Proposal Professional Impact Paper
Submitted and Presented by:
Keith Roberts
Impact Summary
• Develop a Proposal Readiness Balanced Scorecard
– Led team to identify Key Performance Indicators in Business
Development Lifecycle (BDL), which were used to monitor proposal
readiness of opportunities at beginning of Pursuit Phase
– Implemented and continually improved on Balance Scorecard
application
• Impact of the Proposal Readiness Balance Scorecard
– Assigned Proposal Managers to opportunities the begin preparation for
Proposal Phase at the start of Pursuit phase
• Allowed proposal staff to better understand challenges and commit to objectives
• Enabled proposal staff to better support Capture Managers during Pursuit Phase
– Allowed organization to focus resources on opportunities with greatest
potential for success
• Allowed organization to take corrective action prior to Final RFP/Tender release to
help improve Win Probability
• Allowed organization to identify opportunities too far outside core market
objectives before over-committing limited proposal resources
Situation
• Weekly Proposals <90 Days briefing slides
provided only minimum information about
upcoming opportunities
• Additional opportunity information needed to
accurately describe status of upcoming
opportunities, but space in slide format was not
available
• Weekly briefing was critical time each week
when all stakeholders were available to discuss
potential issues about upcoming opportunities,
yet only minimum collaboration occurred due to
limited opportunity data on briefing slides
• As a result, teams during proposal phase often
struggled to meet their schedules due to poorly
developed Capture/Pursuit Plans
• Business unit was under pressure from Division
Headquarters to improve proposal win rate
• Interaction Design (IxD) Model was used to
create a cost-effective, low-tech solution using
Microsoft Excel
The Tasks
1.Intent – identified prospective users for the
solution and documented their goals
2.High-level Design –selected system
platform that supported business strategy
and developed initial prototype design
3.Low-level Design – verified information
interface design and validated data reported
on the dashboard
4.Implementation – integrated live data into
initial prototype application
5.Deployment & Feedback – launched final
application design and solicited feedback
for improvement
Using the phases outlined in the IxD Model (Intent, High-Level Design, Low-Level Design,
Implementation, Deployment & Feedback), I accomplished the following tasks:
Use of the IxD Model helped ensure the solution
I developed was grounded in an understanding
of the business unit’s users—their goals, tasks,
experiences, and needs. Approaching design
from this perspective, while endeavoring to
balance users’ needs with business goals and
technological capabilities enabled innovation of a
new and evolving tool that improved support for
existing unit objectives and strategies.
I diagnosed the current
condition and formed
an initial hypothesis
The Capture and Proposal
Managers helped identify
specific pain points and unmet
needs in the Weekly Proposal
Briefing slides
I created a “Win-Win” understanding
that highlighted gaps in proposal
preparations and Win Probability
improvement
I analyzed previous opportunity
data, identified patterns relating to
poorly developed Capture/Pursuit
Plans, and extracted insights
My proposal staff helped identify Key
Performance Indicators (KPI) in the Business
Development Lifecycle most likely to affect
Proposal Readiness for upcoming opportunities
I built an initial prototype application of
the Proposal Readiness Dashboard that
integrated all the requested information
into a single view for review during
weekly briefings by the stakeholders
I created a roadmap that validated the
prototype application, solicited feedback
from the user group, and implemented
improvements
I worked with Division Headquarters to
further expand use of Proposal
Readiness Dashboard for all business
units in the Division
The Activities
• Opportunity is Identified
• Capture Plan is started
• Projecting RFP in 264 days
The Results This is a sample scenario of how the
evolving status of proposal preparations
are now reported in the dashboard
application
The Results This is a sample scenario of how the
evolving status of proposal preparations
are now reported in the dashboard
application
• Opportunity is now Qualified
• Capture Plan improved
• Initial Past Performances
identified, but shows currently
inadequate
• Reaching out to teammate to
help address Solution Gap
• Initial analysis of Draft RFP
• Solution Workshop scheduled
The Results This is a sample scenario of how the
evolving status of proposal preparations
are now reported in the dashboard
application
• Opportunity is still in Qualified
• Solution Workshop helps to
identify addition teammates
needed to fill Solution Gap
The Results This is a sample scenario of how the
evolving status of proposal preparations
are now reported in the dashboard
application
• Opportunity is in Pursue stage
• Concern noted about teaming
status of addition teammates
needed to fill Solution Gap
• Steady progress being made
on proposal prep
The Results This is a sample scenario of how the
evolving status of proposal preparations
are now reported in the dashboard
application
• RFP is released early, but team
is well prepared and ready to
move to proposal stage
• Initial review of Final RFP
doesn’t show any major
changes from Draft version
• Bid/No Bid Review scheduled
• B&P Requested
• Proposal Kickoff Call
scheduled
The Results This is a sample scenario of how the
evolving status of proposal preparations
are now reported in the dashboard
application
• Opportunity now In Proposal
stage
• Kickoff Call is successful
• War Room established
• Teammates scheduled to work
next two weeks onsite until Red
Team Review completed
• Opportunity in Won stage
• Thanks to advance prep work
the team was ready to respond
to early RFP release and still
WIN!
The Results This is a sample scenario of how the
evolving status of proposal preparations
are now reported in the dashboard
application
The Results
• Won good bids
• Avoided bad contracts
• Evolved solution for entire Federal Division
Revenue
Year 1 Year 2 Year 1 Year 2
Win/Loss Ratio
Total
Bids
Total
Bids
CPD Plan for the next 24 months
• I will attend regularly scheduled local Chapter meetings
• I will attend the next International APMP conference
• I will take a course in Risk Management
• I will further develop Proposal Readiness Dashboard solution to address task
scheduling, so as to further promote collaboration and decision making for all
participants in the Business Development Lifecycle (illustration below)
• I will help members of my local Chapter prepared for their APMP accreditation

