SlideShare a Scribd company logo
1 of 4
Dave B. Ramos
Cuta Central, Batangas City
Batangas City 4200 Philippines
Mobile: +63977 7789 935 / +63932 034 5140
Email: dave.b.ramos1984@gmail.com
Summary:
More than eight years of experience in detailed electrical engineering and design of oil, gas,
site development, building design and mining projects. Worked as an Electrical Instrument Detailer in
Yamal Project, Russia; Goro Nickel Project, New Caledonia (AGNP Batangas). Worked as an
Engineering Coordinator in EPCIC of JDA Block-17 B1701 Field Development Project Phase 3, EVA-
NMB Gas Delivery System Project ( Petronas Malaysia). Worked as an Electrical Instrument Engineer in
Gorgon Par Project (Saipem Leighton Consortium Malaysia). Worked as an Electrical Designer in Royal
Comission of Jubail and Yanbu Projects in Saudi Arabia.
Responsibilities include preparation of electrical engineering and design documents and calculations
such as cable schedules, single line diagrams, cable sizing and fill calculation, lighting calculations,
material take off, site supervision and verification / as-building. Knowledgeable in electrical lighting,
grounding, cable routing, power and cable tray layout development.
Knowledgeable in International codes and standards such as NEC, IEC, AS/NZ, PEC. Also,
knowledgeable in softwares such as SP3D, AutoCAD, Microstation and Dialux. Knowledgeable in
Microsoft Office, Excel and Power Point.
Educational Attainment:
Batangas State University, Batangas City, Philippines
Bachelor of Science, Electrical Engineer (2006)
Experiences:
Electrical Designer II – January 18, 2016 – July 18, 2016t
FLUOR Alabang, Muntinlupa, Philippines
Projects Handled / Involved:
Client: NEXUS Gas Transmission Project
Duties and Responsibilities:
• Preparation and development of the detailed engineering design for the whole electrical system of the
project.
• Prepares electrical engineering calculations such as sizing of cables, motor starters, controllers, circuit
breakers, transformers, panel boards, electrical trenches, conduits, cable trays, etc.
• Prepares and develops lighting designs for all areas.
• Prepares and develops electrical drawing such as plans and layouts for power, lighting, grounding and heat
tracings, schematic and wiring diagrams for pump motors, motor operated valves and lighting control
circuits, one line diagrams, cable and panel load schedule, etc.
• Prepares installation detail drawing for pump motors, MOV’s, lighting, power outlets, junction boxes, cable
ladders, local control stations etc.
• Prepares materials take-off, equipment specifications and vendor evaluation.
Electrical Instrumentation Detailer II – July18, 2015 – November 30, 2015
AGNP Batangas Heavy Fabrication Yard, San Roque Bauan Batangas
Projects Handled / Involved:
Yamal LNG Project, Russia
Duties and Responsibilities:
• Studies the drawings and other pertinent papers for the preparation of fabrication / erection drawings.
• Prepare drawings in accordance with the standard drafting / detailing procedures.
• Prepares materials take-off, materials requisition, and shipping list.
• Executes drawing analysis and interpretations and prepares necessary revisions caused by drawing
implications.
• Checks drawings to suite client standards and specification based on International Standards.
• Supervise in site construction and interpretation of drawings during erection stage.
• Performs other related works such as field verifications / as-building and field assistance
during erection stage.
Electrical Instrumentation Engineer/Engineering Coordinator – August 12, 2013 – Present
Sapura Kencana Petroleum, Sitiawan Perak Darul Ridzuan, Malaysia
Projects Handled / Involved:
Client: Petronas Caligari
C14/002 – EVA-NMB GAS DELIVERY SYSTEM PROJECT
Client: Saipem Leighton Consortium
KTO10FSFI01 – GORGON PAR PROJECT
Client: FMC Technologies Pte. Ltd.
KTO12 – 01 – GWF SUBSEA PROJECT
Client: Cameron International
KTO12 – 02 – MOONDYNE SUBSEA PROJECT
Duties and Responsibilities:
• Coordinates with all department heads in order to prepare Progress Reports to be discussed in weekly
meetings to monitor the progress of the project.
• Monitors and tracks drawing progress of all discipline and make sure that all deliverables are delivered on
time.
• Supervise in site construction and interpretation of drawings during erection stage.
• Performs other related works such as field verifications / as-building and field assistance
during erection stage.
• Preparation and completion of as-build drawings for all electrical system such as power, lighting, grounding,
heat tracing and cable ladder and tray layout.
• Checks drawings to suite client standards and specification based on International Standards.
• Performs other related works such as field verifications / as-building and field assistance
during erection stage.
Electrical Design Engineer – March 24, 2011 – August 5, 2013
Fahad Aleriza Engineering Consultants, Kingdom of Saudi Arabia
Projects Handled / Involved:
Client: Royal Commission for Jubail and Yanbu Kingdom of Saudi Arabia
98019.02 – VILLAS IN JALMUDAH
98019.02a – ADDITIONAL BEDROOM
98019.02b – NEIGHBORHOOD CENTER
98019.03 – DAREEN EAST BEACH DEVELOPMENT
98019.04 – FAMILY APARTMENTS IN JALMUDAH
98019.05 – URBAN PLANNING AND SITE DEVELOPMENT
98019.06 – APARTMENT BUILDINGS
98019.05 – URBAN PLANNING AND SITE DEVELOPMENT
98019.08 – VILLAS IN A3-10 (815-C17)
98019.09 – REGIONAL PARK
