ARAB REPUBLIC OF EGYPT
MIDANPIRG CNS SG/7 Meeting
Cairo, Egypt, 31May - 2June 2016
EGYPT– CNS Implementation
Presented by
Khaled Mohamed Reda Ahmed
CNS Inspector – ANS Engineer
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Outline
 Egypt Strategy
 Current CNS Implementations in Egypt
 Update of the CNS tables in e-ANP
 Update on B0-FICE and B0-ACAS
 General update on supporting implementation of
B0-APTA, B0-SURF, B0-ACDM
 Challenges and Ideas
2
ARAB REPUBLIC OF EGYPT
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Egypt Strategy
3
ARAB REPUBLIC OF EGYPT
• Develop the strategic plan and investment decisions with
a goal of global aviation system interoperability.
• Implement priority 1 ASBU modules according to MID
air navigation strategy to be in line with global air navigation
objectives.
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Egypt Strategy
4
ARAB REPUBLIC OF EGYPT
• Near Term CNS Strategy (2013-2018) includes:
1. Improving coordination with the remaining neighboring ACCs by
establishing AIDC/OLDI connections with these ACCs if applicable.
2. Implementing collaborative applications (A-CDM) at Cairo Airport.
3. Upgrading Surveillance radar systems and ATM systems at
the International airports.
4. Implementing new radars stations (Mode-S) and ADS-B sensors to
avoid single surveillance coverage in the ATS routes.
5. Establishing a new Satellite communication link between CANC
and airports as a backup link for the current GSI links.
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Current implementation of CNS infrastructure aligning with MID
air navigation Strategy:-
1. Cairo Air Navigation Center (CANC)
 Managing the air traffic in Egypt FIR by utilizing THALES
TOPSKY Automation system since 2013, which has AIDC/OLDI
connection capability up to seven interfaces with the adjacent
ACCs.
Current Implementations
5
Arab Republic of EGYPT
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
 Enhancing the exchange of ATS messages with the states COM centres
(AFTN/AMHS) by implementing COMSOFT AMHS System since
2010, by which the ATS message can be provided through the ATN
based on Internet Protocol (IP) to support AFS Communication
requirements.
2. International Cairo Airport
 Fully Implementing A-SMGCS level 1-2 system at 2013 which provides
surveillance and alerting of movements of both aircraft and vehicles at
the aerodrome and enhance capacity and safety by making use of
modern technologies such as cooperative surveillance systems (MLAT).
Current Implementations
6
Arab Republic of EGYPT
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
e-ANP : Table CNS II-1
7
Arab Republic of EGYPT
 Update of the CNS tables in e-ANP – Volume II
 TABLE CNS II-1 – (AFTN) PLAN
 TABLE CNS II-2 – Required ATN Infrastructure Routing Plan
 TABLE CNS II-3 – ATS Direct Speech Circuits Plan
 TABLE CNS II-4 – HF Network Designations
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
e-ANP : Table CNS II-1
8
Arab Republic of EGYPT
State/Station Category
Requirement
RemarksType Signalling
Speed
Protocol Code
1 2 3 4 5 6
EGYPT
CAIRO
AMMAN
ATHENS
BEN GURION
BEIRUT
JEDDAH
KHARTOUM
NAIROBI
TUNIS
TRIPOLI
TRIPOLI
DAMASCUS
ASMRA
M
M
M
M
M
M
T
M
M
T
T
T
T
64-9.6Kbps
64-9.6Kbps
64-9.6Kbps
9.6 Kbps
128-9.6Kbps
9.6Kbps
9.6Kbps
64-9.6Kbps
64-9.6Kbps
9.6Kbps
64-9.6Kbps
9.6Kbps
AMHS
CIDIN
None
CIDIN
AMHS
None
None
None
None
None
None
None
IA-5
IA-5
IA-5
IA-5
IA-5
IA-5
IA-5
IA-5
IA-5
IA-5
AMHS is under Oper. Test
STNDBY
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
e-ANP : Table CNS II-2
9
Arab Republic of EGYPT
Admin. and
Location
Type of
Router
Type of
Interconnection
Connected
Router Bandwidth
Network
Protocol Via Remarks
1 2 3 4 5 6 7 8
EGYPT,
Cairo
BIS
Inter-Regional
Intra Regional
AFI, EUR
Israel,
Jordan,
Lebanon,
Athena
Saudi Arabia
IPv4
Table CNS II-2: Required ATN Infrastructure Routing Plan
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
e-ANP : Table CNS II-3
10
Arab Republic of EGYPT
ATS REQUIREMENTS FOR
SPEECH COMMUNICATIONS
CIRCUIT
Remarks
TERMINAL
I
TERMINAL
II
TYPE SERVICE DIR/SW TO BE
SWITCHED
1 2 3 4 5 6 8
EGYPT
Cairo
Amman
Athens
Jeddah
Khartoum
Nicosia
Tel Aviv
Tripoli
A
A
A
A
A
A
A
LTF
LTF
LTF
LTF
LTF
LTF
LTF
DIR
DIR
DIR
DIR
DIR
DIR
DIR
1LINE
2LINES
2LINES
1LINE
1LINE
1LINE
1LINE
Table CNS II-3: ATS DIRECT SPEECH CIRCUITS PLAN
