SlideShare a Scribd company logo
1 of 3
VIKLESH KUMAR TRIPATHI
Mobile: +91 9760594474
E-Mail: tripathi.vikky91@gmail.com
OBJECTIVE
To work in the area where my knowledge and experience can be best availed of and be an asset for
the organization for its mutual growth. To pursue a career, which requires an optimistic attitude,
high confidence and the absolute intelligence in the motivational, progressive, and friendly
environment, where the individual achievements and performance will be counted.
PROFESSIONAL SUMMATION
B.TECH(Electronics & Communication) with more than 2 Years’ Experience in
Detail Engineering and operation & maintenance of Control & Instrumentation
Systems.
 2 Years of competitive experience in Power plant as CHP Maintenance engineer in
Instrumentation department.
 Industrial Automation on Distributed Control system, Programmable control system,
SCADA, Field instruments etc.
 3 months of training in Industrial Automation in Technocrat Automation Solution Pvt. Ltd
Chennai (IAO) (DCS, PLC, SCADA, DNP3, MODBUS, HOST TO HOST Protocol TCP/IP etc.).
 Handling multiple responsibilities (Troubleshooting the problems, Scheduling and completing
Periodic maintenance visits, Scheduling and completing Shutdown maintenance visits,
Scheduling and completing Emergency visits, Helping team in case they stuck in problem at
site, Resource planning and sharing the Final maintenance report).
 Well versed with MS Office & Internet Applications.
CORE STRENGTHS
 Ability to provide thought leadership
 Ability to work individually and as part of cross functional teams
 Demonstrated decision making and problem solving skills
 Team oriented with excellent collaboration skills
 Attention to detail and commitment to quality of work
 Good work ethics with excellent communication and interpersonal skills.
EMPLOYMENT CHRONICLE
Organisation Position Period
S R TURBO ENERGY (P) LTD
(FATEPUR,U.P) Sri Lakshmi cotsyn
Limited, fatehpur, up
Instrumentation maintenance
Engineer (Ash handling plant)
March 2014-till
Essar power ltd under Vimla
enterprises, singraulli, UP
Instrumentation maintenance
Engineer (coal handling plant)
July 2014 – feb 2014
JIPT/JINDAL POWER LTD
(RAIGARGH,C.G)
PGDC in thermal Power plant
technology
July 2013 – June 2014
EDUCATION BACKGROUND
SUMMATION
Degree Year Board/University Percentage
B Tech (Electronics
and Communication)
2013
I.E.T Dr R.M.LA.U,
Faizabad UP
73.54%
DIPLOMA in
automation(3 month)
2012
Technocrat Automation Solution Pvt.
Ltd Chennai (IAO) First div
TECHNICAL SKILLS
DCS Centum VP, CS 3000, CS1000,
PLC Siemens S7-200, Allen Bradley micrologix(1000) & Mitsubishi etc.
SCADA Yokogawa’s Fast Tool SCADA ,Wonderware intouch(10.1)
Field Instruments
Flow, Pressure, Temperature, Differential pressure, Level transmitters,
expertise on Indicators and controllers, Sensors etc.
Organization: Essar power ltd under Vimla enterprises singraulli, MP (2*600MW)
PROJECTS UNDERTAKEN
Functional
Responsibilities
 Detailed engineering and application software development for industrial
projects using YOKOGAWA DCS systems – CENTUM CS-3000.
 DCS system Hardware & software testing, System integration third party
components selection and loop checking.
 Design and finalization of Graphics on system according to Process and
Instrumentation schemes (P&ID schemes).
 Calibration, commissioning and installation of various plant applicable
instruments i.e. RTD, THERMOCOUPLE, PRESSURE GUAGE, TEMPERATURE
GAUGE, PRESSURE TRANSMITTER and many other instruments.
 Alarms, Trend, History and Reports configuration through PLG Web Server
interfaced and networked with main plant DCS system.
 Logics development, Simulation and Implementation in different
programming languages with thorough knowledge of Process Control.
 Logics development, Simulation and Implementation in different
programming languages with thorough knowledge of Process Control.
Organization: S R TURBO ENERGY (P) LTD (FATEPUR, U.P) Sri Lakshmi cotsyn Limited,
fatepur, up
PROJECTS UNDERTAKEN
Functional
Responsibilities  Detailed engineering and application for industrial projects using YOKOGAWA
DCS systems – CENTUM CS-3000.
 Instrumentation Maintenance of ash handling plant.
 Maintenance of solenoid, pressure switch & Vibrator.
 AB Power flex Variable Frequency Drive
Organization: JIPT/JINDAL POWER LTD (RAIGARGH, C.G) equivalent to NPTI
PROJECTS UNDERTAKEN
Functional
Responsibilities
As a Power plant trainee Engineer, I am responsible for the following:
 simulator training in 250mwand 600mw(PC boiler) in JIPT
Projects
Handled
1. Power plant (4*250 MW & 4*600MW))
 Erection and commissioning work for the plants Power plant
 Operation & maintenance.
 Scheme tracing & power plant familiarisation.
 Controlling of power plant (through C&I dept.)
 Monitoring and performance of thermal power plant
 Protection of thermal power plant.
 Rotation on job operation at 4*250 mw
 Maintenance and Calibration of all Field Instruments like Distributed Control
system (having Yokogawa , PLCs, , Variable Frequency Drives [VFDs], DC/AC
Drives, Control Valves, Solenoid Valves, Motorized Valves, all types of
Transmitters, Switches, Sensors, Pneumatic Cylinders, Field Gauges, Local/Field
Indicators, etc.
INDUSTRIAL TRAININGS
 I did simulator training in 250mwand 600mw(PC boiler) in JIPT and have
introductory simulator training knowledge in 135mwCFBC boiler.
 Three months industrial training in Technocrat Automation Solution Pvt. Ltd Chennai (IAO)
 Six weeks training Technocrat Automation Solution Pvt. Ltd Chennai (IAO)
PERSONAL DOSSIER
Present Address:
Jawahar nagar, Manikpur, Chitrakoot, UP
pin code-210208
Permanent Address :
Vil-Semardaha, Post - Semardhaha,
Dist -Chitrakoot UP Pin code: - 210205
Date of Birth: March-13-1991
Linguistics: English & Hindi.
I, VIKLESH KUMAR tripathi hereby declare that all of the above statements are correct and true to the best of
my knowledge.
Place:SINGRAULII (VIKLESH KUMAR TRIPATHI) Date-03/07/2014