98019.11 – SECONDARY INFRASTRUCTURE AND CONSTRUCTION OF 144 FAMILY APARTMENTS (098-C59)
98019.13 – SECONDARY INFRASTRUCTURE & CONSTRUCTION OF 392 FAMILY APARTMENTS IN SECTOR
A3-10 (815-C16)
Client: King Fahad University – Al-Khobar, Kingdom Of Saudi Arabia
DHARAN TECHNO VALLEY SITE AND BUILDING DESIGN
Client: Mouwasat Hospital – Riyadh, Kingdom of Saudi Arabia
MOUWASAT HOSPITAL BUILDING DESIGN
Duties and Responsibilities:
• Preparation and development of the detailed engineering design for the whole electrical system of the
project.
• Prepares electrical engineering calculations such as sizing of cables, motor starters, controllers, circuit
breakers, transformers, panel boards, electrical trenches, conduits, cable trays, etc.
• Prepares and develops lighting designs for all areas.
• Prepares and develops electrical drawing such as plans and layouts for power, lighting, grounding and heat
tracings, schematic and wiring diagrams for pump motors, motor operated valves and lighting control
circuits, one line diagrams, cable and panel load schedule, etc.
• Prepares installation detail drawing for pump motors, MOV’s, lighting, power outlets, junction boxes, cable
ladders, local control stations etc.
• Prepares materials take-off, equipment specifications and vendor evaluation.
Electrical Design Engineer – June 22, 2008 – November 8, 2010
S.A. KENTZ Co. Ltd., Kingdom of Saudi Arabia
Projects Handled / Involved:
Client: Royal Commission for Jubail and Yanbu Kingdom of Saudi Arabia
202 –T23 TASK 8 ELEMENT 1 POTABLE WATER PUMP STATION
027 –T15 TASK 4 JUBAIL UNIVERSITY COLLEGE
027 –T15 TASK 6 JALMUDAH APARTMENTS
027 –T15 TASK 3 FIRE STATIONS (AL-KHALEEJ, JALMUDAH AND JUBAIL
202 –T15 TASK 15 JALMUDAH SITE DEVELOPMENT PROJECT
202 –T13 TASK 13 PUBLIC RELATION BUILDING
J106 – OIL COUNTRY TUBULAR GOODS (OCTG) PIPE PROCESSING FACILITY (AL-ZAMIL)
J104 – JUBAIL EXPORT REFINERY (JER)
J108 – BDO ACETAL POLISHING UNIT
Duties and Responsibilities:
• Preparation and development of the detailed engineering design for the whole electrical system of the
project.
• Prepares electrical engineering calculations such as sizing of cables, motor starters, controllers, circuit
breakers, transformers, panel boards, electrical trenches, conduits, cable trays, etc.
• Prepares and develops lighting designs for all areas.
• Prepares and develops electrical drawing such as plans and layouts for power, lighting, earthing and heat
tracings, schematic and wiring diagrams for pump motors, motor operated valves and lighting control
circuits, one line diagrams, cable and panel load schedule, etc.
• Prepares installation detail drawing for pump motors, MOV’s, lighting, power outlets, junction boxes, cable
ladders, local control stations etc.
• Prepares materials take-off, equipment specifications and vendor evaluation.
Engineer / Detailer 1 – February 1, 2007 – February 1, 2008;
Promoted Engineer / Detailer 2 February 1, 2008 – June 15, 2008.
AGNP Batangas Heavy Fabrication Yard, San Roque Bauan Batangas
Projects Handled / Involved:
GORO NICKEL PROJECT
Duties and Responsibilities:
• Studies the drawings and other pertinent papers for the preparation of fabrication / erection drawings.
• Prepare drawings in accordance with the standard drafting / detailing procedures.
• Prepares materials take-off, materials requisition, and shipping list.
• Executes drawing analysis and interpretations and prepares necessary revisions caused by drawing
implications.
• Checks drawings to suite client standards and specification based on International Standards.
• Supervise in site construction and interpretation of drawings during erection stage.
• Performs other related works such as field verifications / as-building and field assistance
during erection stage.
Field Engineer / Surveyor – October 26, 2006 – January 26, 2007
AGNP Batangas Heavy Fabrication Yard, San Roque Bauan Batangas
Projects Handled / Involved:
GORO NICKEL PROJECT
Duties and Responsibilities:
• Responsible in performing construction engineering works which requires application of standard
construction engineering techniques and procedures in carrying out a sequence of related engineering
tasks.
• Review specifications and related documents of the project. Ensure drawing specifications and procedures
are in current revision.
• Evaluate, select and apply standard construction engineering techniques, procedures and criteria using
judgment based on all applicable codes, specifications and engineering information.
• Conduct regular technical assessment and see to it that the works are in accordance with the designed
plans and specifications, and to ensure work efficiency, quality and workmanship to meet the good quality of
the project. Maintain knowledge of safety policies and procedures and perform assigned duties in safe
manner.
Maintenance Engineer – April 1, 2005 - September 30, 2006
General Milling Corporation, Tabangao Batangas City, Philippines
Duties and Responsibilities:
• Worked as Maintenance engineer and technician by performing duties such as maintenance of different
apparatuses, troubleshooting of faulty electrical wiring, designing layouts and inventory of equipments.
•
Professional / Social Involvement:
2002 – Present TAU BETA PHI Confraternity Batangas State University
Character References: Available Upon Request
I hereby certify that the above statements are true and correct to the best of my knowledge and belief.

