ESTABLISHMENT OF A NEW
10.7 MW POWER STATION
PRESENTERS
James Muchongwe
Vicus Esterhuizen
DATE: 7 October 2010
POWER ALT PROJECT
10.7 MW POWER STATION
Project Developer for 30.7 MW
– ADC (Pty) Ltd.
1ST Phase – 10.7 MW
2ND Phase – 20 MW
Client
– Thos Begbie Holdings (Pty) Ltd
Site
– Middelburg, Mpumalanga, South Africa
Contract Basis
– BOO 12 Year Take Or Pay
Technology
– GE Jenbacher Reciprocating Engines
PROJECT STRUCTURE
LOAN CAPITAL
79% DEBT
SHAREHOLDERS
21% EQUITY
POWER ALT
ORIGINAL
EQUIPMENT SUPPLIER
EQUIPMENT
SUPPLY
PROJECT
DEVELOPER
PROJECT
MANAGEMENT
SERVICES
OPERATIONS
CONTRACT
MAINTENANCE
CONTRACT
EPC
CONTRACT
LUBRICATION
CONTRACT
LEGAL REVIEW
CONTRACT
GEOTECH
&
SURVEY
CONTRACTS
ELECTRICITY SUPPLY
CONTRACT
LONG-TERM CONTRACTS
EXECUTION CONTRACTS
SHAREHOLDING STRUCTURE
ADC: 10%
Investec: 20%
Astra: 19%
Jubilee: 51%
– Jubilee has an option to acquire Astra’s total
shareholding.
POWER ALT PROJECT
TECHNICAL FEASIBILITIES
Assessment of Client demand and technical interface
requirements
– Measurements of harmonic distortion done and recorded
– Measurements of electrical currents done and recorded
Technology matching and decision
– Matched specific demand requirements with Technology
– Technology Provider supply all spare parts and do all
major services and overhauls over 12 years
Control philosophy to operate in parallel with Municipal grid
done in conformance with Grid Code
POWER ALT PROJECT
LONG TERM CONTRACTS
Gas Supply
– Sasol : 18 year contract
– Tolling arrangement whereby Thos Begbie buys gas from Sasol
and supply to Power Alt (Gas take off point on Thos Begbie site)
Maintenance, Overhauls and Spare Parts Supply
– GE Jenbacher: 12 year contract
Oil Supply
– Engen: As required
Operations and Business Administration
– ADC: 12 year contract
POWER ALT PROJECT
ENVIRONMENTAL IMPACT
ASSESSMENT
Thos Begbie site
– Power Plant on Thos Begbie site
– Industrial zone privately owned
Emissions
– In full conformance to European Standards
No public/government assets
– No overhead systems
– No roads
– No underground systems
EIA
– Approval in Place from Dept of Environmental Affairs
POWER ALT PROJECT
THOS BEGBIE STATUS
6 MW available from Municipality
– Weekly power shedding
– Cannot operate all furnaces at same time
– Desperately needs additional power
Expansion for Ferromanganese
– 1st 2.5MVA arc furnace installed
– Converter bought and on site
– Other furnaces on order
– Jubilee expansion plans envisaged
THANK YOU

More Related Content

What's hot

B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...
B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...
B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...Iceland Geothermal
 
Roofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy
 
Gas fired power plants
Gas fired power plantsGas fired power plants
Gas fired power plantsDaniele Pinto
 
Solar canopy project progress pp
Solar canopy project progress ppSolar canopy project progress pp
Solar canopy project progress ppCALSTART
 
Uratom presentation of on grid solar system for industries
Uratom presentation of on grid solar system for industriesUratom presentation of on grid solar system for industries
Uratom presentation of on grid solar system for industriesnihitsunray
 
Solar Tender News of Rajathan - 27 march 2019
Solar Tender News of Rajathan - 27 march 2019Solar Tender News of Rajathan - 27 march 2019
Solar Tender News of Rajathan - 27 march 2019RaysPowerExperts
 
STE technology
STE technologySTE technology
STE technologyAbengoa
 
Solarsense presentation moorhouse community solar lcsw business breakfast 190515
Solarsense presentation moorhouse community solar lcsw business breakfast 190515Solarsense presentation moorhouse community solar lcsw business breakfast 190515
Solarsense presentation moorhouse community solar lcsw business breakfast 190515The Future Economy Network
 
(Fossil fuel car)
(Fossil fuel car)(Fossil fuel car)
(Fossil fuel car)Ravi Rao
 
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-planttanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plantChristopher Gray
 
Hywind sheringham-shoal
Hywind sheringham-shoalHywind sheringham-shoal
Hywind sheringham-shoalStatoil
 
ASQ Competition 2009 - Greenwood Primary School
ASQ Competition 2009 - Greenwood Primary SchoolASQ Competition 2009 - Greenwood Primary School
ASQ Competition 2009 - Greenwood Primary SchoolDamien Wang
 
Halim Hani - HHFSD001-The Floating Solar Dome
Halim Hani - HHFSD001-The Floating Solar DomeHalim Hani - HHFSD001-The Floating Solar Dome
Halim Hani - HHFSD001-The Floating Solar DomeHalim Hani
 

What's hot (20)

BP WRMP Project
BP WRMP ProjectBP WRMP Project
BP WRMP Project
 
B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...
B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...
B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...
 
