SlideShare a Scribd company logo
1 of 12
Download to read offline
U.S. Flood Control Corp.
THE Sandbag Replacement Company
The World’s Largest Manufacturer
of the Tiger Dam System™
info@usfloodcontrol.com
www.usfloodcontrol.com
1-866-852-1118
Rapid Deployment Inflatable Tiger Dam System
H History and Development H
H Design Features H
H Engineering H
H Applications H
H Costs Comparisons H
H Standard Emergency Response Trailer H
H Photos H
History and Development
H Due to an ever increasing demand for an 	
	 innovative, feasible alternative to sandbags, U.S. 	
	 Flood Control Corp. developed a simple rapid 	
	 deployment system designed to act as a temporary 	
	 emergency Tiger Dam suitable for use in a wide 	
	 variety of situations.
H Soaring fuel costs to operate dump trucks, loaders, conveyer belts, and sandbag machines, coupled 	
	 with the lack of labor during critical notice of the accident or impending disaster, our rapid 		
	 deployment system is both labor and energy efficient as well as much more environmentally friendly 	
	 when compared to sandbags.
H The problem of flooding is wide spread and its effects are catastrophic when left unchecked.
H Property damage may be mitigated and lives may be saved by implementing a proactive strategy to 	
	 deal with floods.
H A critical element in any action plan is the ability to control, divert, and contain flood waters 		
	 to certain areas and to have the ability to respond in a rapid, flexible fashion during an emergency, 	
	 especially when resources are stretched to the limit.
H Our inflatable Tiger Dam system may be able to meets the needs of emergency response personnel 	
	 and integrates with existing systems to allow the response teams a greater opportunity to control the 	
	 flood and mitigate damage.
H Low labor and quick filling time minimizes people’s time on the front lines who may be in harms 	
	 way. Plus no heavy sandbags to lift will MINIMIZE Employee Health claims.
H Environmentally friendly so it leaves no foot print and can be filled with the flood water
	 (fresh/salt).
Design Features
H The system has been designed to be rugged, stable 	
	 and adaptable to a wide variety of situations 		
	 and 	climates. The product was originally designed for 	
	 ice flow in rivers, making it a very durable product.
H It is comprised of a series of engineered,			
	 interlocking Tiger Dams that when filled with water 	
	 form a (temporary) diversion Tiger Dam.
H Can be configured in a wide variety of shapes and 	
	 sizes ranging from a few feet in length to a few miles 	
	 in length and from 1.5 feet high to 32 feet high.
H Modular and simple to use (like building blocks). The universal components are easily connected 	
	 and can be stacked. This avoids wasting valuable time and resources keeping people out of harms 	
	 way with the most precious commodity during a storm - TIME.
H With speed as a critical component in building an emergency barrier, the system was designed to 		
	 be deployed rapidly. Depending on the method of filling, each tube (19 inches x 50 feet long) can be 	
	 filled in as little as 90 seconds.
H Each component (tube weighs approx. 60 lbs. empty) can be handled by one or two people, thus 		
	 eliminating the need for heavy equipment. When full of water it weighs over 6100 lbs. (3 tons) to 	
	 help ensure Tiger Dam stability.
H After the flood the equipment is simply 			
	 drained, cleaned and rolled up for future use.
H With proper care the reusable system (tube/		
	 Tiger Dam) is designed to last up to 17 years 		
	 (its maximum UV rating) or longer if not 		
	 left in the sun.
H Can be temporarily repaired with duct tape or 		
	 permanently repaired with an adhesive patch.
H The system has been independently assessed 	
	 for function and safety by a leading certified 	
	 engineering laboratory (Engineer Report is 	
	 attached).
H Research and development was conducted 	
	 at the University of British Columbia’s Ocean 	
	 Engineering Test Center (Oceanic Institute).
H Test results showed that the system exceeded 	
	 its design criteria and performed well under a 	
	 wide variety of situations.
Engineering
During this test:
H The system was stable when subjected to wave action.
	
