This document provides details about a cancer institute project in Lucknow, India. It includes:
- An overview of the 100-acre project with a total built-up area of 1,15,727 square meters and a projected cost of 798.34 crores.
- Details on the 10 different buildings that make up the facility including an entrance square, operation theaters, outpatient department, radiology, and more.
- Safety protocols in place during construction including use of helmets, safety shoes, belts, and fire extinguishers.
- Building materials being used like cement, brick, aggregates, reinforcement steel, and formwork.
- Structural elements under construction like the foundation
2. CONTENTS
• Aesthetic View of the Site
• Project detail
• Project Overview
• Safety
• Building Material
• Quality Analysis
• Structural Members
• Machines & Equipments
6. PROJECT DETAIL
S.NO BUILDING NO OF FLOOR TOTAL BUILT UP
AREA IN SQM
1 Entrance Square G 3800
2 Radiation Onclogy G+3 10270
3 OPD& Emergency G+3 14580
4 OT G+4 25482
5 Radiology G+2 7020
6 ADMIN G+3 8738
7 IPD G+9 3376
8 Kitchen& Laundry G 2790
9 Visitor Accommodation G 1584
10 Mortuary G 317
11 Central Store& Workshop G 886
12 HVAC G 734
13 Electrical Substation G 1200
14 STE/ETP G 325
15 Pump Room G 425
16 Material Supply Passage G 4000
TOTAL AREA 115727
7. PROJECT OVERVIEW
• Project was started in september 2015.
• Project covers an area of 100 acres.
• Project cost is approx 798.34 crores.
• It is targeted to have capacity of 1000 beds.
• This project was under UPRNN ,Shapoorji Pallonji as
a contractor and Mukesh & Associates as 3rd party for
quality control.
8. SAFETY
• Helmet
• Safety shoes
• Safety belt
• Welding shield
• Apron
• Fire
extinguisher
• Ambulance
11. Quality Analysis:-
FINENESS MODULUS OF AGGREGATE
Type of Sand Fineness Modulus Range
Fine Sand 2.2 – 2.6
Medium Sand 2.6 – 2.9
Coarse Sand 2.9 – 3.2
SLUMP TEST
• To find out the workability of concrete
• Slump cone & tampering rod is used
12. Age Strength per cent
1 day 16%
3 days 40%
7 days 65%
14 days 90%
28 days 99%
CUBE COMPRESSIVE STRENGTH TEST
REBOUND HAMMER TEST
• NON-DESTRUCTIVE TEST OF CONCRETE
• READINGS ARE TAKEN FROM THE GIVEN
SCALE IN THE HAMMER & USED TO
CALCULATE COMPRESSIVE STRENGTH
13. ULTRASONIC PULSE VELOCITY TEST
COMPACTION TEST
• IT IS USED TO FIND FIELD
DENSITY OF SOIL
• IT CONSIST OF RAPID
MOISTURE
METER,CYLINDRICAL CORE
CUTTER,RAMMER & BALANCE.
14. Structural Members
FOUNDATION:-
• It is a structural
element which
transmit the load of
structure to the
ground.
• These can be
shallow or deep
type.
15. BEAM:-
• A beam is a structural
element that primarily
resist loads applied
laterally to beam axis.
• In engineering beams
are several types
including simply
supported,fixed
beam,overhang beam,
double overhang
beam,continious
beam,cantiliver beam.
16. COLUMN:-
• These are compression
member in a buildings
• These are used to transmit the
load of superstructure to the
foundation
• The effective length of
column should be minimum
three times of its lateral
dimension.
17. CONCRETE SLAB:-
• Concrete slab is an
important structural
element and are
constructed to provide
flat useful surface.
• Concrete floor slab may
in-situ or prefabricated.