SlideShare a Scribd company logo
1 of 23
Download to read offline
CABLE LAID SLINGS
By:
Cor Dekker
Inspection & QHSE
Manager
IMCA
INSPECTION, ACCEPTATION AND DISCARD
CRITERIA
IMCA M179 Revision Sub-workgroup
7 October 2013
4.2 Revision of IMCA M179
Guidance on the use of cable laid Slings and Grommets
PROPOSE DRAFT TEXST FOR INSPECTION AND DISCARD CRITERIA
Responsibility – C. Dekker
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
IMCA
9 July 2014
C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
NOW
Ch. 9. Inspection and Thorough Examination
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
NOW
Appendix 5
Assessment of the condition of the
sling or grommet and discard
guidance
Which is derived from
ISO 8792 - 1986
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
Art. 5
Inspection, thorough examination
and discard criteria
Content is the same as in
IMCA 179 with minor
textual changes
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
• Interpretations of the text is difficult
• Depending on: - employment
(Independent inspector, owners representative)
- background
(Steel wire rope specialist, steel wire rope user)
- time path (objectivity)
(Material and/or time available for replacement)
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
IMCA
9 July 2014
Examples
REJECT / ACCEPT
According IMCA 179/ISO 8792
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION
OF THE ROPE
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION
OF THE ROPE
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
The other side
DISTORTION
OF THE ROPE
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
Displacement
> D
DISTORTION
OF THE ROPE
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION
OF THE ROPE
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie
Core protrusion
C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION
OF THE ROPE
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie
Core protrusion
C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION
OF THE ROPE
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie
Core protrusion
C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION
OF THE ROPE
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
DISTORTION
OF THE ROPE
Rope distortion
Broken wires
Used sling
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
LOCALISED
BREAKS
Wear & Tear
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
Valley breaking
LOCALISED
BREAKS
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
CORROSION
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
Tail ends < 3xD
TERMINATION
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
LOCALISED
BREAKS
Broken core rope
IMCA
9 July 2014
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie
IMCA
INSPECTION, ACCEPTATION AND REJECTION CRITERIA
Undistorted rope
< 15xD
TERMINATION
IMCA
9 July 2014
C. Dekker
QUESTIONS ?
27-06-2014 C. Dekker
IMCA
9 July 2014
C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie

More Related Content

What's hot (6)

WH Scott - Load Testing
WH Scott - Load TestingWH Scott - Load Testing
WH Scott - Load Testing
 
ARUN NARGUN
ARUN NARGUNARUN NARGUN
ARUN NARGUN
 
Training history
Training historyTraining history
Training history
 
CV.2016
CV.2016CV.2016
CV.2016
 
Jeffrey Wood
Jeffrey WoodJeffrey Wood
Jeffrey Wood
 
STUDIO NAVALE, General Presentation, January 2015
STUDIO NAVALE, General Presentation, January 2015STUDIO NAVALE, General Presentation, January 2015
STUDIO NAVALE, General Presentation, January 2015
 

Similar to IMCA Inspection Acceptance Discard-criteria rev.3

Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV New
Steven Wilson
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
Dylan Olivier
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
George Ward
 
abridged CV 2015 Feb
abridged CV 2015 Febabridged CV 2015 Feb
abridged CV 2015 Feb
Mark Howell
 

Similar to IMCA Inspection Acceptance Discard-criteria rev.3 (20)

RAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEERRAMASAMY NACE CP LEVEL II ENGINEER
RAMASAMY NACE CP LEVEL II ENGINEER
 
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
 
ROV Pilot Tech
ROV Pilot TechROV Pilot Tech
ROV Pilot Tech
 
doss sri cv
doss sri cvdoss sri cv
doss sri cv
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 
Steven Wilson CV New
Steven Wilson CV NewSteven Wilson CV New
Steven Wilson CV New
 
What is the ASME Code and Why is it Important?
What is the ASME Code and Why is it Important?What is the ASME Code and Why is it Important?
What is the ASME Code and Why is it Important?
 
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
OFFSHORE CV DYLAN OLIVIER UPDATE Oct 2014
 
Arun Resume .
Arun Resume .Arun Resume .
Arun Resume .
 
