More Related Content
Similar to CV_Jimmy See 3-16 (20)
CV_Jimmy See 3-16
- 1. XXXXXX 1/4
© Laing O’Rourke 2013, all rights reserved
SEE Hung Keung, Jimmy
Site Agent
Qualification
Authorised Signatory {Registered
Minor works contractors company}
Top-up Course (2012)
-Certificate in Integrated Management
System Training Course .ISO 9001,
ISO 14001 &
OHSAS 18001 ( 2011)
-Advanced Diploma in Building &
Construction Project Management
(2002)
-Course for Qualifying Site Supervisor
as Technically CompetentPersons
Equivalent Certificate (3) (2001)
-Course for ConstructionSafety
Supervisor (2000)
-Landslip Preventive Measures
Course for Supervisory Personnel
(1997)
-Certificate in ConstructionSupervisor
(1993)
-General Course for Clerks of Works
(1994)
-Member of The Institute of Clerks of
Works of Great Britain Incorporated
and Member of The Hong Kong
Institute of Clerks of Works
Experience overview
- 2. Curriculum Vitae • SEE Hung Keung, Jimmy 2/4
© Laing O’Rourke 2013, all rights reserved
36 years construction experience in various kind of building, such as Housing, A.S.D. private &
commercial project. Keep in mind to follow the requirement from the employers and patiently,
intelligently, sensitively to solve any problem.
Employment experience
Site Manager
2013–Present Laing O'Rourke
Express Rail Link: C810B West Kowloon Terminus Station (South) HK$8.3bn
-Liaising with Sub-Contractors and Engineers
-Provide technical adviceon-site
-To lead the RC Structure team and Architectural team
-Report, update and monitor project/site progress to timely completion
-Responsiblefor the site safety and Quality.
-Conduct meetings and risk analysis on a regular basis
-Responsibleof all activities to run smoothly in the operation
Senior Project Manager
2011–2013 Vaford Contracting Co LTd
Main Street Retail expansion at Hong Kong Disneyland HK$83M
-Provide adequate quality control and safety measures on site in accordance withquality plan,
safety plan and contract requirements.
-Preparing master program, middle term and shortterm program
-Monitoring site progress against the planned program
-Ensure all materials, testand works are in compliance with contract requirements and B.D.
requirement.
-Chair site meeting and coordination meeting
-Prepare and control budget
-Communicate with consulant, mangement office and operation Division's in charge for project
co-ordination.
Quality Manager
2009–2011 Sun Fook Kong Construction Ltd
A&A Works and Vacant Flat Refurbishment at Hong Kong Island (West) HK$235M
DTC 20090027/HKW (HKHA)
-Provide adequate quality control and safety measures on site in accordance withquality plan,
safety plan and contract requirements.
-Ensure all materials, testand works are in compliance with contract requirements.
-Prepare quality monthly managementreport.
-Monitoring site progress against the planned program.
- 3. Curriculum Vitae • SEE Hung Keung, Jimmy 3/4
© Laing O’Rourke 2013, all rights reserved
Quality Manager
2009–2009 Shui On Building Construction Ltd
A&A Works and Vacant Flat Refurbishment at Hong Kong Island (West) HK$275M
DTC 2007001/HKW (HKHA)
-Provide adequate quality control and safety measures on site in accordance withquality plan,
safety plan and contract requirements.
-Ensure all materials, testand works are in compliance with contract requirements.
-Prepare quality monthly managementreport.
-Monitoring site progress against the planned program.
Site Agent
2007–2009 Able Engineering Co Ltd
THE CAPTOL of LOHAS Park, 「日出康城」, Proposed Residential Development (Package One) at TKOTL No. 70,
Area 86,Site F, Tseung Kwan O,New Territories HK$1.6bn
-Preparing master program, middle term and shortterm program
-Monitoring site progress against the planned program
-Supervision for site safety issues quality assurance, quality control issues,submission including
method statements, shop drawings, materials, etc.
-Managing statutory submissions to BD, EPD& LD etc.
-Coordination with Governmentdepartment, utility company, clients, consultants and
subcontractor.
Site Agent
1998-2007 Gammon Construction Limited
A & A Works At Discovery Bay Town Plaza HK$197M
The Hong Kong Jockey club - Proposed Alteration and Additional Works for HK$53M
High Value / Member Rookies Area, Happy Valley Racecourse
Fitting out Works for Zung Fu Garage at Hunghom HK$48M
A.S.D.Fire Station at Hong Kong Disneyland HK$380M
Industry and Office Building at Kwai Hei Street HK$295M
(HKHA) Tsz Man Estate HK$850M
Maintenance Term Contract (ASD) and DTC(HKHA) HK$250M
-Liaising with Sub-Contractors and Engineers
-Provide technical adviceon-site
-To lead the RC Structure team and Architectural team
-Report, update and monitor project/site progress to timely completion
-Responsiblefor the site safety and Quality.
- 4. Curriculum Vitae • SEE Hung Keung, Jimmy 4/4
© Laing O’Rourke 2013, all rights reserved
-Conduct meetings and risk analysis on a regular basis
-Responsibleof all activities to run smoothly in the operation
Project Manager
1997-1998 RDL Asia Ltd
Fitting out Works for Star Telecom & CTITelcom Office at New Century Square
Project Manager
1994-1997 K&R Wong Construction Co Ltd
Ma On Shan Swimming Pool Complex & Ma On Shan Sport Complex (ASD)
General Foreman
1992-1994 Chau Mou Engineering Co Ltd
Fitting out Works of Hong Kong Baptist Hospital & Hong Kong Telecom
General Foreman
1984-1991 Shun Shing Construction Co Ltd
Nam Cheong Estate, Wah Kwai Estate and Hau Tak Estate (HKHA)
Site Supervisor
1978-1983 Hip Hing Construction Co Ltd
Bond Centre, New World Centre