H Burst test demonstrated a maximum internal pressure of 17 pounds per square inch. The system 		
	 typically operates at 2 pounds per square inch.
H Puncture tests met or exceed all applicable ISO standards.
H The fabric is a heavy vinyl coated polyester in a propriety fashion. The fabric is resistant to a wide 		
	 range of chemicals and is UV stable.
H The valves are 2 inch check valves with a bayonet style connector.
H The connecting straps are 2 inch polyester with a ten thousand pound tensile strength.
H DURING THE TEST, THE TIGER DAM CAN BE TOPPED WITHOUT FAILURE.
Homeland Security
U.S. Flood Control Corp. products may be able to
contain spilled bio-hazardous materials, wastewater
and terrorist intended chemical liquids.
The 90 second rapid deployment diversion Tiger Dam
weighs 60 lbs. when empty, can be immediately filled
to 50 feet holding 6000 lbs. of chemical liquid or slurry
type mixtures. Simply use a 2” pump to pump the
sand/debris into the tube. The tube becomes an airtight
holding tank, with over 6000 lbs. capacity. Once
contained in the holding tank, the spill can be pumped
out at a safe and convenient time into a bio-hazardous
tank truck/water truck and disposed of according to
environmental standards.
Retention Ponds – Urban Areas
Product can be used as an alternative to reduce the
number of acres required for storm water retention and
the costs associated with excavating and removing fill
material from subdivisions.
Retention Ponds – Rural Areas
U.S. Flood Control Corp. products can retain spring
run off for future seasonal irrigation.
Telephone, Fiber Optics, Hydro Dams
and Utilities
U.S. Flood Control Corp. products can replace the use
of sandbags and crews needed to man the sandbag walls
to protect the utility and the employees in a time of
flooding.
Chemical Plants / HAZMAT
U.S. Flood Control Corp. products can be used
to contain spills versus expensive earth works and
containment membranes.
Containment for Sewage
Many cities in older areas have combined sewer
systems (sewage and storm water). During peak
rain events, the system cannot handle the capacity
and spills directly into the river system, bypassing
the sewage treatment. Containment, specifically
placed could control large volumes of water
accumulation to reduce the threat of the combined
system reaching its capacity causing raw sewage
from going into the river system.
Golf Courses
U.S. Flood Control Corp. products can be used to
protect golf course fairways and greens through the
process of diverting rivers and other threatening
water sources.
Personal Property
U.S. Flood Control Corp. products can quickly
protect your property from the onset of floods. By
strategically placing the flexible barrier around your
home, you can prevent floodwaters from destroying
your property and assets.
Applications
Road Ways
When constructing roadways, crews can effortlessly
implement the U.S. Flood Control Corp. water diversion
system to block waters. This enables a hassle free
environment to easily and efficiently complete a project.
River Crossings
Whether the need is to contain parts of a river for
environmental reasons or simply to repair walkways or
bridges, the U.S. Flood Control Corp. water diversion
system is an economical and environmentally friendly
product that assists in making any project easier.
Bridge Repair
U.S. Flood Control Corp. products can assist in creating
safe work areas for crews working on jobs such as major
bridge repairs. The products also enables crews to
maneuver around with ease.
Water Storage
Some floods cause irreparable damages, including to a
towns water supply. When the U.S. Flood Control Corp.
water diversion system is filled with clean water it can be
used for safe drinking water in case of emergencies.
Irrigation Ditches
U.S. Flood Control Corp. products can be used to
transport/divert water from rivers similar to irrigation
channels. The product can be used to contain/channel
water to agricultural areas versus excavating costly
irrigation ditches, used only in low precipitation years.
Refineries / Chemical Plants
U.S. Flood Control Corp. products can be used to
protect refineries from potentially threatening flood
water as well may contain many spills.
Applications
Applications
Cost Comparison
Cost Compa
Description of Material / Activity USACOE
*
Customer
**
Berms
# Sandbags / # of Berms 3,100 2,500 6
Direct Material Cost NA $2000 $7500
Labor hrs / Cost to fill 69 hrs $5500 <5 mins
Annual Makeup Costs (no deployment) - $7700 $7500
Labor hrs / Cost to deploy 61 hrs $3000 1 hr
Labor hrs / Cost to remove 53 hrs $2000 1 hr
Deployment Labor Hours / Cost per Event 114 hrs $6000 2 Hrs
Sandbag transport: # Pickup loads 15 - -
Equipment Costs for makeup, deployment, removal - $1200 -
Berm transport: # Pickup loads - - 1
Total Cost for 100’ Protection (make, deploy, remove) $19,375 $14,700 $7500
Total Cost/ Sandbag or Berm (make, deploy, remove) $6.25 $4.40 $1250 + 2 hrs
Average lifetime before replacement 1 yr 1 yr 20+ yrs
2 Year Cumulative Costs (no deployment) - $15,400 $7500
5 Year Cumulative Costs (no deployment) - $38,500 $7500
10 Year Cumulative Costs (no deployment) - $77,000 $7500
T COMPARISON OF SANDBAGS TO PORTABLE WATER-FILLED BERMS TO PRODUCE A 100 FOOT
IMPOUNDMENT FOR PROVIDING 18” PROTECTION
Compares USACOE Data with Customer Actual Costs for Making 2500 Sandbags and 50’ Sectional Berm Syste
*US Army Corps of Engineers estimate of $6.25/sandbag total cost for materials, makeup, deployment, and removal of 3100 sandbags.
** Customer actual costs to makeup 2500 Sandbags annually, deployment and removal costs estimated using standard labor rates.
Cost Comparison of Sandbags to portable water-filled
berms to produce a 100 footlong impoundment
for providing 18” Protection
Compares USACOE Data with Customer Actual Costs for
Making 2500 Sandbags and 50’ Sectional Berm System
*US Army Corps of Engineers estimate of $6.25/sandbag total cost for materials,
makeup, deployment, and removal of 3100 sandbags.
** Customer actual costs to makeup 2500 Sandbags annually, deployment and
removal costs estimated using standard labor rates.
S.E.R.T.
Photos
Office Tower Protection
Condo Tower Protection
Levee Topping
Photos
Can be Frozen
Instant HAZMAT Dump
Large Scale Industrial Application
THE Sandbag Replacement Company
www.usfloodcontrol.com H Toll Free: 1-866-852-1118 H Email: info@usfloodcontrol.com
402 N Division Street
Carson City, Nevada 89703
121 Kaylee Drive
Hahnville LA 70057201
505 8th Avenue SW
Calgary, Alberta T2P 1G1
The World’s Largest Manufacturer
of the Tiger Dam System™

