SlideShare a Scribd company logo
1 of 4
Download to read offline
1
CURRICULUM VITAE
GENERAL DATA
Name : JATMIKA BUDI SANTOSA
Date of Birth : Semarang, March, 08, 1972
Address : Jln. Cempaka 2 GgH.Nemin RT 03/RW 02 No 79
Jatibening, PondokGede, Bekasi.
Nationality : Indonesia
Religion : Islam (Moslem)
Sex : Male
Marital Status : Married
Occupation : Welding Inspector / QC Inspector (Lead)
Mobile Number : +6281218191580
E-mail : jatmika.bsantosa@yahoo.com
QUALIFICATION :
Θ Welding Inspector. Certificate no. 2072 / WI – KS / II / 2009. Certified by Biro Klasifikasi Indonesia (BKI)
Member of IWS (Indonesian Welding Society)
Θ NDT Level II Liquid Penetrant Testing. Certificate no.NDR – CT0015 – CER – PT2.
Θ Radiographic Interpreter (RI) Level II Certificate no.724 / RI / N / 15. Certified by Multi Spec Sinergindo (MSS).
SPECIALIZATIONS :
ΘThorough knowledge and work experience in Oil, Gas and Petrochemical Industry especially in pressure
Vessels, piping and storage tanks.
ΘFamiliar with ASME, ANSI, API, AWS and other International Standart Code requirements.
ΘProficient in welding inspection, quality control inspection, NDT inspection, interpretation, documentation,
Coordination.
ΘKnowledgeable in some surveying equipment operation.
ΘProficient in personal computer operation ( MS Office)
2
SUMMARY OF EXPERIENCE AND RESPONSIBILITIES:
Θ Experience in Welding Supervisor 2 years and welding more than 12 years.
# Responsible of welding consumable to be use.
# Monitoring welder, before, during, and after welding.
# Responsible of quality product before, during, and after welding.
# Daily activity report welder performance and recording
ΘExperience in QC Inspector / Welding Inspector 10 years
# Work as welding inspector for piping, pressure vessels and tanks.
# Direct, supervise and participate in Quality Control activities to dertimine product conformity to
Customer specification through independent inspection and tests in accordance with the Project Quality
Plan.
# Generates standard documentation format in line with all the project requirements.
# Witness welder’s performance qualification test and make judgment as per applicable codes. Also
Welding procedure qualification test/record and production test record.
# Conduct, coordination and verification of NDT work such as Penetrant Test, Magnetig Test, PAMI,
Vaccum Box Test and Penetrating Oil Test in accordance with specified codes and Project Specification
Requirements.
# Conduct final inspection of completed vessels/tanks and piping systems interface with ASME
Authorized Inspector and /or Client representative and preparation of puch lis for rectificattion and
Repairs. Also, box up and hand over inspection.
# Preparation test packages of piping and conduct walkdowns prior to line pressure testing.
# Perform destructive test such as pneumatic leak test on reinforcing pads, pontoon blocks, roof and
Completed tanks.
# Perform orientation, dimensional and fit-up inspection prior to any welding activiteis. Check for any
Pre-weld requirement such as preheating, joint preparation and welder’s qualification.
# Conduct final dimensional inspections such as Straightness, Peaking, Banding, Plumbness, Roundness
And Tank Settlement Inspection in accordance to applicable codes and client’s related specifications.
# In-process welding surveillance to verify compliance to qualified WPS, the electrode used, the
Technique, inter-pass cleaning, temperature and heat maintenance.
# Conduct weld quality control inspection to all completed weld seam for any surface discontinuities
And other visible defect evaluation. Also, monitoring of post-weld heat treatment/stress relieving as
Required.
# Advise specifications on the acts of negligence by fiiters and welders with respect to poor workmanship,
Technique and safety.
3
TRAINING / COURSE:
ΘWelding School at BLK Jakarta, Indonesia, 1994 and certified.
ΘWelding Inspector School at Biro Klasifikasi Indonesia Jakarta, Indonesia, November 04 to December 13, 2008
and certified.
ΘIn house training of Penetrant Testing ASNT level II at Toyo Kanetsu Indonesia, December 2011 and certified
ΘBasic training course on radiation safety and monitoring in X-ray fluorescence, Singapore. August 26, 2011 and
certified
ΘEnglish Course.
ΘSafety Training and Supervisor Training Skill for Incident and Injury Free (IIF) Program.
WORK EXPERIENCE:
1. PT. TOYO KANETSU INDONESIA.
As WELDING / QC INSPECTOR LEAD.
€ WWT Project. LNG Tangguh, Papua. From October 22, 2010 to March 15, 2011.
€ Pre-assembly LNG Tank (140.000 M3) , for Queensland LNG project, Australia. From April 17,
2011 to February 11, 2012.
€ LNG Tank (170.000 M3), for Donggi Senoro LNG project, Central Sulawesi. From March 10,
2012 to Mei 20, 2014.
€ Additional Naphtha Storage Tank, for PT. Chandra Asri Petrochemical, Anyer – Banten. From June 12,
2014 to April 15, 2015.
€ VCM Storage Receiver Phase VI Project, for PT. Asahimas Chemical., Anyer – Banten.
From April 20, 2015 to November 02, 2015
2. PT. ACECE SARANA PRIMA.
As WELDING / QC INSPECTOR.
€FireFighting Pipe Line for PLTU 3 Banten Project (Coal-Fired Power Plant) Teluk Naga,
Tangerang. From February 15, 2010 to October 20, 2010.
3. SHI QATAR Co. W.L.L.
As QC INSPECTOR.
€ Dolphin Upstream and Compression Facilities Project. Raslaffan, State of Qatar. From December 24. 2004
to June 30, 2006.
€ 5 unit LNG tanks (140.000 M3) for Qatar Gas II LNG Onshore Facilities Project. Raslaffan, State of Qatar.
From August 20, 2006 to June 20, 2008.
€ Privatization of Cleaning Service and Waste Treatment Facilities Project. Mesaeed, State of Qatar.
4
From July 21, 2008 to December 25, 2009.
4. SAMSUNG CORPORATION.
As WELDER SMAW & SAW.
€ LPG Tanks Qatar Petroleum Project, Mesaeed, State of Qatar. From March 7, 2003 to January 18, 2004.
5. SAMSUNG HEAVY INDUSTRIES Co. Ltd.
As WELDER SMAW & SAW.
€ Yukong Storage Tanker Project, South Korea. from May 23, 1996 to December 20, 1997.
€ Formosa Heavy Industries Project, Taiwan ROC.From July, 1998 to July, 1999.
€ Nodco Refinery Project, Mesaeed, State of Qatar. From June 4, 2000 to September 30, 2000.
6. PT. CBI INDONESIA.
As WELDER SMAW.
Following many project with PT CBI INDONESIA since July 26, 1993 to March 23 1996.
Sincerely yours,
Jatmika Budi Santosa