Roofsol Energy - O&M Presentation
Roofsol Energy - O&M PresentationRoofsol Energy - O&M Presentation
Roofsol Energy - O&M Presentation
 
Gas fired power plants
Gas fired power plantsGas fired power plants
Gas fired power plants
 
Solar canopy project progress pp
Solar canopy project progress ppSolar canopy project progress pp
Solar canopy project progress pp
 
Uratom presentation of on grid solar system for industries
Uratom presentation of on grid solar system for industriesUratom presentation of on grid solar system for industries
Uratom presentation of on grid solar system for industries
 
Solar Tender News of Rajathan - 27 march 2019
Solar Tender News of Rajathan - 27 march 2019Solar Tender News of Rajathan - 27 march 2019
Solar Tender News of Rajathan - 27 march 2019
 
STE technology
STE technologySTE technology
STE technology
 
Solarsense presentation moorhouse community solar lcsw business breakfast 190515
Solarsense presentation moorhouse community solar lcsw business breakfast 190515Solarsense presentation moorhouse community solar lcsw business breakfast 190515
Solarsense presentation moorhouse community solar lcsw business breakfast 190515
 
(Fossil fuel car)
(Fossil fuel car)(Fossil fuel car)
(Fossil fuel car)
 
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-planttanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
 
Hywind sheringham-shoal
Hywind sheringham-shoalHywind sheringham-shoal
Hywind sheringham-shoal
 
Airport Commerce
Airport CommerceAirport Commerce
Airport Commerce
 
Projects
ProjectsProjects
Projects
 
ASQ Competition 2009 - Greenwood Primary School
ASQ Competition 2009 - Greenwood Primary SchoolASQ Competition 2009 - Greenwood Primary School
ASQ Competition 2009 - Greenwood Primary School
 
Solar demo plant
Solar demo plantSolar demo plant
Solar demo plant
 
Roof top brochure
Roof top brochureRoof top brochure
Roof top brochure
 
Halim Hani - HHFSD001-The Floating Solar Dome
Halim Hani - HHFSD001-The Floating Solar DomeHalim Hani - HHFSD001-The Floating Solar Dome
Halim Hani - HHFSD001-The Floating Solar Dome
 
Mark Luntley - Westmill Windfarm
Mark Luntley - Westmill WindfarmMark Luntley - Westmill Windfarm
Mark Luntley - Westmill Windfarm
 
SC ppt
SC pptSC ppt
SC ppt
 

Similar to Power Alt application on establishment of a new 10_7 MW Power station- NERSA presentation 07 October 2010

Bulk Solar Electricity Generation
Bulk Solar Electricity GenerationBulk Solar Electricity Generation
Bulk Solar Electricity Generationfernando nuño
 
Bulk Solar Power Generation :CSP and CPV technologies
Bulk Solar Power Generation :CSP and CPV technologiesBulk Solar Power Generation :CSP and CPV technologies
Bulk Solar Power Generation :CSP and CPV technologiesLeonardo ENERGY
 
Wind Power Romania
Wind Power RomaniaWind Power Romania
Wind Power RomaniaEnel S.p.A.
 
Colgreen North Shore presentation-1.8a.13
Colgreen North Shore presentation-1.8a.13Colgreen North Shore presentation-1.8a.13
Colgreen North Shore presentation-1.8a.13Graeme Donaldson
 
Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Graeme Donaldson
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeriaRCREEE
 
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Dutch Power
 
Romelectro_presentation 2017
Romelectro_presentation 2017Romelectro_presentation 2017
Romelectro_presentation 2017Anka Volintiru
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie MauledSolar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie MauledLovemore Freddie Mauled (Geologist)
 
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FSAiman Ali
 
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptxFinal Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptxhurain5
 
Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Kiran Singh
 

Similar to Power Alt application on establishment of a new 10_7 MW Power station- NERSA presentation 07 October 2010 (20)

Bulk Solar Electricity Generation
Bulk Solar Electricity GenerationBulk Solar Electricity Generation
Bulk Solar Electricity Generation
 
Bulk Solar Power Generation :CSP and CPV technologies
Bulk Solar Power Generation :CSP and CPV technologiesBulk Solar Power Generation :CSP and CPV technologies
Bulk Solar Power Generation :CSP and CPV technologies
 
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...The Peterhead Carbon Capture and Storage Project - plenary presentation given...
The Peterhead Carbon Capture and Storage Project - plenary presentation given...
 
