CAP D’ CAPEX
Date, 8-9 September, 2022
WASTEFRONT- SUNDERLAND PROJECT
Agenda
All ideas are great
Presentation title 2
DISCUSS DEBATE REALIZE
We have a
common aim &
intent
Let’s make it
happen
BRING TIRE CHIPS
DIRECTLY
Presentation title 3
SHREDDER AREA
SHREDDING CHAIN TO BE PUT IN
FUTURE, RESERVE SPACE NOW
THOUGHTS
Capex Reduction for :
• Shredder Package,
• Shredder Building
• Instrumentation
• Decrease in loading
mechanism costs
 Slightly increased
cost of chips than
shreds
INSTALL JUST THE
RASPER
Presentation title 4
SHREDDER AREA
SHREDDER PORTION OF
SHREDDER PACKAGE TO BE
PUT IN FUTURE, RESERVE
SPACE
THOUGHTS
Capex Reduction for :
• Shredder Package
partial,
• Shredder Building
partial
• Instrumentation
 Decrease in
maintenance costs
 No increase in
Opex
Presentation title 5
SHREDDER AREA
THOUGHTS
Capex Reduction for :
• Building
 Slightly dirtier area
 A little extra
maintenance
 Permitting
NO BUILDING- NO ROOF
Numerous Examples in industry
Presentation title 6
PYROLYSIS BUILDING
THOUGHTS
Capex Reduction for :
• Building
 A little extra
maintenance
 Permitting
INDUSTRIAL SHED – WITHOUT SIDE SHEETING
Numerous Examples in industry
Presentation title 7
PYROLYSIS BUILDING
THOUGHTS
Capex Reduction for :
• Building
 A little extra
maintenance
 Permitting
NO BUILDING- NO ROOF
Numerous Examples in industry
Presentation title 8
POWER GENERATION
THOUGHTS
Capex Reduction for :
• Mark up costs of
TTS Martin
 Would Mitsubishi
agree?
 Better schedule
DOES IT MAKE BUSINESS SENSE?
ENGAGE DIRECTLY WITH ENGINE VENDOR
Presentation title 9
POWER GENERATION
THOUGHTS
Capex Increase for :
• Catalytic
Convertor
 Shall reduce the
size of RTO, and a
bigger capex
reduction
ADDITIONAL ITEM IN GAS ENGINE PACKAGE
CATALYTIC CONVERTOR
Presentation title 10
FIRE WATER TANKS
THOUGHTS
Capex reduction:
• Tank fabrication
costs
• Pumps and
associated costs
 One FW Tank is
also a common
philosophy
REDUCTION IN NUMBER
Two TO One
Presentation title 11
FIRE WATER TANK
THOUGHTS
Capex reduction:
• Tank fabrication
costs
 Permitting?
Design
Without Roof Design
Presentation title 12
FIRE WATER TANKS
THOUGHTS
Capex reduction:
• Tank costs
• FW Pump House
 Permitting
approvals?
REDUCTION IN NUMBER
Two TO Zero
Vertical pump at jetty, FW
directly from sea
Presentation title 13
PYROLYSIS OIL LOADING
THOUGHTS
Capex reduction:
• Flexible arm is
economical
 UK regulations?
TYPE CHANGE
Loading arm TO Flexible Hose
Presentation title 14
RCB PELLETIZING
THOUGHTS
Capex reduction:
• Pelletizer
• Binder Tanks
• Binder Pumps
 Market
acceptance?
PELLETIZING OR POWDERED
Pellets replaced with Powder
Presentation title 15
Pyrolysis Oil Loading Area Location
Shear key area or Main Plant area
Discussion Points
Whether ours's is a Pier NO
Whether ours's is a wharf NO
Whether ours's is a space loading racks NO
Does our facility have large numbers of
trucks, rail cars, barges or ships
NO
Applicability of GAPS Guideline ???
GAPS Guideline are typically for Oil and Chemical Plants i.e., Oil & Gas
or Refinery or Chemical plants- Ours is not
GAPS is a mere guideline, Neither a statutory nor a codal requirement
Presentation title 16
Pyrolysis Oil Loading Area Location
Shear key area or Main Plant area
Discussion Points
GAPS layout and spacing recommendations are for property loss prevention purposes only.
These guidelines are intended to limit explosion overpressure and fire exposure damage. If
these guidelines cannot be followed, then additional loss control measures, such as fire
proofing, waterspray or blast hardening will be necessary.
Quote
Unquote
THOUGHTS
Capex reduction:
 Piping
 UK Regulations?
Presentation title 17
Weighbridge
THOUGHTS
Capex reduction:
• Weigh bridge
• Civil and
Instrumentation
 Operations to be
scheduled
accordingly
REDUCTION IN NUMBER
Two TO One
Presentation title 18
rCB Storage Area
THOUGHTS
Capex reduction:
• Building Costs
 Take-off of Rcb
from plant to be
planned
accordingly
REDUCTION IN HEIGHT
15 TO 8 Metres
Presentation title 19
Internal Roads
THOUGHTS
Capex reduction:
• Civil Costs
REDUCTION IN ROAD LENGTHS
Phase 1 : These may be omitted
&
Presentation title 20
Cooling Tower
THOUGHTS
Capex reduction:
• Cooling Tower
• 1 Pump
 Maintenance to be
scheduled along
with plant shut
downs.
 Add spare motor
for Fan
REDUCTION IN NUMBER
Two TO One
Presentation title 21
Utility Piperack
THOUGHTS
Capex reduction:
• Structural and Civil
Costs
REDUCTION IN TIER
Presentation title 22
PID Review Value Engineering Points
THOUGHTS
Capex reduction:
a) .
b) .
c) .
d) .
e) .
f) .
g) .
h) .
i) .
Miscellaneous Learnings
Presentation title 24
Value Engineering Workshop with our GET’s
Presentation title 25
Value Engineering Workshop with our GET’s
Thank you