More Related Content

What's hot (20)

MZS umc (4)
MZS umc (4)MZS umc (4)
MZS umc (4)
 
shan resume 2015.1.1
shan resume 2015.1.1shan resume 2015.1.1
shan resume 2015.1.1
 
Mark Smith-CV 1(1)2016WORD
Mark Smith-CV 1(1)2016WORDMark Smith-CV 1(1)2016WORD
Mark Smith-CV 1(1)2016WORD
 
Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)
 
Senthilnathan
SenthilnathanSenthilnathan
Senthilnathan
 
Welding Inspector - QC Inspector
Welding Inspector - QC InspectorWelding Inspector - QC Inspector
Welding Inspector - QC Inspector
 
CV CANADA OCT 2016
CV CANADA OCT 2016CV CANADA OCT 2016
CV CANADA OCT 2016
 
Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14Cv for welding inspector ud 08.05.14
Cv for welding inspector ud 08.05.14
 
Balkar Latest CV 2016
Balkar Latest CV 2016Balkar Latest CV 2016
Balkar Latest CV 2016
 
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2JONE. WELDING piping inspector new  ROPE ACCESS LEVEL 2
JONE. WELDING piping inspector new ROPE ACCESS LEVEL 2
 
Tin's CV
Tin's CVTin's CV
Tin's CV
 
Mani cv
Mani   cvMani   cv
Mani cv
 
mark cv
mark cvmark cv
mark cv
 
venkatesh QC resume.
venkatesh QC resume.venkatesh QC resume.
venkatesh QC resume.
 
Aramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector Resume
 
CV FOR N.R.IYER
CV FOR N.R.IYERCV FOR N.R.IYER
CV FOR N.R.IYER
 
Rajesh kannan -BGAS level 2 CV
Rajesh kannan -BGAS level 2 CVRajesh kannan -BGAS level 2 CV
Rajesh kannan -BGAS level 2 CV
 
Ashok 222
Ashok 222Ashok 222
Ashok 222
 
Prem's Resume
Prem's  ResumePrem's  Resume
Prem's Resume
 
my cv
my cvmy cv
my cv
 

Similar to CV Jatmika Budi

Similar to CV Jatmika Budi (20)

Curriculum Vitae-Hilwan Sulton
Curriculum Vitae-Hilwan SultonCurriculum Vitae-Hilwan Sulton
Curriculum Vitae-Hilwan Sulton
 
Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1Cv ardiansyah t.a cswip 3.1
Cv ardiansyah t.a cswip 3.1
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
Resume-Welding inspector
Resume-Welding inspectorResume-Welding inspector
Resume-Welding inspector
 
navjay
navjaynavjay
navjay
 
Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)
 
API_CV (1)
API_CV (1)API_CV (1)
API_CV (1)
 
RAJU CV
RAJU  CVRAJU  CV
RAJU CV
 
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+W
 
QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
 
S. Vibin CV
S. Vibin CVS. Vibin CV
S. Vibin CV
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 
Venugopal revised Cv
Venugopal revised CvVenugopal revised Cv
Venugopal revised Cv
 
Venugopal revised cv
Venugopal revised cvVenugopal revised cv
Venugopal revised cv
 
LINGAM
LINGAMLINGAM
LINGAM
 
IMRAN YAMEEN CV
IMRAN YAMEEN CV IMRAN YAMEEN CV
IMRAN YAMEEN CV
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Tahir CV
Tahir CVTahir CV
Tahir CV
 
Ananda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCVAnanda_Mariyan_DsouzaCV
Ananda_Mariyan_DsouzaCV
 

