SlideShare a Scribd company logo
1 of 14
4/17/2014
7.0
PRODUCT
REALIZATION
Mr. Manoj Kumar Maharana
Sr. Engineer [Dept. of Electrical ]
BLA Power Pvt Ltd
1
BLA Power Pvt. Ltd BLA Power Pvt. Ltd
ISO 9001:2000
Balancing the Equation
6.2 Human
Resources
6.3
Infrastructure
6.4 Work
Environment
7 .0 Product
Realization
8.0
Measurement,
Analysis and
Improvement
8.2.1 Customer
Satisfaction
5.4.1 Quality
Objectives
+
+
+
=
=
A B C=+
4/17/2014 www.brainybetty.com 4
• Processes,
• Documents
• Service time,
• Delivery time,
• Number of complaints, etc.
• Required verification
• Validation
• Monitoring
• Inspection
• Test activities
• Records needed to
provide evidence that
Realization processes
resulting service meet the
requirements.
7.2 Customer Related Processes
7.2.1
Determination Of
Requirements to
the Product
• Delivery activities & Post delivery activities such as
> Warranty provisions & Contractual Obligations
> such as Maintenance services.
> Recycling Or Final disposal.
• Statutory & Regulatory requirement applicable to product.
7.2.2
Review Of
Requirement
Related to the
Product/Services
The organization shall review the requirements related to product
[ submission of tenders, acceptance of contracts or orders, acceptance
of changes to contracts or orders ]
•Product requirements are defined
•Contract or order requirements differing from those previously
expressed are resolved.
•The organization has the ability to meet the defined requirements.
•Records should maintained of the results of the review & actions.
7.2.3
Customer
Communication
Determine and implement effective arrangements for communicating
with customers in relation to
•Product information
•Enquiries, contracts or order handling, including amendments,
•Customer feedback, including customer complaints
7.4 Purchasing
7.4.1
Purchasing Process
• Approved indent from store.
•Enquires send to min 3 suppliers to submit quotation
•Comparative statement made.
•After Approval of quotation purchase order issued to supplier.
•Evaluation Done suppliers based on Quality, and delivery of products
Grade A- Material supplied OK , Material received in time.
Grade B -Material supplied OK, Material received late.
Grade C -Material supplied Rej. , Material received in time.
Grade B -Material supplied Rej. , Material received late.
7.4.2
Purchasing
Information
describing the product/ service to be purchased including :
a. Requirement for approval of product, procedures, processes
b. Requirement for qualification of personnel.
c. Quality management system requirements.
d. The organization ensures purchase requirements contained in
purchasing documents, prior to their communication to the supplier.
7.4.3
Verification Of
Purchasing
Product
Establishes and implements
• Inspection and other activities necessary for verification of the
purchased material with the specified purchasing requirements.
• Checking at party’s premises/& at our premises
4/17/2014 www.brainybetty.com 8
7.5 Production & Service Provision
7.5.1
Control Of
Production & Service
Provision
Production and service provision under controlled conditions
including as applicable:
•Description of the characteristics of the product.
• Availability of work instructions, as necessary.
• Use of suitable equipments.
•Availability and use of the measure and monitoring equipments.
•Implementation of monitoring and measurement.
•The implementation of product release, delivery and post- delivery
activities includes meeting customer complaints
7.5.3
Identification &
Traceability
•Un-inspected material/product is marked with white tag/paint
• ok material is marked with green tag/paint
•rejected material is marked with red tag/paint
•Under Re-Process is marked with yellow tag/paint
•Incoming materials are identified by Shape & Size, date of receipt
and tag on it
7.5.5
Preservation Of
Product
•Including constituent parts, during internal processing and
delivery in order to maintain conformity to product requirement
•Preservation shall include identification, handling packing, storage
and protection
• Soft copies of all back-up data recorded on computers during
internal processing is preserved.
7.6 Control of Monitoring & Measuring
Equipments
Provide evidence of conformity of product / components to the established requirements.
Based on this need, the necessary monitoring & measuring equipments are to be
identified & made available.
The required monitoring / measurement procedure are established
Established a suitable system for all monitoring / measuring equipments :
•Calibration/verification should done at regular intervals. In this process measuring
equipments are adjusted or re adjusted.
•Source of calibration or calibration agency.
•Tractability of calibration / verification to national or international standards.
•The equipments have unique identification number to determine and identify their
calibration status. ‘C’ for Calibrated , ‘UC’ for un-Calibrated & ‘OO’ for out of order.
Protection from damage, deterioration during handling, maintenance & storage.
• Action should be taken to the not conforming to the requirement is assessed & recorded.
• Maintains records of calibration & / verification.
•If Computer software is used for measurement, it shall be ensured prior to release for use
that computer software satisfies the requirements.
•Maintains the list of monitoring & measuring equipments including calibration status.
4/17/2014 www.brainybetty.com 11
12
Poor
Product
Quality
High
Product
Quality
Satisfied
Customer
s
Increased
Sales
(Locally & Exports)
Improved
Economy
Higher
Revenue
Greater possibility
of Investment
and Development
Dissatisfi
ed
Customer
s
Less
Revenue
Pressure on the
government to provide
employment
opportunities
Economic
Depression
No
Improvement
& decreased
Employment
Decrease
d Sales
Happy Citizens
13
Improved Quality
Reduced Waste
Reduced Costs
Less Pressure on
the Economy
Positive Balance of
Trade
(Export >Imports)
Special Thanks
• for Guidance
Mr. Kalpesh Goswami
Sr. Manager [ Dept. Of Inst. ]
Acknowledgement [suggested reading]
• ANSI/ASQ 9000:2000 Quality Management Systems – Fundamentals and Vocabulary
• ANSI/ASQ 9001:2000 Quality Management Systems – Requirements, December
13,2000
• Quality Management System manual Doc No: BLAPOWER/M/QMSM/01
14