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
e-ANP : Table CNS II-4
11
Arab Republic of EGYPT
Location Indicator and
Name of location
HF en-route family
1 2
Cairo AFI-3
Frequency
(kHz)
ITU
allotment
area
AFI-3 MID-1 MID-2 MID-3 V MID Remarks
1 2 3 4 5 6 7 8
3467 MID, AFI X X
5517 AFI X
10018 MID, AFI X X
11300 AFI X
13288 MID, AFI X X
17961 AFI, MID X X
Table CNS II-4: HF Network Designators
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
ASBU Block 0 - Modules
12
Arab Republic of EGYPT
Performance Improvement
Area (PIA)
Module Module Name Priority Egypt Status
PIA 1:
Airport Operations
APTA
Optimization of Approach Procedures
including vertical guidance
1
SURF
Safety and Efficiency of Surface
Operations (A‐SMGCS Level 1‐2)
1
ACDM
Improved Airport Operations through
Airport‐CDM
1
PIA 2:
Globally Interoperable
Systems and Data
FICE
Increased Interoperability, Efficiency
and Capacity through Ground‐Ground
Integration
1
PIA 3:
Optimum Capacity and
Flexible Flights
ACAS ACAS Improvements 1
PIA 4:
Efficient Flight Path TBO
Improved Safety and Efficiency
through the initial application of Data
Link En‐Route
2
In-Progress
In-Progress
Not Implemented
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
ASBU Module B0-APTA
13
Arab Republic of EGYPT
• B0-APTA : Optimization of Approach Procedures including vertical guidance
State/Aerodrome
Location Indicator
RWY
Conventional Approaches APTA
Precision
VOR or NDB
PBN
PLAN
LNAV
LNAV /
VNAV
ILS CAT
Update
date
HEBA 14 NIL NIL NIL 2014 N N
32 ILS I NIL 2014 Y N
HESN 17 NIL NIL VOR/DME 2014 Y N
35 ILS I VOR/DME 2014 Y N
HECA 05L ILS I DVOR/DME 2014 Y N
05C ILS II DVOR/DME 2014 Y N
05R ILS II NIL 2014 N N
23L ILS II DVOR/DME 2014 N N
23C ILS II DVOR/DME 2014 Y N
23R ILS I DVOR/DME 2014 Y N
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
ASBU Module B0-APTA
14
Arab Republic of EGYPT
• B0-APTA : Optimization of Approach Procedures including vertical guidance
State/Aerodrome
Location Indicator
RWY
Conventional Approaches APTA Implementation
Precision
VOR or NDB
PBN
PLAN
LNAV
LNAV /
VNAV
ILS CAT
Update
date
HEGN 16 NIL NIL VOR/DME 2014 Y N
34 ILS I VOR/DME 2014 Y N
HELX 02 ILS I VOR/DME 2014 Y N
20 ILS I VOR/DME 2014 Y N
HEMA 15 NIL NIL DVOR/DME 2014 Y N
33 NIL NIL DVOR/DME 2014 Y N
HESH 04L ILS I DVOR/DME 2014 Y N
04R NIL NIL DVOR/DME 2014 Y N
22L NIL NIL NIL 2014 Y N
22R NIL NIL NIL 2014 Y N
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
ASBU Module B0-SURF
15
Arab Republic of EGYPT
• B0-SURF : Safety and Efficiency of Surface Operations (A‐SMGCS Level 1‐2)
State
City/ Aerodrome
Location Indicator
Level 1 Level 2
Action
Plan
Remarks
1 2 3 4 5 6
EGYPT
Cairo/Cairo Intl
(HECA)
Implemented Implemented
Completed
since 2013
State
City/Aerodrome
Location Indicator
NCSS CSS DF Alert
Action
Plan
1 2 3 4 5 6 7
EGYPT
Cairo/Cairo Intl
(HECA)
Y
Two SMR
Y
MLAT
Y Y
• B0-SURF : Monitoring of A-SMGCS Elements Implementation
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
ASBU Module B0-FICE
16
Arab Republic of EGYPT
• B0-FICE : Increased interoperability, efficiency and capacity through G/G
State AMHS Capability
AMHS
Interconnection
AIDC/OLDI
Capability
AIDC/OLDI
Implementation
Action
Plan
1 2 3 4 5 6
EGYPT Y Y Y Y
State
Location of
AIDC/OLDI end sys.
Adjacent
ACCs
Implementation
Status
Report for MID
AN Strategy
Action
Plan
EGYPT Cairo ACC
Athens ACC Y
Y
Jeddah ACC Y
Khartoum ACC N
Tripoli ACC N
Nicosia ACC N
Amman ACC N
• B0-FICE : The status of Implementation of AIDC/OLDI between Adjacent ACCs
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
ASBU Module B0-ACAS
17
Arab Republic of EGYPT
• B0-ACAS : Airborne Collision Avoidance Systems (ACAS) Improvements
State
TCAS V7.1
requirement
Regulation Reference
Action
Plan
Remarks
EGYPT Y
ECAR Part 121.356 &
ECAR Part 91.221
ECAA will ensure the
conformity through
its surveillance
program starting
from Jan 2017
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
ASBU Module B0-ACAS
18
Arab Republic of EGYPT
• B0-ACAS : Airborne Collision Avoidance Systems (ACAS) Improvements
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Challenges and Ideas
19
ARAB REPUBLIC OF EGYPT
 Challenge: B0 – APTA
Performance Indicator of APTA depends mainly on GNSS application
Performance
Improvement Area (PIA)
Module Module Name Elements
PIA 1:
Airport Operations
APTA
