SlideShare a Scribd company logo
1 of 2
Download to read offline
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited. Photo credits: © ALSTOM 2015. All rights reserved. Printed on environmentally friendly paper.
TPW/LEAF/TJGMLS12/eng/THP/06.15/FR/7599
Alstom and its consortium partners (Mudajaya and Shin Eversendai) have signed a
contract with Tanjung Bin Energy Issuer Bhd, the wholly owned subsidiary of Malakoff
Corporation Berhad, to provide a 1,000 MW ultra-supercritical, coal-fired power plant
at Tanjung Bin, in the southern peninsular province of Johor, Malaysia.
Alstom will supply all key power generation equipment and will be in charge of the
overall engineering, project management and commissioning.
The Tanjung Bin power plant is Alstom’s second contract for a supercritical, coal-fired
unit in Malaysia, following the order to build the 1,000 MW Manjung 4 power plant
last year. Combined with the new Manjung power plant, the power plants together will
provide an additional capacity of 2,000 MW for Peninsular Malaysia.
This contract further strengthens Alstom’s position as the largest original equipment
manufacturer in Malaysia, having supplied key equipment for nearly 7.5 GW of the
country’s installed power generation capacity.
Customer:	����������������������������Tanjung Bin Energy Issuer Bhd
Scope:	����������������������������������Full turnkey EPC* contract for an ultra-supercritical,
coal-fired steam power plant including:
– Overall plant engineering
– Global procurement and logistics
– Civil, electrical and mechanical construction
– Comprehensive commissioning of the power plant
Electrical output:	�����������������1,000 MW
Fuel:	�������������������������������������Coal
Cooling system:	�������������������Direct cooling with seawater
Application:	��������������������������Power generation
ADVANTAGES
•	High performance
•	Increased operational flexibility
•	Maximised fuel flexibility
•	Low NOx emissions over a wide load range
•	With its environmental and economic advantages, this plant is another
example of Alstom’s capability to deliver clean, integrated power solutions
* EPC = Engineering, Procurement and Construction
3D-conceptualisation of the 1,000 MW ultra-
supercritical coal-fired power plant at Tanjung Bin
Doubling Alstom’s
Malaysian steam
stake with a new
1 GW power plant.
Tanjung Bin, Malaysia
Ultra-supercritical coal-fired power plant
CASE STUDY: STEAM
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority,
is strictly prohibited. Photo credits: © ALSTOM 2015. All rights reserved. Printed on environmentally friendly paper.
TPW/LEAF/TJGMLS12/eng/THP/06.15/FR/7599
For more information
please contact Alstom Power:
Alstom Power
Brown Boveri Strasse 7
5401 Baden
Switzerland
Phone: +41 56 205 6923
Visit us online: www.alstom.com
CASE STUDY: STEAM
TANJUNG BIN, MALAYSIA – USC COAL-FIRED POWER PLANT
PROJECT FEATURES
The Tanjung Bin Project benefits from
the superior integration resulting from
Alstom’s project management skills,
EPC capabilities and state-of-the-art key
components:
•	1 two-pass, ultra-supercritical, once-
through PC boiler (tangential firing,
low-NOx combustion system) with
mills and air pre-heaters
•	1 STF100 steam turbine with one
highpressure, one intermediate-
pressure and two double-flow, low-
pressure turbines for high efficiency
and reliability
•	1 two-pole GIGATOP turbogenerator
with the most advanced water-
hydrogen-cooling technology for
generators, featuring high efficiency,
outstanding reliability and simple
maintenance
•	Closed cooling water cycle
•	Alstom’s latest ALSPA Series 6
Distributed Control System
•	The highly efficient seawater flue gas
desulphurisation facility and fabric
filters to lower nitrous oxides, sulphur
oxides and dust emissions
Our Plant Integrator™approach offers more value for customers
The Plant Integrator™concept is Alstom’s unique way of creating more value for
customers. We combine outstanding expertise at a component and plant level,
as we are both an equipment designer and manufacturer. In addition, we are an
Engineering, Procurement and Construction (EPC) contractor with proven worldwide
references. Through close collaboration, we guarantee that our customers meet
their business objectives and serve their market more effectively. There are six Plant
Integrator™factors that help increase the Net Present Value for our customers.
PLANT INTEGRATOR™ FACTORS
Investment •	Optimised capital investment
Lead time •	Shorter lead times to produce electricity faster
Performance •	Higher power plant efficiency for increased power
output over a wide range of operational modes
•	Reduced emissions to meet environmental
responsibility
Availability & flexibility •	Better reliability, availability and flexibility
Life extension •	Extended power plant life options
3D-conceptualisation of the 1,000 MW ultra-supercritical coal-fired power plant at Tanjung Bin
An environmentally friendly
plant with high efficiency.