More Related Content

What's hot

14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT ProjectsBhuWan Khadka
 
2. Project management body of knowledge
2. Project management body of knowledge2. Project management body of knowledge
2. Project management body of knowledgeBhuWan Khadka
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project ManagementInam Khosa
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]skzarif
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management ProcessesJoshua Render
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTSAJJAD KHUDHUR ABBAS
 
Project Initiation Document
Project Initiation DocumentProject Initiation Document
Project Initiation DocumentDave Angelow
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkRahul Sudame
 
Project initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureProject initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureRudreshSamant
 
Project integration management
Project integration managementProject integration management
Project integration managementSaad Al Jabri
 
Step by Step Guide to Learn SDLC
Step by Step Guide to Learn SDLCStep by Step Guide to Learn SDLC
Step by Step Guide to Learn SDLCSunil-QA
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsAhmed Alageed
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process GroupsBhuWan Khadka
 

What's hot (20)

14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects
 
2. Project management body of knowledge
2. Project management body of knowledge2. Project management body of knowledge
2. Project management body of knowledge
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]
 
Project Management Processes
Project Management ProcessesProject Management Processes
Project Management Processes
 
Episode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXTEpisode 20 :PROJECT MANAGEMENT CONTEXT
Episode 20 :PROJECT MANAGEMENT CONTEXT
 
4. PMP Training - Scope management
4. PMP Training - Scope management4. PMP Training - Scope management
4. PMP Training - Scope management
 
Software Project Management 03
Software Project Management 03Software Project Management 03
Software Project Management 03
 
Overview of Program Management
Overview of Program ManagementOverview of Program Management
Overview of Program Management
 
Project Initiation Document
Project Initiation DocumentProject Initiation Document
Project Initiation Document
 
Software Project Management 02
Software Project Management 02Software Project Management 02
Software Project Management 02
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Project Management : Project Planning by iFour Technolab Pvt. Ltd.
Project Management : Project Planning by iFour Technolab Pvt. Ltd.Project Management : Project Planning by iFour Technolab Pvt. Ltd.
Project Management : Project Planning by iFour Technolab Pvt. Ltd.
 