More Related Content

What's hot

Process Validation & Verification (V&V) for Medical Devices
Process Validation & Verification (V&V) for Medical DevicesProcess Validation & Verification (V&V) for Medical Devices
Process Validation & Verification (V&V) for Medical DevicesRina Nir
 
ISO: 14971 Quality risk management of medical devices
ISO: 14971 Quality risk management  of medical devicesISO: 14971 Quality risk management  of medical devices
ISO: 14971 Quality risk management of medical devicesAtul Bhombe
 
ISO 13485 | ISO 13485 Training | ISO 13485 INTERNAL AUDITOR TRAINING
ISO 13485 | ISO 13485 Training | ISO 13485 INTERNAL AUDITOR TRAININGISO 13485 | ISO 13485 Training | ISO 13485 INTERNAL AUDITOR TRAINING
ISO 13485 | ISO 13485 Training | ISO 13485 INTERNAL AUDITOR TRAININGhimalya sharma
 
ISO 13485 training | ISO 13485 Internal Auditor Training
ISO 13485 training | ISO 13485 Internal Auditor Training ISO 13485 training | ISO 13485 Internal Auditor Training
ISO 13485 training | ISO 13485 Internal Auditor Training himalya sharma
 
ISO 13485:2016 Revisions Webinar
ISO 13485:2016 Revisions WebinarISO 13485:2016 Revisions Webinar
ISO 13485:2016 Revisions WebinarDQS Inc.
 
ISO 13485:2016 Transition Are You Prepared - OMTEC 2017
ISO 13485:2016 Transition Are You Prepared - OMTEC 2017ISO 13485:2016 Transition Are You Prepared - OMTEC 2017
ISO 13485:2016 Transition Are You Prepared - OMTEC 2017April Bright
 
ISO-13485-2016.pptx
ISO-13485-2016.pptxISO-13485-2016.pptx
ISO-13485-2016.pptxPradeepa J
 
Understanding the New ISO 13485:2016 Revision
Understanding the New ISO 13485:2016 RevisionUnderstanding the New ISO 13485:2016 Revision
Understanding the New ISO 13485:2016 RevisionGreenlight Guru
 