More Related Content

What's hot

Vishnu CV New
Vishnu CV NewVishnu CV New
Vishnu CV NewVishnu TS
 
5kW on grid case study, Chennai, India
5kW on grid case study, Chennai, India 5kW on grid case study, Chennai, India
5kW on grid case study, Chennai, India giridaran123
 
Control & Instrumentation Engineer_2
Control & Instrumentation Engineer_2Control & Instrumentation Engineer_2
Control & Instrumentation Engineer_2maunik Sorathiya
 
Excitation Systems
Excitation Systems Excitation Systems
Excitation Systems PowerEDGE
 
Excitation Systems
Excitation Systems Excitation Systems
Excitation Systems PowerEDGE
 
IRJET-Investigation of Three Phase Induction Speed Control Strategies using N...
IRJET-Investigation of Three Phase Induction Speed Control Strategies using N...IRJET-Investigation of Three Phase Induction Speed Control Strategies using N...
IRJET-Investigation of Three Phase Induction Speed Control Strategies using N...IRJET Journal
 
Ahmed gamal ali cv 26-4
Ahmed gamal ali cv 26-4Ahmed gamal ali cv 26-4
Ahmed gamal ali cv 26-4Ahmed Gamal
 
Aaron Sem curriculum vitea
Aaron Sem curriculum viteaAaron Sem curriculum vitea
Aaron Sem curriculum viteaAaron Sem
 
FARAZDAQ ALGRARI C.V.new.optimum
FARAZDAQ ALGRARI C.V.new.optimumFARAZDAQ ALGRARI C.V.new.optimum
FARAZDAQ ALGRARI C.V.new.optimumFarazdaq Ghrairi
 
Design of Mechatronics System
Design of Mechatronics SystemDesign of Mechatronics System
Design of Mechatronics SystemVeerakumar S
 
ME8791 Mechatronics UNIT-I (VK-SSM)
ME8791 Mechatronics UNIT-I (VK-SSM)ME8791 Mechatronics UNIT-I (VK-SSM)
ME8791 Mechatronics UNIT-I (VK-SSM)Dr. Kandavel V
 