More Related Content

What's hot

Utopia - Ecogate
Utopia - EcogateUtopia - Ecogate
Utopia - EcogateIan Rayner
 
Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer trainingShivam Jain
 
Developing a new generation of energy efficiency products for reciprocating e...
Developing a new generation of energy efficiency products for reciprocating e...Developing a new generation of energy efficiency products for reciprocating e...
Developing a new generation of energy efficiency products for reciprocating e...Bowman Power
 
Bowman Power Innovation Showcase - Cleantech Forum Asia 19
Bowman Power Innovation Showcase - Cleantech Forum Asia 19Bowman Power Innovation Showcase - Cleantech Forum Asia 19
Bowman Power Innovation Showcase - Cleantech Forum Asia 19Bowman Power
 
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...Bowman Power
 
Serial hybrid marine propulsion
Serial hybrid marine propulsionSerial hybrid marine propulsion
Serial hybrid marine propulsionAlys Spillman
 
EcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An OverviewEcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An Overviewquonseteer
 
LBS GES 2014 - Younicos - Philip Hiersemenzel
LBS GES 2014 - Younicos - Philip HiersemenzelLBS GES 2014 - Younicos - Philip Hiersemenzel
LBS GES 2014 - Younicos - Philip Hiersemenzelglobalenergysummit
 
Morewe english ppt
Morewe english pptMorewe english ppt
Morewe english pptMoreweMall
 
Sa energy storage-2018-future proofing ess - charmoille
Sa energy storage-2018-future proofing ess - charmoilleSa energy storage-2018-future proofing ess - charmoille
Sa energy storage-2018-future proofing ess - charmoilleLoic Charmoille
 
Project Presentation
Project PresentationProject Presentation
Project Presentationphilip appoh
 
Microgrids for Mines : How to go green and reduce operation costs ?
Microgrids for Mines : How to go green and reduce operation costs ?Microgrids for Mines : How to go green and reduce operation costs ?
Microgrids for Mines : How to go green and reduce operation costs ?Loic Charmoille
 
2015 sia powertrain versailles duret_2 stroke range extender
2015 sia powertrain versailles duret_2 stroke range extender2015 sia powertrain versailles duret_2 stroke range extender
2015 sia powertrain versailles duret_2 stroke range extenderPierre DURET
 
Cogeneration on Campus
Cogeneration on CampusCogeneration on Campus
Cogeneration on Campusnalinwik
 
Presentation innovative hybrid_heavy_vehicle
Presentation innovative hybrid_heavy_vehiclePresentation innovative hybrid_heavy_vehicle
Presentation innovative hybrid_heavy_vehicleLiviu Giurca
 
2011 Siat 2 Stroke For Range Extender
2011 Siat 2 Stroke For Range Extender2011 Siat 2 Stroke For Range Extender
2011 Siat 2 Stroke For Range ExtenderPierre DURET
 
Road power generation
Road power generationRoad power generation
Road power generationYateesh Yadav
 
2014 SETC - Small gasoline direct fuel injection two-stroke engines for range...
2014 SETC - Small gasoline direct fuel injection two-stroke engines for range...2014 SETC - Small gasoline direct fuel injection two-stroke engines for range...
2014 SETC - Small gasoline direct fuel injection two-stroke engines for range...Pierre DURET
 
Road Power Generator
Road Power GeneratorRoad Power Generator
Road Power GeneratorHasnain Arif
 
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...James Muchongwe
 

What's hot (20)

Utopia - Ecogate
Utopia - EcogateUtopia - Ecogate
Utopia - Ecogate
 
Ntpc badarpur summer training
Ntpc badarpur summer trainingNtpc badarpur summer training
Ntpc badarpur summer training
 
Developing a new generation of energy efficiency products for reciprocating e...
Developing a new generation of energy efficiency products for reciprocating e...Developing a new generation of energy efficiency products for reciprocating e...
Developing a new generation of energy efficiency products for reciprocating e...
 