More Related Content

What's hot

Fady samir cv
Fady samir cvFady samir cv
Fady samir cvfady toma
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar BeheraTarun Behera
 
Sarah Melendrez Resume Current
Sarah Melendrez Resume CurrentSarah Melendrez Resume Current
Sarah Melendrez Resume CurrentSarah Melendrez
 
UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016Vic Carino
 
Peter Chakwenya Curriculum Vitae
Peter Chakwenya  Curriculum VitaePeter Chakwenya  Curriculum Vitae
Peter Chakwenya Curriculum VitaeTazviona
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project managementDr Bhavana Deshpande
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profilepheyer351
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CVLeo Rosario
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEHSAN ASGHAR, RE
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016Raymond Guo
 
Samuel A McBride Resume 1-13-15
Samuel A McBride Resume 1-13-15Samuel A McBride Resume 1-13-15
Samuel A McBride Resume 1-13-15Sam McBride
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103Kenneth Horner
 

What's hot (20)

resume-ehlibongco_2015e
resume-ehlibongco_2015eresume-ehlibongco_2015e
resume-ehlibongco_2015e
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
CV_Tarun Kumar Behera
CV_Tarun Kumar BeheraCV_Tarun Kumar Behera
CV_Tarun Kumar Behera
 
Sarah Melendrez Resume Current
Sarah Melendrez Resume CurrentSarah Melendrez Resume Current
Sarah Melendrez Resume Current
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 
CV OF MVV
CV OF MVVCV OF MVV
CV OF MVV
 
REMIGIO D GLORIA CV
REMIGIO D GLORIA CVREMIGIO D GLORIA CV
REMIGIO D GLORIA CV
 
ART Resume
ART Resume ART Resume
ART Resume
 
UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016
 
Peter Chakwenya Curriculum Vitae
Peter Chakwenya  Curriculum VitaePeter Chakwenya  Curriculum Vitae
Peter Chakwenya Curriculum Vitae
 