Atppmp1ov1
Atppmp1ov1Atppmp1ov1
Atppmp1ov1
 
Project initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureProject initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structure
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Step by Step Guide to Learn SDLC
Step by Step Guide to Learn SDLCStep by Step Guide to Learn SDLC
Step by Step Guide to Learn SDLC
 
Project / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes GroupsProject / Program / Portfolio Management and Processes Groups
Project / Program / Portfolio Management and Processes Groups
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process Groups
 
Software Project Management 4
Software Project Management 4Software Project Management 4
Software Project Management 4
 

Similar to APMP Proposal Professional Impact Paper

04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagementDhamo daran
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxAshraf206702
 
E success client-software-development
E success client-software-developmentE success client-software-development
E success client-software-developmentRiyaan Sharma
 
Applying both of waterfall and iterative development
Applying both of waterfall and iterative developmentApplying both of waterfall and iterative development
Applying both of waterfall and iterative developmentDeny Prasetia
 
The LintonWharfe 'Nine Box Project Management Framework' (v.2)
The LintonWharfe 'Nine Box Project Management Framework' (v.2)The LintonWharfe 'Nine Box Project Management Framework' (v.2)
The LintonWharfe 'Nine Box Project Management Framework' (v.2)Colin Whalen
 
Stoyan Atanasov “How crucial is the BA role in an IT Project"
Stoyan Atanasov “How crucial is the BA role in an IT Project"Stoyan Atanasov “How crucial is the BA role in an IT Project"
Stoyan Atanasov “How crucial is the BA role in an IT Project"Sigma Software
 
Annual Results and Impact Evaluation Workshop for RBF - Day Seven - Measureme...
Annual Results and Impact Evaluation Workshop for RBF - Day Seven - Measureme...Annual Results and Impact Evaluation Workshop for RBF - Day Seven - Measureme...
Annual Results and Impact Evaluation Workshop for RBF - Day Seven - Measureme...RBFHealth
 
Project Formulation and Management - Project Scope Management
Project Formulation and Management - Project Scope ManagementProject Formulation and Management - Project Scope Management
Project Formulation and Management - Project Scope ManagementHrishikesh Satpute
 
Projects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailProjects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailBarbara Franks
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure ReportCheryl Burcham
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackProject Management Solutions
 
CRM Implementations and Upgrades
CRM Implementations and UpgradesCRM Implementations and Upgrades
CRM Implementations and UpgradesPeter Ware PMP
 
Better release planning for Feature Teams
Better release planning for Feature TeamsBetter release planning for Feature Teams
Better release planning for Feature TeamsAmit Singh
 
Pragya_Rathore_Updated_Resume
Pragya_Rathore_Updated_ResumePragya_Rathore_Updated_Resume
Pragya_Rathore_Updated_ResumePragya Rathore
 
Eliminate Bottlenecks in Software Development & Delivery
Eliminate Bottlenecks in Software Development & DeliveryEliminate Bottlenecks in Software Development & Delivery
Eliminate Bottlenecks in Software Development & DeliveryMicro Focus
 

Similar to APMP Proposal Professional Impact Paper (20)

04 projectintegrationmanagement
04 projectintegrationmanagement04 projectintegrationmanagement
04 projectintegrationmanagement
 
ASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptxASAP-01 Implementaion.pptx
ASAP-01 Implementaion.pptx
 
E success client-software-development
E success client-software-developmentE success client-software-development
E success client-software-development
 
Applying both of waterfall and iterative development
Applying both of waterfall and iterative developmentApplying both of waterfall and iterative development
Applying both of waterfall and iterative development
 
The LintonWharfe 'Nine Box Project Management Framework' (v.2)
The LintonWharfe 'Nine Box Project Management Framework' (v.2)The LintonWharfe 'Nine Box Project Management Framework' (v.2)
The LintonWharfe 'Nine Box Project Management Framework' (v.2)
 