Sequence and interaction of qms processes
Sequence and interaction of qms processesSequence and interaction of qms processes
Sequence and interaction of qms processesJorge Torres
 
How to Simplify Your Compliance to the New ISO 13485:2016
How to Simplify Your Compliance to the New ISO 13485:2016How to Simplify Your Compliance to the New ISO 13485:2016
How to Simplify Your Compliance to the New ISO 13485:2016Greenlight Guru
 
Gmp (good manufacturing practices)
Gmp (good manufacturing practices)Gmp (good manufacturing practices)
Gmp (good manufacturing practices)RAJESHWAR CHAVAN
 
Fda quality system regulation 21 CFR820_Medical devices_k_trautman
Fda quality system regulation 21 CFR820_Medical devices_k_trautmanFda quality system regulation 21 CFR820_Medical devices_k_trautman
Fda quality system regulation 21 CFR820_Medical devices_k_trautmanLatvian University
 
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideOverview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideProPharma Group
 
Overview of computer system validation
Overview of computer system validationOverview of computer system validation
Overview of computer system validationNilesh Damale
 
Medical Device Regulatory Approval
Medical Device Regulatory ApprovalMedical Device Regulatory Approval
Medical Device Regulatory Approvalruyang89
 
Medical Devices Regulation (MDR) 2017/745 - Postmarket surveillance
Medical Devices Regulation (MDR)  2017/745 - Postmarket surveillance Medical Devices Regulation (MDR)  2017/745 - Postmarket surveillance
Medical Devices Regulation (MDR) 2017/745 - Postmarket surveillance Arete-Zoe, LLC
 
Specific Detailed Changes to the New ISO 13485:2016
Specific Detailed Changes to the New ISO 13485:2016Specific Detailed Changes to the New ISO 13485:2016
Specific Detailed Changes to the New ISO 13485:2016Greenlight Guru
 

What's hot (20)

Process Validation & Verification (V&V) for Medical Devices
Process Validation & Verification (V&V) for Medical DevicesProcess Validation & Verification (V&V) for Medical Devices
Process Validation & Verification (V&V) for Medical Devices
 
21 CFR 820....pptx
21 CFR 820....pptx21 CFR 820....pptx
21 CFR 820....pptx
 
ISO: 14971 Quality risk management of medical devices
ISO: 14971 Quality risk management  of medical devicesISO: 14971 Quality risk management  of medical devices
ISO: 14971 Quality risk management of medical devices
 
ISO 13485 | ISO 13485 Training | ISO 13485 INTERNAL AUDITOR TRAINING
ISO 13485 | ISO 13485 Training | ISO 13485 INTERNAL AUDITOR TRAININGISO 13485 | ISO 13485 Training | ISO 13485 INTERNAL AUDITOR TRAINING
ISO 13485 | ISO 13485 Training | ISO 13485 INTERNAL AUDITOR TRAINING
 
ISO 13485 training | ISO 13485 Internal Auditor Training
ISO 13485 training | ISO 13485 Internal Auditor Training ISO 13485 training | ISO 13485 Internal Auditor Training
ISO 13485 training | ISO 13485 Internal Auditor Training
 
ISO 13485:2016 Revisions Webinar
ISO 13485:2016 Revisions WebinarISO 13485:2016 Revisions Webinar
ISO 13485:2016 Revisions Webinar
 
ISO 13485:2016 Transition Are You Prepared - OMTEC 2017
ISO 13485:2016 Transition Are You Prepared - OMTEC 2017ISO 13485:2016 Transition Are You Prepared - OMTEC 2017
ISO 13485:2016 Transition Are You Prepared - OMTEC 2017
 
ISO-13485-2016.pptx
ISO-13485-2016.pptxISO-13485-2016.pptx
ISO-13485-2016.pptx
 
Understanding the New ISO 13485:2016 Revision
Understanding the New ISO 13485:2016 RevisionUnderstanding the New ISO 13485:2016 Revision
Understanding the New ISO 13485:2016 Revision
 
