SlideShare a Scribd company logo
1 of 18
Download to read offline
Third Meeting of the Aeronautical Information
Management Sub-Group (AIM SG/3)
Cairo, Egypt, 15-18 May 2017
EGYPT
ASBU B0-DATM
Implementation Status
1AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
Outline
 EGYPT National AIM Implementation Roadmap
 Status of B0-DATM Implementation
 Outlook 2020
 Status of AIM Deficiencies
 Challenges
 Lessons Learned
 Recommendations
AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
2
3
Egypt National AIM
Implementation Roadmap
AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
4AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
EGYPT National AIM Implementation Roadmap
Phase/Step
Step
No.
Timeline
Start End Remarks
2014 2015 2016 2017 2018
Phase I
AIRAC
adherence
P-03 2008 - Already Implemented
WGS-84
implementation
P-05 2008 - Already Implemented
QMS P-17 2007 - Already Implemented
Phase II
Data Quality
Monitoring
P-01 2006 2018
SLA are implemented with
most data originators
Data Integrity
Monitoring
P-02 2006 2018
The target is to be
implemented by 2018
AIXM P-06 2006 ‐ Already Implemented
Unique
identifiers
P-07 2006 ‐ Already Implemented
Aeronautical
information
conceptual
model
P-08 2006 ‐ Already Implemented
5AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
EGYPT National AIM Implementation Roadmap
Phase/Step
Step
No.
Timeline
Start End Remarks
2014 2015 2016 2017 2018
Phase II
eAIP P-11 2014 2018
The target is to be
implemented by 2018
Terrain A-1 P-13 2007 - Already Implemented
Obstacle A-1 P-14 2017 2019
The target is to be
implemented by 2019
Terrain A-4 P-13 2007 - Already Implemented
Obstacle A-4 P-14 2017 2019
The target is to be
implemented by 2019
Terrain A-2 P-13 2020
The target is to be
implemented by 2020
Obstacle A-2 P-14 2020
The target is to be
implemented by 2020
6AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
EGYPT National AIM Implementation Roadmap
Phase/Step
Step
No.
Timeline
Start End Remarks
2014 2015 2016 2017 2018
Phase II
Terrain A-3 P-13 2018 2019
The target is to be
implemented by 2019
Obstacle A-3 P-14 2018 2019
The target is to be
implemented by 2019
AD Mapping P-15 2019 2020
The target is to be
implemented by 2020
Phase III
Aeronautical
data exchange
P-09 2018 2020
Communication
networks
P-10 2005 2020
Aeronautical
information
briefing
P-12 2001 2018
Training P-16 2005 2020
7AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
EGYPT National AIM Implementation Roadmap
Phase/Step
Step
No.
Timeline
Start End Remarks
2014 2015 2016 2017 2018
Phase III
Agreement with
data originators
P-18 2006 2018
Interoperability
with
meteorological
products
P-19 2017 2020
Electronic
aeronautical
charts
P-20 2018 2020
Digital
NOTAM
P-21 2017 2020
8AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
Status of Egypt B0-DATM
Implementation
9AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
Status of Egypt B0-DATM Implementation
Provision of AIS/AIM products and services based on the Integrated Aeronautical Information Database (IAID)
Elements Status Action Plan Remarks
Integrated Aeronautical
Information Database
(IAID)
FI -
AIXM (+version) FI -
version 4.5 – upgrading to
version 5.1 by 2018
eAIP (IAID-based) PI To be completed by 2018
eAIP is provided in digital
format - CD since 2006
NOTAM (IAID-based) FC -
SNOWTAM (IAID-based) NC -
PIB (IAID-based) FC -
Charting (interoperable
with IAID)
NC To be completed by 2018
Procedure Design
(interoperable with IAID)
NI To be completed by 2018
ATS (interoperable with
IAID)
FI -
10AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
Status of Egypt B0-DATM Implementation
Aeronautical Data Quality
Elements Status Action Plan Remarks
Quality
Management
System (QMS)
FC -
Formal agreement
with originators
PC To be completed by 2018
Digital data
exchange with
originators
PI To be completed by 2018
Metadata FC -
Data quality
monitoring
PC To be completed by 2018
Data integrity
monitoring
PC To be completed by 2018
AIRAC adherence FC -
11AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
Status of Egypt B0-DATM Implementation
WGS-84
Elements Status Action Plan Remarks
FIR/ENR FC ‐
Terminal FC ‐
AD FC ‐
Geoid Undulation
(GUND)
FC ‐
12
AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
Status of Egypt B0-DATM Implementation
electronic Terrain and Obstacle Datasets (eTOD)
Elements Status Action Plan Remarks
Area 1 Terrain FC -
Area 1 Obstacles NC To be completed 2019
Area 4 Terrain FC -
Area 4 Obstacles NC To be completed 2019
Area 2a Terrain PC To be completed 2020 HECA & HEBA Completed
Area 2a Obstacles NC To be completed 2020
Area 2b Terrain PI To be completed 2020 HECA & HEBA Completed
Area 2b Obstacles NI To be completed 2020
Area 2c Terrain PI To be completed 2020 HECA & HEBA Completed
Area 2c Obstacles NI To be completed 2020
Area 2d Terrain PI To be completed 2020 HECA & HEBA Completed
Area 2d Obstacles NI To be completed 2020
Area 3 Terrain NI To be completed 2019
Area 3 Obstacles NI To be completed 2019
AMDB NI To be completed 2020
13AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
B0 – DATM: Service Improvement through Digital Aeronautical Information Management
Elements Applicability Status
Action
Plan/Timelines
Remarks
National AIM
Roadmap
Egypt Fully Implemented ‐ Updated Version by Nov 2016
AIXM Egypt Fully Implemented ‐
Current: version 4.5
upgrading to version 5.1
by 2018
eAIP Egypt Fully Implemented
Fully Implemented
by Dec 2018
QMS Egypt Fully Compliant -
WGS-84
ENR
AD
TMA
GUND
Fully Compliant -
eTOD
Area 1 Terrain
Area 1 Obstacle
Area 4 Terrain
Area 4 Obstacle
Fully Compliant
Fully Compliant
Fully Compliant
Fully Compliant
Fully complaint by
Dec 2019
Outlook 2020
(Status of B0-DATM by 2020)
14AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
Status of AIM Deficiencies
AIM Deficiency Status
Action
Plan/Timelines
Remarks
Lack of the required Obstacle
Datasets for eTOD Area 1 and
Area 4
Not Completed
Completed by
Dec, 2019
Tender for the new system
was completed and we are
in phase of signing the
contract with the supplier
15
Challenges
AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
B0-DATM
 eAIP (P-11): Software Provider insolvent issue.
 P-19: Interoperability with different systems.
 P-13, P-14: Funding issue.
 Civil / Military Coordination.
Comprehensive training is required for operational personnel
16
Lessons Learned
AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
 Working groups Development
The implementation of working groups for different subjects has
proven to be very useful and effective.
 Stakeholder Engagement
Implementation of ASBU blocks require close collaboration
between all stakeholders.
17
Recommendations
AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
 Reconsider that some similar steps should be merged in one
step e.g (AIXM, Unique identifier, AICM) as the state implement
an automated system, all these steps are achieved.
 ICAO invited to arrange AIM training courses and seminars in
order to keep the states in line with the new concepts and subjects
in the AIM field.
18AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
Thank You !

