SlideShare a Scribd company logo
1 of 83
Introducing;
Geotechnical, Environmental and Bioengineering
Design to enhance humans Living, while enhancing Future…
Our future living depend on your today’s planning
What is Soil Chain?
Soil Chain is a trademark and patented ecological engineering system, which consist of
non-biodegradable, eco-friendly geo-block and chain components, which made out of
recyclable material.
It is an ecosystem which designed for erosion protection and control, for wide range of
civil structure to be construct, that supports earth embankment and erosion
restoration, while sustaining lateral earth pressure or load surcharge.
It is an innovative system, capable of handling unique engineering like; Self-Standing
Wall, or even structure that to be construct along parameter where land and water
meets, truly without using any conventional hard material, or substance that may cause
chemical reaction .
Soil Chain is also a vibrant system as it is root friendly, that allows various kind of
planting media to be sustainably grows onto the structure, which could achieve
uniform vegetation, that capable to reflect heats back to the atmosphere, while
reducing noise and carbon in the environment.
Separately, completed structure and it surface is also water permeable, which
further allow water to be discharge freely, without requiring any other sub-system
compliment.
Components Introduction
Soil Chain system consist of Three main & Two optional components
» Soil Chain Block; Meant for filling with recommended earth
media and convert into soft modular geo-block.
» Mini-micro pocket of the block material, is capable to filter
and prevent filling particle seepage, and allows water to
pass freely and has proven to be root friendly.
» Non Biodegradable.
» Ideal to accept various kind of planting media
» Soil Chain Mechanism; Provides permanent stability and fix
the positioning of individual soft modular block, either onto
earth surface or in between layers, via eight downward spikes
and four upward spikes.
» It also provides four directional structural chaining
foundation, via eight ready spike compartments making it
feasible for further chaining with another mechanism, and
eventually form a total structural chain strength solution.
» Soil Chain Connector; For chaining connection between Soil
Chain Mechanism, via spike compartment to form structural
chain strength. Using directional methodology through spikes
connection, provide permanent stability with shear strength
of mechanical geo-engineering structure.
» Soil Chain Connector and its materials, are also capable to
withstand more than 180 degree of bending, without any
cracking, or compromising its native strength, which caters
for structural chaining designed for bending to continue
chaining up the entire geo-engineering structure.
Soil Chain™ Connector – (Main)
» Soil Chain™ Base Plate; It is the base foundation for
column to be permanently secured onto ground footing
during constructing of the Self-Standing Ecology Wall™.
We contribute our part to the earth, through our eco-system innovation.
Material: Recyclable High Density Polyethylene
Breaking Strength: 9.5KN/m2
Bursting Strength: 1.5KN/m2
Trap Tear Strength: 0.24KN/m2
Weight: 45gsm/95gsm
Dimension for Soil Chain™ Base Plate:
Length- 150(mm)
Width- 147(mm)
Height- 153(mm)
Spike Height- 025(mm)
No of upward spike- 02(pcs)
No of downward spike- 0(pc)
No of Spike’ Compartment- 08(pcs)
No of Column Holder- 01(pc)
Column Holder (Diameter)- 59mm
Column Holder (Thickness)- 8mm
» Soil Chain™ Column; It is the pillar column which connects all
the way down to ground footing during the construction of the
Self-Standing Ecology Wall™.
» It further strengthens and upright the wall structure
permanently on every meter apart.
Material: Recyclable High Density Polyethylene
Breaking Strength: 9.5KN/m2
Bursting Strength: 1.5KN/m2
Trap Tear Strength: 0.24KN/m2
Weight: 45gsm/95gsm
Dimension for Soil Chain™ Column:
Length- (Before Extension) 1600(mm)
Width- (Diameter) 60(mm)
Thickness- (Parameter) 0.5(mm)
Length- (Full Extension) 2600(mm)
Width- (Diameter) 59(mm)
Thickness- (Parameter) 0.5(mm)
Column Top Cap cover- 01(pc)
Height- 25(mm)
Thickness- (Parameter) 0.2(mm)
We contribute our part to the earth, through our eco-system innovation.
Soil Chain Innovation
mitigate climate conditions during construction
The following demonstrates the base layer construction of Soil Chain system
The following demonstrates the above layers construction of Soil Chain system
Construction on
Slope Application
How to construct on Slope Application
Earth
Earth Surface
Below 60 degree