More Related Content

What's hot

Aquasource membrane systems 2013 EN
Aquasource membrane systems 2013 ENAquasource membrane systems 2013 EN
Aquasource membrane systems 2013 ENDegrémont
 
Blackburn Bowls Club Lessons for water storage
Blackburn Bowls Club Lessons for water storageBlackburn Bowls Club Lessons for water storage
Blackburn Bowls Club Lessons for water storageNEXTDC
 
MARC BMP Manual Training Module 3
MARC BMP Manual Training Module 3MARC BMP Manual Training Module 3
MARC BMP Manual Training Module 3Lesley Rigney
 
Design of Effective Stormwater Treatment Systems for Water Quality
Design of Effective Stormwater Treatment Systems for Water QualityDesign of Effective Stormwater Treatment Systems for Water Quality
Design of Effective Stormwater Treatment Systems for Water Qualitystrinkaus
 
Charleston midterm
Charleston midtermCharleston midterm
Charleston midtermbtdubos
 
Elgin Water Solutions Presentation
Elgin Water Solutions PresentationElgin Water Solutions Presentation
Elgin Water Solutions PresentationJohn McNeill
 

What's hot (10)

Aquasource membrane systems 2013 EN
Aquasource membrane systems 2013 ENAquasource membrane systems 2013 EN
Aquasource membrane systems 2013 EN
 
Blackburn Bowls Club Lessons for water storage
Blackburn Bowls Club Lessons for water storageBlackburn Bowls Club Lessons for water storage
Blackburn Bowls Club Lessons for water storage
 
MARC BMP Manual Training Module 3
MARC BMP Manual Training Module 3MARC BMP Manual Training Module 3
MARC BMP Manual Training Module 3
 
Design of Effective Stormwater Treatment Systems for Water Quality
Design of Effective Stormwater Treatment Systems for Water QualityDesign of Effective Stormwater Treatment Systems for Water Quality
Design of Effective Stormwater Treatment Systems for Water Quality
 