Role of project engineering in project management
Role of project engineering in project managementRole of project engineering in project management
Role of project engineering in project management
 
Heyer Professional Profile
Heyer Professional ProfileHeyer Professional Profile
Heyer Professional Profile
 
ROSARIO LEO G_CV
ROSARIO LEO G_CVROSARIO LEO G_CV
ROSARIO LEO G_CV
 
Imaran CV
Imaran CVImaran CV
Imaran CV
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
Samuel A McBride Resume 1-13-15
Samuel A McBride Resume 1-13-15Samuel A McBride Resume 1-13-15
Samuel A McBride Resume 1-13-15
 
Resume of Hariom
Resume of HariomResume of Hariom
Resume of Hariom
 
OSAS-CV5
OSAS-CV5OSAS-CV5
OSAS-CV5
 
K Horner_RESUME_20161103
K Horner_RESUME_20161103K Horner_RESUME_20161103
K Horner_RESUME_20161103
 

Similar to Electrical Engineer with Extensive Experience

Similar to Electrical Engineer with Extensive Experience (20)

Ben's CV
Ben's CVBen's CV
Ben's CV
 
Yasser Wahba CV
Yasser Wahba CVYasser Wahba CV
Yasser Wahba CV
 
Rajmohan_Sep_2015
Rajmohan_Sep_2015Rajmohan_Sep_2015
Rajmohan_Sep_2015
 
GuruResume
GuruResumeGuruResume
GuruResume
 
cv umar
cv umarcv umar
cv umar
 
CS Design Engineer
CS Design EngineerCS Design Engineer
CS Design Engineer
 
farhan cv with passport detail
farhan cv with passport detailfarhan cv with passport detail
farhan cv with passport detail
 
Anthoniraj (1)
Anthoniraj (1)Anthoniraj (1)
Anthoniraj (1)
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Brijesh cv
Brijesh cvBrijesh cv
Brijesh cv
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Sagar_cv
Sagar_cv Sagar_cv
Sagar_cv
 
reeshu_updated resume
reeshu_updated resumereeshu_updated resume
reeshu_updated resume
 