Bowman Power Innovation Showcase - Cleantech Forum Asia 19
Bowman Power Innovation Showcase - Cleantech Forum Asia 19Bowman Power Innovation Showcase - Cleantech Forum Asia 19
Bowman Power Innovation Showcase - Cleantech Forum Asia 19
 
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
Evaluation of Electric-Turbo-Compounding Technology applied to Marine Diesel-...
 
Serial hybrid marine propulsion
Serial hybrid marine propulsionSerial hybrid marine propulsion
Serial hybrid marine propulsion
 
EcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An OverviewEcoMarine Propulsion Systems - An Overview
EcoMarine Propulsion Systems - An Overview
 
LBS GES 2014 - Younicos - Philip Hiersemenzel
LBS GES 2014 - Younicos - Philip HiersemenzelLBS GES 2014 - Younicos - Philip Hiersemenzel
LBS GES 2014 - Younicos - Philip Hiersemenzel
 
Morewe english ppt
Morewe english pptMorewe english ppt
Morewe english ppt
 
Sa energy storage-2018-future proofing ess - charmoille
Sa energy storage-2018-future proofing ess - charmoilleSa energy storage-2018-future proofing ess - charmoille
Sa energy storage-2018-future proofing ess - charmoille
 
Project Presentation
Project PresentationProject Presentation
Project Presentation
 
Microgrids for Mines : How to go green and reduce operation costs ?
Microgrids for Mines : How to go green and reduce operation costs ?Microgrids for Mines : How to go green and reduce operation costs ?
Microgrids for Mines : How to go green and reduce operation costs ?
 
2015 sia powertrain versailles duret_2 stroke range extender
2015 sia powertrain versailles duret_2 stroke range extender2015 sia powertrain versailles duret_2 stroke range extender
2015 sia powertrain versailles duret_2 stroke range extender
 
Cogeneration on Campus
Cogeneration on CampusCogeneration on Campus
Cogeneration on Campus
 
Presentation innovative hybrid_heavy_vehicle
Presentation innovative hybrid_heavy_vehiclePresentation innovative hybrid_heavy_vehicle
Presentation innovative hybrid_heavy_vehicle
 
2011 Siat 2 Stroke For Range Extender
2011 Siat 2 Stroke For Range Extender2011 Siat 2 Stroke For Range Extender
2011 Siat 2 Stroke For Range Extender
 
Road power generation
Road power generationRoad power generation
Road power generation
 
2014 SETC - Small gasoline direct fuel injection two-stroke engines for range...
2014 SETC - Small gasoline direct fuel injection two-stroke engines for range...2014 SETC - Small gasoline direct fuel injection two-stroke engines for range...
2014 SETC - Small gasoline direct fuel injection two-stroke engines for range...
 
Road Power Generator
Road Power GeneratorRoad Power Generator
Road Power Generator
 
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...
Power Alt application on establishment of a new 10_7 MW Power station- NERSA ...
 

Viewers also liked

Supercritical boiler ntpc sipat
Supercritical boiler ntpc sipatSupercritical boiler ntpc sipat
Supercritical boiler ntpc sipatpratikguptateddy
 
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantWater steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantHareesh VS
 
thermodynamics of power plant
thermodynamics of power plantthermodynamics of power plant
thermodynamics of power plantupasana_panigrahi
 

Viewers also liked (6)

Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Supercritical boiler ntpc sipat
Supercritical boiler ntpc sipatSupercritical boiler ntpc sipat
Supercritical boiler ntpc sipat
 