Optimization of Approach
Procedures including
vertical guidance
• States PBN Plan
• LNAV procedures
• LNAV/VNAV procedures
- The main challenges are:
 GNSS Vulnerabilities
 GNSS RAIM Outage
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Challenges B0-APTA
20
ARAB REPUBLIC OF EGYPT
Challenge Ideas
GNSS
Vulnerabilities
GNSS RAIM
Outage
 The low power signal
received from GNSS core
satellite constellations can be
easily interfered by low power
transmitters (Unintentional
interference) or spoofed by
Intentional Interference.
 Unpredicted outages of
GNSS services can cause
undesired interruptions on
aircraft operations. Safety
impacts may become more
severe during approach phase
of flights.
 Utilizing terrestrial aids as
part of a mitigation strategy,
Through reliance on stand alone
systems such as Instrument
landing system at selected
runways and Issuance RNAV
(GNSS) Approach NOTAM.
 A common, regional RAIM
prediction service for MID region
can prove to be effective solution
to unpredicted outages of GNSS
services, since RAIM prediction
results are needed daily by pilots,
flight dispatchers, ATC….etc
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Challenges and Ideas
21
Arab Republic Of EGYPT
 Challenges: B0 – Surf
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Challenges B0-SURF
22
ARAB REPUBLIC OF EGYPT
Challenge Ideas
 Lack of experts in the beginning
stage of A-SMGCS implementation.
 As a result of the ongoing
development works at Cairo
International Airport over the last
ten years, either by building the new
control tower or the new Terminal 3
that led to existence of non-covered
areas by SMR.
Providing specific training for CNS
Engineers during implementation of
A-SMGCS project.
Installing new SMR 2 on the top of
the new ATC tower and MLAT
system to overcome non-covered
areas issues.
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Challenges B0-SURF
23
ARAB REPUBLIC OF EGYPT
Challenge Ideas
Difficulty to dig under runways to
extend fiber cable to connect MLAT
Transmitters and Receivers with the
processing unit.
The need for coordination with
various suppliers due to nature of A-
SMGCS (system of systems), as no
single company can supply all its
systems.
Usage of Microwave links to
connect between MLAT
transmitters and receivers with the
processing unit.
Ensuring that all systems (SMR –
SSR – PSR - MLAT) can be
integrated with surveillance data
fusing (SDF) to combine A-SMGCS
before contracting on the system.
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Challenges and Ideas
24
ARAB REPUBLIC OF EGYPT
 Challenge: B0 – FICE
Performance
Improvement Area
(PIA)
Module Module Name Elements
PIA 2:
Globally Interoperable
Systems and Data
FICE
Increased
Interoperability,
Efficiency and
Capacity through
Ground‐Ground
Integration
• AMHS Capability
• AMHS Implementation
• Implementation of AIDC/OLDI
between adjacent ACCs
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Challenges B0-FICE
25
ARAB REPUBLIC OF EGYPT
Challenge Ideas
Limitations of the old AFTN system and
lack of the AMHS Capability (Element 1).
 Upgrading AFS system by
COMSOFT AFTN/AMHS System
since 2010, which support AMHS
Capability.
 Limitations of the old Automation
system which was responsible for
Managing the air traffic in Egypt FIR and
not supporting AIDC/OLDI connections
with the adjacent ACCs (Element 3).
 Upgrading Area Automation
System by THALES TOPSKY
Automation system since 2013,
which support AIDC/OLDI
Capability.
Difficulty of coordination with the
remaining neighboring ACCs by
establishing AIDC/OLDI connections with
these ACCs due to compatibility issues of
their systems.
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
Challenges and Ideas
26
ARAB REPUBLIC OF EGYPT
 Challenge: B0 – ACDM
Performance
Improvement Area (PIA)
Module Module Name Elements
PIA 1:
Airport Operations
ACDM
Improved Airport Operations
through Airport‐CDM
• ACDM at HECA
Challenge Idea
Difficulty of coordination between
all stakeholders of airport, and
convincing them about importance of
implementing ACDM applications at
HECA.
 Inviting all stakeholders for conducting
various awareness meetings about ACDM
applications and its impact for improving
surface traffic management at movement
and maneuvering areas.
CNS SG/7 Cairo, Egypt 31May-2Jun 2016
27
ARAB REPUBLIC OF EGYPT
Thank You !

