Magadh-Amrapali Area is the newly formed area of Central
Coalfields Limited. The area has been formed in October 2012.
There are Four Projects falling under this area:
 Magadh
 Amrapali
 Sanghamitra
 Chandragupta
The Land Acquisition of Amrapali Project has been done under
Sec 9 (1) of CBA Act. The details of the acquisition are as under:
Tenancy GM (JJ+K+A) Forest Total
240.66 Ha 245.97 Ha 812.71 Ha 1299.34 Ha
As per the initial approved Project Report of Amrapali Project,
the CCL Board approved the Project Report for 12 MTY.
Now a revised Project Report has been approved in which it is
projected with a capacity of 25 MTY (Normative).
The mining operation at Amrapali Project has started since 7th of
February 2015.
The Coal production has begun since 24th of October 2015.
The Land Acquisition of Magadh Project has been done under
Sec 9 (1) of CBA Act. The details of the acquisition are as under:
Tenancy GM (JJ+K+A) Forest Total
756.35 Ha 540.07 Ha 391.12 Ha 1687.54 Ha
As per the initial approved Project Report of Magadh Project,
the CCL Board approved the Project Report for 20 MTY.
Now a revised Project Report has been approved in which it is
projected with a capacity of 51 MTY (Normative) to 70 MTY
(Peak). Henceforth it will become one of the largest Coal Mine
in Asia.
The mining operation at Magadh Project has started since 7th of
February 2015.
The Coal production has begun since 24th of October 2015.
Coal dispatch is also undergoing.
The Land Acquisition for Sanghamitra and Chandragupta is
under process.
As per the initial approved Project Report of Sanghamitra
Project, the CCL Board approved the Project Report for 27 MTY
whereas for Chandragupta the CCL Board has approved the
Project Report for 25 MTY.
Production of Coal, OB & Off Take for the year 2015-16
Target Achievement
till Dec’2015
Commitment for
rest of the
period of FY
2015-16
Total to be
achieved
Coal (Te) 46,00,000 3236360 1366500 46,02,860
OB (M3) 124,00,000 10201025 2218026 124,19,051
Despatch
(Te)
55,40,000 3219401.81 2320600.19 55,40,002
Production of Coal, OB & Off Take for the year 2016-17
Area Coal (M Te) OB(M m3) Off Take (M Te)
Amrapali
OCP
08 12 08
Magadh
OCP
07 11 07
TOTAL 15 23 15
Monsoon Preparation for the Year 2016
 Mine Dewatering will be done by the contractor
(Outsourcing).
 Existing Garland Drains are to be cleaned wherever
necessary.
 New Garland Drains of around 02 km are to be prepared in
each Project.
 One Dozer, one Grader & one small capacity Backhoe are
needed for each Project.
 Two numbers of 15 HP (Diesel Operated) pumps are
required for each Project for dewatering of small pocket
deposit of water.
PHYSICAL POSSESSION OF LAND
Land Tenancy (Ha) GMK &
GMA(Ha)
Forest (Ha) Total
Existing Reqd. Existing Reqd. Existing Reqd.
AmrapaliOCP
(12 MTY)
4.85 235.81 44.92 49.53 531.64 432.59 1299.34
Magadh OCP
(20 MTY)
17.00 739.35 0.00 28.87 96.72 805.60 1687.54
 Out of 96.72 Ha of released Forest Land at Magadh OCP,
only 19.20 Ha Notified Forest will be handed over by DFO
(South) Chatra after Pillaring.
Infrastructure:
 Construction of 100 Mts. PCC Road at Tandwa.
 Construction of Earthen Moorum Road at Gulitand.
 Construction of PCC Road at Binglat Village.
 Construction of Boundary Wall at Binglat Primary School.
 Construction of Hume Pipe Culverts at Honhe,
Kumurangkala and Kumurangkhurd villages.
Drinking Water:
 Construction of Well at Honhe, Binglat, Pokla,
Kumurangkala, Garilaung, Kundi, Saradu, Devalgada,
Masilaung, Arra, Chamatu and Fulbasia Villages.
 Construction of Deep Borewell at Kamta, Kumurangkala,
Kumurangkhurd, Honhe, Tandwa and Saradu villages.
 Distribution of RO Drinking Water to all house-holds
falling under Amrapali Project.
Skill Development/Social Empowerment:
 Skill training to 90 youths from Magadh-Amrapali Project
in Electrician and Welder trade.
 ITI- 8 youths from Magadh-Amrapali Project have been
selected for 2 year ITI Programme.
 Mining Sirdar- 6 youths from Magadh-Amrapali Area have
been selected for 3 years Mining Sirdar Programme.
Environment:
 Construction of Check Dam at Kumurangkala, Soparan,
Koed and Arra.
 Construction of Ponds at Pokla, Honhe and Fulbasia
villages.
 Installation of Solar Street Lights for different villages of
Magadh-Amrapali Area.
Sports and Culture:
 Football kit has been distributed to 12 Village teams of
Magadh and Amrapali Projects.
Education:
 203 numbers of Desk, Benches has been distributed in 13
Schools falling under Magadh & Amrapali Area.
 7 Children from socially weaker sections of Magadh-
Amrapali Project has been adopted for education.
Health Care:
 Health Care Camps are organized in a routine manner at
villages falling under Magadh-Amrapali Area.
 8393 Patients from the villages falling under Magadh-
Amrapali Area were examined in 2014-16 and free
medicines were distributed among them.
 Health Care Camps at Kundi, Saradu, Kumrangkala,
Kumrangkhurd, Ursu, Honhe, Masilaung, Binglat and Arra
were organized.
 Dispensary has been established at Honhe Village.
Glimpses of CSR activities
Construction of Pond at Fulbasiya (Magadh Project)
Handpump at Fulbasiya (Magadh Project)
RO Water Supply to each Household (Amrapali Project)
Deep Borewell with control room and Tank – Kumrang Khurd (Amrapali Project)
Sports Ground at Chamatu (Magadh Project)
Drinking Water supply with Water Tanker (Magadh Project)