Automatic headlight intensity control system
Automatic headlight intensity control systemAutomatic headlight intensity control system
Automatic headlight intensity control systemAmosElliot
 

What's hot (20)

Vishnu CV New
Vishnu CV NewVishnu CV New
Vishnu CV New
 
AHMED ABD EL BASET EL SAYIAD
AHMED ABD EL BASET EL SAYIADAHMED ABD EL BASET EL SAYIAD
AHMED ABD EL BASET EL SAYIAD
 
5kW on grid case study, Chennai, India
5kW on grid case study, Chennai, India 5kW on grid case study, Chennai, India
5kW on grid case study, Chennai, India
 
subrat resume
subrat resumesubrat resume
subrat resume
 
Control & Instrumentation Engineer_2
Control & Instrumentation Engineer_2Control & Instrumentation Engineer_2
Control & Instrumentation Engineer_2
 
Excitation Systems
Excitation Systems Excitation Systems
Excitation Systems
 
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
2014 PV Performance Modeling Workshop: Inverter performance models Opportunit...
 
Saran Resume
Saran ResumeSaran Resume
Saran Resume
 
Excitation Systems
Excitation Systems Excitation Systems
Excitation Systems
 
IRJET-Investigation of Three Phase Induction Speed Control Strategies using N...
IRJET-Investigation of Three Phase Induction Speed Control Strategies using N...IRJET-Investigation of Three Phase Induction Speed Control Strategies using N...
IRJET-Investigation of Three Phase Induction Speed Control Strategies using N...
 
Ahmed gamal ali cv 26-4
Ahmed gamal ali cv 26-4Ahmed gamal ali cv 26-4
Ahmed gamal ali cv 26-4
 
Aaron Sem curriculum vitea
Aaron Sem curriculum viteaAaron Sem curriculum vitea
Aaron Sem curriculum vitea
 
FARAZDAQ ALGRARI C.V.new.optimum
FARAZDAQ ALGRARI C.V.new.optimumFARAZDAQ ALGRARI C.V.new.optimum
FARAZDAQ ALGRARI C.V.new.optimum
 
Saroja patra@cv
Saroja patra@cvSaroja patra@cv
Saroja patra@cv
 
Mechatronics
MechatronicsMechatronics
Mechatronics
 
veeru cv
veeru cvveeru cv
veeru cv
 
Design of Mechatronics System
Design of Mechatronics SystemDesign of Mechatronics System
Design of Mechatronics System
 
Gensol detailed engineering services
Gensol detailed engineering servicesGensol detailed engineering services
Gensol detailed engineering services
 
ME8791 Mechatronics UNIT-I (VK-SSM)
ME8791 Mechatronics UNIT-I (VK-SSM)ME8791 Mechatronics UNIT-I (VK-SSM)
ME8791 Mechatronics UNIT-I (VK-SSM)
 
Automatic headlight intensity control system
Automatic headlight intensity control systemAutomatic headlight intensity control system
Automatic headlight intensity control system
 

Viewers also liked

HARSH JIPT RESUME(2)
HARSH JIPT RESUME(2)HARSH JIPT RESUME(2)
HARSH JIPT RESUME(2)harsh singh
 
Jindal steel and power
Jindal steel and powerJindal steel and power
Jindal steel and powerakrutipoojary
 
BHEL SUMMER TRAINING REPORT
BHEL SUMMER TRAINING REPORTBHEL SUMMER TRAINING REPORT
BHEL SUMMER TRAINING REPORTBhupendra Shukla
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
Jindal steel and power limited ppt
Jindal steel and power limited pptJindal steel and power limited ppt
Jindal steel and power limited pptvijaya kisku
 
Sip report on marketing of Jindal Steel & Power
Sip report on marketing of Jindal Steel & PowerSip report on marketing of Jindal Steel & Power
Sip report on marketing of Jindal Steel & PowerBishnu Shankar Singh
 

Viewers also liked (7)

HARSH JIPT RESUME(2)
HARSH JIPT RESUME(2)HARSH JIPT RESUME(2)
HARSH JIPT RESUME(2)
 
Jindal steel and power
Jindal steel and powerJindal steel and power
Jindal steel and power
 
