1. Page 1 of 4
Rita Thakur
DOB: 14th
January 1988
Qualification: B.Tech (Power Electrical), 2011
Total experience: 4 years 5 months
Mobile number: +91-9990295933
E-mail: rtthakur88@gmail.com
Objective
Electrical engineering professional with diversified experience and knowledge of principles
and practices of electrical engineering. Seeking a position which offers utilization of my skills,
ability and enhancement of professional growth while adding value to the organization.
Skills and Software Proficiency
MS Office, , Excel, Word,
Power-point Proficient
ETAP Basic
CGLUX, LUXICON Proficient
Work Experience
Working as an Electrical Engineer in SK Engineering & Construction, Gurgaon since July’11
till date.
Project : FORT HILLS SECONDARY EXTRACTION (FROM SKEC SEOUL)
Period : April 2014 to till Date (Deputed to Seoul for 8 Months)
Client : Suncor
Position : RE (Responsible engineer)
Activities:
Preparation of typical schematics for MV, LV motors and VFDs.
Preparation of Protection Narrative Datasheet of 600V LV SWGR including GE C60
relay (Incomer & Tie Protection), B30 relay (For LV Transformer and Incomer
Differential Protection), SE330 (for Ground fault), ETU (Entelligurad*G trip unit for
Incomer & Outgoing Breaker Trip units). Protection narrative include complete details
of Protection zone of relay, VPs, Protected Equipment, SC Levels, Protection Setting,
Applicable TCCC curves, DI/DOs, Goose Messaging (Publishing & Subscribing).
Relay setting data input in GE Enervista software.
Preparation of Typical MV, LV Motor Schematics. Checking & review of final vendor
schematics.
2. Page 2 of 4
Technical Bid Evaluation of Pre-fabricated Blast resistant Substation (E-house). FHSE
Project included five number of E-House (four Blast resistant, one non-blast resistant),
where each E-House Module consisted of four split sections. TBE of these E-Houses
included inter-discipline co-ordination and vendor co-ordination to meet the delivery
and schedule. All Electrical equipment including internal wiring were installed inside
E-House in E-House Vendor Shop which were then shipped to Site and external
connection along with split section wiring was done at site.
Preparation of Purchase Specification of E-House including inter discipline co-
ordination. Also among five E-Houses four E-Houses were Blast resistant type so
needed Blast resistant guarantee from authorized organization (like Atkins) for Blast
proof design.
Handling all E-Houses issues during TBE & PO stage and preparation of RFIs during
initial stage of VPs.
Support in preparation of EPN (electrical protection network) architectural drawing and
EPN Cable schedule for Communication of Electrical equipment.
Project : Hanam CHP Project (1 x 400MW)
Period : 2013 – 2014
Client : SKE&S
Position : RE
Activities:
Supported in preparation of ITB Summary.
Supported my Seoul counterpart in preparation of EDG MR.
Support to Seoul counterpart in preparation of Power Transformer MR.
Modelling preliminary Key SLD model in ETAP software.
Lighting Calculation for indoor & outdoor areas via Luxicon software.
Preparation of DC & UPS sizing calculation and gathering load information from other
discipline.
Support in EDG sizing calculation
Project : PACCO Power Plant (1 x 400MW
Period : Nov 2012 – Mar 2013
Client : Minera Panama
Position : RE
Activities:
Lighting BOM Validation
Value Engineering & suggested some cost saving idea.
Review of MV & LV SLDs.
Review of Cable sizing calculation
3. Page 3 of 4
Project : IRPC CHP II (Proposal 2 x 120MW)
Period : 2012-13
Client : IRPC Public Co.
Position : RE
Activities:
Prepared ITB Summary and clarification Sheet
Prepared MR of lighting, DC & UPS System
Prepared BOM of Lighting
Prepared Lighting Calculation on CG LUX
Project : Jordan Oil shale Fired CFBC Power Plant (Proposal 2 x 230MW)
Period : 2012
Client : Attarat Power Co.
Position : RE
Activities:
Prepared ITB Summary and clarification Sheet
Prepared MR of lighting, Paging, PA & Communication
Prepared BOM of Lighting & Communication
Prepared Lighting Calculation on excel and Luxicon
Prepared MR of EDG
Project : Ashuganj 450 MW CCPP (Proposal)
Period : Sept 2011 – Feb 2012
Client : Ashuganj Power Station Company Ltd. (APSCL)
Position : GET
Activities:
Supported my team in preparing ITB summary
Supported my team in preparing Electrical Design Criteria
Prepared MR (Power transformer, Emergency Diesel generator)
4. Page 4 of 4
SKEC, South Korea, Seoul (3 months on deputation)
Project : Hanam CHP Proposal
Client : SKE&S
Position : Graduate Engineer Trainee (2012)
Activities:
Design calculation of EDG and Power Transformer under guidance
Carried out IEES Electrical Load preparation
Load list preparation
This GET Training also included Site Visit to ULSAN REFINARY(1 week) with specific
focus on Pipe Rack, vessels, Motor & Pumps and Control Room, Site visit of Oseong
(Combined cycle power plant) with specific focus on Generator, GCB, Switchgear, IPBD,
Transformer, Cable trays, Control Room and visit To Kori Nuclear Power plant
Education Qualification
B.Tech (Power Electrical-2011) National Power Training Institute (NPTI), GGSIPU
(76%)
Senior Secondary School
Examination (2005)
From K.V.No.2 School, APS Colony Delhi Cantt.
(C.B.S.E)
(75%)
Secondary School Examination
(2003)
From K.V.NO.1 Jodhpur(C.B.S.E)
(86%)