More Related Content

What's hot

Bp present panel
Bp present panelBp present panel
Bp present panel
bp
 
City council june 18, 2013 hickory update
City council june 18, 2013   hickory updateCity council june 18, 2013   hickory update
City council june 18, 2013 hickory update
City of San Angelo Texas
 
01.05.2014 Examining the potential for successful renewable energy projects i...
01.05.2014 Examining the potential for successful renewable energy projects i...01.05.2014 Examining the potential for successful renewable energy projects i...
01.05.2014 Examining the potential for successful renewable energy projects i...
The Business Council of Mongolia
 
Nothern Coalfields Limited
Nothern Coalfields LimitedNothern Coalfields Limited
Nothern Coalfields Limited
Ashz Mahajan
 
Bentley Case Study
Bentley Case StudyBentley Case Study
Bentley Case Study
Lynx Energy Ltd
 
BEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNABEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNA
Saakaar constructions
 
12 02 lima - gccsi - why invest in ccs - final
12 02 lima - gccsi - why invest in ccs - final12 02 lima - gccsi - why invest in ccs - final
12 02 lima - gccsi - why invest in ccs - final
Global CCS Institute
 
Findings of the IPCC
Findings of the IPCCFindings of the IPCC

What's hot (8)

Bp present panel
Bp present panelBp present panel
Bp present panel
 
City council june 18, 2013 hickory update
City council june 18, 2013   hickory updateCity council june 18, 2013   hickory update
City council june 18, 2013 hickory update
 
01.05.2014 Examining the potential for successful renewable energy projects i...
01.05.2014 Examining the potential for successful renewable energy projects i...01.05.2014 Examining the potential for successful renewable energy projects i...
01.05.2014 Examining the potential for successful renewable energy projects i...
 
