All about ISO clause No-7 i.e. production Realization
7.1 Planning of Product Realization
7.2 Customer Related Processes
7.4 Purchasing
7.5.1 Control of production & service provision
7.5.2 Validation of processes for production and service provision
7.5.3 Identification & Traceability
7.5.4 Customer Property
7.5.5 Preservation of Product
7.6 Control of monitoring & measuring devices
5. • Processes,
• Documents
• Service time,
• Delivery time,
• Number of complaints, etc.
• Required verification
• Validation
• Monitoring
• Inspection
• Test activities
• Records needed to
provide evidence that
Realization processes
resulting service meet the
requirements.
6. 7.2 Customer Related Processes
7.2.1
Determination Of
Requirements to
the Product
• Delivery activities & Post delivery activities such as
> Warranty provisions & Contractual Obligations
> such as Maintenance services.
> Recycling Or Final disposal.
• Statutory & Regulatory requirement applicable to product.
7.2.2
Review Of
Requirement
Related to the
Product/Services
The organization shall review the requirements related to product
[ submission of tenders, acceptance of contracts or orders, acceptance
of changes to contracts or orders ]
•Product requirements are defined
•Contract or order requirements differing from those previously
expressed are resolved.
•The organization has the ability to meet the defined requirements.
•Records should maintained of the results of the review & actions.
7.2.3
Customer
Communication
Determine and implement effective arrangements for communicating
with customers in relation to
•Product information
•Enquiries, contracts or order handling, including amendments,
•Customer feedback, including customer complaints
7. 7.4 Purchasing
7.4.1
Purchasing Process
• Approved indent from store.
•Enquires send to min 3 suppliers to submit quotation
•Comparative statement made.
•After Approval of quotation purchase order issued to supplier.
•Evaluation Done suppliers based on Quality, and delivery of products
Grade A- Material supplied OK , Material received in time.
Grade B -Material supplied OK, Material received late.
Grade C -Material supplied Rej. , Material received in time.
Grade B -Material supplied Rej. , Material received late.
7.4.2
Purchasing
Information
describing the product/ service to be purchased including :
a. Requirement for approval of product, procedures, processes
b. Requirement for qualification of personnel.
c. Quality management system requirements.
d. The organization ensures purchase requirements contained in
purchasing documents, prior to their communication to the supplier.
7.4.3
Verification Of
Purchasing
Product
Establishes and implements
• Inspection and other activities necessary for verification of the
purchased material with the specified purchasing requirements.
• Checking at party’s premises/& at our premises
9. 7.5 Production & Service Provision
7.5.1
Control Of
Production & Service
Provision
Production and service provision under controlled conditions
including as applicable:
•Description of the characteristics of the product.
• Availability of work instructions, as necessary.
• Use of suitable equipments.
•Availability and use of the measure and monitoring equipments.
•Implementation of monitoring and measurement.
•The implementation of product release, delivery and post- delivery
activities includes meeting customer complaints
7.5.3
Identification &
Traceability
•Un-inspected material/product is marked with white tag/paint
• ok material is marked with green tag/paint
•rejected material is marked with red tag/paint
•Under Re-Process is marked with yellow tag/paint
•Incoming materials are identified by Shape & Size, date of receipt
and tag on it
7.5.5
Preservation Of
Product
•Including constituent parts, during internal processing and
delivery in order to maintain conformity to product requirement
•Preservation shall include identification, handling packing, storage
and protection
• Soft copies of all back-up data recorded on computers during
internal processing is preserved.
10. 7.6 Control of Monitoring & Measuring
Equipments
Provide evidence of conformity of product / components to the established requirements.
Based on this need, the necessary monitoring & measuring equipments are to be
identified & made available.
The required monitoring / measurement procedure are established
Established a suitable system for all monitoring / measuring equipments :
•Calibration/verification should done at regular intervals. In this process measuring
equipments are adjusted or re adjusted.
•Source of calibration or calibration agency.
•Tractability of calibration / verification to national or international standards.
•The equipments have unique identification number to determine and identify their
calibration status. ‘C’ for Calibrated , ‘UC’ for un-Calibrated & ‘OO’ for out of order.
Protection from damage, deterioration during handling, maintenance & storage.
• Action should be taken to the not conforming to the requirement is assessed & recorded.
• Maintains records of calibration & / verification.
•If Computer software is used for measurement, it shall be ensured prior to release for use
that computer software satisfies the requirements.
•Maintains the list of monitoring & measuring equipments including calibration status.