Stoyan Atanasov “How crucial is the BA role in an IT Project"
Stoyan Atanasov “How crucial is the BA role in an IT Project"Stoyan Atanasov “How crucial is the BA role in an IT Project"
Stoyan Atanasov “How crucial is the BA role in an IT Project"
 
Making of Stakeholders Delight
Making of Stakeholders DelightMaking of Stakeholders Delight
Making of Stakeholders Delight
 
Making of Stakeholders Delight
Making of Stakeholders Delight Making of Stakeholders Delight
Making of Stakeholders Delight
 
Sdec10 lean AMS
Sdec10 lean AMSSdec10 lean AMS
Sdec10 lean AMS
 
Annual Results and Impact Evaluation Workshop for RBF - Day Seven - Measureme...
Annual Results and Impact Evaluation Workshop for RBF - Day Seven - Measureme...Annual Results and Impact Evaluation Workshop for RBF - Day Seven - Measureme...
Annual Results and Impact Evaluation Workshop for RBF - Day Seven - Measureme...
 
SAFe v4.6 full
SAFe v4.6 fullSAFe v4.6 full
SAFe v4.6 full
 
Project Formulation and Management - Project Scope Management
Project Formulation and Management - Project Scope ManagementProject Formulation and Management - Project Scope Management
Project Formulation and Management - Project Scope Management
 
Projects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFailProjects2016_Franks_Top10ReasonsProjectsFail
Projects2016_Franks_Top10ReasonsProjectsFail
 
C. Burcham - Project Closure Report
C. Burcham - Project Closure ReportC. Burcham - Project Closure Report
C. Burcham - Project Closure Report
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
CRM Implementations and Upgrades
CRM Implementations and UpgradesCRM Implementations and Upgrades
CRM Implementations and Upgrades
 
PMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope managementPMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope management
 
Better release planning for Feature Teams
Better release planning for Feature TeamsBetter release planning for Feature Teams
Better release planning for Feature Teams
 
Pragya_Rathore_Updated_Resume
Pragya_Rathore_Updated_ResumePragya_Rathore_Updated_Resume
Pragya_Rathore_Updated_Resume
 
Eliminate Bottlenecks in Software Development & Delivery
Eliminate Bottlenecks in Software Development & DeliveryEliminate Bottlenecks in Software Development & Delivery
Eliminate Bottlenecks in Software Development & Delivery
 

Recently uploaded

VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 

Recently uploaded (20)

VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 

APMP Proposal Professional Impact Paper

  • 1. Proposal Professional Impact Paper Submitted and Presented by: Keith Roberts
  • 2. Impact Summary • Develop a Proposal Readiness Balanced Scorecard – Led team to identify Key Performance Indicators in Business Development Lifecycle (BDL), which were used to monitor proposal readiness of opportunities at beginning of Pursuit Phase – Implemented and continually improved on Balance Scorecard application • Impact of the Proposal Readiness Balance Scorecard – Assigned Proposal Managers to opportunities the begin preparation for Proposal Phase at the start of Pursuit phase • Allowed proposal staff to better understand challenges and commit to objectives • Enabled proposal staff to better support Capture Managers during Pursuit Phase – Allowed organization to focus resources on opportunities with greatest potential for success • Allowed organization to take corrective action prior to Final RFP/Tender release to help improve Win Probability • Allowed organization to identify opportunities too far outside core market objectives before over-committing limited proposal resources
  • 3. Situation • Weekly Proposals <90 Days briefing slides provided only minimum information about upcoming opportunities • Additional opportunity information needed to accurately describe status of upcoming opportunities, but space in slide format was not available • Weekly briefing was critical time each week when all stakeholders were available to discuss potential issues about upcoming opportunities, yet only minimum collaboration occurred due to limited opportunity data on briefing slides • As a result, teams during proposal phase often struggled to meet their schedules due to poorly developed Capture/Pursuit Plans • Business unit was under pressure from Division Headquarters to improve proposal win rate • Interaction Design (IxD) Model was used to create a cost-effective, low-tech solution using Microsoft Excel
  • 4. The Tasks 1.Intent – identified prospective users for the solution and documented their goals 2.High-level Design –selected system platform that supported business strategy and developed initial prototype design 3.Low-level Design – verified information interface design and validated data reported on the dashboard 4.Implementation – integrated live data into initial prototype application 5.Deployment & Feedback – launched final application design and solicited feedback for improvement Using the phases outlined in the IxD Model (Intent, High-Level Design, Low-Level Design, Implementation, Deployment & Feedback), I accomplished the following tasks: Use of the IxD Model helped ensure the solution I developed was grounded in an understanding of the business unit’s users—their goals, tasks, experiences, and needs. Approaching design from this perspective, while endeavoring to balance users’ needs with business goals and technological capabilities enabled innovation of a new and evolving tool that improved support for existing unit objectives and strategies.
  • 5. I diagnosed the current condition and formed an initial hypothesis The Capture and Proposal Managers helped identify specific pain points and unmet needs in the Weekly Proposal Briefing slides I created a “Win-Win” understanding that highlighted gaps in proposal preparations and Win Probability improvement I analyzed previous opportunity data, identified patterns relating to poorly developed Capture/Pursuit Plans, and extracted insights My proposal staff helped identify Key Performance Indicators (KPI) in the Business Development Lifecycle most likely to affect Proposal Readiness for upcoming opportunities I built an initial prototype application of the Proposal Readiness Dashboard that integrated all the requested information into a single view for review during weekly briefings by the stakeholders I created a roadmap that validated the prototype application, solicited feedback from the user group, and implemented improvements I worked with Division Headquarters to further expand use of Proposal Readiness Dashboard for all business units in the Division The Activities
  • 6. • Opportunity is Identified • Capture Plan is started • Projecting RFP in 264 days The Results This is a sample scenario of how the evolving status of proposal preparations are now reported in the dashboard application
  • 7. The Results This is a sample scenario of how the evolving status of proposal preparations are now reported in the dashboard application • Opportunity is now Qualified • Capture Plan improved • Initial Past Performances identified, but shows currently inadequate • Reaching out to teammate to help address Solution Gap • Initial analysis of Draft RFP • Solution Workshop scheduled
  • 8. The Results This is a sample scenario of how the evolving status of proposal preparations are now reported in the dashboard application • Opportunity is still in Qualified • Solution Workshop helps to identify addition teammates needed to fill Solution Gap
  • 9. The Results This is a sample scenario of how the evolving status of proposal preparations are now reported in the dashboard application • Opportunity is in Pursue stage • Concern noted about teaming status of addition teammates needed to fill Solution Gap • Steady progress being made on proposal prep
  • 10. The Results This is a sample scenario of how the evolving status of proposal preparations are now reported in the dashboard application • RFP is released early, but team is well prepared and ready to move to proposal stage • Initial review of Final RFP doesn’t show any major changes from Draft version • Bid/No Bid Review scheduled • B&P Requested • Proposal Kickoff Call scheduled
  • 11. The Results This is a sample scenario of how the evolving status of proposal preparations are now reported in the dashboard application • Opportunity now In Proposal stage • Kickoff Call is successful • War Room established • Teammates scheduled to work next two weeks onsite until Red Team Review completed
  • 12. • Opportunity in Won stage • Thanks to advance prep work the team was ready to respond to early RFP release and still WIN! The Results This is a sample scenario of how the evolving status of proposal preparations are now reported in the dashboard application
  • 13. The Results • Won good bids • Avoided bad contracts • Evolved solution for entire Federal Division Revenue Year 1 Year 2 Year 1 Year 2 Win/Loss Ratio Total Bids Total Bids
  • 14. CPD Plan for the next 24 months • I will attend regularly scheduled local Chapter meetings • I will attend the next International APMP conference • I will take a course in Risk Management • I will further develop Proposal Readiness Dashboard solution to address task scheduling, so as to further promote collaboration and decision making for all participants in the Business Development Lifecycle (illustration below) • I will help members of my local Chapter prepared for their APMP accreditation