Rita Thakur
DOB: 14th
January 1988
Qualification: B.Tech (Power Electrical), 2011
Total experience: 4 years 5 months
Mobile number: +91-9990295933
E-mail: rtthakur88@gmail.com
Objective
Electrical engineering professional with diversified experience and knowledge of principles
and practices of electrical engineering. Seeking a position which offers utilization of my skills,
ability and enhancement of professional growth while adding value to the organization.
Skills and Software Proficiency
MS Office, , Excel, Word,
Power-point Proficient
ETAP Basic
CGLUX, LUXICON Proficient
Work Experience
 Working as an Electrical Engineer in SK Engineering & Construction, Gurgaon since July’11
till date.
Project : FORT HILLS SECONDARY EXTRACTION (FROM SKEC SEOUL)
Period : April 2014 to till Date (Deputed to Seoul for 8 Months)
Client : Suncor
Position : RE (Responsible engineer)
Activities:
 Preparation of typical schematics for MV, LV motors and VFDs.
 Preparation of Protection Narrative Datasheet of 600V LV SWGR including GE C60
relay (Incomer & Tie Protection), B30 relay (For LV Transformer and Incomer
Differential Protection), SE330 (for Ground fault), ETU (Entelligurad*G trip unit for
Incomer & Outgoing Breaker Trip units). Protection narrative include complete details
of Protection zone of relay, VPs, Protected Equipment, SC Levels, Protection Setting,
Applicable TCCC curves, DI/DOs, Goose Messaging (Publishing & Subscribing).
Relay setting data input in GE Enervista software.
 Preparation of Typical MV, LV Motor Schematics. Checking & review of final vendor
schematics.
Page 2 of 4
 Technical Bid Evaluation of Pre-fabricated Blast resistant Substation (E-house). FHSE
Project included five number of E-House (four Blast resistant, one non-blast resistant),
where each E-House Module consisted of four split sections. TBE of these E-Houses
included inter-discipline co-ordination and vendor co-ordination to meet the delivery
and schedule. All Electrical equipment including internal wiring were installed inside
E-House in E-House Vendor Shop which were then shipped to Site and external
connection along with split section wiring was done at site.
 Preparation of Purchase Specification of E-House including inter discipline co-
ordination. Also among five E-Houses four E-Houses were Blast resistant type so
needed Blast resistant guarantee from authorized organization (like Atkins) for Blast
proof design.
 Handling all E-Houses issues during TBE & PO stage and preparation of RFIs during
initial stage of VPs.
 Support in preparation of EPN (electrical protection network) architectural drawing and
EPN Cable schedule for Communication of Electrical equipment.
Project : Hanam CHP Project (1 x 400MW)
Period : 2013 – 2014
Client : SKE&S
Position : RE
Activities:
 Supported in preparation of ITB Summary.
 Supported my Seoul counterpart in preparation of EDG MR.
 Support to Seoul counterpart in preparation of Power Transformer MR.
 Modelling preliminary Key SLD model in ETAP software.
 Lighting Calculation for indoor & outdoor areas via Luxicon software.
 Preparation of DC & UPS sizing calculation and gathering load information from other
discipline.
 Support in EDG sizing calculation
Project : PACCO Power Plant (1 x 400MW
Period : Nov 2012 – Mar 2013
Client : Minera Panama
Position : RE
Activities:
 Lighting BOM Validation
 Value Engineering & suggested some cost saving idea.
 Review of MV & LV SLDs.
 Review of Cable sizing calculation
Page 3 of 4
Project : IRPC CHP II (Proposal 2 x 120MW)
Period : 2012-13
Client : IRPC Public Co.
Position : RE
Activities:
 Prepared ITB Summary and clarification Sheet
 Prepared MR of lighting, DC & UPS System
 Prepared BOM of Lighting
 Prepared Lighting Calculation on CG LUX
Project : Jordan Oil shale Fired CFBC Power Plant (Proposal 2 x 230MW)
Period : 2012
Client : Attarat Power Co.
Position : RE
Activities:
 Prepared ITB Summary and clarification Sheet
 Prepared MR of lighting, Paging, PA & Communication
 Prepared BOM of Lighting & Communication
 Prepared Lighting Calculation on excel and Luxicon
 Prepared MR of EDG
Project : Ashuganj 450 MW CCPP (Proposal)
Period : Sept 2011 – Feb 2012
Client : Ashuganj Power Station Company Ltd. (APSCL)
Position : GET
Activities:
 Supported my team in preparing ITB summary
 Supported my team in preparing Electrical Design Criteria
 Prepared MR (Power transformer, Emergency Diesel generator)
Page 4 of 4
SKEC, South Korea, Seoul (3 months on deputation)
Project : Hanam CHP Proposal
Client : SKE&S
Position : Graduate Engineer Trainee (2012)
Activities:
 Design calculation of EDG and Power Transformer under guidance
 Carried out IEES Electrical Load preparation
 Load list preparation
This GET Training also included Site Visit to ULSAN REFINARY(1 week) with specific
focus on Pipe Rack, vessels, Motor & Pumps and Control Room, Site visit of Oseong
(Combined cycle power plant) with specific focus on Generator, GCB, Switchgear, IPBD,
Transformer, Cable trays, Control Room and visit To Kori Nuclear Power plant
Education Qualification
B.Tech (Power Electrical-2011) National Power Training Institute (NPTI), GGSIPU
(76%)
Senior Secondary School
Examination (2005)
From K.V.No.2 School, APS Colony Delhi Cantt.
(C.B.S.E)
(75%)
Secondary School Examination
(2003)
From K.V.NO.1 Jodhpur(C.B.S.E)
(86%)