More Related Content

Similar to CAP D’ CAPEX.pptx

Petrofed_2015_Oct-Dec_KBR-DWC
Petrofed_2015_Oct-Dec_KBR-DWCPetrofed_2015_Oct-Dec_KBR-DWC
Petrofed_2015_Oct-Dec_KBR-DWC
Saran Raj
 
2 co making the business case for ccs
2 co   making the business case for ccs2 co   making the business case for ccs
2 co making the business case for ccs
Global CCS Institute
 
JEC 030916 wide FINALR2
JEC 030916 wide FINALR2JEC 030916 wide FINALR2
JEC 030916 wide FINALR2
Stephen Oman
 

Similar to CAP D’ CAPEX.pptx (20)

Power-Gen 2016 Coal to Gas Conversion Paper
Power-Gen 2016 Coal to Gas Conversion PaperPower-Gen 2016 Coal to Gas Conversion Paper
Power-Gen 2016 Coal to Gas Conversion Paper
 
Project review
Project reviewProject review
Project review
 
Revamps for Modern Hydrogen Plants
Revamps for Modern Hydrogen PlantsRevamps for Modern Hydrogen Plants
Revamps for Modern Hydrogen Plants
 
ELEMENTS OF A ROBUST CARBON CAPTURE, UTILIZATION, AND STORAGE BUSINESS MODEL
ELEMENTS OF A ROBUST CARBON CAPTURE, UTILIZATION, AND STORAGE BUSINESS MODELELEMENTS OF A ROBUST CARBON CAPTURE, UTILIZATION, AND STORAGE BUSINESS MODEL
ELEMENTS OF A ROBUST CARBON CAPTURE, UTILIZATION, AND STORAGE BUSINESS MODEL
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALS
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALS
 
Petrofed_2015_Oct-Dec_KBR-DWC
Petrofed_2015_Oct-Dec_KBR-DWCPetrofed_2015_Oct-Dec_KBR-DWC
Petrofed_2015_Oct-Dec_KBR-DWC
 
Power Generation-21n.ppt
Power Generation-21n.pptPower Generation-21n.ppt
Power Generation-21n.ppt
 
Condensing Boilers
Condensing BoilersCondensing Boilers
Condensing Boilers
 
Social Landlords - The Business case is Compelling
Social Landlords - The Business case is CompellingSocial Landlords - The Business case is Compelling
Social Landlords - The Business case is Compelling
 
Commercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler OptimizaitonCommercial Condensing Boiler Optimizaiton
Commercial Condensing Boiler Optimizaiton
 
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASEUNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
UNDERSTANDING THE IMPLEMENTATION OF CCUS BUSINESS CASE
 
Mg Innovation Flng Cn 2010 R1
Mg Innovation Flng Cn 2010 R1Mg Innovation Flng Cn 2010 R1
Mg Innovation Flng Cn 2010 R1
 
2 co making the business case for ccs
2 co   making the business case for ccs2 co   making the business case for ccs
2 co making the business case for ccs
 
CatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentationCatFT(r) Fischer-Tropsch Process presentation
CatFT(r) Fischer-Tropsch Process presentation
 
paper selected for national conference at IMU-MUMBAI
paper selected for national conference at IMU-MUMBAIpaper selected for national conference at IMU-MUMBAI
paper selected for national conference at IMU-MUMBAI
 
Revamps for Ageing Ammonia Plants
Revamps for Ageing Ammonia PlantsRevamps for Ageing Ammonia Plants
Revamps for Ageing Ammonia Plants
 
pressure vessel details for design and it components
pressure vessel details for design and it componentspressure vessel details for design and it components
pressure vessel details for design and it components
 
CH3080_pressure_vessels.ppt
CH3080_pressure_vessels.pptCH3080_pressure_vessels.ppt
CH3080_pressure_vessels.ppt
 
JEC 030916 wide FINALR2
JEC 030916 wide FINALR2JEC 030916 wide FINALR2
JEC 030916 wide FINALR2
 

Recently uploaded

DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DrGurudutt
 

Recently uploaded (20)

Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message QueuesLinux Systems Programming: Semaphores, Shared Memory, and Message Queues
Linux Systems Programming: Semaphores, Shared Memory, and Message Queues
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Attraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptxAttraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptx
 
Circuit Breaker arc phenomenon.pdf engineering
Circuit Breaker arc phenomenon.pdf engineeringCircuit Breaker arc phenomenon.pdf engineering
Circuit Breaker arc phenomenon.pdf engineering
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoning
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
Lesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsxLesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsx
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
 
Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdf
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
Fabrication Of Automatic Star Delta Starter Using Relay And GSM Module By Utk...
 
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWINGBRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
BRAKING SYSTEM IN INDIAN RAILWAY AutoCAD DRAWING
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 

