SlideShare a Scribd company logo
1 of 1
Download to read offline
Up
Existing
Bedroom
Drawn By Scale
Drg No.
00001/1
Drawing Title:
Revision
Checked By
Project:
Client::
Rev. By.Date:Description
Contractor
Prestbury Building Services,
Cringle Cottage
Prestbury,
Macclesfield
Cheshire.
18 Wakefield Avenue
Congleton
Cheshire
CW12 2HP
Proposed Loft Conversion Of An
Existing Three Bedroom Detached
Dormer Bungalow
Mr Martin Hodgkinson
M.Williams 1:75 @A3
Construction Notes;
Waste Pipes:
Sizes to be as follows;
Electrical Installation
All lighting to comply with the
approved building regs
document L2 for energy
efficiency and in accordance
with the latest (17th) edition
of the IEE regulations 2008.
All electrical installations to
bre carried out by a suitably
qualified engineer. Upon
completion a commissioning
certificate is required to be
provided in accordance with
BS 7671
Heating:
New radiators to be
connected to existing hot
water system. Radiators to
have thermostatic valves.
Radiator sizes to be confirmed
by specialist.
Timber:
All timber to be stress graded
This Drawing To Be Read In Conjunction With All
Relevant Drawings And Specifications.
Main Contractor To Check & Verify All Building And Site
Dimensions Prior To Commencement Of Works Date.
04/01/2015
Section
first Floor Plan
25mm Clear Space Between
Insulation & Undershelf
100 x 50 Existing Rafters @450
Ctrs 75mm Extra Therm With
Thinsulux Insulation. 50 x 25mm
Batons With 12mm Plaster Board
Insuwall. Insulation Fixed To
Batons & Plaster Scim
75 x 50 Stud Wall
Boxing
Gable Wall To Be
Insulated Internally
With 50mm
Insulation Booard
75 x 50 Stud Wall With 75mm
Extra Therm & 12mm
Plasterboard
Existing 100mm Load
Bearing Wall
3600
2200
2580
FFLToFirstFloor
300mm Insulation
225 x 50 Joists
@ 450 Ctrs
22mm Flooring
300mm Insulation
Between Joists
Velux Roof Lights
550 x 980 All Velux To Have
Double Rafters & Trimmers
Screwed To Existing
Install New Velux Roof Lights
550 x 980 To Existing
Bedroom
New 100mm
Soil Pipe
Falls To
Existing
Soil Drain
50mm Insulated
Plaster Boards
To External Wall
New 100mm Fixed
To Ceiling Rafter
50mm Waste Pipe
From Bath
6" x 2" Bridging
8" x 2" Double Joists
Double Joists This
Side Only Screwed
To Existing Joists
Mechanical
Extract 12v
4" x 2" Ceiling Joists
Light Out Stairs / Newells /
Spindles Existing Stairs To
Remain
Rodding Point
Loft Access Door
Velux Roof Lights
550 x 980 All Velux To Have
Double Rafters & Trimmers
Screwed To Existing
100mm Block Wall Below
Ridge Vents @
2000 Mtr Ctrs
Existing 100 x 225 Purlins
150 x 100 Soffit Vents @ 1 Mtr
Centres
150 x 100 Soffit
Vents @ 1 Mtr
Centres
Up
Lounge
G.F. Plan
Kitchen
Bathroom
A 03/03/2015Notes & Ground Floor Plan Added. MW
A
2000
existing house is a 3 bed detactached dormer bungalow

More Related Content

What's hot

Shophouse Repair & Restoration Do's & Don'ts
Shophouse Repair & Restoration Do's & Don'ts Shophouse Repair & Restoration Do's & Don'ts
Shophouse Repair & Restoration Do's & Don'ts
penangshophouse
 
Nj future redevelopment forum 2014 green infrastructure testa
Nj future redevelopment forum 2014 green infrastructure testaNj future redevelopment forum 2014 green infrastructure testa
Nj future redevelopment forum 2014 green infrastructure testa
New Jersey Future
 
SCTE Solar Story
SCTE Solar StorySCTE Solar Story
SCTE Solar Story
SCTE
 
Energy Assignments
Energy AssignmentsEnergy Assignments
Energy Assignments
Eamon Healy
 

What's hot (18)