Sequence and interaction of qms processes
Sequence and interaction of qms processesSequence and interaction of qms processes
Sequence and interaction of qms processes
 
How to Simplify Your Compliance to the New ISO 13485:2016
How to Simplify Your Compliance to the New ISO 13485:2016How to Simplify Your Compliance to the New ISO 13485:2016
How to Simplify Your Compliance to the New ISO 13485:2016
 
Gmp (good manufacturing practices)
Gmp (good manufacturing practices)Gmp (good manufacturing practices)
Gmp (good manufacturing practices)
 
Fda quality system regulation 21 CFR820_Medical devices_k_trautman
Fda quality system regulation 21 CFR820_Medical devices_k_trautmanFda quality system regulation 21 CFR820_Medical devices_k_trautman
Fda quality system regulation 21 CFR820_Medical devices_k_trautman
 
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 GuideOverview of Computerized Systems Compliance Using the GAMP® 5 Guide
Overview of Computerized Systems Compliance Using the GAMP® 5 Guide
 
Corrective Action & Preventive Action
Corrective Action & Preventive ActionCorrective Action & Preventive Action
Corrective Action & Preventive Action
 
Overview of computer system validation
Overview of computer system validationOverview of computer system validation
Overview of computer system validation
 
Medical Device Regulatory Approval
Medical Device Regulatory ApprovalMedical Device Regulatory Approval
Medical Device Regulatory Approval
 
IEC 62304 Action List
IEC 62304 Action List IEC 62304 Action List
IEC 62304 Action List
 
Medical Devices Regulation (MDR) 2017/745 - Postmarket surveillance
Medical Devices Regulation (MDR)  2017/745 - Postmarket surveillance Medical Devices Regulation (MDR)  2017/745 - Postmarket surveillance
Medical Devices Regulation (MDR) 2017/745 - Postmarket surveillance
 
Specific Detailed Changes to the New ISO 13485:2016
Specific Detailed Changes to the New ISO 13485:2016Specific Detailed Changes to the New ISO 13485:2016
Specific Detailed Changes to the New ISO 13485:2016
 

Viewers also liked

The use of imagery in monitoring existing sub surface structures
The use of imagery in monitoring existing sub surface structuresThe use of imagery in monitoring existing sub surface structures
The use of imagery in monitoring existing sub surface structuresPeter McCready
 
Korea and norway maritime opportunities and challenges in the high north
Korea and norway maritime opportunities and challenges in the high northKorea and norway maritime opportunities and challenges in the high north
Korea and norway maritime opportunities and challenges in the high northInnovation Norway
 
Calibration of MMDs to meet QMS
Calibration of MMDs to meet QMSCalibration of MMDs to meet QMS
Calibration of MMDs to meet QMSAmsavel Vel
 
Norsok standards for oil and gas
Norsok standards for oil and gasNorsok standards for oil and gas
Norsok standards for oil and gasmarco garofanello
 
Zigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar powerZigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar powereSAT Journals
 
Robots for Industrial Inspection
Robots for Industrial InspectionRobots for Industrial Inspection
Robots for Industrial Inspectionmarshallbutler
 
Polyinform_pipelines inspection_english
Polyinform_pipelines inspection_englishPolyinform_pipelines inspection_english
Polyinform_pipelines inspection_englishPolyinform
 
Corrosion monitoring in petroleum refineries
Corrosion monitoring in petroleum refineriesCorrosion monitoring in petroleum refineries
Corrosion monitoring in petroleum refineriesK R SONI
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in constructionIsidro Sid Calayag
 
Calibration of Coordinate Measuring Machines (CMM)
Calibration of Coordinate Measuring Machines (CMM)Calibration of Coordinate Measuring Machines (CMM)
Calibration of Coordinate Measuring Machines (CMM)Hassan Habib
 
Under water welding.smnr
Under water welding.smnrUnder water welding.smnr
Under water welding.smnrChuchu Beera
 
