1. VIKLESH KUMAR TRIPATHI
Mobile: +91 9760594474
E-Mail: tripathi.vikky91@gmail.com
OBJECTIVE
To work in the area where my knowledge and experience can be best availed of and be an asset for
the organization for its mutual growth. To pursue a career, which requires an optimistic attitude,
high confidence and the absolute intelligence in the motivational, progressive, and friendly
environment, where the individual achievements and performance will be counted.
PROFESSIONAL SUMMATION
B.TECH(Electronics & Communication) with more than 2 Years’ Experience in
Detail Engineering and operation & maintenance of Control & Instrumentation
Systems.
2 Years of competitive experience in Power plant as CHP Maintenance engineer in
Instrumentation department.
Industrial Automation on Distributed Control system, Programmable control system,
SCADA, Field instruments etc.
3 months of training in Industrial Automation in Technocrat Automation Solution Pvt. Ltd
Chennai (IAO) (DCS, PLC, SCADA, DNP3, MODBUS, HOST TO HOST Protocol TCP/IP etc.).
Handling multiple responsibilities (Troubleshooting the problems, Scheduling and completing
Periodic maintenance visits, Scheduling and completing Shutdown maintenance visits,
Scheduling and completing Emergency visits, Helping team in case they stuck in problem at
site, Resource planning and sharing the Final maintenance report).
Well versed with MS Office & Internet Applications.
CORE STRENGTHS
Ability to provide thought leadership
Ability to work individually and as part of cross functional teams
Demonstrated decision making and problem solving skills
Team oriented with excellent collaboration skills
Attention to detail and commitment to quality of work
Good work ethics with excellent communication and interpersonal skills.
EMPLOYMENT CHRONICLE
Organisation Position Period
S R TURBO ENERGY (P) LTD
(FATEPUR,U.P) Sri Lakshmi cotsyn
Limited, fatehpur, up
Instrumentation maintenance
Engineer (Ash handling plant)
March 2014-till
Essar power ltd under Vimla
enterprises, singraulli, UP
Instrumentation maintenance
Engineer (coal handling plant)
July 2014 – feb 2014
JIPT/JINDAL POWER LTD
(RAIGARGH,C.G)
PGDC in thermal Power plant
technology
July 2013 – June 2014
2. EDUCATION BACKGROUND
SUMMATION
Degree Year Board/University Percentage
B Tech (Electronics
and Communication)
2013
I.E.T Dr R.M.LA.U,
Faizabad UP
73.54%
DIPLOMA in
automation(3 month)
2012
Technocrat Automation Solution Pvt.
Ltd Chennai (IAO) First div
TECHNICAL SKILLS
DCS Centum VP, CS 3000, CS1000,
PLC Siemens S7-200, Allen Bradley micrologix(1000) & Mitsubishi etc.
SCADA Yokogawa’s Fast Tool SCADA ,Wonderware intouch(10.1)
Field Instruments
Flow, Pressure, Temperature, Differential pressure, Level transmitters,
expertise on Indicators and controllers, Sensors etc.
Organization: Essar power ltd under Vimla enterprises singraulli, MP (2*600MW)
PROJECTS UNDERTAKEN
Functional
Responsibilities
Detailed engineering and application software development for industrial
projects using YOKOGAWA DCS systems – CENTUM CS-3000.
DCS system Hardware & software testing, System integration third party
components selection and loop checking.
Design and finalization of Graphics on system according to Process and
Instrumentation schemes (P&ID schemes).
Calibration, commissioning and installation of various plant applicable
instruments i.e. RTD, THERMOCOUPLE, PRESSURE GUAGE, TEMPERATURE
GAUGE, PRESSURE TRANSMITTER and many other instruments.
Alarms, Trend, History and Reports configuration through PLG Web Server
interfaced and networked with main plant DCS system.
Logics development, Simulation and Implementation in different
programming languages with thorough knowledge of Process Control.
Logics development, Simulation and Implementation in different
programming languages with thorough knowledge of Process Control.
Organization: S R TURBO ENERGY (P) LTD (FATEPUR, U.P) Sri Lakshmi cotsyn Limited,
fatepur, up
PROJECTS UNDERTAKEN
Functional
Responsibilities Detailed engineering and application for industrial projects using YOKOGAWA
DCS systems – CENTUM CS-3000.
Instrumentation Maintenance of ash handling plant.
Maintenance of solenoid, pressure switch & Vibrator.
AB Power flex Variable Frequency Drive
3. Organization: JIPT/JINDAL POWER LTD (RAIGARGH, C.G) equivalent to NPTI
PROJECTS UNDERTAKEN
Functional
Responsibilities
As a Power plant trainee Engineer, I am responsible for the following:
simulator training in 250mwand 600mw(PC boiler) in JIPT
Projects
Handled
1. Power plant (4*250 MW & 4*600MW))
Erection and commissioning work for the plants Power plant
Operation & maintenance.
Scheme tracing & power plant familiarisation.
Controlling of power plant (through C&I dept.)
Monitoring and performance of thermal power plant
Protection of thermal power plant.
Rotation on job operation at 4*250 mw
Maintenance and Calibration of all Field Instruments like Distributed Control
system (having Yokogawa , PLCs, , Variable Frequency Drives [VFDs], DC/AC
Drives, Control Valves, Solenoid Valves, Motorized Valves, all types of
Transmitters, Switches, Sensors, Pneumatic Cylinders, Field Gauges, Local/Field
Indicators, etc.
INDUSTRIAL TRAININGS
I did simulator training in 250mwand 600mw(PC boiler) in JIPT and have
introductory simulator training knowledge in 135mwCFBC boiler.
Three months industrial training in Technocrat Automation Solution Pvt. Ltd Chennai (IAO)
Six weeks training Technocrat Automation Solution Pvt. Ltd Chennai (IAO)
PERSONAL DOSSIER
Present Address:
Jawahar nagar, Manikpur, Chitrakoot, UP
pin code-210208
Permanent Address :
Vil-Semardaha, Post - Semardhaha,
Dist -Chitrakoot UP Pin code: - 210205
Date of Birth: March-13-1991
Linguistics: English & Hindi.
I, VIKLESH KUMAR tripathi hereby declare that all of the above statements are correct and true to the best of
my knowledge.
Place:SINGRAULII (VIKLESH KUMAR TRIPATHI) Date-03/07/2014