RAPID CONSTRUCTION, ECOLOGICAL ENGINEERING
Earth
Construction on
near or Vertical
Application
How to construct on Vertical Application
Earth
Profile between 75 till 90 degree
Earth
Earth
Earth
Earth
Earth
Earth
GEOTECHNICAL ENGINEERING, ENVIRONMENTAL FRIENDLY CONSTRUCTION
Construction on
Self-Standing
Ecology Application
How to construct on Self-Standing Wall
BIO-ENGINEERING, CARBON FREE CONSTRUCTION
Soil Chain™ - Green product : environmental friendly through bio-
engineering solution which is capable to construct without any pollutions:
- Able to build structure with uniform vegetated face;
- Root friendly which creates sufficient rooms for future growth and
development of root system which allows to penetrate from bag to
bag;
- Accept various kinds of vegetation media;
- Flexi-system which is able to accept various planting method;
- Capable of constructing vertical planting structure;
- Absolutely friendly to wildlife habitat;
- Permanent Noise and Heat reduction;
- Minimize wastage of nature resources and troubles of debris handling;
- Entire system using only recyclable material;
- Reduce Green House Gases and Carbon footprint;
- Improvement of Social and Economic values;
Spread the Message!
Fleets of Environmental Benefits
which produces
Environmental benefits
Soil Chain™ - Green product : environmental friendly and permanent
structure sheer strength sustainability without hard or chemical material;
- Versatile eco-friendly engineering system;
- Low impact and rapid construction;
- Economical and easy logistics handling;
- Cost effective and efficient construction;
- Minimize cost on footing, drainage and conventional pre-requisite;
- Minimize pollutions causes by traditional hardware;
- Ability to mimic existing contour;
- Ability to absorb differential settlement;
- Capable of handling mechanical connection;
- Instant solution for wetlands or soft area;
- No cracking or staining which reduce maintenance;
- Immediate construction system for nature disaster;
Spread the Message!
Fleets of Construction Benefits
which delivered
Construction benefits
0
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
Days
$100
100%
Comparison between Conventional/Innovation based on 1(m2) Structure
Conventional Material/Method Soil Chain™ System
Summary benefits of using Soil Chain™ system:
- Increase productivity by 300% at least, which further lessen 1.5% of work force
- Reduction on cost by 51.52% for both supply and install
- Generates 500% or more advantages (environmental) compares to conventional on
either during construction or permanent aspects.
All information including drawing, pictures, calculation and technical data presented in
this publication is only meant for general information. Soil Chain™ made effort to
ensure the information accuracy, but this publication content should not be used or
relied on any new application development without accuracy verification.
Final project evaluation, designed, engineering calculation, specification authority
submission must be prepared by Qualified Personnel or Professional Engineer locally
(licensed) on individual project site condition basis. Soil Chain™ reserved all rights at
all times to disclaims all express and warranties of components fitness for any reason
in general or particular reason in regard to information or product contained or herein.
Soil Chain™ is subject to pending and registered patent.
All rights reserved. Copy© rights reserved. 2013.
Soil Chain™ Projects Shoreline Application
Before Construction – Palawan Beach, Sentosa
(LW Model)
Soil Chain™ Projects
Before Construction – Palawan Beach, Sentosa
(LW Model)
Shoreline Application
Soil Chain™ Projects
Before Construction – Palawan Beach, Sentosa
(LW Model)
Shoreline Application
Soil Chain™ Projects
After Construction – Palawan Beach, Sentosa
(LW Model)
Shoreline Application
Soil Chain™ Projects
After Construction – Palawan Beach, Sentosa
(LW Model)
Shoreline Application
Soil Chain™ Projects
After Construction – Palawan Beach, Sentosa
(LW Model)
Shoreline Application
Soil Chain™ Projects
After Construction – Palawan Beach, Sentosa
(LW Model)
Shoreline Application
Soil Chain™ Projects Shoreline Application
After Construction – Palawan Beach, Sentosa
(LW Model)
Soil Chain™ Projects Shoreline Application
After Construction – Palawan Beach, Sentosa
(LW Model)
Soil Chain™ Projects
Before Construction – Bishan Park 1, PUB
(LW Model)
Stream Bank Application
Soil Chain™ Projects Stream Bank Application
After Construction – Bishan Park 1, PUB
(LW Model)
Soil Chain™ Projects Stream Bank Application
After Construction – Bishan Park 1, PUB
(LW Model)
Soil Chain™ Projects Stream Bank Application