Charleston midterm
Charleston midtermCharleston midterm
Charleston midterm
 
Elgin Water Solutions Presentation
Elgin Water Solutions PresentationElgin Water Solutions Presentation
Elgin Water Solutions Presentation
 
Site Solutions by Contech
Site Solutions by ContechSite Solutions by Contech
Site Solutions by Contech
 
TECHNICAL ACCOMPLISHMENTS
TECHNICAL ACCOMPLISHMENTSTECHNICAL ACCOMPLISHMENTS
TECHNICAL ACCOMPLISHMENTS
 
Static Pipe Bursting Systems
Static Pipe Bursting SystemsStatic Pipe Bursting Systems
Static Pipe Bursting Systems
 
Pipe Bursting Project Considerations
Pipe Bursting Project ConsiderationsPipe Bursting Project Considerations
Pipe Bursting Project Considerations
 

Similar to Us Flood E Brochure

Flood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionFlood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionPRANTIKSINHA2
 
Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPTCherylwitmer
 
“DESIGN & DEVELOPMENT OF AQUATIC WEEDS COLLECTING MACHINE”
“DESIGN & DEVELOPMENT OF AQUATIC WEEDS COLLECTING MACHINE”“DESIGN & DEVELOPMENT OF AQUATIC WEEDS COLLECTING MACHINE”
“DESIGN & DEVELOPMENT OF AQUATIC WEEDS COLLECTING MACHINE”IRJET Journal
 
WPD-Case study-Utility Pole Storage
WPD-Case study-Utility Pole StorageWPD-Case study-Utility Pole Storage
WPD-Case study-Utility Pole StorageRoss Atkin
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeRick Nabett
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternativeRick Nabett
 
Fabrication of Semi-Automatic Water Cleaning System
Fabrication of Semi-Automatic Water Cleaning SystemFabrication of Semi-Automatic Water Cleaning System
Fabrication of Semi-Automatic Water Cleaning SystemIRJET Journal
 
IRJET- Multi Use Eco Friendly Floating Panel
IRJET-  	  Multi Use Eco Friendly Floating PanelIRJET-  	  Multi Use Eco Friendly Floating Panel
IRJET- Multi Use Eco Friendly Floating PanelIRJET Journal
 
doc - Interdisciplinary Capstone Design
doc - Interdisciplinary Capstone Designdoc - Interdisciplinary Capstone Design
doc - Interdisciplinary Capstone Designbutest
 
Illustration Of Advanced Flood Control Management Techniques for Flood Area U...
Illustration Of Advanced Flood Control Management Techniques for Flood Area U...Illustration Of Advanced Flood Control Management Techniques for Flood Area U...
Illustration Of Advanced Flood Control Management Techniques for Flood Area U...IRJET Journal
 
Closed loop model for a water supply axel 7
Closed loop model for a water supply axel 7Closed loop model for a water supply axel 7
Closed loop model for a water supply axel 7Axel Michael Haase
 
How to apply stormwater treatment to increase environmental benefits and achi...
How to apply stormwater treatment to increase environmental benefits and achi...How to apply stormwater treatment to increase environmental benefits and achi...
How to apply stormwater treatment to increase environmental benefits and achi...Hydro International
 
Inlet Protection Devices
Inlet Protection DevicesInlet Protection Devices
Inlet Protection Devicesbwmtools
 
Environmental Neutral Design
Environmental Neutral DesignEnvironmental Neutral Design
Environmental Neutral DesignFelipe Kovacic
 
CCGC Flyer Publication 10-28-15
CCGC Flyer Publication 10-28-15CCGC Flyer Publication 10-28-15
CCGC Flyer Publication 10-28-15Seth Church
 

Similar to Us Flood E Brochure (20)

Flood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionFlood Barrier US inflated for water restriction
Flood Barrier US inflated for water restriction
 
Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPT
 
“DESIGN & DEVELOPMENT OF AQUATIC WEEDS COLLECTING MACHINE”
“DESIGN & DEVELOPMENT OF AQUATIC WEEDS COLLECTING MACHINE”“DESIGN & DEVELOPMENT OF AQUATIC WEEDS COLLECTING MACHINE”
“DESIGN & DEVELOPMENT OF AQUATIC WEEDS COLLECTING MACHINE”
 