CV Jatmika Budi

  • 1. 1 CURRICULUM VITAE GENERAL DATA Name : JATMIKA BUDI SANTOSA Date of Birth : Semarang, March, 08, 1972 Address : Jln. Cempaka 2 GgH.Nemin RT 03/RW 02 No 79 Jatibening, PondokGede, Bekasi. Nationality : Indonesia Religion : Islam (Moslem) Sex : Male Marital Status : Married Occupation : Welding Inspector / QC Inspector (Lead) Mobile Number : +6281218191580 E-mail : jatmika.bsantosa@yahoo.com QUALIFICATION : Θ Welding Inspector. Certificate no. 2072 / WI – KS / II / 2009. Certified by Biro Klasifikasi Indonesia (BKI) Member of IWS (Indonesian Welding Society) Θ NDT Level II Liquid Penetrant Testing. Certificate no.NDR – CT0015 – CER – PT2. Θ Radiographic Interpreter (RI) Level II Certificate no.724 / RI / N / 15. Certified by Multi Spec Sinergindo (MSS). SPECIALIZATIONS : ΘThorough knowledge and work experience in Oil, Gas and Petrochemical Industry especially in pressure Vessels, piping and storage tanks. ΘFamiliar with ASME, ANSI, API, AWS and other International Standart Code requirements. ΘProficient in welding inspection, quality control inspection, NDT inspection, interpretation, documentation, Coordination. ΘKnowledgeable in some surveying equipment operation. ΘProficient in personal computer operation ( MS Office)
  • 2. 2 SUMMARY OF EXPERIENCE AND RESPONSIBILITIES: Θ Experience in Welding Supervisor 2 years and welding more than 12 years. # Responsible of welding consumable to be use. # Monitoring welder, before, during, and after welding. # Responsible of quality product before, during, and after welding. # Daily activity report welder performance and recording ΘExperience in QC Inspector / Welding Inspector 10 years # Work as welding inspector for piping, pressure vessels and tanks. # Direct, supervise and participate in Quality Control activities to dertimine product conformity to Customer specification through independent inspection and tests in accordance with the Project Quality Plan. # Generates standard documentation format in line with all the project requirements. # Witness welder’s performance qualification test and make judgment as per applicable codes. Also Welding procedure qualification test/record and production test record. # Conduct, coordination and verification of NDT work such as Penetrant Test, Magnetig Test, PAMI, Vaccum Box Test and Penetrating Oil Test in accordance with specified codes and Project Specification Requirements. # Conduct final inspection of completed vessels/tanks and piping systems interface with ASME Authorized Inspector and /or Client representative and preparation of puch lis for rectificattion and Repairs. Also, box up and hand over inspection. # Preparation test packages of piping and conduct walkdowns prior to line pressure testing. # Perform destructive test such as pneumatic leak test on reinforcing pads, pontoon blocks, roof and Completed tanks. # Perform orientation, dimensional and fit-up inspection prior to any welding activiteis. Check for any Pre-weld requirement such as preheating, joint preparation and welder’s qualification. # Conduct final dimensional inspections such as Straightness, Peaking, Banding, Plumbness, Roundness And Tank Settlement Inspection in accordance to applicable codes and client’s related specifications. # In-process welding surveillance to verify compliance to qualified WPS, the electrode used, the Technique, inter-pass cleaning, temperature and heat maintenance. # Conduct weld quality control inspection to all completed weld seam for any surface discontinuities And other visible defect evaluation. Also, monitoring of post-weld heat treatment/stress relieving as Required. # Advise specifications on the acts of negligence by fiiters and welders with respect to poor workmanship, Technique and safety.
  • 3. 3 TRAINING / COURSE: ΘWelding School at BLK Jakarta, Indonesia, 1994 and certified. ΘWelding Inspector School at Biro Klasifikasi Indonesia Jakarta, Indonesia, November 04 to December 13, 2008 and certified. ΘIn house training of Penetrant Testing ASNT level II at Toyo Kanetsu Indonesia, December 2011 and certified ΘBasic training course on radiation safety and monitoring in X-ray fluorescence, Singapore. August 26, 2011 and certified ΘEnglish Course. ΘSafety Training and Supervisor Training Skill for Incident and Injury Free (IIF) Program. WORK EXPERIENCE: 1. PT. TOYO KANETSU INDONESIA. As WELDING / QC INSPECTOR LEAD. € WWT Project. LNG Tangguh, Papua. From October 22, 2010 to March 15, 2011. € Pre-assembly LNG Tank (140.000 M3) , for Queensland LNG project, Australia. From April 17, 2011 to February 11, 2012. € LNG Tank (170.000 M3), for Donggi Senoro LNG project, Central Sulawesi. From March 10, 2012 to Mei 20, 2014. € Additional Naphtha Storage Tank, for PT. Chandra Asri Petrochemical, Anyer – Banten. From June 12, 2014 to April 15, 2015. € VCM Storage Receiver Phase VI Project, for PT. Asahimas Chemical., Anyer – Banten. From April 20, 2015 to November 02, 2015 2. PT. ACECE SARANA PRIMA. As WELDING / QC INSPECTOR. €FireFighting Pipe Line for PLTU 3 Banten Project (Coal-Fired Power Plant) Teluk Naga, Tangerang. From February 15, 2010 to October 20, 2010. 3. SHI QATAR Co. W.L.L. As QC INSPECTOR. € Dolphin Upstream and Compression Facilities Project. Raslaffan, State of Qatar. From December 24. 2004 to June 30, 2006. € 5 unit LNG tanks (140.000 M3) for Qatar Gas II LNG Onshore Facilities Project. Raslaffan, State of Qatar. From August 20, 2006 to June 20, 2008. € Privatization of Cleaning Service and Waste Treatment Facilities Project. Mesaeed, State of Qatar.
  • 4. 4 From July 21, 2008 to December 25, 2009. 4. SAMSUNG CORPORATION. As WELDER SMAW & SAW. € LPG Tanks Qatar Petroleum Project, Mesaeed, State of Qatar. From March 7, 2003 to January 18, 2004. 5. SAMSUNG HEAVY INDUSTRIES Co. Ltd. As WELDER SMAW & SAW. € Yukong Storage Tanker Project, South Korea. from May 23, 1996 to December 20, 1997. € Formosa Heavy Industries Project, Taiwan ROC.From July, 1998 to July, 1999. € Nodco Refinery Project, Mesaeed, State of Qatar. From June 4, 2000 to September 30, 2000. 6. PT. CBI INDONESIA. As WELDER SMAW. Following many project with PT CBI INDONESIA since July 26, 1993 to March 23 1996. Sincerely yours, Jatmika Budi Santosa