Aprds system
Aprds systemAprds system
Aprds system
 
BHEL SUMMER TRAINING REPORT
BHEL SUMMER TRAINING REPORTBHEL SUMMER TRAINING REPORT
BHEL SUMMER TRAINING REPORT
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
Jindal steel and power limited ppt
Jindal steel and power limited pptJindal steel and power limited ppt
Jindal steel and power limited ppt
 
Sip report on marketing of Jindal Steel & Power
Sip report on marketing of Jindal Steel & PowerSip report on marketing of Jindal Steel & Power
Sip report on marketing of Jindal Steel & Power
 

Similar to viklesh essar (20)

ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
RESUME
RESUMERESUME
RESUME
 
Pramod cv 04 feb2016
Pramod cv 04 feb2016Pramod cv 04 feb2016
Pramod cv 04 feb2016
 
KAPIL.Oct
KAPIL.OctKAPIL.Oct
KAPIL.Oct
 
Arun kumar
Arun kumar Arun kumar
Arun kumar
 
Vishnu_CV final rev2
Vishnu_CV final rev2Vishnu_CV final rev2
Vishnu_CV final rev2
 
Radhe_Resume
Radhe_ResumeRadhe_Resume
Radhe_Resume
 
Waheed Bhutto Resume
Waheed Bhutto ResumeWaheed Bhutto Resume
Waheed Bhutto Resume
 
Skm Nov. 2016
Skm  Nov. 2016Skm  Nov. 2016
Skm Nov. 2016
 
social profile _sachin soni_220715
social profile _sachin soni_220715social profile _sachin soni_220715
social profile _sachin soni_220715
 
irfan final cv (2)
irfan final cv (2)irfan final cv (2)
irfan final cv (2)
 
Arun kumar Resume
Arun kumar ResumeArun kumar Resume
Arun kumar Resume
 
Arun kumar resume
Arun kumar resumeArun kumar resume
Arun kumar resume
 
Amit Wanjari Electrical Engineer.
Amit Wanjari Electrical Engineer.Amit Wanjari Electrical Engineer.
Amit Wanjari Electrical Engineer.
 
CV Dewaharbabu
CV DewaharbabuCV Dewaharbabu
CV Dewaharbabu
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
Sales Engg
Sales EnggSales Engg
Sales Engg
 