Drenes Atlantis Guia Productos 2016
Drenes Atlantis Guia Productos 2016Drenes Atlantis Guia Productos 2016
Drenes Atlantis Guia Productos 2016
 
WPD-Case study-Utility Pole Storage
WPD-Case study-Utility Pole StorageWPD-Case study-Utility Pole Storage
WPD-Case study-Utility Pole Storage
 
Flo-Water
Flo-WaterFlo-Water
Flo-Water
 
Desalination, The Sustainable Alternative
Desalination, The Sustainable AlternativeDesalination, The Sustainable Alternative
Desalination, The Sustainable Alternative
 
Desalination the sustainable alternative
Desalination the sustainable alternativeDesalination the sustainable alternative
Desalination the sustainable alternative
 
Fabrication of Semi-Automatic Water Cleaning System
Fabrication of Semi-Automatic Water Cleaning SystemFabrication of Semi-Automatic Water Cleaning System
Fabrication of Semi-Automatic Water Cleaning System
 
Desalination
DesalinationDesalination
Desalination
 
Cgt short with storm
Cgt  short with stormCgt  short with storm
Cgt short with storm
 
IRJET- Multi Use Eco Friendly Floating Panel
IRJET-  	  Multi Use Eco Friendly Floating PanelIRJET-  	  Multi Use Eco Friendly Floating Panel
IRJET- Multi Use Eco Friendly Floating Panel
 
doc - Interdisciplinary Capstone Design
doc - Interdisciplinary Capstone Designdoc - Interdisciplinary Capstone Design
doc - Interdisciplinary Capstone Design
 
Illustration Of Advanced Flood Control Management Techniques for Flood Area U...
Illustration Of Advanced Flood Control Management Techniques for Flood Area U...Illustration Of Advanced Flood Control Management Techniques for Flood Area U...
Illustration Of Advanced Flood Control Management Techniques for Flood Area U...
 
Closed loop model for a water supply axel 7
Closed loop model for a water supply axel 7Closed loop model for a water supply axel 7
Closed loop model for a water supply axel 7
 
How to apply stormwater treatment to increase environmental benefits and achi...
How to apply stormwater treatment to increase environmental benefits and achi...How to apply stormwater treatment to increase environmental benefits and achi...
How to apply stormwater treatment to increase environmental benefits and achi...
 
Inlet Protection Devices
Inlet Protection DevicesInlet Protection Devices
Inlet Protection Devices
 
Environmental Neutral Design
Environmental Neutral DesignEnvironmental Neutral Design
Environmental Neutral Design
 
SRT Final Report
SRT Final ReportSRT Final Report
SRT Final Report
 
CCGC Flyer Publication 10-28-15
CCGC Flyer Publication 10-28-15CCGC Flyer Publication 10-28-15
CCGC Flyer Publication 10-28-15
 

Recently uploaded

Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsAndrey Dotsenko
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 

Recently uploaded (20)

Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 

Us Flood E Brochure

  • 1. U.S. Flood Control Corp. THE Sandbag Replacement Company The World’s Largest Manufacturer of the Tiger Dam System™ info@usfloodcontrol.com www.usfloodcontrol.com 1-866-852-1118
  • 2. Rapid Deployment Inflatable Tiger Dam System H History and Development H H Design Features H H Engineering H H Applications H H Costs Comparisons H H Standard Emergency Response Trailer H H Photos H
  • 3. History and Development H Due to an ever increasing demand for an innovative, feasible alternative to sandbags, U.S. Flood Control Corp. developed a simple rapid deployment system designed to act as a temporary emergency Tiger Dam suitable for use in a wide variety of situations. H Soaring fuel costs to operate dump trucks, loaders, conveyer belts, and sandbag machines, coupled with the lack of labor during critical notice of the accident or impending disaster, our rapid deployment system is both labor and energy efficient as well as much more environmentally friendly when compared to sandbags. H The problem of flooding is wide spread and its effects are catastrophic when left unchecked. H Property damage may be mitigated and lives may be saved by implementing a proactive strategy to deal with floods. H A critical element in any action plan is the ability to control, divert, and contain flood waters to certain areas and to have the ability to respond in a rapid, flexible fashion during an emergency, especially when resources are stretched to the limit. H Our inflatable Tiger Dam system may be able to meets the needs of emergency response personnel and integrates with existing systems to allow the response teams a greater opportunity to control the flood and mitigate damage. H Low labor and quick filling time minimizes people’s time on the front lines who may be in harms way. Plus no heavy sandbags to lift will MINIMIZE Employee Health claims. H Environmentally friendly so it leaves no foot print and can be filled with the flood water (fresh/salt).
  • 4. Design Features H The system has been designed to be rugged, stable and adaptable to a wide variety of situations and climates. The product was originally designed for ice flow in rivers, making it a very durable product. H It is comprised of a series of engineered, interlocking Tiger Dams that when filled with water form a (temporary) diversion Tiger Dam. H Can be configured in a wide variety of shapes and sizes ranging from a few feet in length to a few miles in length and from 1.5 feet high to 32 feet high. H Modular and simple to use (like building blocks). The universal components are easily connected and can be stacked. This avoids wasting valuable time and resources keeping people out of harms way with the most precious commodity during a storm - TIME. H With speed as a critical component in building an emergency barrier, the system was designed to be deployed rapidly. Depending on the method of filling, each tube (19 inches x 50 feet long) can be filled in as little as 90 seconds. H Each component (tube weighs approx. 60 lbs. empty) can be handled by one or two people, thus eliminating the need for heavy equipment. When full of water it weighs over 6100 lbs. (3 tons) to help ensure Tiger Dam stability. H After the flood the equipment is simply drained, cleaned and rolled up for future use. H With proper care the reusable system (tube/ Tiger Dam) is designed to last up to 17 years (its maximum UV rating) or longer if not left in the sun. H Can be temporarily repaired with duct tape or permanently repaired with an adhesive patch.
  • 5. H The system has been independently assessed for function and safety by a leading certified engineering laboratory (Engineer Report is attached). H Research and development was conducted at the University of British Columbia’s Ocean Engineering Test Center (Oceanic Institute). H Test results showed that the system exceeded its design criteria and performed well under a wide variety of situations. Engineering During this test: H The system was stable when subjected to wave action. H Burst test demonstrated a maximum internal pressure of 17 pounds per square inch. The system typically operates at 2 pounds per square inch. H Puncture tests met or exceed all applicable ISO standards. H The fabric is a heavy vinyl coated polyester in a propriety fashion. The fabric is resistant to a wide range of chemicals and is UV stable. H The valves are 2 inch check valves with a bayonet style connector. H The connecting straps are 2 inch polyester with a ten thousand pound tensile strength. H DURING THE TEST, THE TIGER DAM CAN BE TOPPED WITHOUT FAILURE.