During vegetation – Bishan Park 1, PUB
(LW Model)
Soil Chain™ Projects Stream Bank Application
3 months later – Bishan Park 1, PUB
(LW Model)
Soil Chain™ Projects Stream Bank Application
3 months later – Bishan Park 1, PUB
(LW Model)
Soil Chain™ Projects
Before Construction – Siloso Beach, Sentosa
(LW Model)
Shoreline Application
Soil Chain™ Projects Shoreline Application
After Construction – Siloso Beach, Sentosa
(LW Model)
Soil Chain™ Projects Shoreline Application
After Construction – Siloso Beach, Sentosa
(LW Model)
Soil Chain™ Projects Shoreline Application
After Construction – Siloso Beach, Sentosa
(LW Model)
Soil Chain™ Projects Shoreline Application
After Construction – Siloso Beach, Sentosa
(LW Model)
Soil Chain™ Projects Shoreline Application
After Construction – Siloso Beach, Sentosa
(LW Model)
Soil Chain™ Projects Shoreline Application
After Construction – Siloso Beach, Sentosa
(LW Model)
Soil Chain™ Projects Slope & Wall Application
Before Construction – Forestville Executive Condominium, Woodlands
(SW Model)
Soil Chain™ Projects Slope & Wall Application
Before Construction – Forestville Executive Condominium, Woodlands
(SW Model)
Soil Chain™ Projects Slope & Wall Application
During Construction – Forestville Executive Condominium, Woodlands
(SW Model)
Soil Chain™ Projects Slope & Wall Application
During Construction – Forestville Executive Condominium, Woodlands
(SW Model)
Soil Chain™ Projects Slope & Wall Application
After Construction – Forestville Executive Condominium, Woodlands
(SW Model)
Soil Chain™ Projects Slope & Wall Application
Prepare for vegetation – Forestville Executive Condominium, Woodlands
(SW Model)
Soil Chain™ Projects Slope & Wall Application
After Vegetation– Forestville Executive Condominium, Woodlands
(SW Model)
Soil Chain™ Projects
3 months later– Forestville Executive Condominium, Woodlands
(SW Model)
Slope & Wall Application
Soil Chain™ Projects Slope & Wall Application
Initial Construction – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
During Construction – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
During Construction – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
During Construction – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
During Vegetation – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
After Vegetation – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
After Vegetation – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
After Vegetation – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
4 months later – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
4 months later – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
4 months later – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects Slope & Wall Application
4 months later – One Canberra Executive Condominium, Yishun
(SW Model)
Soil Chain™ Projects
Before Construction – Bishan Park 2, PUB
(LW Model)
Stream Bank Application
Soil Chain™ Projects
During Construction – Bishan Park 2, PUB
(LW Model)
Stream Bank Application
Soil Chain™ Projects
Completion of structure– Bishan Park 2, PUB
(LW Model)
Stream Bank Application
Soil Chain™ Projects Stream Bank Application
3 months after completion– Bishan Park 2, PUB
(LW Model)
Soil Chain™ Projects Stream Bank Application
3 months after completion– Bishan Park 2, PUB
(LW Model)
Soil Chain™ Projects Slope & Wall Application
Before Construction – Sea Horizon Executive Condominium
(SW Model)
Soil Chain™ Projects Slope & Wall Application
During Construction – Sea Horizon Executive Condominium
(SW Model)
Soil Chain™ Projects Slope & Wall Application
During Construction – Sea Horizon Executive Condominium
(SW Model)
Soil Chain™ Projects Slope & Wall Application
Completion of structure – Sea Horizon Executive Condominium
(SW Model)
Soil Chain™ Projects Slope & Wall Application
Vegetation of structure – Sea Horizon Executive Condominium
(SW Model)
Soil Chain™ Projects Slope & Wall Application
Vegetation on structure – Sea Horizon Executive Condominium
(SW Model)
Soil Chain™ Projects Slope & Wall Application
4 months later – Sea Horizon Executive Condominium
(SW Model)
Soil Chain™ Projects Slope & Wall Application
4 months later – Sea Horizon Executive Condominium
(SW Model)
Thank you for your attention.
Proudly brought to you by:
SystemNix Technologies Pte. Ltd
No. 61 Kaki Bukit Industrial Terrace #04-01 Singapore 416141
Tel: (65)6748 5122 Fax: (65)6748 5322
Email: info@systemnixasia.com
So now, what is your message to Earth?
www.facebook.com/soilchain www.twitter.com/soilchain www.flipboard.com/@soilchain www.youtube.com/channel/UCPgF4
YVmMBPB_iv4tIF9HTA