CV Nagashiva
CV Nagashiva CV Nagashiva
CV Nagashiva
 
CV
CVCV
CV
 
c&i24.12.1014
c&i24.12.1014c&i24.12.1014
c&i24.12.1014
 

viklesh essar

  • 1. VIKLESH KUMAR TRIPATHI Mobile: +91 9760594474 E-Mail: tripathi.vikky91@gmail.com OBJECTIVE To work in the area where my knowledge and experience can be best availed of and be an asset for the organization for its mutual growth. To pursue a career, which requires an optimistic attitude, high confidence and the absolute intelligence in the motivational, progressive, and friendly environment, where the individual achievements and performance will be counted. PROFESSIONAL SUMMATION B.TECH(Electronics & Communication) with more than 2 Years’ Experience in Detail Engineering and operation & maintenance of Control & Instrumentation Systems.  2 Years of competitive experience in Power plant as CHP Maintenance engineer in Instrumentation department.  Industrial Automation on Distributed Control system, Programmable control system, SCADA, Field instruments etc.  3 months of training in Industrial Automation in Technocrat Automation Solution Pvt. Ltd Chennai (IAO) (DCS, PLC, SCADA, DNP3, MODBUS, HOST TO HOST Protocol TCP/IP etc.).  Handling multiple responsibilities (Troubleshooting the problems, Scheduling and completing Periodic maintenance visits, Scheduling and completing Shutdown maintenance visits, Scheduling and completing Emergency visits, Helping team in case they stuck in problem at site, Resource planning and sharing the Final maintenance report).  Well versed with MS Office & Internet Applications. CORE STRENGTHS  Ability to provide thought leadership  Ability to work individually and as part of cross functional teams  Demonstrated decision making and problem solving skills  Team oriented with excellent collaboration skills  Attention to detail and commitment to quality of work  Good work ethics with excellent communication and interpersonal skills. EMPLOYMENT CHRONICLE Organisation Position Period S R TURBO ENERGY (P) LTD (FATEPUR,U.P) Sri Lakshmi cotsyn Limited, fatehpur, up Instrumentation maintenance Engineer (Ash handling plant) March 2014-till Essar power ltd under Vimla enterprises, singraulli, UP Instrumentation maintenance Engineer (coal handling plant) July 2014 – feb 2014 JIPT/JINDAL POWER LTD (RAIGARGH,C.G) PGDC in thermal Power plant technology July 2013 – June 2014
  • 2. EDUCATION BACKGROUND SUMMATION Degree Year Board/University Percentage B Tech (Electronics and Communication) 2013 I.E.T Dr R.M.LA.U, Faizabad UP 73.54% DIPLOMA in automation(3 month) 2012 Technocrat Automation Solution Pvt. Ltd Chennai (IAO) First div TECHNICAL SKILLS DCS Centum VP, CS 3000, CS1000, PLC Siemens S7-200, Allen Bradley micrologix(1000) & Mitsubishi etc. SCADA Yokogawa’s Fast Tool SCADA ,Wonderware intouch(10.1) Field Instruments Flow, Pressure, Temperature, Differential pressure, Level transmitters, expertise on Indicators and controllers, Sensors etc. Organization: Essar power ltd under Vimla enterprises singraulli, MP (2*600MW) PROJECTS UNDERTAKEN Functional Responsibilities  Detailed engineering and application software development for industrial projects using YOKOGAWA DCS systems – CENTUM CS-3000.  DCS system Hardware & software testing, System integration third party components selection and loop checking.  Design and finalization of Graphics on system according to Process and Instrumentation schemes (P&ID schemes).  Calibration, commissioning and installation of various plant applicable instruments i.e. RTD, THERMOCOUPLE, PRESSURE GUAGE, TEMPERATURE GAUGE, PRESSURE TRANSMITTER and many other instruments.  Alarms, Trend, History and Reports configuration through PLG Web Server interfaced and networked with main plant DCS system.  Logics development, Simulation and Implementation in different programming languages with thorough knowledge of Process Control.  Logics development, Simulation and Implementation in different programming languages with thorough knowledge of Process Control. Organization: S R TURBO ENERGY (P) LTD (FATEPUR, U.P) Sri Lakshmi cotsyn Limited, fatepur, up PROJECTS UNDERTAKEN Functional Responsibilities  Detailed engineering and application for industrial projects using YOKOGAWA DCS systems – CENTUM CS-3000.  Instrumentation Maintenance of ash handling plant.  Maintenance of solenoid, pressure switch & Vibrator.  AB Power flex Variable Frequency Drive
  • 3. Organization: JIPT/JINDAL POWER LTD (RAIGARGH, C.G) equivalent to NPTI PROJECTS UNDERTAKEN Functional Responsibilities As a Power plant trainee Engineer, I am responsible for the following:  simulator training in 250mwand 600mw(PC boiler) in JIPT Projects Handled 1. Power plant (4*250 MW & 4*600MW))  Erection and commissioning work for the plants Power plant  Operation & maintenance.  Scheme tracing & power plant familiarisation.  Controlling of power plant (through C&I dept.)  Monitoring and performance of thermal power plant  Protection of thermal power plant.  Rotation on job operation at 4*250 mw  Maintenance and Calibration of all Field Instruments like Distributed Control system (having Yokogawa , PLCs, , Variable Frequency Drives [VFDs], DC/AC Drives, Control Valves, Solenoid Valves, Motorized Valves, all types of Transmitters, Switches, Sensors, Pneumatic Cylinders, Field Gauges, Local/Field Indicators, etc. INDUSTRIAL TRAININGS  I did simulator training in 250mwand 600mw(PC boiler) in JIPT and have introductory simulator training knowledge in 135mwCFBC boiler.  Three months industrial training in Technocrat Automation Solution Pvt. Ltd Chennai (IAO)  Six weeks training Technocrat Automation Solution Pvt. Ltd Chennai (IAO) PERSONAL DOSSIER Present Address: Jawahar nagar, Manikpur, Chitrakoot, UP pin code-210208 Permanent Address : Vil-Semardaha, Post - Semardhaha, Dist -Chitrakoot UP Pin code: - 210205 Date of Birth: March-13-1991 Linguistics: English & Hindi. I, VIKLESH KUMAR tripathi hereby declare that all of the above statements are correct and true to the best of my knowledge. Place:SINGRAULII (VIKLESH KUMAR TRIPATHI) Date-03/07/2014