More Related Content

What's hot

Mlat ads-b-reference-guide
Mlat ads-b-reference-guideMlat ads-b-reference-guide
Mlat ads-b-reference-guideSergio Llugdar
 
EGYPT PBN Implementation Status
EGYPT PBN Implementation StatusEGYPT PBN Implementation Status
EGYPT PBN Implementation StatusKhaled Eltanany
 
ADS-B Update: equipping for 2020 (August 2015 edition)
ADS-B Update: equipping for 2020 (August 2015 edition)ADS-B Update: equipping for 2020 (August 2015 edition)
ADS-B Update: equipping for 2020 (August 2015 edition)sportyspilotshop
 
ADS-B & The 2020 FAA Final Rule
ADS-B & The 2020 FAA Final RuleADS-B & The 2020 FAA Final Rule
ADS-B & The 2020 FAA Final RuleTodd Shellnutt
 
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...GLOBAL HEAVYLIFT HOLDINGS
 
SESAR at World ATM Congress 2016 - SESAR Awards
SESAR at World ATM Congress 2016 - SESAR AwardsSESAR at World ATM Congress 2016 - SESAR Awards
SESAR at World ATM Congress 2016 - SESAR AwardsSESAR Joint Undertaking
 
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92SESAR Joint Undertaking
 
Wgs 84 Ref Rnav
Wgs 84 Ref RnavWgs 84 Ref Rnav
Wgs 84 Ref Rnavcochez
 
SESAR at World ATM Congress 2016 - High Performing Aviation for Europe
SESAR at World ATM Congress 2016 - High Performing Aviation for EuropeSESAR at World ATM Congress 2016 - High Performing Aviation for Europe
SESAR at World ATM Congress 2016 - High Performing Aviation for EuropeSESAR Joint Undertaking
 
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...IPPAI
 
Uas-15008-a-slides for PDR
Uas-15008-a-slides for PDRUas-15008-a-slides for PDR
Uas-15008-a-slides for PDRmattogodoy
 

What's hot (20)

Mlat ads-b-reference-guide
Mlat ads-b-reference-guideMlat ads-b-reference-guide
Mlat ads-b-reference-guide
 
EGYPT PBN Implementation Status
EGYPT PBN Implementation StatusEGYPT PBN Implementation Status
EGYPT PBN Implementation Status
 
ADS-B: A Special Report
ADS-B: A Special ReportADS-B: A Special Report
ADS-B: A Special Report
 
ADS-B Update: equipping for 2020 (August 2015 edition)
ADS-B Update: equipping for 2020 (August 2015 edition)ADS-B Update: equipping for 2020 (August 2015 edition)
ADS-B Update: equipping for 2020 (August 2015 edition)
 
ADS-B & The 2020 FAA Final Rule
ADS-B & The 2020 FAA Final RuleADS-B & The 2020 FAA Final Rule
ADS-B & The 2020 FAA Final Rule
 
UMS Company Presentation 03062014
UMS Company Presentation 03062014UMS Company Presentation 03062014
UMS Company Presentation 03062014
 
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR GuideRADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
RADAR, Mlat, ADS, Bird RADAR, Weather RADAR Guide
 
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...
eMOTION! REPORTS.com Archives: (Boeing) Air Traffic Management: Revolutionary...
 
SESAR at World ATM Congress 2016 - SESAR Awards
SESAR at World ATM Congress 2016 - SESAR AwardsSESAR at World ATM Congress 2016 - SESAR Awards
SESAR at World ATM Congress 2016 - SESAR Awards
 
News on Satnav for GA
News on Satnav for GANews on Satnav for GA
News on Satnav for GA
 
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
 
Wgs 84 Ref Rnav
Wgs 84 Ref RnavWgs 84 Ref Rnav
Wgs 84 Ref Rnav
 
Status of Galileo
Status of Galileo Status of Galileo
Status of Galileo
 
Galileo differentiators for mass market
Galileo differentiators for mass marketGalileo differentiators for mass market
Galileo differentiators for mass market
 
PBN RNAV
PBN RNAVPBN RNAV
PBN RNAV
 
SESAR at World ATM Congress 2016 - High Performing Aviation for Europe
SESAR at World ATM Congress 2016 - High Performing Aviation for EuropeSESAR at World ATM Congress 2016 - High Performing Aviation for Europe
SESAR at World ATM Congress 2016 - High Performing Aviation for Europe
 
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...
Smartpath SLS-4000 Ground Based Augmentation System By Brian Davis,Air Traffi...
 