More Related Content

What's hot

Typical Applications for Cementitious Grout
Typical Applications for Cementitious GroutTypical Applications for Cementitious Grout
Typical Applications for Cementitious GroutHess Pumice Products
 
Turkey - Retaining Wall case study
Turkey - Retaining Wall case studyTurkey - Retaining Wall case study
Turkey - Retaining Wall case studyHilit Noy
 
Southeast Stoney Trail Project Profile
Southeast Stoney Trail Project ProfileSoutheast Stoney Trail Project Profile
Southeast Stoney Trail Project ProfileDan MacDonald, P.Eng.
 
Salus Passive House PresentationNV
Salus Passive House PresentationNVSalus Passive House PresentationNV
Salus Passive House PresentationNVKen Williams
 
Dim cs whynes_12.07
Dim cs whynes_12.07Dim cs whynes_12.07
Dim cs whynes_12.07Tensar
 
Emin sg sistema dimension caso west hynes tank farm
Emin sg   sistema dimension caso west hynes tank farmEmin sg   sistema dimension caso west hynes tank farm
Emin sg sistema dimension caso west hynes tank farmEMIN Sistemas Geotecnicos
 
Deltalok BCOverview Jan 2010
Deltalok BCOverview Jan 2010Deltalok BCOverview Jan 2010
Deltalok BCOverview Jan 2010jaydmorgan
 
Mitigating foundation distress
Mitigating foundation distressMitigating foundation distress
Mitigating foundation distressInfocengrs63
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010Tonyamis
 
Ground improvement techniques
Ground improvement techniquesGround improvement techniques
Ground improvement techniquesQasim Virk
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Vladimir Popovic
 
Deltalok Presentation
Deltalok PresentationDeltalok Presentation
Deltalok PresentationDeltalok AHS
 
1206765 634528654292080000
1206765 6345286542920800001206765 634528654292080000
1206765 634528654292080000Civil Engineers
 
Research in geotechnical engineering
Research in geotechnical engineeringResearch in geotechnical engineering
Research in geotechnical engineeringAbhineet Godayal CE
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Vladimir Popovic
 
Ram Jack Company Slide Show
Ram Jack Company Slide ShowRam Jack Company Slide Show
Ram Jack Company Slide Showjamieram
 
Emin sg estabilizacion de la subrasante geogrillas tensar
Emin sg estabilizacion de la subrasante geogrillas tensarEmin sg estabilizacion de la subrasante geogrillas tensar
Emin sg estabilizacion de la subrasante geogrillas tensarEMIN Sistemas Geotecnicos
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsVladimir Popovic
 

What's hot (19)

Typical Applications for Cementitious Grout
Typical Applications for Cementitious GroutTypical Applications for Cementitious Grout
Typical Applications for Cementitious Grout
 
Turkey - Retaining Wall case study
Turkey - Retaining Wall case studyTurkey - Retaining Wall case study
Turkey - Retaining Wall case study
 
Southeast Stoney Trail Project Profile
Southeast Stoney Trail Project ProfileSoutheast Stoney Trail Project Profile
Southeast Stoney Trail Project Profile
 
SFPR-Project-Profile_0
SFPR-Project-Profile_0SFPR-Project-Profile_0
SFPR-Project-Profile_0
 
Salus Passive House PresentationNV
Salus Passive House PresentationNVSalus Passive House PresentationNV
Salus Passive House PresentationNV
 
Dim cs whynes_12.07
Dim cs whynes_12.07Dim cs whynes_12.07
Dim cs whynes_12.07
 
Emin sg sistema dimension caso west hynes tank farm
Emin sg   sistema dimension caso west hynes tank farmEmin sg   sistema dimension caso west hynes tank farm
Emin sg sistema dimension caso west hynes tank farm
 
Deltalok BCOverview Jan 2010
Deltalok BCOverview Jan 2010Deltalok BCOverview Jan 2010
Deltalok BCOverview Jan 2010
 
Mitigating foundation distress
Mitigating foundation distressMitigating foundation distress
Mitigating foundation distress
 
GE Presentation 6th October 2010
GE Presentation 6th October 2010GE Presentation 6th October 2010
GE Presentation 6th October 2010
 
Ground improvement techniques
Ground improvement techniquesGround improvement techniques
Ground improvement techniques
 
Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)Lanchkhuti City / Lashis Gele RC Tank (500m3)
Lanchkhuti City / Lashis Gele RC Tank (500m3)
 
Deltalok Presentation
Deltalok PresentationDeltalok Presentation
Deltalok Presentation
 
1206765 634528654292080000
1206765 6345286542920800001206765 634528654292080000
1206765 634528654292080000
 
Research in geotechnical engineering
Research in geotechnical engineeringResearch in geotechnical engineering
Research in geotechnical engineering
 
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
Lanchkhuti City / Oragvis Gele RC Tank (1,900m3)
 
Ram Jack Company Slide Show
Ram Jack Company Slide ShowRam Jack Company Slide Show
Ram Jack Company Slide Show
 
Emin sg estabilizacion de la subrasante geogrillas tensar
Emin sg estabilizacion de la subrasante geogrillas tensarEmin sg estabilizacion de la subrasante geogrillas tensar
Emin sg estabilizacion de la subrasante geogrillas tensar
 
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing ConditionsRehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
Rehabilitation of Oragvis-Gele Water RC Reservoir, Existing Conditions
 

Similar to Presentation1 timing

Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPTCherylwitmer
 
Flood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionFlood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionPRANTIKSINHA2
 
Neptune solutions brochure may 2017
Neptune solutions brochure may 2017Neptune solutions brochure may 2017
Neptune solutions brochure may 2017Micheal Mullvihill
 
Block-Based Living Walls of Filtrexx v.1
Block-Based Living Walls of Filtrexx v.1Block-Based Living Walls of Filtrexx v.1
Block-Based Living Walls of Filtrexx v.1Greenwall Ventures, LLC
 
Aquacrete Capability Statement 2016
Aquacrete Capability Statement 2016Aquacrete Capability Statement 2016
Aquacrete Capability Statement 2016Suzanne Knight
 