Wind Power Romania
Wind Power RomaniaWind Power Romania
Wind Power Romania
 
Colgreen North Shore presentation-1.8a.13
Colgreen North Shore presentation-1.8a.13Colgreen North Shore presentation-1.8a.13
Colgreen North Shore presentation-1.8a.13
 
Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12Colgreen North Shore presentation-7.26.12
Colgreen North Shore presentation-7.26.12
 
Page6 Pembroke
Page6 PembrokePage6 Pembroke
Page6 Pembroke
 
RCREEE-enerMENA_présentation algeria
RCREEE-enerMENA_présentation  algeriaRCREEE-enerMENA_présentation  algeria
RCREEE-enerMENA_présentation algeria
 
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
Energietransitie in industrie: de impact op de netten - Shell Energy and Chem...
 
Romelectro_presentation 2017
Romelectro_presentation 2017Romelectro_presentation 2017
Romelectro_presentation 2017
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie MauledSolar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
Solar PV Project Seeks Investor in Zimbabwe...by Lovemore Freddie Mauled
 
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
Status of North American CO2 Capture and Storage (CCS) Projects - presentatio...
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
Introduction to Cofely and Southampton
Introduction to Cofely and SouthamptonIntroduction to Cofely and Southampton
Introduction to Cofely and Southampton
 
Powering Waste Diversion
Powering Waste DiversionPowering Waste Diversion
Powering Waste Diversion
 
(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS(CCGT - Final) Preliminary FS
(CCGT - Final) Preliminary FS
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptxFinal Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
 
Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01
 

Power Alt application on establishment of a new 10_7 MW Power station- NERSA presentation 07 October 2010

  • 1.
  • 2. NERSA PRESENTATION ESTABLISHMENT OF A NEW 10.7 MW POWER STATION PRESENTERS James Muchongwe Vicus Esterhuizen DATE: 7 October 2010
  • 3. POWER ALT PROJECT 10.7 MW POWER STATION Project Developer for 30.7 MW – ADC (Pty) Ltd. 1ST Phase – 10.7 MW 2ND Phase – 20 MW Client – Thos Begbie Holdings (Pty) Ltd Site – Middelburg, Mpumalanga, South Africa Contract Basis – BOO 12 Year Take Or Pay Technology – GE Jenbacher Reciprocating Engines
  • 4. PROJECT STRUCTURE LOAN CAPITAL 79% DEBT SHAREHOLDERS 21% EQUITY POWER ALT ORIGINAL EQUIPMENT SUPPLIER EQUIPMENT SUPPLY PROJECT DEVELOPER PROJECT MANAGEMENT SERVICES OPERATIONS CONTRACT MAINTENANCE CONTRACT EPC CONTRACT LUBRICATION CONTRACT LEGAL REVIEW CONTRACT GEOTECH & SURVEY CONTRACTS ELECTRICITY SUPPLY CONTRACT LONG-TERM CONTRACTS EXECUTION CONTRACTS
  • 5. SHAREHOLDING STRUCTURE ADC: 10% Investec: 20% Astra: 19% Jubilee: 51% – Jubilee has an option to acquire Astra’s total shareholding.
  • 6. POWER ALT PROJECT TECHNICAL FEASIBILITIES Assessment of Client demand and technical interface requirements – Measurements of harmonic distortion done and recorded – Measurements of electrical currents done and recorded Technology matching and decision – Matched specific demand requirements with Technology – Technology Provider supply all spare parts and do all major services and overhauls over 12 years Control philosophy to operate in parallel with Municipal grid done in conformance with Grid Code
  • 7. POWER ALT PROJECT LONG TERM CONTRACTS Gas Supply – Sasol : 18 year contract – Tolling arrangement whereby Thos Begbie buys gas from Sasol and supply to Power Alt (Gas take off point on Thos Begbie site) Maintenance, Overhauls and Spare Parts Supply – GE Jenbacher: 12 year contract Oil Supply – Engen: As required Operations and Business Administration – ADC: 12 year contract
  • 8. POWER ALT PROJECT ENVIRONMENTAL IMPACT ASSESSMENT Thos Begbie site – Power Plant on Thos Begbie site – Industrial zone privately owned Emissions – In full conformance to European Standards No public/government assets – No overhead systems – No roads – No underground systems EIA – Approval in Place from Dept of Environmental Affairs
  • 9. POWER ALT PROJECT THOS BEGBIE STATUS 6 MW available from Municipality – Weekly power shedding – Cannot operate all furnaces at same time – Desperately needs additional power Expansion for Ferromanganese – 1st 2.5MVA arc furnace installed – Converter bought and on site – Other furnaces on order – Jubilee expansion plans envisaged