FIRST SOLAR (M) SDN BHD:
Staff Engineer
2014 – Present
Process/KPI Achievements (14/16):
- Meeting ramp goal target of 30% ramp goal quarterly and increased plating
throughput to 2660 wph. Collaborate closely with equipment team for MECO
plating tool retrofit activities.
- Reduced silver complex chemistry replenishment by 10X. Implemented the 1st
DOR add back to the silver sump tank, to avoid precious silver metal lost during
production.
- Set up all the required analysis for plating process. Train technicians on how to
perform the chemical analysis, analytical tool troubleshooting and maintenance
for plating process sustaining.
- Achieve tool uptime > 85% & yield > 95% across all quarters respectively.
- Meeting goal for zero case reported for repeated NCP case with similar root
cause.
- Implemented an affective equipment sign off process by participating in PPE
assessments, participate in JHA (Job Hazard Assessment) reviews or work with
EHS to complete all Safety Level (SL1, SL2, and SL3) for the equipments in the
factory.
- Actively participate in Safety Walk and Talks (SWAT); involved in factories ERT or
Communicate Personal and Safety issues through the near miss reporting system.
- Completed all required safety related training such as Hazcom, respirator
training.
- Engage in several projects on Yield (mechanical/process > 95%), Cost (Cell
Processing OpEx to $0.40 per wafer), Throughput (2000 uph net) Improvement
and Variance Reduction (tool matching).
- Work as team with cross functional team to produce first production line solar
cell with efficiency of > 20% by Nov 30th 2014.
- Supervise overall plating process/daily line issue application for line sustaining as
a plating process owner for continuous production line run of 50,000 cells with
cumulative yield > 90%.
- Coordinate with Meco vendor and other cross functional team to ensure the
Meco plater release on targeted tool release date.
- Coordinate leaching and chemicals charge in activities to ensure the plating tool
is ready for process optimization.
- Guide to Meco equipment owner to complete the SL1, SL2 sign off for the tool
start up readiness.
- Coordinate with metrology vendors (ECI technology, Agilent, Sigma, Mettler
Toledo) on tool installation, tool commissioning for chemicals bath stability and
performance monitoring and sustaining.
- Plan, execute and coordinate with manufacturing team for setting up plating lab
which includes fume hood installation, chemicals storage, lab apparatus storage
layout planning and set up coordination.
- Manage a group of manufacturing technicians in the shift. Lead and guide them
in daily process engineering and troubleshooting activities. Train and certify
process technicians, continuously develop their competencies to handle
production issues.

More Related Content

What's hot

What's hot (7)

Steve Isaac CV
Steve Isaac  CVSteve Isaac  CV
Steve Isaac CV
 
Gavin Murray new layout Resume
Gavin Murray new layout ResumeGavin Murray new layout Resume
Gavin Murray new layout Resume
 
Gary Clark Riley Resume
Gary Clark Riley ResumeGary Clark Riley Resume
Gary Clark Riley Resume
 
CV20170111
CV20170111CV20170111
CV20170111
 
ALameResume
ALameResumeALameResume
ALameResume
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Mohamed gamal cv
Mohamed gamal cvMohamed gamal cv
Mohamed gamal cv
 

Similar to LinkedIn – Staff Engineer at First Solar

Similar to LinkedIn – Staff Engineer at First Solar (20)

Eng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerEng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments Engineer
 
Muayad- CV
Muayad- CVMuayad- CV
Muayad- CV
 
Hammad Ashraf CV
Hammad Ashraf CVHammad Ashraf CV
Hammad Ashraf CV
 
Anupama Kutty Resume
Anupama Kutty ResumeAnupama Kutty Resume
Anupama Kutty Resume
 
Danilo B. Lim
Danilo B. LimDanilo B. Lim
Danilo B. Lim
 
rahul new
rahul newrahul new
rahul new
 
Asik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali Battery Production and Maintenance
Asik Ali Battery Production and Maintenance
 
Armin Camantigue Lumanglas_2014
Armin Camantigue Lumanglas_2014Armin Camantigue Lumanglas_2014
Armin Camantigue Lumanglas_2014
 
Armin Camantigue Lumanglas_2014
Armin Camantigue Lumanglas_2014Armin Camantigue Lumanglas_2014
Armin Camantigue Lumanglas_2014
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
 
Kalle Mallikarjuna
Kalle MallikarjunaKalle Mallikarjuna
Kalle Mallikarjuna
 
Resume 032515
Resume 032515Resume 032515
Resume 032515
 
resume-april-2016
resume-april-2016resume-april-2016
resume-april-2016
 
New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)New Resume Francis Ellivera.. (1)
New Resume Francis Ellivera.. (1)
 
GSL_Resume
GSL_ResumeGSL_Resume
GSL_Resume
 
Updated CV
Updated CVUpdated CV
Updated CV
 
mohammed ahmed awaad final
mohammed ahmed awaad finalmohammed ahmed awaad final
mohammed ahmed awaad final
 