Mountain View Window and Door Andersen Project
Mountain View Window and Door Andersen ProjectMountain View Window and Door Andersen Project
Mountain View Window and Door Andersen Project
 
Smartspace Property Standards Brochure
Smartspace Property Standards BrochureSmartspace Property Standards Brochure
Smartspace Property Standards Brochure
 
Shophouse Repair & Restoration Do's & Don'ts
Shophouse Repair & Restoration Do's & Don'ts Shophouse Repair & Restoration Do's & Don'ts
Shophouse Repair & Restoration Do's & Don'ts
 
10 Mistakes Report
10 Mistakes Report10 Mistakes Report
10 Mistakes Report
 
Contemporary building Group 3
Contemporary building Group 3Contemporary building Group 3
Contemporary building Group 3
 
CCM 01.13.20 Item #9 ppt 275 Oakview e
CCM 01.13.20 Item #9   ppt 275 Oakview eCCM 01.13.20 Item #9   ppt 275 Oakview e
CCM 01.13.20 Item #9 ppt 275 Oakview e
 
Tipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes projectTipperary Energy Agency SuperHomes project
Tipperary Energy Agency SuperHomes project
 
Nj future redevelopment forum 2014 green infrastructure testa
Nj future redevelopment forum 2014 green infrastructure testaNj future redevelopment forum 2014 green infrastructure testa
Nj future redevelopment forum 2014 green infrastructure testa
 
Zed ria marketing ppt
Zed ria marketing pptZed ria marketing ppt
Zed ria marketing ppt
 
SCTE Solar Story
SCTE Solar StorySCTE Solar Story
SCTE Solar Story
 
Live and work brochure 6 30 11
Live and work brochure 6 30 11Live and work brochure 6 30 11
Live and work brochure 6 30 11
 
Environmental Room
Environmental RoomEnvironmental Room
Environmental Room
 
contrac1
contrac1contrac1
contrac1
 
Surviving Disaster on the Farm
Surviving Disaster on the FarmSurviving Disaster on the Farm
Surviving Disaster on the Farm
 
Residential tenancies healthy homes standards regulations
Residential tenancies healthy homes standards regulations Residential tenancies healthy homes standards regulations
Residential tenancies healthy homes standards regulations
 
Montevettolini - Tuscan Olive Trees and Vineyard
Montevettolini - Tuscan Olive Trees and VineyardMontevettolini - Tuscan Olive Trees and Vineyard
Montevettolini - Tuscan Olive Trees and Vineyard
 
Energy Assignments
Energy AssignmentsEnergy Assignments
Energy Assignments
 
Delaware Apt
Delaware AptDelaware Apt
Delaware Apt
 

Similar to Wakefield Avenue Congleton Rev B

1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_Drawings
Mark Daly
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Sin Byrne
 
House Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsHouse Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & Elevations
Ayla Damon
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
David Dinsdale
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Sin Byrne
 
MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4
siyabulela mxalisa
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
grahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
grahamelanders
 
Floor Plans All Floors 201d
Floor Plans All Floors 201dFloor Plans All Floors 201d
Floor Plans All Floors 201d
Eric Madej
 
New Street In Colour
New Street In ColourNew Street In Colour
New Street In Colour
Ken Crook
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
grahamelanders
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Sin Byrne
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
Danny Chiverton
 
House Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsHouse Messinger Proposal 2-Layouts
House Messinger Proposal 2-Layouts
Ayla Damon
 

Similar to Wakefield Avenue Congleton Rev B (20)

1515-T_Drawings
1515-T_Drawings1515-T_Drawings
1515-T_Drawings
 
15-106 3
15-106 315-106 3
15-106 3
 
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILSMill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
Mill 14-1-15 - Sheet - A111 - PROPOSED PLAN DETAILS
 
final dcc
final dccfinal dcc
final dcc
 
House Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & ElevationsHouse Messinger Proposal 2-Sections & Elevations
House Messinger Proposal 2-Sections & Elevations
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONSMill 14-1-15 - Sheet - A118 - 3D SECTIONS
Mill 14-1-15 - Sheet - A118 - 3D SECTIONS
 
MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4MMAMOKOENA PROJECT REVISSION 4
MMAMOKOENA PROJECT REVISSION 4
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Floor Plans All Floors 201d
Floor Plans All Floors 201dFloor Plans All Floors 201d
Floor Plans All Floors 201d
 