More Related Content

What's hot

What's hot (19)

Resume David A Long
Resume David A LongResume David A Long
Resume David A Long
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
 
Resume for Electrical design engineer
Resume for Electrical design engineerResume for Electrical design engineer
Resume for Electrical design engineer
 
Resume
ResumeResume
Resume
 
Vignesh_Sr.Elec Designer
Vignesh_Sr.Elec DesignerVignesh_Sr.Elec Designer
Vignesh_Sr.Elec Designer
 
MRIDUL_RESUME_ELECTRICAL ENGINEER.
MRIDUL_RESUME_ELECTRICAL ENGINEER.MRIDUL_RESUME_ELECTRICAL ENGINEER.
MRIDUL_RESUME_ELECTRICAL ENGINEER.
 
JIYUAN FAN resume
JIYUAN FAN resumeJIYUAN FAN resume
JIYUAN FAN resume
 
SHAMIM
SHAMIMSHAMIM
SHAMIM
 
RESUME_ MANJARI DUTTA
RESUME_ MANJARI DUTTARESUME_ MANJARI DUTTA
RESUME_ MANJARI DUTTA
 
girish_cv
girish_cvgirish_cv
girish_cv
 
Tom's Resume 9-1-16
Tom's Resume 9-1-16Tom's Resume 9-1-16
Tom's Resume 9-1-16
 
Summer training l&t
Summer training l&tSummer training l&t
Summer training l&t
 
Suresh Resume
Suresh ResumeSuresh Resume
Suresh Resume
 
Amol bakane update rockstar
Amol bakane    update rockstarAmol bakane    update rockstar
Amol bakane update rockstar
 
Resume
ResumeResume
Resume
 
Nisarg updated resume
Nisarg updated resumeNisarg updated resume
Nisarg updated resume
 
RAJPAL @cv
RAJPAL @cvRAJPAL @cv
RAJPAL @cv
 
Engr Wasim Khan CV
Engr Wasim Khan CVEngr Wasim Khan CV
Engr Wasim Khan CV
 
MI cv
MI cvMI cv
MI cv
 

Similar to Rita Thakur Resume

VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEvijayabaskar v
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBala G
 
asif cv aijade new 2014 December
asif cv aijade new 2014 Decemberasif cv aijade new 2014 December
asif cv aijade new 2014 DecemberSyed Asif Ali
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15Santosh Singh
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineerIram shahzad khan
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)Reddy Premnath
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshitRixit Patel
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 
Resume mju 03.10.2016
Resume mju 03.10.2016Resume mju 03.10.2016
Resume mju 03.10.2016Jashim Pd-2
 

Similar to Rita Thakur Resume (20)

CV_Rachmad Arif
CV_Rachmad ArifCV_Rachmad Arif
CV_Rachmad Arif
 
G K M Jafar_UAE
G K M Jafar_UAEG K M Jafar_UAE
G K M Jafar_UAE
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
Sudarsang electrical designer
Sudarsang electrical designerSudarsang electrical designer
Sudarsang electrical designer
 
Balaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical DesignerBalaguru.G_ Senior Electrical Designer
Balaguru.G_ Senior Electrical Designer
 
asif cv aijade new 2014 December
asif cv aijade new 2014 Decemberasif cv aijade new 2014 December
asif cv aijade new 2014 December
 
CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15CURRICULUM VITAE 25.05.15
CURRICULUM VITAE 25.05.15
 
khalid obaidullah resume
khalid obaidullah resumekhalid obaidullah resume
khalid obaidullah resume
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
Ferdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CVFerdinand Hong Boon Pun CV
Ferdinand Hong Boon Pun CV
 
Mohamed rabee cv
Mohamed rabee cvMohamed rabee cv
Mohamed rabee cv
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
Resume
Resume Resume
Resume
 
Resume
ResumeResume
Resume
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshit
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
Resume mju 03.10.2016
Resume mju 03.10.2016Resume mju 03.10.2016
Resume mju 03.10.2016
 