Us Flood E Brochure
Us Flood E BrochureUs Flood E Brochure
Us Flood E BrochureCherylwitmer
 
Encon Best - sales right, proposal version 1
Encon Best - sales right, proposal version 1Encon Best - sales right, proposal version 1
Encon Best - sales right, proposal version 1Glenn Davis
 
Armoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream CrossingArmoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream CrossingEric Lestock Kay
 
PROJECT DOCUMENT OF PERVIOUS CONCRETE
PROJECT DOCUMENT OF PERVIOUS CONCRETEPROJECT DOCUMENT OF PERVIOUS CONCRETE
PROJECT DOCUMENT OF PERVIOUS CONCRETEG.Ajith Kumar
 
Geo 101 detailed
Geo 101  detailedGeo 101  detailed
Geo 101 detailedbgoehring
 
IRJET- Multi Use Eco Friendly Floating Panel
IRJET-  	  Multi Use Eco Friendly Floating PanelIRJET-  	  Multi Use Eco Friendly Floating Panel
IRJET- Multi Use Eco Friendly Floating PanelIRJET Journal
 
9. portafloormax - explo groupperu
9.  portafloormax - explo groupperu9.  portafloormax - explo groupperu
9. portafloormax - explo groupperuRicardo Reaño
 
GFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemGFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemRajdeep Chowdhury
 
Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.WorldHaus
 

Similar to Presentation1 timing (20)

Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPT
 
Trinity Living Walls of Filtrexx v.1
Trinity Living Walls of Filtrexx v.1Trinity Living Walls of Filtrexx v.1
Trinity Living Walls of Filtrexx v.1
 
Flood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionFlood Barrier US inflated for water restriction
Flood Barrier US inflated for water restriction
 
Neptune solutions brochure may 2017
Neptune solutions brochure may 2017Neptune solutions brochure may 2017
Neptune solutions brochure may 2017
 
GreenLoxx Living Walls of Filtrexx v.1
GreenLoxx Living Walls of Filtrexx v.1GreenLoxx Living Walls of Filtrexx v.1
GreenLoxx Living Walls of Filtrexx v.1
 
Block-Based Living Walls of Filtrexx v.1
Block-Based Living Walls of Filtrexx v.1Block-Based Living Walls of Filtrexx v.1
Block-Based Living Walls of Filtrexx v.1
 
Aquacrete Capability Statement 2016
Aquacrete Capability Statement 2016Aquacrete Capability Statement 2016
Aquacrete Capability Statement 2016
 
Us Flood E Brochure
Us Flood E BrochureUs Flood E Brochure
Us Flood E Brochure
 
Encon Best - sales right, proposal version 1
Encon Best - sales right, proposal version 1Encon Best - sales right, proposal version 1
Encon Best - sales right, proposal version 1
 
Armoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream CrossingArmoured Ford - Low Water Stream Crossing
Armoured Ford - Low Water Stream Crossing
 
PROJECT DOCUMENT OF PERVIOUS CONCRETE
PROJECT DOCUMENT OF PERVIOUS CONCRETEPROJECT DOCUMENT OF PERVIOUS CONCRETE
PROJECT DOCUMENT OF PERVIOUS CONCRETE
 
Nykilde geoweb channel protection design package
Nykilde geoweb channel protection design packageNykilde geoweb channel protection design package
Nykilde geoweb channel protection design package
 
Geo 101 detailed
Geo 101  detailedGeo 101  detailed
Geo 101 detailed
 
Nykilde geoweb retaining wall design package
Nykilde geoweb retaining wall design packageNykilde geoweb retaining wall design package
Nykilde geoweb retaining wall design package
 
IRJET- Multi Use Eco Friendly Floating Panel
IRJET-  	  Multi Use Eco Friendly Floating PanelIRJET-  	  Multi Use Eco Friendly Floating Panel
IRJET- Multi Use Eco Friendly Floating Panel
 
9. portafloormax - explo groupperu
9.  portafloormax - explo groupperu9.  portafloormax - explo groupperu
9. portafloormax - explo groupperu
 
Cgt short with storm
Cgt  short with stormCgt  short with storm
Cgt short with storm
 
Permable paving
Permable pavingPermable paving
Permable paving
 
GFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building SystemGFRG Rapidwall Sustainable Load Bearing Building System
GFRG Rapidwall Sustainable Load Bearing Building System
 
Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Presentation1 timing

  • 1.
  • 2. Introducing; Geotechnical, Environmental and Bioengineering Design to enhance humans Living, while enhancing Future…
  • 3. Our future living depend on your today’s planning
  • 4. What is Soil Chain? Soil Chain is a trademark and patented ecological engineering system, which consist of non-biodegradable, eco-friendly geo-block and chain components, which made out of recyclable material.
  • 5. It is an ecosystem which designed for erosion protection and control, for wide range of civil structure to be construct, that supports earth embankment and erosion restoration, while sustaining lateral earth pressure or load surcharge.
  • 6. It is an innovative system, capable of handling unique engineering like; Self-Standing Wall, or even structure that to be construct along parameter where land and water meets, truly without using any conventional hard material, or substance that may cause chemical reaction .
  • 7. Soil Chain is also a vibrant system as it is root friendly, that allows various kind of planting media to be sustainably grows onto the structure, which could achieve uniform vegetation, that capable to reflect heats back to the atmosphere, while reducing noise and carbon in the environment.
  • 8. Separately, completed structure and it surface is also water permeable, which further allow water to be discharge freely, without requiring any other sub-system compliment.
  • 9. Components Introduction Soil Chain system consist of Three main & Two optional components
  • 10. » Soil Chain Block; Meant for filling with recommended earth media and convert into soft modular geo-block. » Mini-micro pocket of the block material, is capable to filter and prevent filling particle seepage, and allows water to pass freely and has proven to be root friendly. » Non Biodegradable. » Ideal to accept various kind of planting media
  • 11. » Soil Chain Mechanism; Provides permanent stability and fix the positioning of individual soft modular block, either onto earth surface or in between layers, via eight downward spikes and four upward spikes. » It also provides four directional structural chaining foundation, via eight ready spike compartments making it feasible for further chaining with another mechanism, and eventually form a total structural chain strength solution.
  • 12. » Soil Chain Connector; For chaining connection between Soil Chain Mechanism, via spike compartment to form structural chain strength. Using directional methodology through spikes connection, provide permanent stability with shear strength of mechanical geo-engineering structure. » Soil Chain Connector and its materials, are also capable to withstand more than 180 degree of bending, without any cracking, or compromising its native strength, which caters for structural chaining designed for bending to continue chaining up the entire geo-engineering structure. Soil Chain™ Connector – (Main)
  • 13. » Soil Chain™ Base Plate; It is the base foundation for column to be permanently secured onto ground footing during constructing of the Self-Standing Ecology Wall™. We contribute our part to the earth, through our eco-system innovation. Material: Recyclable High Density Polyethylene Breaking Strength: 9.5KN/m2 Bursting Strength: 1.5KN/m2 Trap Tear Strength: 0.24KN/m2 Weight: 45gsm/95gsm Dimension for Soil Chain™ Base Plate: Length- 150(mm) Width- 147(mm) Height- 153(mm) Spike Height- 025(mm) No of upward spike- 02(pcs) No of downward spike- 0(pc) No of Spike’ Compartment- 08(pcs) No of Column Holder- 01(pc) Column Holder (Diameter)- 59mm Column Holder (Thickness)- 8mm
  • 14. » Soil Chain™ Column; It is the pillar column which connects all the way down to ground footing during the construction of the Self-Standing Ecology Wall™. » It further strengthens and upright the wall structure permanently on every meter apart. Material: Recyclable High Density Polyethylene Breaking Strength: 9.5KN/m2 Bursting Strength: 1.5KN/m2 Trap Tear Strength: 0.24KN/m2 Weight: 45gsm/95gsm Dimension for Soil Chain™ Column: Length- (Before Extension) 1600(mm) Width- (Diameter) 60(mm) Thickness- (Parameter) 0.5(mm) Length- (Full Extension) 2600(mm) Width- (Diameter) 59(mm) Thickness- (Parameter) 0.5(mm) Column Top Cap cover- 01(pc) Height- 25(mm) Thickness- (Parameter) 0.2(mm) We contribute our part to the earth, through our eco-system innovation.
  • 15. Soil Chain Innovation mitigate climate conditions during construction
  • 16. The following demonstrates the base layer construction of Soil Chain system
  • 17. The following demonstrates the above layers construction of Soil Chain system
  • 19. How to construct on Slope Application Earth Earth Surface Below 60 degree RAPID CONSTRUCTION, ECOLOGICAL ENGINEERING Earth
  • 20. Construction on near or Vertical Application
  • 21. How to construct on Vertical Application Earth Profile between 75 till 90 degree Earth Earth Earth Earth Earth Earth GEOTECHNICAL ENGINEERING, ENVIRONMENTAL FRIENDLY CONSTRUCTION
  • 23. How to construct on Self-Standing Wall BIO-ENGINEERING, CARBON FREE CONSTRUCTION