Resume
ResumeResume
Resume
 
jay-resume
jay-resumejay-resume
jay-resume
 
F. CV
F. CVF. CV
F. CV
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 

Electrical Engineer with Extensive Experience

  • 1. Dave B. Ramos Cuta Central, Batangas City Batangas City 4200 Philippines Mobile: +63977 7789 935 / +63932 034 5140 Email: dave.b.ramos1984@gmail.com Summary: More than eight years of experience in detailed electrical engineering and design of oil, gas, site development, building design and mining projects. Worked as an Electrical Instrument Detailer in Yamal Project, Russia; Goro Nickel Project, New Caledonia (AGNP Batangas). Worked as an Engineering Coordinator in EPCIC of JDA Block-17 B1701 Field Development Project Phase 3, EVA- NMB Gas Delivery System Project ( Petronas Malaysia). Worked as an Electrical Instrument Engineer in Gorgon Par Project (Saipem Leighton Consortium Malaysia). Worked as an Electrical Designer in Royal Comission of Jubail and Yanbu Projects in Saudi Arabia. Responsibilities include preparation of electrical engineering and design documents and calculations such as cable schedules, single line diagrams, cable sizing and fill calculation, lighting calculations, material take off, site supervision and verification / as-building. Knowledgeable in electrical lighting, grounding, cable routing, power and cable tray layout development. Knowledgeable in International codes and standards such as NEC, IEC, AS/NZ, PEC. Also, knowledgeable in softwares such as SP3D, AutoCAD, Microstation and Dialux. Knowledgeable in Microsoft Office, Excel and Power Point. Educational Attainment: Batangas State University, Batangas City, Philippines Bachelor of Science, Electrical Engineer (2006) Experiences: Electrical Designer II – January 18, 2016 – July 18, 2016t FLUOR Alabang, Muntinlupa, Philippines Projects Handled / Involved: Client: NEXUS Gas Transmission Project Duties and Responsibilities: • Preparation and development of the detailed engineering design for the whole electrical system of the project. • Prepares electrical engineering calculations such as sizing of cables, motor starters, controllers, circuit breakers, transformers, panel boards, electrical trenches, conduits, cable trays, etc. • Prepares and develops lighting designs for all areas. • Prepares and develops electrical drawing such as plans and layouts for power, lighting, grounding and heat tracings, schematic and wiring diagrams for pump motors, motor operated valves and lighting control circuits, one line diagrams, cable and panel load schedule, etc. • Prepares installation detail drawing for pump motors, MOV’s, lighting, power outlets, junction boxes, cable ladders, local control stations etc. • Prepares materials take-off, equipment specifications and vendor evaluation. Electrical Instrumentation Detailer II – July18, 2015 – November 30, 2015 AGNP Batangas Heavy Fabrication Yard, San Roque Bauan Batangas Projects Handled / Involved: Yamal LNG Project, Russia Duties and Responsibilities: • Studies the drawings and other pertinent papers for the preparation of fabrication / erection drawings.
  • 2. • Prepare drawings in accordance with the standard drafting / detailing procedures. • Prepares materials take-off, materials requisition, and shipping list. • Executes drawing analysis and interpretations and prepares necessary revisions caused by drawing implications. • Checks drawings to suite client standards and specification based on International Standards. • Supervise in site construction and interpretation of drawings during erection stage. • Performs other related works such as field verifications / as-building and field assistance during erection stage. Electrical Instrumentation Engineer/Engineering Coordinator – August 12, 2013 – Present Sapura Kencana Petroleum, Sitiawan Perak Darul Ridzuan, Malaysia Projects Handled / Involved: Client: Petronas Caligari C14/002 – EVA-NMB GAS DELIVERY SYSTEM PROJECT Client: Saipem Leighton Consortium KTO10FSFI01 – GORGON PAR PROJECT Client: FMC Technologies Pte. Ltd. KTO12 – 01 – GWF SUBSEA PROJECT Client: Cameron International KTO12 – 02 – MOONDYNE SUBSEA PROJECT Duties and Responsibilities: • Coordinates with all department heads in order to prepare Progress Reports to be discussed in weekly meetings to monitor the progress of the project. • Monitors and tracks drawing progress of all discipline and make sure that all deliverables are delivered on time. • Supervise in site construction and interpretation of drawings during erection stage. • Performs other related works such as field verifications / as-building and field assistance during erection stage. • Preparation and completion of as-build drawings for all electrical system such as power, lighting, grounding, heat tracing and cable ladder and tray layout. • Checks drawings to suite client standards and specification based on International Standards. • Performs other related works such as field verifications / as-building and field assistance during erection stage. Electrical Design Engineer – March 24, 2011 – August 5, 2013 Fahad Aleriza Engineering Consultants, Kingdom of Saudi Arabia Projects Handled / Involved: Client: Royal Commission for Jubail and Yanbu Kingdom of Saudi Arabia 98019.02 – VILLAS IN JALMUDAH 98019.02a – ADDITIONAL BEDROOM 98019.02b – NEIGHBORHOOD CENTER 98019.03 – DAREEN EAST BEACH DEVELOPMENT 98019.04 – FAMILY APARTMENTS IN JALMUDAH 98019.05 – URBAN PLANNING AND SITE DEVELOPMENT 98019.06 – APARTMENT BUILDINGS 98019.05 – URBAN PLANNING AND SITE DEVELOPMENT 98019.08 – VILLAS IN A3-10 (815-C17) 98019.09 – REGIONAL PARK 98019.11 – SECONDARY INFRASTRUCTURE AND CONSTRUCTION OF 144 FAMILY APARTMENTS (098-C59) 98019.13 – SECONDARY INFRASTRUCTURE & CONSTRUCTION OF 392 FAMILY APARTMENTS IN SECTOR A3-10 (815-C16) Client: King Fahad University – Al-Khobar, Kingdom Of Saudi Arabia DHARAN TECHNO VALLEY SITE AND BUILDING DESIGN
