Surface Water Facilities construction progress 11-2012

  1. 1. SJRA GRPSurface Water Facilities Construction Projects November 2012
  2. 2. Surface Water Facilities• Cost = $42,874,840.00 (thru EWP2)• Change Orders = $0.00• Total = $42,874,840.00• Total Estimated Cost To Date: $190,078,395.00• Total Project Budget: $191,000,000.00• Scheduled Completion Date: June 1, 2015
  3. 3. Drilling Rig Hoisting CraneDredging Crane
  4. 4. Steel Casing being set in-placeat Bent 2 of the BridgeFoundation
  5. 5. Steel casing beingdriven to theproper depth
  6. 6. Drilling of 1stShaft - Bent 2
  7. 7. Rebar installationat first shaft –Bent 2
  8. 8. ConcretePlacement forDrilled Shaft –Bent 2
  9. 9. ConcretePlacement forDrilled Shaft –Bent 2
  10. 10. Aerial PhotosFlyover October 22, 2012
  11. 11. WATER TREATMENT PLANT AND HIGH SERVICE PUMP STATION AERIAL Water Treatment Plant Work Zone High Service Pump Station Work Zone
  12. 12. RAW WATER INTAKE – BRIDGE CONNECTION TOTHE DAM Drilling Rig Dredging Crane Hoisting Crane

×