  • 24. Soil Chain™ - Green product : environmental friendly through bio- engineering solution which is capable to construct without any pollutions: - Able to build structure with uniform vegetated face; - Root friendly which creates sufficient rooms for future growth and development of root system which allows to penetrate from bag to bag; - Accept various kinds of vegetation media; - Flexi-system which is able to accept various planting method; - Capable of constructing vertical planting structure; - Absolutely friendly to wildlife habitat; - Permanent Noise and Heat reduction; - Minimize wastage of nature resources and troubles of debris handling; - Entire system using only recyclable material; - Reduce Green House Gases and Carbon footprint; - Improvement of Social and Economic values; Spread the Message! Fleets of Environmental Benefits which produces Environmental benefits
  • 25. Soil Chain™ - Green product : environmental friendly and permanent structure sheer strength sustainability without hard or chemical material; - Versatile eco-friendly engineering system; - Low impact and rapid construction; - Economical and easy logistics handling; - Cost effective and efficient construction; - Minimize cost on footing, drainage and conventional pre-requisite; - Minimize pollutions causes by traditional hardware; - Ability to mimic existing contour; - Ability to absorb differential settlement; - Capable of handling mechanical connection; - Instant solution for wetlands or soft area; - No cracking or staining which reduce maintenance; - Immediate construction system for nature disaster; Spread the Message! Fleets of Construction Benefits which delivered Construction benefits
  • 26. 0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 5 Days $100 100% Comparison between Conventional/Innovation based on 1(m2) Structure Conventional Material/Method Soil Chain™ System Summary benefits of using Soil Chain™ system: - Increase productivity by 300% at least, which further lessen 1.5% of work force - Reduction on cost by 51.52% for both supply and install - Generates 500% or more advantages (environmental) compares to conventional on either during construction or permanent aspects.
  • 27. All information including drawing, pictures, calculation and technical data presented in this publication is only meant for general information. Soil Chain™ made effort to ensure the information accuracy, but this publication content should not be used or relied on any new application development without accuracy verification. Final project evaluation, designed, engineering calculation, specification authority submission must be prepared by Qualified Personnel or Professional Engineer locally (licensed) on individual project site condition basis. Soil Chain™ reserved all rights at all times to disclaims all express and warranties of components fitness for any reason in general or particular reason in regard to information or product contained or herein. Soil Chain™ is subject to pending and registered patent. All rights reserved. Copy© rights reserved. 2013.
  • 28. Soil Chain™ Projects Shoreline Application Before Construction – Palawan Beach, Sentosa (LW Model)
  • 29. Soil Chain™ Projects Before Construction – Palawan Beach, Sentosa (LW Model) Shoreline Application
  • 30. Soil Chain™ Projects Before Construction – Palawan Beach, Sentosa (LW Model) Shoreline Application
  • 31. Soil Chain™ Projects After Construction – Palawan Beach, Sentosa (LW Model) Shoreline Application
  • 32. Soil Chain™ Projects After Construction – Palawan Beach, Sentosa (LW Model) Shoreline Application
  • 33. Soil Chain™ Projects After Construction – Palawan Beach, Sentosa (LW Model) Shoreline Application
  • 34. Soil Chain™ Projects After Construction – Palawan Beach, Sentosa (LW Model) Shoreline Application
  • 35. Soil Chain™ Projects Shoreline Application After Construction – Palawan Beach, Sentosa (LW Model)
  • 36. Soil Chain™ Projects Shoreline Application After Construction – Palawan Beach, Sentosa (LW Model)
  • 37. Soil Chain™ Projects Before Construction – Bishan Park 1, PUB (LW Model) Stream Bank Application
  • 38. Soil Chain™ Projects Stream Bank Application After Construction – Bishan Park 1, PUB (LW Model)
  • 39. Soil Chain™ Projects Stream Bank Application After Construction – Bishan Park 1, PUB (LW Model)
  • 40. Soil Chain™ Projects Stream Bank Application During vegetation – Bishan Park 1, PUB (LW Model)
  • 41. Soil Chain™ Projects Stream Bank Application 3 months later – Bishan Park 1, PUB (LW Model)
  • 42. Soil Chain™ Projects Stream Bank Application 3 months later – Bishan Park 1, PUB (LW Model)
  • 43. Soil Chain™ Projects Before Construction – Siloso Beach, Sentosa (LW Model) Shoreline Application
  • 44. Soil Chain™ Projects Shoreline Application After Construction – Siloso Beach, Sentosa (LW Model)
  • 45. Soil Chain™ Projects Shoreline Application After Construction – Siloso Beach, Sentosa (LW Model)
  • 46. Soil Chain™ Projects Shoreline Application After Construction – Siloso Beach, Sentosa (LW Model)