2017 cranes_hoists_and_elevators_ codes_regulations.pdf
2017 cranes_hoists_and_elevators_ codes_regulations.pdf2017 cranes_hoists_and_elevators_ codes_regulations.pdf
2017 cranes_hoists_and_elevators_ codes_regulations.pdf
 
Khairul Amilin CV
Khairul Amilin CVKhairul Amilin CV
Khairul Amilin CV
 
Ward, George Resume
Ward, George ResumeWard, George Resume
Ward, George Resume
 
abridged CV 2015 Feb
abridged CV 2015 Febabridged CV 2015 Feb
abridged CV 2015 Feb
 
Dayton Griffin - Current Status and Ongoing Development of Wind Turbine Blade...
Dayton Griffin - Current Status and Ongoing Development of Wind Turbine Blade...Dayton Griffin - Current Status and Ongoing Development of Wind Turbine Blade...
Dayton Griffin - Current Status and Ongoing Development of Wind Turbine Blade...
 
KOM 15082014 HUC
KOM 15082014 HUCKOM 15082014 HUC
KOM 15082014 HUC
 
Lead Inspection Engineer CV
Lead Inspection Engineer CVLead Inspection Engineer CV
Lead Inspection Engineer CV
 
MNC-14
MNC-14MNC-14
MNC-14
 
DNVGL_ST_N0001 FULL.pdf
DNVGL_ST_N0001 FULL.pdfDNVGL_ST_N0001 FULL.pdf
DNVGL_ST_N0001 FULL.pdf
 
ABB Consulting Aberdeen
ABB Consulting AberdeenABB Consulting Aberdeen
ABB Consulting Aberdeen
 

IMCA Inspection Acceptance Discard-criteria rev.3

  • 1. CABLE LAID SLINGS By: Cor Dekker Inspection & QHSE Manager IMCA INSPECTION, ACCEPTATION AND DISCARD CRITERIA
  • 2. IMCA M179 Revision Sub-workgroup 7 October 2013 4.2 Revision of IMCA M179 Guidance on the use of cable laid Slings and Grommets PROPOSE DRAFT TEXST FOR INSPECTION AND DISCARD CRITERIA Responsibility – C. Dekker 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA IMCA 9 July 2014 C. Dekker
  • 3. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA NOW Ch. 9. Inspection and Thorough Examination IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 4. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA NOW Appendix 5 Assessment of the condition of the sling or grommet and discard guidance Which is derived from ISO 8792 - 1986 IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 5. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA Art. 5 Inspection, thorough examination and discard criteria Content is the same as in IMCA 179 with minor textual changes IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 6. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA • Interpretations of the text is difficult • Depending on: - employment (Independent inspector, owners representative) - background (Steel wire rope specialist, steel wire rope user) - time path (objectivity) (Material and/or time available for replacement) IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 7. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA IMCA 9 July 2014 Examples REJECT / ACCEPT According IMCA 179/ISO 8792 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 8. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA DISTORTION OF THE ROPE IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 9. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA DISTORTION OF THE ROPE IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 10. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA The other side DISTORTION OF THE ROPE IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 11. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA Displacement > D DISTORTION OF THE ROPE IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 12. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA DISTORTION OF THE ROPE IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie Core protrusion C. Dekker
  • 13. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA DISTORTION OF THE ROPE IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie Core protrusion C. Dekker
  • 14. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA DISTORTION OF THE ROPE IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie Core protrusion C. Dekker
  • 15. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA DISTORTION OF THE ROPE IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 16. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA DISTORTION OF THE ROPE Rope distortion Broken wires Used sling IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 17. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA LOCALISED BREAKS Wear & Tear IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 18. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA Valley breaking LOCALISED BREAKS IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 19. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA CORROSION IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 20. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA Tail ends < 3xD TERMINATION IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 21. IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA LOCALISED BREAKS Broken core rope IMCA 9 July 2014 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie C. Dekker
  • 22. 27-06-2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie IMCA INSPECTION, ACCEPTATION AND REJECTION CRITERIA Undistorted rope < 15xD TERMINATION IMCA 9 July 2014 C. Dekker
  • 23. QUESTIONS ? 27-06-2014 C. Dekker IMCA 9 July 2014 C:UsersCor.UOS-NLDesktopIMCA - WorkgroupPresentatie