New Street In Colour
New Street In ColourNew Street In Colour
New Street In Colour
 
Freelance project management case studies - residential
Freelance project management case studies - residentialFreelance project management case studies - residential
Freelance project management case studies - residential
 
7545 102 final elevations as proposed
7545 102 final elevations as proposed7545 102 final elevations as proposed
7545 102 final elevations as proposed
 
Scope Of Work Allison Ave
Scope Of Work   Allison AveScope Of Work   Allison Ave
Scope Of Work Allison Ave
 
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONSMill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
Mill 14-1-15 - Sheet - A107 - PROPOSED EAST & SOUTH ELEVATIONS
 
011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan011 - Proposed Ground Floor plan
011 - Proposed Ground Floor plan
 
Nitesh hunter valley
Nitesh hunter valleyNitesh hunter valley
Nitesh hunter valley
 
House Messinger Proposal 2-Layouts
House Messinger Proposal 2-LayoutsHouse Messinger Proposal 2-Layouts
House Messinger Proposal 2-Layouts
 
Reframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofitsReframed Tech Series: Prefabricated panels & deep retrofits
Reframed Tech Series: Prefabricated panels & deep retrofits
 

Wakefield Avenue Congleton Rev B

  • 1. Up Existing Bedroom Drawn By Scale Drg No. 00001/1 Drawing Title: Revision Checked By Project: Client:: Rev. By.Date:Description Contractor Prestbury Building Services, Cringle Cottage Prestbury, Macclesfield Cheshire. 18 Wakefield Avenue Congleton Cheshire CW12 2HP Proposed Loft Conversion Of An Existing Three Bedroom Detached Dormer Bungalow Mr Martin Hodgkinson M.Williams 1:75 @A3 Construction Notes; Waste Pipes: Sizes to be as follows; Electrical Installation All lighting to comply with the approved building regs document L2 for energy efficiency and in accordance with the latest (17th) edition of the IEE regulations 2008. All electrical installations to bre carried out by a suitably qualified engineer. Upon completion a commissioning certificate is required to be provided in accordance with BS 7671 Heating: New radiators to be connected to existing hot water system. Radiators to have thermostatic valves. Radiator sizes to be confirmed by specialist. Timber: All timber to be stress graded This Drawing To Be Read In Conjunction With All Relevant Drawings And Specifications. Main Contractor To Check & Verify All Building And Site Dimensions Prior To Commencement Of Works Date. 04/01/2015 Section first Floor Plan 25mm Clear Space Between Insulation & Undershelf 100 x 50 Existing Rafters @450 Ctrs 75mm Extra Therm With Thinsulux Insulation. 50 x 25mm Batons With 12mm Plaster Board Insuwall. Insulation Fixed To Batons & Plaster Scim 75 x 50 Stud Wall Boxing Gable Wall To Be Insulated Internally With 50mm Insulation Booard 75 x 50 Stud Wall With 75mm Extra Therm & 12mm Plasterboard Existing 100mm Load Bearing Wall 3600 2200 2580 FFLToFirstFloor 300mm Insulation 225 x 50 Joists @ 450 Ctrs 22mm Flooring 300mm Insulation Between Joists Velux Roof Lights 550 x 980 All Velux To Have Double Rafters & Trimmers Screwed To Existing Install New Velux Roof Lights 550 x 980 To Existing Bedroom New 100mm Soil Pipe Falls To Existing Soil Drain 50mm Insulated Plaster Boards To External Wall New 100mm Fixed To Ceiling Rafter 50mm Waste Pipe From Bath 6" x 2" Bridging 8" x 2" Double Joists Double Joists This Side Only Screwed To Existing Joists Mechanical Extract 12v 4" x 2" Ceiling Joists Light Out Stairs / Newells / Spindles Existing Stairs To Remain Rodding Point Loft Access Door Velux Roof Lights 550 x 980 All Velux To Have Double Rafters & Trimmers Screwed To Existing 100mm Block Wall Below Ridge Vents @ 2000 Mtr Ctrs Existing 100 x 225 Purlins 150 x 100 Soffit Vents @ 1 Mtr Centres 150 x 100 Soffit Vents @ 1 Mtr Centres Up Lounge G.F. Plan Kitchen Bathroom A 03/03/2015Notes & Ground Floor Plan Added. MW A 2000 existing house is a 3 bed detactached dormer bungalow