MujibCV
MujibCVMujibCV
MujibCV
 
MANZAR_CVH
MANZAR_CVHMANZAR_CVH
MANZAR_CVH
 

Rita Thakur Resume

  • 1. Page 1 of 4 Rita Thakur DOB: 14th January 1988 Qualification: B.Tech (Power Electrical), 2011 Total experience: 4 years 5 months Mobile number: +91-9990295933 E-mail: rtthakur88@gmail.com Objective Electrical engineering professional with diversified experience and knowledge of principles and practices of electrical engineering. Seeking a position which offers utilization of my skills, ability and enhancement of professional growth while adding value to the organization. Skills and Software Proficiency MS Office, , Excel, Word, Power-point Proficient ETAP Basic CGLUX, LUXICON Proficient Work Experience  Working as an Electrical Engineer in SK Engineering & Construction, Gurgaon since July’11 till date. Project : FORT HILLS SECONDARY EXTRACTION (FROM SKEC SEOUL) Period : April 2014 to till Date (Deputed to Seoul for 8 Months) Client : Suncor Position : RE (Responsible engineer) Activities:  Preparation of typical schematics for MV, LV motors and VFDs.  Preparation of Protection Narrative Datasheet of 600V LV SWGR including GE C60 relay (Incomer & Tie Protection), B30 relay (For LV Transformer and Incomer Differential Protection), SE330 (for Ground fault), ETU (Entelligurad*G trip unit for Incomer & Outgoing Breaker Trip units). Protection narrative include complete details of Protection zone of relay, VPs, Protected Equipment, SC Levels, Protection Setting, Applicable TCCC curves, DI/DOs, Goose Messaging (Publishing & Subscribing). Relay setting data input in GE Enervista software.  Preparation of Typical MV, LV Motor Schematics. Checking & review of final vendor schematics.
  • 2. Page 2 of 4  Technical Bid Evaluation of Pre-fabricated Blast resistant Substation (E-house). FHSE Project included five number of E-House (four Blast resistant, one non-blast resistant), where each E-House Module consisted of four split sections. TBE of these E-Houses included inter-discipline co-ordination and vendor co-ordination to meet the delivery and schedule. All Electrical equipment including internal wiring were installed inside E-House in E-House Vendor Shop which were then shipped to Site and external connection along with split section wiring was done at site.  Preparation of Purchase Specification of E-House including inter discipline co- ordination. Also among five E-Houses four E-Houses were Blast resistant type so needed Blast resistant guarantee from authorized organization (like Atkins) for Blast proof design.  Handling all E-Houses issues during TBE & PO stage and preparation of RFIs during initial stage of VPs.  Support in preparation of EPN (electrical protection network) architectural drawing and EPN Cable schedule for Communication of Electrical equipment. Project : Hanam CHP Project (1 x 400MW) Period : 2013 – 2014 Client : SKE&S Position : RE Activities:  Supported in preparation of ITB Summary.  Supported my Seoul counterpart in preparation of EDG MR.  Support to Seoul counterpart in preparation of Power Transformer MR.  Modelling preliminary Key SLD model in ETAP software.  Lighting Calculation for indoor & outdoor areas via Luxicon software.  Preparation of DC & UPS sizing calculation and gathering load information from other discipline.  Support in EDG sizing calculation Project : PACCO Power Plant (1 x 400MW Period : Nov 2012 – Mar 2013 Client : Minera Panama Position : RE Activities:  Lighting BOM Validation  Value Engineering & suggested some cost saving idea.  Review of MV & LV SLDs.  Review of Cable sizing calculation
  • 3. Page 3 of 4 Project : IRPC CHP II (Proposal 2 x 120MW) Period : 2012-13 Client : IRPC Public Co. Position : RE Activities:  Prepared ITB Summary and clarification Sheet  Prepared MR of lighting, DC & UPS System  Prepared BOM of Lighting  Prepared Lighting Calculation on CG LUX Project : Jordan Oil shale Fired CFBC Power Plant (Proposal 2 x 230MW) Period : 2012 Client : Attarat Power Co. Position : RE Activities:  Prepared ITB Summary and clarification Sheet  Prepared MR of lighting, Paging, PA & Communication  Prepared BOM of Lighting & Communication  Prepared Lighting Calculation on excel and Luxicon  Prepared MR of EDG Project : Ashuganj 450 MW CCPP (Proposal) Period : Sept 2011 – Feb 2012 Client : Ashuganj Power Station Company Ltd. (APSCL) Position : GET Activities:  Supported my team in preparing ITB summary  Supported my team in preparing Electrical Design Criteria  Prepared MR (Power transformer, Emergency Diesel generator)
  • 4. Page 4 of 4 SKEC, South Korea, Seoul (3 months on deputation) Project : Hanam CHP Proposal Client : SKE&S Position : Graduate Engineer Trainee (2012) Activities:  Design calculation of EDG and Power Transformer under guidance  Carried out IEES Electrical Load preparation  Load list preparation This GET Training also included Site Visit to ULSAN REFINARY(1 week) with specific focus on Pipe Rack, vessels, Motor & Pumps and Control Room, Site visit of Oseong (Combined cycle power plant) with specific focus on Generator, GCB, Switchgear, IPBD, Transformer, Cable trays, Control Room and visit To Kori Nuclear Power plant Education Qualification B.Tech (Power Electrical-2011) National Power Training Institute (NPTI), GGSIPU (76%) Senior Secondary School Examination (2005) From K.V.No.2 School, APS Colony Delhi Cantt. (C.B.S.E) (75%) Secondary School Examination (2003) From K.V.NO.1 Jodhpur(C.B.S.E) (86%)