Nothern Coalfields Limited
Nothern Coalfields LimitedNothern Coalfields Limited
Nothern Coalfields Limited
 
Bentley Case Study
Bentley Case StudyBentley Case Study
Bentley Case Study
 
BEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNABEST REAL ESTATE COMPANY IN PATNA
BEST REAL ESTATE COMPANY IN PATNA
 
12 02 lima - gccsi - why invest in ccs - final
12 02 lima - gccsi - why invest in ccs - final12 02 lima - gccsi - why invest in ccs - final
12 02 lima - gccsi - why invest in ccs - final
 
Findings of the IPCC
Findings of the IPCCFindings of the IPCC
Findings of the IPCC
 

Viewers also liked

central coalfeild limited
central coalfeild limitedcentral coalfeild limited
central coalfeild limited
samohi
 
Black men in the workplace
Black men in the workplaceBlack men in the workplace
Black men in the workplace
Spinks97
 
Linkedin work summary
Linkedin work summaryLinkedin work summary
Linkedin work summary
David Mills
 
Rein
ReinRein
Zvit pro robotu_shkilnogo_parlamentu_veselivskogo_nvk
Zvit pro robotu_shkilnogo_parlamentu_veselivskogo_nvkZvit pro robotu_shkilnogo_parlamentu_veselivskogo_nvk
Zvit pro robotu_shkilnogo_parlamentu_veselivskogo_nvk
Vidiborenko
 
EME185 Presentation
EME185 PresentationEME185 Presentation
EME185 Presentation
Anahita Yazdi
 
Rethink how your brokerage pays insurance carriers
Rethink how your brokerage pays insurance carriersRethink how your brokerage pays insurance carriers
Rethink how your brokerage pays insurance carriers
Sally Macdonnell Paradine
 
Resume Breeden 2016
Resume Breeden 2016Resume Breeden 2016
Resume Breeden 2016
Laura Breeden
 
Tugas km 2
Tugas km 2Tugas km 2
Tugas km 2
Tommy Christianto
 
App
AppApp
Antonio cano
Antonio canoAntonio cano
Antonio cano
JORGE ANTONIO FALCÓN
 
Presentación
PresentaciónPresentación
Presentación
asdfrex
 
My CV
My CVMy CV
Tarea jorge luis samaniego conceptos
Tarea jorge luis samaniego conceptosTarea jorge luis samaniego conceptos
Tarea jorge luis samaniego conceptos
MiryamOrtiz
 
SoftRoboticsProjectReport (6)
SoftRoboticsProjectReport (6)SoftRoboticsProjectReport (6)
SoftRoboticsProjectReport (6)
Leon Kim
 
ภาษาสำหรับเด็กปฐมวัย
ภาษาสำหรับเด็กปฐมวัยภาษาสำหรับเด็กปฐมวัย
ภาษาสำหรับเด็กปฐมวัย
N'par Korat
 
Native Advertising
Native AdvertisingNative Advertising
Native Advertising
Jordyn Alexander
 

Viewers also liked (17)

central coalfeild limited
central coalfeild limitedcentral coalfeild limited
central coalfeild limited
 
Black men in the workplace
Black men in the workplaceBlack men in the workplace
Black men in the workplace
 
Linkedin work summary
Linkedin work summaryLinkedin work summary
Linkedin work summary
 
Rein
ReinRein
Rein
 
Zvit pro robotu_shkilnogo_parlamentu_veselivskogo_nvk
Zvit pro robotu_shkilnogo_parlamentu_veselivskogo_nvkZvit pro robotu_shkilnogo_parlamentu_veselivskogo_nvk
Zvit pro robotu_shkilnogo_parlamentu_veselivskogo_nvk
 
EME185 Presentation
EME185 PresentationEME185 Presentation
EME185 Presentation
 
Rethink how your brokerage pays insurance carriers
Rethink how your brokerage pays insurance carriersRethink how your brokerage pays insurance carriers
Rethink how your brokerage pays insurance carriers
 
Resume Breeden 2016
Resume Breeden 2016Resume Breeden 2016
Resume Breeden 2016
 
Tugas km 2
Tugas km 2Tugas km 2
Tugas km 2
 
App
AppApp
App
 
Antonio cano
Antonio canoAntonio cano
Antonio cano
 
Presentación
PresentaciónPresentación
Presentación
 
My CV
My CVMy CV
My CV
 
Tarea jorge luis samaniego conceptos
Tarea jorge luis samaniego conceptosTarea jorge luis samaniego conceptos
Tarea jorge luis samaniego conceptos
 