GNSS Opportunities in Aviation
GNSS Opportunities in AviationGNSS Opportunities in Aviation
GNSS Opportunities in Aviation
 
EGNOS benefits for General Aviation
EGNOS benefits for General AviationEGNOS benefits for General Aviation
EGNOS benefits for General Aviation
 
Uas-15008-a-slides for PDR
Uas-15008-a-slides for PDRUas-15008-a-slides for PDR
Uas-15008-a-slides for PDR
 

Similar to CNS SG7 -PPT5

Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...rsanAkbaba
 
Global Global Air Traffic Management
Global Global Air Traffic ManagementGlobal Global Air Traffic Management
Global Global Air Traffic ManagementARVIND KUMAR SINGH
 
EffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptEffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptSURAJ SINGH SAINI
 
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...Finmeccanica
 
GAGAN (GPS Aided Geo Augmented Navigation)
GAGAN (GPS Aided Geo Augmented Navigation)GAGAN (GPS Aided Geo Augmented Navigation)
GAGAN (GPS Aided Geo Augmented Navigation)Prakhar Aditya
 
Iaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geoIaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geoIaetsd Iaetsd
 
Report No.22 of 2023 - Union Government - Ministry of Civil Aviation - Compli...
Report No.22 of 2023 - Union Government - Ministry of Civil Aviation - Compli...Report No.22 of 2023 - Union Government - Ministry of Civil Aviation - Compli...
Report No.22 of 2023 - Union Government - Ministry of Civil Aviation - Compli...Life of A Public Auditor
 
Seminar Report on Airport Authority of India [AAI]
Seminar Report on Airport Authority of India [AAI]Seminar Report on Airport Authority of India [AAI]
Seminar Report on Airport Authority of India [AAI]Aditya Gupta
 
Aviation powered by EGNOS: high precision, low investment
Aviation powered by EGNOS: high precision, low investmentAviation powered by EGNOS: high precision, low investment
Aviation powered by EGNOS: high precision, low investmentThe European GNSS Agency (GSA)
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...IRJET Journal
 
"High positioning accuracy and precise time transfer with PPP GNSS receivers"
"High positioning accuracy and precise time transfer with PPP GNSS receivers""High positioning accuracy and precise time transfer with PPP GNSS receivers"
"High positioning accuracy and precise time transfer with PPP GNSS receivers"Marco Lisi
 

Similar to CNS SG7 -PPT5 (20)

Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...
 
Global Global Air Traffic Management
Global Global Air Traffic ManagementGlobal Global Air Traffic Management
Global Global Air Traffic Management
 
EffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptEffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.ppt
 
Secretaria de Aviação Civil - SESAR Experience and Deployment
Secretaria de Aviação Civil - SESAR Experience and DeploymentSecretaria de Aviação Civil - SESAR Experience and Deployment
Secretaria de Aviação Civil - SESAR Experience and Deployment
 
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...
The future of EGNOS beyond aviation: standardizing SBAS in intermodal freight...
 
GAGAN (GPS Aided Geo Augmented Navigation)
GAGAN (GPS Aided Geo Augmented Navigation)GAGAN (GPS Aided Geo Augmented Navigation)
GAGAN (GPS Aided Geo Augmented Navigation)
 
GNSS FP7 Research and Development
GNSS FP7 Research and DevelopmentGNSS FP7 Research and Development
GNSS FP7 Research and Development
 
General Aviation and NextGen
General Aviation and NextGenGeneral Aviation and NextGen
General Aviation and NextGen
 
European GNSS & rail market
European GNSS & rail marketEuropean GNSS & rail market
European GNSS & rail market
 
com_procedure
com_procedurecom_procedure
com_procedure
 
EGNSS for robots - GSA special prize
EGNSS for robots - GSA special prizeEGNSS for robots - GSA special prize
EGNSS for robots - GSA special prize
 
Iaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geoIaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geo
 
GSA EGNOS and Galileo for Aviation
GSA EGNOS and Galileo for AviationGSA EGNOS and Galileo for Aviation
GSA EGNOS and Galileo for Aviation
 
10. Enhanced gnss user terminal
10. Enhanced gnss user terminal10. Enhanced gnss user terminal
10. Enhanced gnss user terminal
 
Report No.22 of 2023 - Union Government - Ministry of Civil Aviation - Compli...
Report No.22 of 2023 - Union Government - Ministry of Civil Aviation - Compli...Report No.22 of 2023 - Union Government - Ministry of Civil Aviation - Compli...
Report No.22 of 2023 - Union Government - Ministry of Civil Aviation - Compli...
 
Seminar Report on Airport Authority of India [AAI]
Seminar Report on Airport Authority of India [AAI]Seminar Report on Airport Authority of India [AAI]
Seminar Report on Airport Authority of India [AAI]
 
Aviation powered by EGNOS: high precision, low investment
Aviation powered by EGNOS: high precision, low investmentAviation powered by EGNOS: high precision, low investment
Aviation powered by EGNOS: high precision, low investment
 
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
Traffic Circulation, Diversion, and Management Plan for Ahmedabad- Mumbai Hig...
 