More Related Content

Similar to Egypt's Status Report on Implementing B0-DATM and AIM Deficiencies

EffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptEffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptSURAJ SINGH SAINI
 
SITA Airport CDM - global end2end experience - Apr2017
SITA Airport CDM - global end2end experience - Apr2017SITA Airport CDM - global end2end experience - Apr2017
SITA Airport CDM - global end2end experience - Apr2017Etienne van Zuijlen
 
Form-M Presentation - Arinta H WIjaya
Form-M Presentation - Arinta H WIjayaForm-M Presentation - Arinta H WIjaya
Form-M Presentation - Arinta H WIjayaArinta Wijaya
 
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...MARRIS Consulting
 
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado EurocontrolÜlger Ahmet
 
AviationSolutions-L1-Oct2022.PPTX
AviationSolutions-L1-Oct2022.PPTXAviationSolutions-L1-Oct2022.PPTX
AviationSolutions-L1-Oct2022.PPTXThinL389917
 
Iaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geoIaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geoIaetsd Iaetsd
 
Dr Bonazountas - Dr Trypitsidis 2014
Dr Bonazountas - Dr Trypitsidis 2014Dr Bonazountas - Dr Trypitsidis 2014
Dr Bonazountas - Dr Trypitsidis 2014aviationsociety
 
The larger picture – an icao update
The larger picture – an icao updateThe larger picture – an icao update
The larger picture – an icao updatealban_sylaj
 
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave Murray
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave MurrayGISCO Fall 2018: Senate Bill 18-167 and GIS – Dave Murray
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave MurrayGIS in the Rockies
 
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave Murray
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave MurrayGISCO Fall 2018: Senate Bill 18-167 and GIS – Dave Murray
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave MurrayGIS Colorado
 
Reduce CO2 Emission of the Civial Aviation - GE Digital - Predix.io - v3.03
Reduce CO2 Emission of the Civial Aviation - GE Digital - Predix.io - v3.03Reduce CO2 Emission of the Civial Aviation - GE Digital - Predix.io - v3.03
Reduce CO2 Emission of the Civial Aviation - GE Digital - Predix.io - v3.03Abdelkrim Boujraf
 
IRJET- Iot Applied to Logistics using Intelligent Cargo
IRJET-  	  Iot Applied to Logistics using Intelligent CargoIRJET-  	  Iot Applied to Logistics using Intelligent Cargo
IRJET- Iot Applied to Logistics using Intelligent CargoIRJET Journal
 

Similar to Egypt's Status Report on Implementing B0-DATM and AIM Deficiencies (20)

CNS SG7 -PPT5
CNS SG7 -PPT5CNS SG7 -PPT5
CNS SG7 -PPT5
 
Secretaria de Aviação Civil - SESAR Experience and Deployment
Secretaria de Aviação Civil - SESAR Experience and DeploymentSecretaria de Aviação Civil - SESAR Experience and Deployment
Secretaria de Aviação Civil - SESAR Experience and Deployment
 
EffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.pptEffectiveAirportManagement-Diffs-Sols-191213.ppt
EffectiveAirportManagement-Diffs-Sols-191213.ppt
 
SITA Airport CDM - global end2end experience - Apr2017
SITA Airport CDM - global end2end experience - Apr2017SITA Airport CDM - global end2end experience - Apr2017
SITA Airport CDM - global end2end experience - Apr2017
 
Form-M Presentation - Arinta H WIjaya
Form-M Presentation - Arinta H WIjayaForm-M Presentation - Arinta H WIjaya
Form-M Presentation - Arinta H WIjaya
 
houstonIS13.pptx
houstonIS13.pptxhoustonIS13.pptx
houstonIS13.pptx
 
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...
 
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
1 Towardsa Global Atm Conceptthe European Contribution Victor Aguado Eurocontrol
 
Sergio Martins - OPERATIONS AND PASSENGERS WORKSHOP - PANEL 2
Sergio Martins - OPERATIONS AND PASSENGERS WORKSHOP - PANEL 2Sergio Martins - OPERATIONS AND PASSENGERS WORKSHOP - PANEL 2
Sergio Martins - OPERATIONS AND PASSENGERS WORKSHOP - PANEL 2
 
10. Enhanced gnss user terminal
10. Enhanced gnss user terminal10. Enhanced gnss user terminal
10. Enhanced gnss user terminal
 
AviationSolutions-L1-Oct2022.PPTX
AviationSolutions-L1-Oct2022.PPTXAviationSolutions-L1-Oct2022.PPTX
AviationSolutions-L1-Oct2022.PPTX
 
Iaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geoIaetsd ads-b technology with gps aided geo
Iaetsd ads-b technology with gps aided geo
 
Dr Bonazountas - Dr Trypitsidis 2014
Dr Bonazountas - Dr Trypitsidis 2014Dr Bonazountas - Dr Trypitsidis 2014
Dr Bonazountas - Dr Trypitsidis 2014
 
Poster
PosterPoster
Poster
 
The larger picture – an icao update
The larger picture – an icao updateThe larger picture – an icao update
The larger picture – an icao update
 
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave Murray
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave MurrayGISCO Fall 2018: Senate Bill 18-167 and GIS – Dave Murray
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave Murray
 