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantWater steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
 
thermodynamics of power plant
thermodynamics of power plantthermodynamics of power plant
thermodynamics of power plant
 
Rankine cycle
Rankine cycleRankine cycle
Rankine cycle
 
Steam power plants
Steam power plantsSteam power plants
Steam power plants
 

Similar to Alstom to provide 1,000 MW ultra-supercritical coal-fired power plant in Malaysia

electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BEmirza gulrez
 
Romelectro general presentation
Romelectro general presentation Romelectro general presentation
Romelectro general presentation Romelectro
 
Steam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdf
Steam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdfSteam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdf
Steam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdfHafidz Akbar
 
Romelectro_presentation 2017
Romelectro_presentation 2017Romelectro_presentation 2017
Romelectro_presentation 2017Anka Volintiru
 
A presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noidaA presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noidaAshutosh Tripathi
 
Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Jailton Rodrigues
 
Powergen off grid power supply
Powergen off grid power supplyPowergen off grid power supply
Powergen off grid power supplyHoward Wright
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010kmccarthy1981
 
Project report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationProject report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationDeepDarsanKalita1
 
2017 11-15 why hywind oslo exchange
2017 11-15 why hywind oslo exchange2017 11-15 why hywind oslo exchange
2017 11-15 why hywind oslo exchangeXynteo
 

Similar to Alstom to provide 1,000 MW ultra-supercritical coal-fired power plant in Malaysia (20)

Az-Zour
Az-ZourAz-Zour
Az-Zour
 
Carrington
CarringtonCarrington
Carrington
 
electrical cv - BE
electrical cv - BEelectrical cv - BE
electrical cv - BE
 
Samra
SamraSamra
Samra
 
HYpact brochure EN
HYpact brochure ENHYpact brochure EN
HYpact brochure EN
 
Romelectro general presentation
Romelectro general presentation Romelectro general presentation
Romelectro general presentation
 
Steam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdf
Steam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdfSteam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdf
Steam_E_RevA_202109_Rev.1_0_Mitsubishi Power.pdf
 
Romelectro_presentation 2017
Romelectro_presentation 2017Romelectro_presentation 2017
Romelectro_presentation 2017
 
A presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noidaA presentation on summer training at NTPC corporate office noida
A presentation on summer training at NTPC corporate office noida
 
Heat exchangers
Heat exchangersHeat exchangers
Heat exchangers
 
Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015Cofely Fabricom Brochure OilGas 2015
Cofely Fabricom Brochure OilGas 2015
 
Powergen off grid power supply
Powergen off grid power supplyPowergen off grid power supply
Powergen off grid power supply
 
ALSTOM report
ALSTOM reportALSTOM report
ALSTOM report
 
EnergiCapt
EnergiCaptEnergiCapt
EnergiCapt
 
Se management presentation november 2010
Se management presentation november 2010Se management presentation november 2010
Se management presentation november 2010
 
The role of Hydrogen storage in a clean responsive power system, Den Gammer, ...
The role of Hydrogen storage in a clean responsive power system, Den Gammer, ...The role of Hydrogen storage in a clean responsive power system, Den Gammer, ...
The role of Hydrogen storage in a clean responsive power system, Den Gammer, ...
 
Gas power-plants
Gas power-plantsGas power-plants
Gas power-plants
 
Axis TLB Ltd
Axis TLB LtdAxis TLB Ltd
Axis TLB Ltd
 
Project report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power StationProject report on Lakwa Thermal Power Station
Project report on Lakwa Thermal Power Station
 
2017 11-15 why hywind oslo exchange
2017 11-15 why hywind oslo exchange2017 11-15 why hywind oslo exchange
2017 11-15 why hywind oslo exchange
 

Alstom to provide 1,000 MW ultra-supercritical coal-fired power plant in Malaysia