I twin technology
I twin technologyI twin technology
I twin technology
 
"High positioning accuracy and precise time transfer with PPP GNSS receivers"
"High positioning accuracy and precise time transfer with PPP GNSS receivers""High positioning accuracy and precise time transfer with PPP GNSS receivers"
"High positioning accuracy and precise time transfer with PPP GNSS receivers"
 

CNS SG7 -PPT5

  • 1. 1 ARAB REPUBLIC OF EGYPT MIDANPIRG CNS SG/7 Meeting Cairo, Egypt, 31May - 2June 2016 EGYPT– CNS Implementation Presented by Khaled Mohamed Reda Ahmed CNS Inspector – ANS Engineer
  • 2. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Outline  Egypt Strategy  Current CNS Implementations in Egypt  Update of the CNS tables in e-ANP  Update on B0-FICE and B0-ACAS  General update on supporting implementation of B0-APTA, B0-SURF, B0-ACDM  Challenges and Ideas 2 ARAB REPUBLIC OF EGYPT
  • 3. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Egypt Strategy 3 ARAB REPUBLIC OF EGYPT • Develop the strategic plan and investment decisions with a goal of global aviation system interoperability. • Implement priority 1 ASBU modules according to MID air navigation strategy to be in line with global air navigation objectives.
  • 4. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Egypt Strategy 4 ARAB REPUBLIC OF EGYPT • Near Term CNS Strategy (2013-2018) includes: 1. Improving coordination with the remaining neighboring ACCs by establishing AIDC/OLDI connections with these ACCs if applicable. 2. Implementing collaborative applications (A-CDM) at Cairo Airport. 3. Upgrading Surveillance radar systems and ATM systems at the International airports. 4. Implementing new radars stations (Mode-S) and ADS-B sensors to avoid single surveillance coverage in the ATS routes. 5. Establishing a new Satellite communication link between CANC and airports as a backup link for the current GSI links.
  • 5. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Current implementation of CNS infrastructure aligning with MID air navigation Strategy:- 1. Cairo Air Navigation Center (CANC)  Managing the air traffic in Egypt FIR by utilizing THALES TOPSKY Automation system since 2013, which has AIDC/OLDI connection capability up to seven interfaces with the adjacent ACCs. Current Implementations 5 Arab Republic of EGYPT
  • 6. CNS SG/7 Cairo, Egypt 31May-2Jun 2016  Enhancing the exchange of ATS messages with the states COM centres (AFTN/AMHS) by implementing COMSOFT AMHS System since 2010, by which the ATS message can be provided through the ATN based on Internet Protocol (IP) to support AFS Communication requirements. 2. International Cairo Airport  Fully Implementing A-SMGCS level 1-2 system at 2013 which provides surveillance and alerting of movements of both aircraft and vehicles at the aerodrome and enhance capacity and safety by making use of modern technologies such as cooperative surveillance systems (MLAT). Current Implementations 6 Arab Republic of EGYPT
  • 7. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 e-ANP : Table CNS II-1 7 Arab Republic of EGYPT  Update of the CNS tables in e-ANP – Volume II  TABLE CNS II-1 – (AFTN) PLAN  TABLE CNS II-2 – Required ATN Infrastructure Routing Plan  TABLE CNS II-3 – ATS Direct Speech Circuits Plan  TABLE CNS II-4 – HF Network Designations
  • 8. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 e-ANP : Table CNS II-1 8 Arab Republic of EGYPT State/Station Category Requirement RemarksType Signalling Speed Protocol Code 1 2 3 4 5 6 EGYPT CAIRO AMMAN ATHENS BEN GURION BEIRUT JEDDAH KHARTOUM NAIROBI TUNIS TRIPOLI TRIPOLI DAMASCUS ASMRA M M M M M M T M M T T T T 64-9.6Kbps 64-9.6Kbps 64-9.6Kbps 9.6 Kbps 128-9.6Kbps 9.6Kbps 9.6Kbps 64-9.6Kbps 64-9.6Kbps 9.6Kbps 64-9.6Kbps 9.6Kbps AMHS CIDIN None CIDIN AMHS None None None None None None None IA-5 IA-5 IA-5 IA-5 IA-5 IA-5 IA-5 IA-5 IA-5 IA-5 AMHS is under Oper. Test STNDBY
  • 9. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 e-ANP : Table CNS II-2 9 Arab Republic of EGYPT Admin. and Location Type of Router Type of Interconnection Connected Router Bandwidth Network Protocol Via Remarks 1 2 3 4 5 6 7 8 EGYPT, Cairo BIS Inter-Regional Intra Regional AFI, EUR Israel, Jordan, Lebanon, Athena Saudi Arabia IPv4 Table CNS II-2: Required ATN Infrastructure Routing Plan