Bader Al-Kaabi C.V
Bader Al-Kaabi C.VBader Al-Kaabi C.V
Bader Al-Kaabi C.V
 
CV
CVCV
CV
 
Zackhayer3
Zackhayer3Zackhayer3
Zackhayer3
 

More from Jan Yeong Koay

LinkedIn – Engineer I at Infineon Technologies
LinkedIn – Engineer I at Infineon TechnologiesLinkedIn – Engineer I at Infineon Technologies
LinkedIn – Engineer I at Infineon TechnologiesJan Yeong Koay
 
LinkedIn – Engineer II at Infineon Technologies
LinkedIn – Engineer II at Infineon TechnologiesLinkedIn – Engineer II at Infineon Technologies
LinkedIn – Engineer II at Infineon TechnologiesJan Yeong Koay
 
LinkedIn – Career Summary
LinkedIn – Career SummaryLinkedIn – Career Summary
LinkedIn – Career SummaryJan Yeong Koay
 
Degree of Bachelor of Science
Degree of Bachelor of ScienceDegree of Bachelor of Science
Degree of Bachelor of ScienceJan Yeong Koay
 
Degree of Master of Science
Degree of Master of ScienceDegree of Master of Science
Degree of Master of ScienceJan Yeong Koay
 
ThinSolidFilms 517 (2009) 5298–5300
ThinSolidFilms 517 (2009) 5298–5300ThinSolidFilms 517 (2009) 5298–5300
ThinSolidFilms 517 (2009) 5298–5300Jan Yeong Koay
 

More from Jan Yeong Koay (6)

LinkedIn – Engineer I at Infineon Technologies
LinkedIn – Engineer I at Infineon TechnologiesLinkedIn – Engineer I at Infineon Technologies
LinkedIn – Engineer I at Infineon Technologies
 
LinkedIn – Engineer II at Infineon Technologies
LinkedIn – Engineer II at Infineon TechnologiesLinkedIn – Engineer II at Infineon Technologies
LinkedIn – Engineer II at Infineon Technologies
 
LinkedIn – Career Summary
LinkedIn – Career SummaryLinkedIn – Career Summary
LinkedIn – Career Summary
 
Degree of Bachelor of Science
Degree of Bachelor of ScienceDegree of Bachelor of Science
Degree of Bachelor of Science
 
Degree of Master of Science
Degree of Master of ScienceDegree of Master of Science
Degree of Master of Science
 
ThinSolidFilms 517 (2009) 5298–5300
ThinSolidFilms 517 (2009) 5298–5300ThinSolidFilms 517 (2009) 5298–5300
ThinSolidFilms 517 (2009) 5298–5300
 

LinkedIn – Staff Engineer at First Solar

  • 1. FIRST SOLAR (M) SDN BHD: Staff Engineer 2014 – Present Process/KPI Achievements (14/16): - Meeting ramp goal target of 30% ramp goal quarterly and increased plating throughput to 2660 wph. Collaborate closely with equipment team for MECO plating tool retrofit activities. - Reduced silver complex chemistry replenishment by 10X. Implemented the 1st DOR add back to the silver sump tank, to avoid precious silver metal lost during production. - Set up all the required analysis for plating process. Train technicians on how to perform the chemical analysis, analytical tool troubleshooting and maintenance for plating process sustaining. - Achieve tool uptime > 85% & yield > 95% across all quarters respectively. - Meeting goal for zero case reported for repeated NCP case with similar root cause. - Implemented an affective equipment sign off process by participating in PPE assessments, participate in JHA (Job Hazard Assessment) reviews or work with EHS to complete all Safety Level (SL1, SL2, and SL3) for the equipments in the factory. - Actively participate in Safety Walk and Talks (SWAT); involved in factories ERT or Communicate Personal and Safety issues through the near miss reporting system. - Completed all required safety related training such as Hazcom, respirator training. - Engage in several projects on Yield (mechanical/process > 95%), Cost (Cell Processing OpEx to $0.40 per wafer), Throughput (2000 uph net) Improvement and Variance Reduction (tool matching). - Work as team with cross functional team to produce first production line solar cell with efficiency of > 20% by Nov 30th 2014. - Supervise overall plating process/daily line issue application for line sustaining as a plating process owner for continuous production line run of 50,000 cells with cumulative yield > 90%. - Coordinate with Meco vendor and other cross functional team to ensure the Meco plater release on targeted tool release date. - Coordinate leaching and chemicals charge in activities to ensure the plating tool is ready for process optimization. - Guide to Meco equipment owner to complete the SL1, SL2 sign off for the tool start up readiness. - Coordinate with metrology vendors (ECI technology, Agilent, Sigma, Mettler Toledo) on tool installation, tool commissioning for chemicals bath stability and performance monitoring and sustaining.
  • 2. - Plan, execute and coordinate with manufacturing team for setting up plating lab which includes fume hood installation, chemicals storage, lab apparatus storage layout planning and set up coordination. - Manage a group of manufacturing technicians in the shift. Lead and guide them in daily process engineering and troubleshooting activities. Train and certify process technicians, continuously develop their competencies to handle production issues.