  • 3. Client: Mouwasat Hospital – Riyadh, Kingdom of Saudi Arabia MOUWASAT HOSPITAL BUILDING DESIGN Duties and Responsibilities: • Preparation and development of the detailed engineering design for the whole electrical system of the project. • Prepares electrical engineering calculations such as sizing of cables, motor starters, controllers, circuit breakers, transformers, panel boards, electrical trenches, conduits, cable trays, etc. • Prepares and develops lighting designs for all areas. • Prepares and develops electrical drawing such as plans and layouts for power, lighting, grounding and heat tracings, schematic and wiring diagrams for pump motors, motor operated valves and lighting control circuits, one line diagrams, cable and panel load schedule, etc. • Prepares installation detail drawing for pump motors, MOV’s, lighting, power outlets, junction boxes, cable ladders, local control stations etc. • Prepares materials take-off, equipment specifications and vendor evaluation. Electrical Design Engineer – June 22, 2008 – November 8, 2010 S.A. KENTZ Co. Ltd., Kingdom of Saudi Arabia Projects Handled / Involved: Client: Royal Commission for Jubail and Yanbu Kingdom of Saudi Arabia 202 –T23 TASK 8 ELEMENT 1 POTABLE WATER PUMP STATION 027 –T15 TASK 4 JUBAIL UNIVERSITY COLLEGE 027 –T15 TASK 6 JALMUDAH APARTMENTS 027 –T15 TASK 3 FIRE STATIONS (AL-KHALEEJ, JALMUDAH AND JUBAIL 202 –T15 TASK 15 JALMUDAH SITE DEVELOPMENT PROJECT 202 –T13 TASK 13 PUBLIC RELATION BUILDING J106 – OIL COUNTRY TUBULAR GOODS (OCTG) PIPE PROCESSING FACILITY (AL-ZAMIL) J104 – JUBAIL EXPORT REFINERY (JER) J108 – BDO ACETAL POLISHING UNIT Duties and Responsibilities: • Preparation and development of the detailed engineering design for the whole electrical system of the project. • Prepares electrical engineering calculations such as sizing of cables, motor starters, controllers, circuit breakers, transformers, panel boards, electrical trenches, conduits, cable trays, etc. • Prepares and develops lighting designs for all areas. • Prepares and develops electrical drawing such as plans and layouts for power, lighting, earthing and heat tracings, schematic and wiring diagrams for pump motors, motor operated valves and lighting control circuits, one line diagrams, cable and panel load schedule, etc. • Prepares installation detail drawing for pump motors, MOV’s, lighting, power outlets, junction boxes, cable ladders, local control stations etc. • Prepares materials take-off, equipment specifications and vendor evaluation. Engineer / Detailer 1 – February 1, 2007 – February 1, 2008; Promoted Engineer / Detailer 2 February 1, 2008 – June 15, 2008. AGNP Batangas Heavy Fabrication Yard, San Roque Bauan Batangas Projects Handled / Involved: GORO NICKEL PROJECT Duties and Responsibilities: • Studies the drawings and other pertinent papers for the preparation of fabrication / erection drawings. • Prepare drawings in accordance with the standard drafting / detailing procedures. • Prepares materials take-off, materials requisition, and shipping list. • Executes drawing analysis and interpretations and prepares necessary revisions caused by drawing implications. • Checks drawings to suite client standards and specification based on International Standards. • Supervise in site construction and interpretation of drawings during erection stage.
  • 4. • Performs other related works such as field verifications / as-building and field assistance during erection stage. Field Engineer / Surveyor – October 26, 2006 – January 26, 2007 AGNP Batangas Heavy Fabrication Yard, San Roque Bauan Batangas Projects Handled / Involved: GORO NICKEL PROJECT Duties and Responsibilities: • Responsible in performing construction engineering works which requires application of standard construction engineering techniques and procedures in carrying out a sequence of related engineering tasks. • Review specifications and related documents of the project. Ensure drawing specifications and procedures are in current revision. • Evaluate, select and apply standard construction engineering techniques, procedures and criteria using judgment based on all applicable codes, specifications and engineering information. • Conduct regular technical assessment and see to it that the works are in accordance with the designed plans and specifications, and to ensure work efficiency, quality and workmanship to meet the good quality of the project. Maintain knowledge of safety policies and procedures and perform assigned duties in safe manner. Maintenance Engineer – April 1, 2005 - September 30, 2006 General Milling Corporation, Tabangao Batangas City, Philippines Duties and Responsibilities: • Worked as Maintenance engineer and technician by performing duties such as maintenance of different apparatuses, troubleshooting of faulty electrical wiring, designing layouts and inventory of equipments. • Professional / Social Involvement: 2002 – Present TAU BETA PHI Confraternity Batangas State University Character References: Available Upon Request I hereby certify that the above statements are true and correct to the best of my knowledge and belief.