Environmental Room
Construction
The assembly starts with building the floor first. The next
step is to assemble the walls.
After the walls are installed,
the ceiling is set in place.
View from above showing walls and door in place with out ceiling.
Setting
of door
thresh
hold.
Completion of the chamber. Now the components are installed.
The control console is
mounted along with the
disconnect for the power
supply.
The duct work and humidifier need to be installed.
After the duct work is installed the desiccant dryer is installed along
with it’s duct work connections.
The compressor is set in place and the remote lines to condenser
are run.
Close up view of compressor.
View of compressor, ductwork, and remote lines completed.
Last items to be install are the interior ceiling grid with lighting and
ductwork.

More Related Content

Viewers also liked

Viewers also liked (11)

We can make the world a better place
We can make the world a better placeWe can make the world a better place
We can make the world a better place
 
Indikatibo baldintza
Indikatibo baldintzaIndikatibo baldintza
Indikatibo baldintza
 
La importancia del juego en el desarrollo del
La importancia del juego en el desarrollo delLa importancia del juego en el desarrollo del
La importancia del juego en el desarrollo del
 
Método científico
Método científico   Método científico
Método científico
 
CREDITS
CREDITSCREDITS
CREDITS
 
Recycle images
Recycle imagesRecycle images
Recycle images
 
Indikatibo baldintza
Indikatibo baldintzaIndikatibo baldintza
Indikatibo baldintza
 
Concussion and subluxation
Concussion and subluxationConcussion and subluxation
Concussion and subluxation
 
Certificates
CertificatesCertificates
Certificates
 
Chemical peel ceu
Chemical peel ceuChemical peel ceu
Chemical peel ceu
 
sahil cv
sahil cvsahil cv
sahil cv
 

Environmental Room