “SMRs can be made in factories and transported to sites where they would be ready to “plug and play” upon arrival, reducing both capital costs and construction times. The smaller size also makes SMRs ideal for small electric grids and for locations that cannot support large reactors, offering utilities the flexibility to scale production as demand changes. “
  • 6. Contenders for the bailout B&W – TVA: mPower at Clinch River site - sell electricity at a “special” price to DOE’s Oak Ridge Lab Westinghouse – Ameren Missouri/Missouri Electric Alliance - at Callaway PWR site near Jefferson City, MO NuScale, Holtec? – DOE’s Savannah River Site, Aiken, SC
  • 7. LETTER OF INTENT FOR THE BABCOCK & WILCOX (B&W) MPOWER PROJECT REACTOR AT TVA’s CLINCH RIVER SITE – February 2010 • Phased approach • TVA will perform an economic and technical suitability eyaluation of its Clinch River site for provisional lead plant implementation of a-single unit BCW mPower reactor. • TVA will analyze the previous environmental studies of the Clinch River site and support an initial scoping study for an Early Site Permit (ESP) application to the NRC that encompasses the construction and operation of the B&W mPower reactor • TVA will work together with B&W to develop the scoping for a Phase 2 submittal of either a) a COLA for B&W mPower at the Clinch River site as described in 10CFR52, or b) separate Construction and Operating license applications for B&W mPower at the Clinch River site as described in 1 0CFR Part 50. • TVA will participate in the B&W mPower Design-Centered Working Group (DCWG) with the objective of supporting preparation of a DCD for submittal to the NRC.
  • 8. mPower’s take on advantages • 125 MWe Nominal Output per Module and 60-Year Plant Life • NSSS Forging Diameter Allows Domestic Forgings and • Unrestricted Rail Shipment • Standard Fuel (less than 5% U 235 ) • Long Fuel Cycle, 4+ Year Core Life • Spent Fuel Storage on Site for Life of Plant • Conventional/Off-the-Shelf Balance of Plant Systems and Components • Accommodate Air-Cooled Condensers as well as Water- • Cooled Condensers • Flexible Grid Interface (50 Hz or 60 Hz) • Digital Instrumentation and Controls Compliant with NRC Regulations
  • 10. Why go for a 6 pack when you can get a 12 pack?
  • 11. mPower licensing timeline, according to the NRC • B&W application for design – end of 2013/early 2014 • TVA application for construction permit for Clinch River project – 2015 • No schedule for license issuance or rulemaking – several yeasr afte applications
  • 12. SMR at Savannah River Site – associated with spent fuel reprocessing complex and transmutation (fast reactor)
  • 13. conclusions • Vendors are after the DOE bailout • Plans only exist on paper • DOE says they won’t fund construction, so where is the money? • No economy shown • Might produce more waste per kwh • Dangers in transport and locating reactors in vulnerable locations, where does waste go? • Who can intervene in B&W, TVA licenses?