  • 10. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 e-ANP : Table CNS II-3 10 Arab Republic of EGYPT ATS REQUIREMENTS FOR SPEECH COMMUNICATIONS CIRCUIT Remarks TERMINAL I TERMINAL II TYPE SERVICE DIR/SW TO BE SWITCHED 1 2 3 4 5 6 8 EGYPT Cairo Amman Athens Jeddah Khartoum Nicosia Tel Aviv Tripoli A A A A A A A LTF LTF LTF LTF LTF LTF LTF DIR DIR DIR DIR DIR DIR DIR 1LINE 2LINES 2LINES 1LINE 1LINE 1LINE 1LINE Table CNS II-3: ATS DIRECT SPEECH CIRCUITS PLAN
  • 11. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 e-ANP : Table CNS II-4 11 Arab Republic of EGYPT Location Indicator and Name of location HF en-route family 1 2 Cairo AFI-3 Frequency (kHz) ITU allotment area AFI-3 MID-1 MID-2 MID-3 V MID Remarks 1 2 3 4 5 6 7 8 3467 MID, AFI X X 5517 AFI X 10018 MID, AFI X X 11300 AFI X 13288 MID, AFI X X 17961 AFI, MID X X Table CNS II-4: HF Network Designators
  • 12. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 ASBU Block 0 - Modules 12 Arab Republic of EGYPT Performance Improvement Area (PIA) Module Module Name Priority Egypt Status PIA 1: Airport Operations APTA Optimization of Approach Procedures including vertical guidance 1 SURF Safety and Efficiency of Surface Operations (A‐SMGCS Level 1‐2) 1 ACDM Improved Airport Operations through Airport‐CDM 1 PIA 2: Globally Interoperable Systems and Data FICE Increased Interoperability, Efficiency and Capacity through Ground‐Ground Integration 1 PIA 3: Optimum Capacity and Flexible Flights ACAS ACAS Improvements 1 PIA 4: Efficient Flight Path TBO Improved Safety and Efficiency through the initial application of Data Link En‐Route 2 In-Progress In-Progress Not Implemented
  • 13. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 ASBU Module B0-APTA 13 Arab Republic of EGYPT • B0-APTA : Optimization of Approach Procedures including vertical guidance State/Aerodrome Location Indicator RWY Conventional Approaches APTA Precision VOR or NDB PBN PLAN LNAV LNAV / VNAV ILS CAT Update date HEBA 14 NIL NIL NIL 2014 N N 32 ILS I NIL 2014 Y N HESN 17 NIL NIL VOR/DME 2014 Y N 35 ILS I VOR/DME 2014 Y N HECA 05L ILS I DVOR/DME 2014 Y N 05C ILS II DVOR/DME 2014 Y N 05R ILS II NIL 2014 N N 23L ILS II DVOR/DME 2014 N N 23C ILS II DVOR/DME 2014 Y N 23R ILS I DVOR/DME 2014 Y N
  • 14. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 ASBU Module B0-APTA 14 Arab Republic of EGYPT • B0-APTA : Optimization of Approach Procedures including vertical guidance State/Aerodrome Location Indicator RWY Conventional Approaches APTA Implementation Precision VOR or NDB PBN PLAN LNAV LNAV / VNAV ILS CAT Update date HEGN 16 NIL NIL VOR/DME 2014 Y N 34 ILS I VOR/DME 2014 Y N HELX 02 ILS I VOR/DME 2014 Y N 20 ILS I VOR/DME 2014 Y N HEMA 15 NIL NIL DVOR/DME 2014 Y N 33 NIL NIL DVOR/DME 2014 Y N HESH 04L ILS I DVOR/DME 2014 Y N 04R NIL NIL DVOR/DME 2014 Y N 22L NIL NIL NIL 2014 Y N 22R NIL NIL NIL 2014 Y N
  • 15. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 ASBU Module B0-SURF 15 Arab Republic of EGYPT • B0-SURF : Safety and Efficiency of Surface Operations (A‐SMGCS Level 1‐2) State City/ Aerodrome Location Indicator Level 1 Level 2 Action Plan Remarks 1 2 3 4 5 6 EGYPT Cairo/Cairo Intl (HECA) Implemented Implemented Completed since 2013 State City/Aerodrome Location Indicator NCSS CSS DF Alert Action Plan 1 2 3 4 5 6 7 EGYPT Cairo/Cairo Intl (HECA) Y Two SMR Y MLAT Y Y • B0-SURF : Monitoring of A-SMGCS Elements Implementation
  • 16. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 ASBU Module B0-FICE 16 Arab Republic of EGYPT • B0-FICE : Increased interoperability, efficiency and capacity through G/G State AMHS Capability AMHS Interconnection AIDC/OLDI Capability AIDC/OLDI Implementation Action Plan 1 2 3 4 5 6 EGYPT Y Y Y Y State Location of AIDC/OLDI end sys. Adjacent ACCs Implementation Status Report for MID AN Strategy Action Plan EGYPT Cairo ACC Athens ACC Y Y Jeddah ACC Y Khartoum ACC N Tripoli ACC N Nicosia ACC N Amman ACC N • B0-FICE : The status of Implementation of AIDC/OLDI between Adjacent ACCs
  • 17. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 ASBU Module B0-ACAS 17 Arab Republic of EGYPT • B0-ACAS : Airborne Collision Avoidance Systems (ACAS) Improvements State TCAS V7.1 requirement Regulation Reference Action Plan Remarks EGYPT Y ECAR Part 121.356 & ECAR Part 91.221 ECAA will ensure the conformity through its surveillance program starting from Jan 2017
  • 18. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 ASBU Module B0-ACAS 18 Arab Republic of EGYPT • B0-ACAS : Airborne Collision Avoidance Systems (ACAS) Improvements