SoftRoboticsProjectReport (6)
SoftRoboticsProjectReport (6)SoftRoboticsProjectReport (6)
SoftRoboticsProjectReport (6)
 
ภาษาสำหรับเด็กปฐมวัย
ภาษาสำหรับเด็กปฐมวัยภาษาสำหรับเด็กปฐมวัย
ภาษาสำหรับเด็กปฐมวัย
 
Native Advertising
Native AdvertisingNative Advertising
Native Advertising
 

Similar to SC ppt

Coal_sector of_bangladesh.pptx
Coal_sector of_bangladesh.pptxCoal_sector of_bangladesh.pptx
Coal_sector of_bangladesh.pptx
PetrobanglaMineOpera
 
BPCL review meeting.pptx
BPCL review meeting.pptxBPCL review meeting.pptx
BPCL review meeting.pptx
Ayazkhan510262
 
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
FICCINorthEast
 
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
RAHULKUMARSAW1
 
2015 First Quarter Budget Review
2015 First Quarter Budget Review2015 First Quarter Budget Review
2015 First Quarter Budget Review
Gibson Ali Holemba
 
Mining industry of bangladesh
Mining industry of bangladeshMining industry of bangladesh
Mining industry of bangladesh
Samiur Sany
 
SECL report.pptx
SECL report.pptxSECL report.pptx
SECL report.pptx
VipinChoudhari2
 
Amc strategies for green mining at mcl
Amc strategies for green mining at mclAmc strategies for green mining at mcl
Amc strategies for green mining at mcl
AMIT SAHU
 
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana RoadsMinister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Kweku Zurek
 
Telangana powersector discrimination
Telangana powersector discriminationTelangana powersector discrimination
Telangana powersector discrimination
GRBabu Naidu
 
Dakshina kannada Lok adalath
Dakshina kannada Lok adalath  Dakshina kannada Lok adalath
Dakshina kannada Lok adalath
prakash_dcpa
 
Yhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptxYhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptx
KheljitSingh
 
Coal india limited_-_the_biggest_energy_provider_in_india
Coal india limited_-_the_biggest_energy_provider_in_indiaCoal india limited_-_the_biggest_energy_provider_in_india
Coal india limited_-_the_biggest_energy_provider_in_india
hapina
 
Training chp
Training chpTraining chp
Training chp
Radhey Lal
 
MDO Concept - An answer to Indian captive coal mining
MDO Concept - An answer to Indian captive coal miningMDO Concept - An answer to Indian captive coal mining
MDO Concept - An answer to Indian captive coal mining
Tapas Das
 
Project report
Project reportProject report
Project report
piyush sahay
 
IFCDongoing
IFCDongoingIFCDongoing
DCC Training Report Final
DCC Training Report FinalDCC Training Report Final
DCC Training Report Final
SOUPARNO ROY
 
41946 ind-seia
41946 ind-seia41946 ind-seia
41946 ind-seia
PRABIR DATTA
 
Lec 3rd year UCM.pptx
Lec 3rd year UCM.pptxLec 3rd year UCM.pptx
Lec 3rd year UCM.pptx
Dileep Gurram
 

Similar to SC ppt (20)

Coal_sector of_bangladesh.pptx
Coal_sector of_bangladesh.pptxCoal_sector of_bangladesh.pptx
Coal_sector of_bangladesh.pptx
 
BPCL review meeting.pptx
BPCL review meeting.pptxBPCL review meeting.pptx
BPCL review meeting.pptx
 
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
18. NECS 2016 _ Energy- Way forward for oil and gas exploration in tripura-Mr...
 
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...Bccl VT Report pb 132Kv  substation by rahul kumar saw & prabhat agarwal  bit...
Bccl VT Report pb 132Kv substation by rahul kumar saw & prabhat agarwal bit...
 