  • 1. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Photo credits: © ALSTOM 2015. All rights reserved. Printed on environmentally friendly paper. TPW/LEAF/TJGMLS12/eng/THP/06.15/FR/7599 Alstom and its consortium partners (Mudajaya and Shin Eversendai) have signed a contract with Tanjung Bin Energy Issuer Bhd, the wholly owned subsidiary of Malakoff Corporation Berhad, to provide a 1,000 MW ultra-supercritical, coal-fired power plant at Tanjung Bin, in the southern peninsular province of Johor, Malaysia. Alstom will supply all key power generation equipment and will be in charge of the overall engineering, project management and commissioning. The Tanjung Bin power plant is Alstom’s second contract for a supercritical, coal-fired unit in Malaysia, following the order to build the 1,000 MW Manjung 4 power plant last year. Combined with the new Manjung power plant, the power plants together will provide an additional capacity of 2,000 MW for Peninsular Malaysia. This contract further strengthens Alstom’s position as the largest original equipment manufacturer in Malaysia, having supplied key equipment for nearly 7.5 GW of the country’s installed power generation capacity. Customer: ����������������������������Tanjung Bin Energy Issuer Bhd Scope: ����������������������������������Full turnkey EPC* contract for an ultra-supercritical, coal-fired steam power plant including: – Overall plant engineering – Global procurement and logistics – Civil, electrical and mechanical construction – Comprehensive commissioning of the power plant Electrical output: �����������������1,000 MW Fuel: �������������������������������������Coal Cooling system: �������������������Direct cooling with seawater Application: ��������������������������Power generation ADVANTAGES • High performance • Increased operational flexibility • Maximised fuel flexibility • Low NOx emissions over a wide load range • With its environmental and economic advantages, this plant is another example of Alstom’s capability to deliver clean, integrated power solutions * EPC = Engineering, Procurement and Construction 3D-conceptualisation of the 1,000 MW ultra- supercritical coal-fired power plant at Tanjung Bin Doubling Alstom’s Malaysian steam stake with a new 1 GW power plant. Tanjung Bin, Malaysia Ultra-supercritical coal-fired power plant CASE STUDY: STEAM
  • 2. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Photo credits: © ALSTOM 2015. All rights reserved. Printed on environmentally friendly paper. TPW/LEAF/TJGMLS12/eng/THP/06.15/FR/7599 For more information please contact Alstom Power: Alstom Power Brown Boveri Strasse 7 5401 Baden Switzerland Phone: +41 56 205 6923 Visit us online: www.alstom.com CASE STUDY: STEAM TANJUNG BIN, MALAYSIA – USC COAL-FIRED POWER PLANT PROJECT FEATURES The Tanjung Bin Project benefits from the superior integration resulting from Alstom’s project management skills, EPC capabilities and state-of-the-art key components: • 1 two-pass, ultra-supercritical, once- through PC boiler (tangential firing, low-NOx combustion system) with mills and air pre-heaters • 1 STF100 steam turbine with one highpressure, one intermediate- pressure and two double-flow, low- pressure turbines for high efficiency and reliability • 1 two-pole GIGATOP turbogenerator with the most advanced water- hydrogen-cooling technology for generators, featuring high efficiency, outstanding reliability and simple maintenance • Closed cooling water cycle • Alstom’s latest ALSPA Series 6 Distributed Control System • The highly efficient seawater flue gas desulphurisation facility and fabric filters to lower nitrous oxides, sulphur oxides and dust emissions Our Plant Integrator™approach offers more value for customers The Plant Integrator™concept is Alstom’s unique way of creating more value for customers. We combine outstanding expertise at a component and plant level, as we are both an equipment designer and manufacturer. In addition, we are an Engineering, Procurement and Construction (EPC) contractor with proven worldwide references. Through close collaboration, we guarantee that our customers meet their business objectives and serve their market more effectively. There are six Plant Integrator™factors that help increase the Net Present Value for our customers. PLANT INTEGRATOR™ FACTORS Investment • Optimised capital investment Lead time • Shorter lead times to produce electricity faster Performance • Higher power plant efficiency for increased power output over a wide range of operational modes • Reduced emissions to meet environmental responsibility Availability & flexibility • Better reliability, availability and flexibility Life extension • Extended power plant life options 3D-conceptualisation of the 1,000 MW ultra-supercritical coal-fired power plant at Tanjung Bin An environmentally friendly plant with high efficiency.