  • 6. Homeland Security U.S. Flood Control Corp. products may be able to contain spilled bio-hazardous materials, wastewater and terrorist intended chemical liquids. The 90 second rapid deployment diversion Tiger Dam weighs 60 lbs. when empty, can be immediately filled to 50 feet holding 6000 lbs. of chemical liquid or slurry type mixtures. Simply use a 2” pump to pump the sand/debris into the tube. The tube becomes an airtight holding tank, with over 6000 lbs. capacity. Once contained in the holding tank, the spill can be pumped out at a safe and convenient time into a bio-hazardous tank truck/water truck and disposed of according to environmental standards. Retention Ponds – Urban Areas Product can be used as an alternative to reduce the number of acres required for storm water retention and the costs associated with excavating and removing fill material from subdivisions. Retention Ponds – Rural Areas U.S. Flood Control Corp. products can retain spring run off for future seasonal irrigation. Telephone, Fiber Optics, Hydro Dams and Utilities U.S. Flood Control Corp. products can replace the use of sandbags and crews needed to man the sandbag walls to protect the utility and the employees in a time of flooding. Chemical Plants / HAZMAT U.S. Flood Control Corp. products can be used to contain spills versus expensive earth works and containment membranes. Containment for Sewage Many cities in older areas have combined sewer systems (sewage and storm water). During peak rain events, the system cannot handle the capacity and spills directly into the river system, bypassing the sewage treatment. Containment, specifically placed could control large volumes of water accumulation to reduce the threat of the combined system reaching its capacity causing raw sewage from going into the river system. Golf Courses U.S. Flood Control Corp. products can be used to protect golf course fairways and greens through the process of diverting rivers and other threatening water sources. Personal Property U.S. Flood Control Corp. products can quickly protect your property from the onset of floods. By strategically placing the flexible barrier around your home, you can prevent floodwaters from destroying your property and assets. Applications
  • 7. Road Ways When constructing roadways, crews can effortlessly implement the U.S. Flood Control Corp. water diversion system to block waters. This enables a hassle free environment to easily and efficiently complete a project. River Crossings Whether the need is to contain parts of a river for environmental reasons or simply to repair walkways or bridges, the U.S. Flood Control Corp. water diversion system is an economical and environmentally friendly product that assists in making any project easier. Bridge Repair U.S. Flood Control Corp. products can assist in creating safe work areas for crews working on jobs such as major bridge repairs. The products also enables crews to maneuver around with ease. Water Storage Some floods cause irreparable damages, including to a towns water supply. When the U.S. Flood Control Corp. water diversion system is filled with clean water it can be used for safe drinking water in case of emergencies. Irrigation Ditches U.S. Flood Control Corp. products can be used to transport/divert water from rivers similar to irrigation channels. The product can be used to contain/channel water to agricultural areas versus excavating costly irrigation ditches, used only in low precipitation years. Refineries / Chemical Plants U.S. Flood Control Corp. products can be used to protect refineries from potentially threatening flood water as well may contain many spills. Applications Applications
  • 8. Cost Comparison Cost Compa Description of Material / Activity USACOE * Customer ** Berms # Sandbags / # of Berms 3,100 2,500 6 Direct Material Cost NA $2000 $7500 Labor hrs / Cost to fill 69 hrs $5500 <5 mins Annual Makeup Costs (no deployment) - $7700 $7500 Labor hrs / Cost to deploy 61 hrs $3000 1 hr Labor hrs / Cost to remove 53 hrs $2000 1 hr Deployment Labor Hours / Cost per Event 114 hrs $6000 2 Hrs Sandbag transport: # Pickup loads 15 - - Equipment Costs for makeup, deployment, removal - $1200 - Berm transport: # Pickup loads - - 1 Total Cost for 100’ Protection (make, deploy, remove) $19,375 $14,700 $7500 Total Cost/ Sandbag or Berm (make, deploy, remove) $6.25 $4.40 $1250 + 2 hrs Average lifetime before replacement 1 yr 1 yr 20+ yrs 2 Year Cumulative Costs (no deployment) - $15,400 $7500 5 Year Cumulative Costs (no deployment) - $38,500 $7500 10 Year Cumulative Costs (no deployment) - $77,000 $7500 T COMPARISON OF SANDBAGS TO PORTABLE WATER-FILLED BERMS TO PRODUCE A 100 FOOT IMPOUNDMENT FOR PROVIDING 18” PROTECTION Compares USACOE Data with Customer Actual Costs for Making 2500 Sandbags and 50’ Sectional Berm Syste *US Army Corps of Engineers estimate of $6.25/sandbag total cost for materials, makeup, deployment, and removal of 3100 sandbags. ** Customer actual costs to makeup 2500 Sandbags annually, deployment and removal costs estimated using standard labor rates. Cost Comparison of Sandbags to portable water-filled berms to produce a 100 footlong impoundment for providing 18” Protection Compares USACOE Data with Customer Actual Costs for Making 2500 Sandbags and 50’ Sectional Berm System *US Army Corps of Engineers estimate of $6.25/sandbag total cost for materials, makeup, deployment, and removal of 3100 sandbags. ** Customer actual costs to makeup 2500 Sandbags annually, deployment and removal costs estimated using standard labor rates.
  • 10. Photos Office Tower Protection Condo Tower Protection Levee Topping
  • 11. Photos Can be Frozen Instant HAZMAT Dump Large Scale Industrial Application
  • 12. THE Sandbag Replacement Company www.usfloodcontrol.com H Toll Free: 1-866-852-1118 H Email: info@usfloodcontrol.com 402 N Division Street Carson City, Nevada 89703 121 Kaylee Drive Hahnville LA 70057201 505 8th Avenue SW Calgary, Alberta T2P 1G1 The World’s Largest Manufacturer of the Tiger Dam System™