  • 19. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Challenges and Ideas 19 ARAB REPUBLIC OF EGYPT  Challenge: B0 – APTA Performance Indicator of APTA depends mainly on GNSS application Performance Improvement Area (PIA) Module Module Name Elements PIA 1: Airport Operations APTA Optimization of Approach Procedures including vertical guidance • States PBN Plan • LNAV procedures • LNAV/VNAV procedures - The main challenges are:  GNSS Vulnerabilities  GNSS RAIM Outage
  • 20. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Challenges B0-APTA 20 ARAB REPUBLIC OF EGYPT Challenge Ideas GNSS Vulnerabilities GNSS RAIM Outage  The low power signal received from GNSS core satellite constellations can be easily interfered by low power transmitters (Unintentional interference) or spoofed by Intentional Interference.  Unpredicted outages of GNSS services can cause undesired interruptions on aircraft operations. Safety impacts may become more severe during approach phase of flights.  Utilizing terrestrial aids as part of a mitigation strategy, Through reliance on stand alone systems such as Instrument landing system at selected runways and Issuance RNAV (GNSS) Approach NOTAM.  A common, regional RAIM prediction service for MID region can prove to be effective solution to unpredicted outages of GNSS services, since RAIM prediction results are needed daily by pilots, flight dispatchers, ATC….etc
  • 21. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Challenges and Ideas 21 Arab Republic Of EGYPT  Challenges: B0 – Surf
  • 22. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Challenges B0-SURF 22 ARAB REPUBLIC OF EGYPT Challenge Ideas  Lack of experts in the beginning stage of A-SMGCS implementation.  As a result of the ongoing development works at Cairo International Airport over the last ten years, either by building the new control tower or the new Terminal 3 that led to existence of non-covered areas by SMR. Providing specific training for CNS Engineers during implementation of A-SMGCS project. Installing new SMR 2 on the top of the new ATC tower and MLAT system to overcome non-covered areas issues.
  • 23. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Challenges B0-SURF 23 ARAB REPUBLIC OF EGYPT Challenge Ideas Difficulty to dig under runways to extend fiber cable to connect MLAT Transmitters and Receivers with the processing unit. The need for coordination with various suppliers due to nature of A- SMGCS (system of systems), as no single company can supply all its systems. Usage of Microwave links to connect between MLAT transmitters and receivers with the processing unit. Ensuring that all systems (SMR – SSR – PSR - MLAT) can be integrated with surveillance data fusing (SDF) to combine A-SMGCS before contracting on the system.
  • 24. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Challenges and Ideas 24 ARAB REPUBLIC OF EGYPT  Challenge: B0 – FICE Performance Improvement Area (PIA) Module Module Name Elements PIA 2: Globally Interoperable Systems and Data FICE Increased Interoperability, Efficiency and Capacity through Ground‐Ground Integration • AMHS Capability • AMHS Implementation • Implementation of AIDC/OLDI between adjacent ACCs
  • 25. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Challenges B0-FICE 25 ARAB REPUBLIC OF EGYPT Challenge Ideas Limitations of the old AFTN system and lack of the AMHS Capability (Element 1).  Upgrading AFS system by COMSOFT AFTN/AMHS System since 2010, which support AMHS Capability.  Limitations of the old Automation system which was responsible for Managing the air traffic in Egypt FIR and not supporting AIDC/OLDI connections with the adjacent ACCs (Element 3).  Upgrading Area Automation System by THALES TOPSKY Automation system since 2013, which support AIDC/OLDI Capability. Difficulty of coordination with the remaining neighboring ACCs by establishing AIDC/OLDI connections with these ACCs due to compatibility issues of their systems.
  • 26. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 Challenges and Ideas 26 ARAB REPUBLIC OF EGYPT  Challenge: B0 – ACDM Performance Improvement Area (PIA) Module Module Name Elements PIA 1: Airport Operations ACDM Improved Airport Operations through Airport‐CDM • ACDM at HECA Challenge Idea Difficulty of coordination between all stakeholders of airport, and convincing them about importance of implementing ACDM applications at HECA.  Inviting all stakeholders for conducting various awareness meetings about ACDM applications and its impact for improving surface traffic management at movement and maneuvering areas.
  • 27. CNS SG/7 Cairo, Egypt 31May-2Jun 2016 27 ARAB REPUBLIC OF EGYPT Thank You !