  • 47. Soil Chain™ Projects Shoreline Application After Construction – Siloso Beach, Sentosa (LW Model)
  • 48. Soil Chain™ Projects Shoreline Application After Construction – Siloso Beach, Sentosa (LW Model)
  • 49. Soil Chain™ Projects Shoreline Application After Construction – Siloso Beach, Sentosa (LW Model)
  • 50. Soil Chain™ Projects Slope & Wall Application Before Construction – Forestville Executive Condominium, Woodlands (SW Model)
  • 51. Soil Chain™ Projects Slope & Wall Application Before Construction – Forestville Executive Condominium, Woodlands (SW Model)
  • 52. Soil Chain™ Projects Slope & Wall Application During Construction – Forestville Executive Condominium, Woodlands (SW Model)
  • 53. Soil Chain™ Projects Slope & Wall Application During Construction – Forestville Executive Condominium, Woodlands (SW Model)
  • 54. Soil Chain™ Projects Slope & Wall Application After Construction – Forestville Executive Condominium, Woodlands (SW Model)
  • 55. Soil Chain™ Projects Slope & Wall Application Prepare for vegetation – Forestville Executive Condominium, Woodlands (SW Model)
  • 56. Soil Chain™ Projects Slope & Wall Application After Vegetation– Forestville Executive Condominium, Woodlands (SW Model)
  • 57. Soil Chain™ Projects 3 months later– Forestville Executive Condominium, Woodlands (SW Model) Slope & Wall Application
  • 58. Soil Chain™ Projects Slope & Wall Application Initial Construction – One Canberra Executive Condominium, Yishun (SW Model)
  • 59. Soil Chain™ Projects Slope & Wall Application During Construction – One Canberra Executive Condominium, Yishun (SW Model)
  • 60. Soil Chain™ Projects Slope & Wall Application During Construction – One Canberra Executive Condominium, Yishun (SW Model)
  • 61. Soil Chain™ Projects Slope & Wall Application During Construction – One Canberra Executive Condominium, Yishun (SW Model)
  • 62. Soil Chain™ Projects Slope & Wall Application During Vegetation – One Canberra Executive Condominium, Yishun (SW Model)
  • 63. Soil Chain™ Projects Slope & Wall Application After Vegetation – One Canberra Executive Condominium, Yishun (SW Model)
  • 64. Soil Chain™ Projects Slope & Wall Application After Vegetation – One Canberra Executive Condominium, Yishun (SW Model)
  • 65. Soil Chain™ Projects Slope & Wall Application After Vegetation – One Canberra Executive Condominium, Yishun (SW Model)
  • 66. Soil Chain™ Projects Slope & Wall Application 4 months later – One Canberra Executive Condominium, Yishun (SW Model)
  • 67. Soil Chain™ Projects Slope & Wall Application 4 months later – One Canberra Executive Condominium, Yishun (SW Model)
  • 68. Soil Chain™ Projects Slope & Wall Application 4 months later – One Canberra Executive Condominium, Yishun (SW Model)
  • 69. Soil Chain™ Projects Slope & Wall Application 4 months later – One Canberra Executive Condominium, Yishun (SW Model)
  • 70. Soil Chain™ Projects Before Construction – Bishan Park 2, PUB (LW Model) Stream Bank Application
  • 71. Soil Chain™ Projects During Construction – Bishan Park 2, PUB (LW Model) Stream Bank Application
  • 72. Soil Chain™ Projects Completion of structure– Bishan Park 2, PUB (LW Model) Stream Bank Application
  • 73. Soil Chain™ Projects Stream Bank Application 3 months after completion– Bishan Park 2, PUB (LW Model)
  • 74. Soil Chain™ Projects Stream Bank Application 3 months after completion– Bishan Park 2, PUB (LW Model)
  • 75. Soil Chain™ Projects Slope & Wall Application Before Construction – Sea Horizon Executive Condominium (SW Model)
  • 76. Soil Chain™ Projects Slope & Wall Application During Construction – Sea Horizon Executive Condominium (SW Model)
  • 77. Soil Chain™ Projects Slope & Wall Application During Construction – Sea Horizon Executive Condominium (SW Model)
  • 78. Soil Chain™ Projects Slope & Wall Application Completion of structure – Sea Horizon Executive Condominium (SW Model)
  • 79. Soil Chain™ Projects Slope & Wall Application Vegetation of structure – Sea Horizon Executive Condominium (SW Model)
  • 80. Soil Chain™ Projects Slope & Wall Application Vegetation on structure – Sea Horizon Executive Condominium (SW Model)
  • 81. Soil Chain™ Projects Slope & Wall Application 4 months later – Sea Horizon Executive Condominium (SW Model)
  • 82. Soil Chain™ Projects Slope & Wall Application 4 months later – Sea Horizon Executive Condominium (SW Model)
  • 83. Thank you for your attention. Proudly brought to you by: SystemNix Technologies Pte. Ltd No. 61 Kaki Bukit Industrial Terrace #04-01 Singapore 416141 Tel: (65)6748 5122 Fax: (65)6748 5322 Email: info@systemnixasia.com So now, what is your message to Earth? www.facebook.com/soilchain www.twitter.com/soilchain www.flipboard.com/@soilchain www.youtube.com/channel/UCPgF4 YVmMBPB_iv4tIF9HTA

Editor's Notes

  1. This presentation demonstrates the new capabilities of PowerPoint and it is best viewed in Slide Show. These slides are designed to give you great ideas for the presentations you’ll create in PowerPoint 2010! For more sample templates, click the File tab, and then on the New tab, click Sample Templates.