Typical Quality Management System Based On Iso 9001 2008
Typical Quality Management System Based On Iso 9001 2008Typical Quality Management System Based On Iso 9001 2008
Typical Quality Management System Based On Iso 9001 2008Isidro Sid Calayag
 
Energy Oil Gas Presentation
Energy  Oil  Gas  PresentationEnergy  Oil  Gas  Presentation
Energy Oil Gas Presentationjlai
 

Viewers also liked (20)

The use of imagery in monitoring existing sub surface structures
The use of imagery in monitoring existing sub surface structuresThe use of imagery in monitoring existing sub surface structures
The use of imagery in monitoring existing sub surface structures
 
Autonomous Underwater Vehicle (AUVs)
Autonomous Underwater Vehicle (AUVs)Autonomous Underwater Vehicle (AUVs)
Autonomous Underwater Vehicle (AUVs)
 
Korea and norway maritime opportunities and challenges in the high north
Korea and norway maritime opportunities and challenges in the high northKorea and norway maritime opportunities and challenges in the high north
Korea and norway maritime opportunities and challenges in the high north
 
OPTICLINE C200 C1000 BY JENOPTIK
OPTICLINE C200 C1000 BY JENOPTIKOPTICLINE C200 C1000 BY JENOPTIK
OPTICLINE C200 C1000 BY JENOPTIK
 
Calibration of MMDs to meet QMS
Calibration of MMDs to meet QMSCalibration of MMDs to meet QMS
Calibration of MMDs to meet QMS
 
Norsok standards for oil and gas
Norsok standards for oil and gasNorsok standards for oil and gas
Norsok standards for oil and gas
 
Emm unit i
Emm unit   iEmm unit   i
Emm unit i
 
hull inspection class
hull inspection classhull inspection class
hull inspection class
 
Zigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar powerZigbee based water quality monitoring system using solar power
Zigbee based water quality monitoring system using solar power
 
Robots for Industrial Inspection
Robots for Industrial InspectionRobots for Industrial Inspection
Robots for Industrial Inspection
 
Polyinform_pipelines inspection_english
Polyinform_pipelines inspection_englishPolyinform_pipelines inspection_english
Polyinform_pipelines inspection_english
 
Corrosion monitoring in petroleum refineries
Corrosion monitoring in petroleum refineriesCorrosion monitoring in petroleum refineries
Corrosion monitoring in petroleum refineries
 
Quality management in construction
Quality management in constructionQuality management in construction
Quality management in construction
 
Calibration of Coordinate Measuring Machines (CMM)
Calibration of Coordinate Measuring Machines (CMM)Calibration of Coordinate Measuring Machines (CMM)
Calibration of Coordinate Measuring Machines (CMM)
 
Under water welding.smnr
Under water welding.smnrUnder water welding.smnr
Under water welding.smnr
 
Typical Quality Management System Based On Iso 9001 2008
Typical Quality Management System Based On Iso 9001 2008Typical Quality Management System Based On Iso 9001 2008
Typical Quality Management System Based On Iso 9001 2008
 
Energy Oil Gas Presentation
Energy  Oil  Gas  PresentationEnergy  Oil  Gas  Presentation
Energy Oil Gas Presentation
 
Plant Maintenance
Plant MaintenancePlant Maintenance
Plant Maintenance
 
Underwater welding
Underwater weldingUnderwater welding
Underwater welding
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 

Similar to ISO Clause No 7 Production Realization

presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxAhmedAltantawi
 
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTION
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTIONPHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTION
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTIONPrincy Agarwal
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation Ankush Sule
 
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATIONValidation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATIONManikant Prasad Shah
 
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptxICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptxNikitaSahu39
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfabdo badr
 
Validation master plan
Validation master planValidation master plan
Validation master planDr. Amsavel A
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptxGargiVaghela
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation Pramod Pal
 
OM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPTOM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPTAynetuTerefe2
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical
 
ASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfMILRAB1
 
GMP Training: Process validation
GMP Training: Process validation GMP Training: Process validation
GMP Training: Process validation Dr. Amsavel A
 

Similar to ISO Clause No 7 Production Realization (20)

Validation
ValidationValidation
Validation
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
Cairo Iso 2000
Cairo Iso 2000Cairo Iso 2000
Cairo Iso 2000
 
Iso 9000 2000
Iso 9000 2000Iso 9000 2000
Iso 9000 2000
 
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTION
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTIONPHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTION
PHARMACEUTICAL CALIBRATION, QUALIFICATION AND VALIDATION: AN INTRODUCTION
 
Introduction to validation
Introduction to validation Introduction to validation
Introduction to validation
 
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATIONValidation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
 
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptxICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
ICH guidelines for validation Of Equipments by Nikita Sahu[1].pptx
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdf
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
validation and verification of medical device.pptx
validation and verification of medical device.pptxvalidation and verification of medical device.pptx
validation and verification of medical device.pptx
 
Commercial Grade Item Dedication
Commercial Grade Item DedicationCommercial Grade Item Dedication
Commercial Grade Item Dedication
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation
 
Verification process
Verification processVerification process
Verification process
 
OM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPTOM CHAPTER SEVEN.PPT
OM CHAPTER SEVEN.PPT
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
Dr. ajmal nasir
Dr. ajmal nasirDr. ajmal nasir
Dr. ajmal nasir
 
ASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdfASPHALT_quality-manual.pdf
ASPHALT_quality-manual.pdf
 
Vendor certification
Vendor certificationVendor certification
Vendor certification
 
GMP Training: Process validation
GMP Training: Process validation GMP Training: Process validation
GMP Training: Process validation
 

More from MANOJ KUMAR MAHARANA

More from MANOJ KUMAR MAHARANA (6)

eres2013_edu_102.content (1).ppt
eres2013_edu_102.content (1).ppteres2013_edu_102.content (1).ppt
eres2013_edu_102.content (1).ppt
 
CMAA.pdf
CMAA.pdfCMAA.pdf
CMAA.pdf
 
Facility
FacilityFacility
Facility
 
Excitation System & capability curve of synchronous generator
Excitation System &  capability curve of synchronous generatorExcitation System &  capability curve of synchronous generator
Excitation System & capability curve of synchronous generator
 
Energy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plantEnergy conservation Activites of thermal power plant
Energy conservation Activites of thermal power plant
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 

Recently uploaded

LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 

Recently uploaded (17)

sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 

ISO Clause No 7 Production Realization

  • 1. 4/17/2014 7.0 PRODUCT REALIZATION Mr. Manoj Kumar Maharana Sr. Engineer [Dept. of Electrical ] BLA Power Pvt Ltd 1 BLA Power Pvt. Ltd BLA Power Pvt. Ltd
  • 2.
  • 3. ISO 9001:2000 Balancing the Equation 6.2 Human Resources 6.3 Infrastructure 6.4 Work Environment 7 .0 Product Realization 8.0 Measurement, Analysis and Improvement 8.2.1 Customer Satisfaction 5.4.1 Quality Objectives + + + = = A B C=+
  • 5. • Processes, • Documents • Service time, • Delivery time, • Number of complaints, etc. • Required verification • Validation • Monitoring • Inspection • Test activities • Records needed to provide evidence that Realization processes resulting service meet the requirements.
  • 6. 7.2 Customer Related Processes 7.2.1 Determination Of Requirements to the Product • Delivery activities & Post delivery activities such as > Warranty provisions & Contractual Obligations > such as Maintenance services. > Recycling Or Final disposal. • Statutory & Regulatory requirement applicable to product. 7.2.2 Review Of Requirement Related to the Product/Services The organization shall review the requirements related to product [ submission of tenders, acceptance of contracts or orders, acceptance of changes to contracts or orders ] •Product requirements are defined •Contract or order requirements differing from those previously expressed are resolved. •The organization has the ability to meet the defined requirements. •Records should maintained of the results of the review & actions. 7.2.3 Customer Communication Determine and implement effective arrangements for communicating with customers in relation to •Product information •Enquiries, contracts or order handling, including amendments, •Customer feedback, including customer complaints
  • 7. 7.4 Purchasing 7.4.1 Purchasing Process • Approved indent from store. •Enquires send to min 3 suppliers to submit quotation •Comparative statement made. •After Approval of quotation purchase order issued to supplier. •Evaluation Done suppliers based on Quality, and delivery of products Grade A- Material supplied OK , Material received in time. Grade B -Material supplied OK, Material received late. Grade C -Material supplied Rej. , Material received in time. Grade B -Material supplied Rej. , Material received late. 7.4.2 Purchasing Information describing the product/ service to be purchased including : a. Requirement for approval of product, procedures, processes b. Requirement for qualification of personnel. c. Quality management system requirements. d. The organization ensures purchase requirements contained in purchasing documents, prior to their communication to the supplier. 7.4.3 Verification Of Purchasing Product Establishes and implements • Inspection and other activities necessary for verification of the purchased material with the specified purchasing requirements. • Checking at party’s premises/& at our premises
  • 9. 7.5 Production & Service Provision 7.5.1 Control Of Production & Service Provision Production and service provision under controlled conditions including as applicable: •Description of the characteristics of the product. • Availability of work instructions, as necessary. • Use of suitable equipments. •Availability and use of the measure and monitoring equipments. •Implementation of monitoring and measurement. •The implementation of product release, delivery and post- delivery activities includes meeting customer complaints 7.5.3 Identification & Traceability •Un-inspected material/product is marked with white tag/paint • ok material is marked with green tag/paint •rejected material is marked with red tag/paint •Under Re-Process is marked with yellow tag/paint •Incoming materials are identified by Shape & Size, date of receipt and tag on it 7.5.5 Preservation Of Product •Including constituent parts, during internal processing and delivery in order to maintain conformity to product requirement •Preservation shall include identification, handling packing, storage and protection • Soft copies of all back-up data recorded on computers during internal processing is preserved.
  • 10. 7.6 Control of Monitoring & Measuring Equipments Provide evidence of conformity of product / components to the established requirements. Based on this need, the necessary monitoring & measuring equipments are to be identified & made available. The required monitoring / measurement procedure are established Established a suitable system for all monitoring / measuring equipments : •Calibration/verification should done at regular intervals. In this process measuring equipments are adjusted or re adjusted. •Source of calibration or calibration agency. •Tractability of calibration / verification to national or international standards. •The equipments have unique identification number to determine and identify their calibration status. ‘C’ for Calibrated , ‘UC’ for un-Calibrated & ‘OO’ for out of order. Protection from damage, deterioration during handling, maintenance & storage. • Action should be taken to the not conforming to the requirement is assessed & recorded. • Maintains records of calibration & / verification. •If Computer software is used for measurement, it shall be ensured prior to release for use that computer software satisfies the requirements. •Maintains the list of monitoring & measuring equipments including calibration status.
  • 12. 12 Poor Product Quality High Product Quality Satisfied Customer s Increased Sales (Locally & Exports) Improved Economy Higher Revenue Greater possibility of Investment and Development Dissatisfi ed Customer s Less Revenue Pressure on the government to provide employment opportunities Economic Depression No Improvement & decreased Employment Decrease d Sales Happy Citizens
  • 13. 13 Improved Quality Reduced Waste Reduced Costs Less Pressure on the Economy Positive Balance of Trade (Export >Imports)
  • 14. Special Thanks • for Guidance Mr. Kalpesh Goswami Sr. Manager [ Dept. Of Inst. ] Acknowledgement [suggested reading] • ANSI/ASQ 9000:2000 Quality Management Systems – Fundamentals and Vocabulary • ANSI/ASQ 9001:2000 Quality Management Systems – Requirements, December 13,2000 • Quality Management System manual Doc No: BLAPOWER/M/QMSM/01 14