CAP D’ CAPEX.pptx

  • 1. This document and all information are confidential and may not be used, reproduced or distributed without prior authorization of TECHNIP ENERGIES CAP D’ CAPEX Date, 8-9 September, 2022 WASTEFRONT- SUNDERLAND PROJECT
  • 2. Agenda All ideas are great Presentation title 2 DISCUSS DEBATE REALIZE We have a common aim & intent Let’s make it happen
  • 3. BRING TIRE CHIPS DIRECTLY Presentation title 3 SHREDDER AREA SHREDDING CHAIN TO BE PUT IN FUTURE, RESERVE SPACE NOW THOUGHTS Capex Reduction for : • Shredder Package, • Shredder Building • Instrumentation • Decrease in loading mechanism costs  Slightly increased cost of chips than shreds
  • 4. INSTALL JUST THE RASPER Presentation title 4 SHREDDER AREA SHREDDER PORTION OF SHREDDER PACKAGE TO BE PUT IN FUTURE, RESERVE SPACE THOUGHTS Capex Reduction for : • Shredder Package partial, • Shredder Building partial • Instrumentation  Decrease in maintenance costs  No increase in Opex
  • 5. Presentation title 5 SHREDDER AREA THOUGHTS Capex Reduction for : • Building  Slightly dirtier area  A little extra maintenance  Permitting NO BUILDING- NO ROOF Numerous Examples in industry
  • 6. Presentation title 6 PYROLYSIS BUILDING THOUGHTS Capex Reduction for : • Building  A little extra maintenance  Permitting INDUSTRIAL SHED – WITHOUT SIDE SHEETING Numerous Examples in industry
  • 7. Presentation title 7 PYROLYSIS BUILDING THOUGHTS Capex Reduction for : • Building  A little extra maintenance  Permitting NO BUILDING- NO ROOF Numerous Examples in industry
  • 8. Presentation title 8 POWER GENERATION THOUGHTS Capex Reduction for : • Mark up costs of TTS Martin  Would Mitsubishi agree?  Better schedule DOES IT MAKE BUSINESS SENSE? ENGAGE DIRECTLY WITH ENGINE VENDOR
  • 9. Presentation title 9 POWER GENERATION THOUGHTS Capex Increase for : • Catalytic Convertor  Shall reduce the size of RTO, and a bigger capex reduction ADDITIONAL ITEM IN GAS ENGINE PACKAGE CATALYTIC CONVERTOR
  • 10. Presentation title 10 FIRE WATER TANKS THOUGHTS Capex reduction: • Tank fabrication costs • Pumps and associated costs  One FW Tank is also a common philosophy REDUCTION IN NUMBER Two TO One
  • 11. Presentation title 11 FIRE WATER TANK THOUGHTS Capex reduction: • Tank fabrication costs  Permitting? Design Without Roof Design
  • 12. Presentation title 12 FIRE WATER TANKS THOUGHTS Capex reduction: • Tank costs • FW Pump House  Permitting approvals? REDUCTION IN NUMBER Two TO Zero Vertical pump at jetty, FW directly from sea
  • 13. Presentation title 13 PYROLYSIS OIL LOADING THOUGHTS Capex reduction: • Flexible arm is economical  UK regulations? TYPE CHANGE Loading arm TO Flexible Hose
  • 14. Presentation title 14 RCB PELLETIZING THOUGHTS Capex reduction: • Pelletizer • Binder Tanks • Binder Pumps  Market acceptance? PELLETIZING OR POWDERED Pellets replaced with Powder
  • 15. Presentation title 15 Pyrolysis Oil Loading Area Location Shear key area or Main Plant area Discussion Points Whether ours's is a Pier NO Whether ours's is a wharf NO Whether ours's is a space loading racks NO Does our facility have large numbers of trucks, rail cars, barges or ships NO Applicability of GAPS Guideline ??? GAPS Guideline are typically for Oil and Chemical Plants i.e., Oil & Gas or Refinery or Chemical plants- Ours is not GAPS is a mere guideline, Neither a statutory nor a codal requirement
  • 16. Presentation title 16 Pyrolysis Oil Loading Area Location Shear key area or Main Plant area Discussion Points GAPS layout and spacing recommendations are for property loss prevention purposes only. These guidelines are intended to limit explosion overpressure and fire exposure damage. If these guidelines cannot be followed, then additional loss control measures, such as fire proofing, waterspray or blast hardening will be necessary. Quote Unquote THOUGHTS Capex reduction:  Piping  UK Regulations?
  • 17. Presentation title 17 Weighbridge THOUGHTS Capex reduction: • Weigh bridge • Civil and Instrumentation  Operations to be scheduled accordingly REDUCTION IN NUMBER Two TO One
  • 18. Presentation title 18 rCB Storage Area THOUGHTS Capex reduction: • Building Costs  Take-off of Rcb from plant to be planned accordingly REDUCTION IN HEIGHT 15 TO 8 Metres
  • 19. Presentation title 19 Internal Roads THOUGHTS Capex reduction: • Civil Costs REDUCTION IN ROAD LENGTHS Phase 1 : These may be omitted &
  • 20. Presentation title 20 Cooling Tower THOUGHTS Capex reduction: • Cooling Tower • 1 Pump  Maintenance to be scheduled along with plant shut downs.  Add spare motor for Fan REDUCTION IN NUMBER Two TO One
  • 21. Presentation title 21 Utility Piperack THOUGHTS Capex reduction: • Structural and Civil Costs REDUCTION IN TIER
  • 22. Presentation title 22 PID Review Value Engineering Points THOUGHTS Capex reduction: a) . b) . c) . d) . e) . f) . g) . h) . i) .
  • 24. Presentation title 24 Value Engineering Workshop with our GET’s
  • 25. Presentation title 25 Value Engineering Workshop with our GET’s