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave Murray
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave MurrayGISCO Fall 2018: Senate Bill 18-167 and GIS – Dave Murray
GISCO Fall 2018: Senate Bill 18-167 and GIS – Dave Murray
 
Reduce CO2 Emission of the Civial Aviation - GE Digital - Predix.io - v3.03
Reduce CO2 Emission of the Civial Aviation - GE Digital - Predix.io - v3.03Reduce CO2 Emission of the Civial Aviation - GE Digital - Predix.io - v3.03
Reduce CO2 Emission of the Civial Aviation - GE Digital - Predix.io - v3.03
 
Boeing-NPS
Boeing-NPSBoeing-NPS
Boeing-NPS
 
IRJET- Iot Applied to Logistics using Intelligent Cargo
IRJET-  	  Iot Applied to Logistics using Intelligent CargoIRJET-  	  Iot Applied to Logistics using Intelligent Cargo
IRJET- Iot Applied to Logistics using Intelligent Cargo
 

Recently uploaded

OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrSaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrsaastr
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyPooja Nehwal
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...Sheetaleventcompany
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...NETWAYS
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 

Recently uploaded (20)

OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrSaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
No Advance 8868886958 Chandigarh Call Girls , Indian Call Girls For Full Nigh...
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
Open Source Camp Kubernetes 2024 | Running WebAssembly on Kubernetes by Alex ...
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 

Egypt's Status Report on Implementing B0-DATM and AIM Deficiencies

  • 1. Third Meeting of the Aeronautical Information Management Sub-Group (AIM SG/3) Cairo, Egypt, 15-18 May 2017 EGYPT ASBU B0-DATM Implementation Status 1AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
  • 2. Outline  EGYPT National AIM Implementation Roadmap  Status of B0-DATM Implementation  Outlook 2020  Status of AIM Deficiencies  Challenges  Lessons Learned  Recommendations AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 2
  • 3. 3 Egypt National AIM Implementation Roadmap AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017
  • 4. 4AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 EGYPT National AIM Implementation Roadmap Phase/Step Step No. Timeline Start End Remarks 2014 2015 2016 2017 2018 Phase I AIRAC adherence P-03 2008 - Already Implemented WGS-84 implementation P-05 2008 - Already Implemented QMS P-17 2007 - Already Implemented Phase II Data Quality Monitoring P-01 2006 2018 SLA are implemented with most data originators Data Integrity Monitoring P-02 2006 2018 The target is to be implemented by 2018 AIXM P-06 2006 ‐ Already Implemented Unique identifiers P-07 2006 ‐ Already Implemented Aeronautical information conceptual model P-08 2006 ‐ Already Implemented
  • 5. 5AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 EGYPT National AIM Implementation Roadmap Phase/Step Step No. Timeline Start End Remarks 2014 2015 2016 2017 2018 Phase II eAIP P-11 2014 2018 The target is to be implemented by 2018 Terrain A-1 P-13 2007 - Already Implemented Obstacle A-1 P-14 2017 2019 The target is to be implemented by 2019 Terrain A-4 P-13 2007 - Already Implemented Obstacle A-4 P-14 2017 2019 The target is to be implemented by 2019 Terrain A-2 P-13 2020 The target is to be implemented by 2020 Obstacle A-2 P-14 2020 The target is to be implemented by 2020
  • 6. 6AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 EGYPT National AIM Implementation Roadmap Phase/Step Step No. Timeline Start End Remarks 2014 2015 2016 2017 2018 Phase II Terrain A-3 P-13 2018 2019 The target is to be implemented by 2019 Obstacle A-3 P-14 2018 2019 The target is to be implemented by 2019 AD Mapping P-15 2019 2020 The target is to be implemented by 2020 Phase III Aeronautical data exchange P-09 2018 2020 Communication networks P-10 2005 2020 Aeronautical information briefing P-12 2001 2018 Training P-16 2005 2020
  • 7. 7AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 EGYPT National AIM Implementation Roadmap Phase/Step Step No. Timeline Start End Remarks 2014 2015 2016 2017 2018 Phase III Agreement with data originators P-18 2006 2018 Interoperability with meteorological products P-19 2017 2020 Electronic aeronautical charts P-20 2018 2020 Digital NOTAM P-21 2017 2020
  • 9. 9AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 Status of Egypt B0-DATM Implementation Provision of AIS/AIM products and services based on the Integrated Aeronautical Information Database (IAID) Elements Status Action Plan Remarks Integrated Aeronautical Information Database (IAID) FI - AIXM (+version) FI - version 4.5 – upgrading to version 5.1 by 2018 eAIP (IAID-based) PI To be completed by 2018 eAIP is provided in digital format - CD since 2006 NOTAM (IAID-based) FC - SNOWTAM (IAID-based) NC - PIB (IAID-based) FC - Charting (interoperable with IAID) NC To be completed by 2018 Procedure Design (interoperable with IAID) NI To be completed by 2018 ATS (interoperable with IAID) FI -
  • 10. 10AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 Status of Egypt B0-DATM Implementation Aeronautical Data Quality Elements Status Action Plan Remarks Quality Management System (QMS) FC - Formal agreement with originators PC To be completed by 2018 Digital data exchange with originators PI To be completed by 2018 Metadata FC - Data quality monitoring PC To be completed by 2018 Data integrity monitoring PC To be completed by 2018 AIRAC adherence FC -
  • 11. 11AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 Status of Egypt B0-DATM Implementation WGS-84 Elements Status Action Plan Remarks FIR/ENR FC ‐ Terminal FC ‐ AD FC ‐ Geoid Undulation (GUND) FC ‐
  • 12. 12 AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 Status of Egypt B0-DATM Implementation electronic Terrain and Obstacle Datasets (eTOD) Elements Status Action Plan Remarks Area 1 Terrain FC - Area 1 Obstacles NC To be completed 2019 Area 4 Terrain FC - Area 4 Obstacles NC To be completed 2019 Area 2a Terrain PC To be completed 2020 HECA & HEBA Completed Area 2a Obstacles NC To be completed 2020 Area 2b Terrain PI To be completed 2020 HECA & HEBA Completed Area 2b Obstacles NI To be completed 2020 Area 2c Terrain PI To be completed 2020 HECA & HEBA Completed Area 2c Obstacles NI To be completed 2020 Area 2d Terrain PI To be completed 2020 HECA & HEBA Completed Area 2d Obstacles NI To be completed 2020 Area 3 Terrain NI To be completed 2019 Area 3 Obstacles NI To be completed 2019 AMDB NI To be completed 2020
  • 13. 13AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 B0 – DATM: Service Improvement through Digital Aeronautical Information Management Elements Applicability Status Action Plan/Timelines Remarks National AIM Roadmap Egypt Fully Implemented ‐ Updated Version by Nov 2016 AIXM Egypt Fully Implemented ‐ Current: version 4.5 upgrading to version 5.1 by 2018 eAIP Egypt Fully Implemented Fully Implemented by Dec 2018 QMS Egypt Fully Compliant - WGS-84 ENR AD TMA GUND Fully Compliant - eTOD Area 1 Terrain Area 1 Obstacle Area 4 Terrain Area 4 Obstacle Fully Compliant Fully Compliant Fully Compliant Fully Compliant Fully complaint by Dec 2019 Outlook 2020 (Status of B0-DATM by 2020)
  • 14. 14AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 Status of AIM Deficiencies AIM Deficiency Status Action Plan/Timelines Remarks Lack of the required Obstacle Datasets for eTOD Area 1 and Area 4 Not Completed Completed by Dec, 2019 Tender for the new system was completed and we are in phase of signing the contract with the supplier
  • 15. 15 Challenges AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017 B0-DATM  eAIP (P-11): Software Provider insolvent issue.  P-19: Interoperability with different systems.  P-13, P-14: Funding issue.  Civil / Military Coordination. Comprehensive training is required for operational personnel
  • 16. 16 Lessons Learned AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017  Working groups Development The implementation of working groups for different subjects has proven to be very useful and effective.  Stakeholder Engagement Implementation of ASBU blocks require close collaboration between all stakeholders.
  • 17. 17 Recommendations AIM SG/3, Cairo, Egypt, 15‐18 MAY 2017  Reconsider that some similar steps should be merged in one step e.g (AIXM, Unique identifier, AICM) as the state implement an automated system, all these steps are achieved.  ICAO invited to arrange AIM training courses and seminars in order to keep the states in line with the new concepts and subjects in the AIM field.