2015 First Quarter Budget Review
2015 First Quarter Budget Review2015 First Quarter Budget Review
2015 First Quarter Budget Review
 
Mining industry of bangladesh
Mining industry of bangladeshMining industry of bangladesh
Mining industry of bangladesh
 
SECL report.pptx
SECL report.pptxSECL report.pptx
SECL report.pptx
 
Amc strategies for green mining at mcl
Amc strategies for green mining at mclAmc strategies for green mining at mcl
Amc strategies for green mining at mcl
 
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana RoadsMinister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
Minister of Roads and Highways, Mr Kwasi Amoako-Attah on Ghana Roads
 
Telangana powersector discrimination
Telangana powersector discriminationTelangana powersector discrimination
Telangana powersector discrimination
 
Dakshina kannada Lok adalath
Dakshina kannada Lok adalath  Dakshina kannada Lok adalath
Dakshina kannada Lok adalath
 
Yhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptxYhh jsn trae trge hba haga njj hgV1.pptx
Yhh jsn trae trge hba haga njj hgV1.pptx
 
Coal india limited_-_the_biggest_energy_provider_in_india
Coal india limited_-_the_biggest_energy_provider_in_indiaCoal india limited_-_the_biggest_energy_provider_in_india
Coal india limited_-_the_biggest_energy_provider_in_india
 
Training chp
Training chpTraining chp
Training chp
 
MDO Concept - An answer to Indian captive coal mining
MDO Concept - An answer to Indian captive coal miningMDO Concept - An answer to Indian captive coal mining
MDO Concept - An answer to Indian captive coal mining
 
Project report
Project reportProject report
Project report
 
IFCDongoing
IFCDongoingIFCDongoing
IFCDongoing
 
DCC Training Report Final
DCC Training Report FinalDCC Training Report Final
DCC Training Report Final
 
41946 ind-seia
41946 ind-seia41946 ind-seia
41946 ind-seia
 
Lec 3rd year UCM.pptx
Lec 3rd year UCM.pptxLec 3rd year UCM.pptx
Lec 3rd year UCM.pptx
 

SC ppt

  • 1. Overview Prepared by: Saumya Apratim PIS No. 14542708 Area Personnel Department Magadh-Amrapali Area
  • 2. Magadh-Amrapali Area is the newly formed area of Central Coalfields Limited. The area has been formed in October 2012. There are Four Projects falling under this area:  Magadh  Amrapali  Sanghamitra  Chandragupta
  • 3. The Land Acquisition of Amrapali Project has been done under Sec 9 (1) of CBA Act. The details of the acquisition are as under: Tenancy GM (JJ+K+A) Forest Total 240.66 Ha 245.97 Ha 812.71 Ha 1299.34 Ha As per the initial approved Project Report of Amrapali Project, the CCL Board approved the Project Report for 12 MTY. Now a revised Project Report has been approved in which it is projected with a capacity of 25 MTY (Normative). The mining operation at Amrapali Project has started since 7th of February 2015. The Coal production has begun since 24th of October 2015.
  • 4. The Land Acquisition of Magadh Project has been done under Sec 9 (1) of CBA Act. The details of the acquisition are as under: Tenancy GM (JJ+K+A) Forest Total 756.35 Ha 540.07 Ha 391.12 Ha 1687.54 Ha As per the initial approved Project Report of Magadh Project, the CCL Board approved the Project Report for 20 MTY. Now a revised Project Report has been approved in which it is projected with a capacity of 51 MTY (Normative) to 70 MTY (Peak). Henceforth it will become one of the largest Coal Mine in Asia. The mining operation at Magadh Project has started since 7th of February 2015. The Coal production has begun since 24th of October 2015. Coal dispatch is also undergoing.
  • 5. The Land Acquisition for Sanghamitra and Chandragupta is under process. As per the initial approved Project Report of Sanghamitra Project, the CCL Board approved the Project Report for 27 MTY whereas for Chandragupta the CCL Board has approved the Project Report for 25 MTY.
  • 6. Production of Coal, OB & Off Take for the year 2015-16 Target Achievement till Dec’2015 Commitment for rest of the period of FY 2015-16 Total to be achieved Coal (Te) 46,00,000 3236360 1366500 46,02,860 OB (M3) 124,00,000 10201025 2218026 124,19,051 Despatch (Te) 55,40,000 3219401.81 2320600.19 55,40,002 Production of Coal, OB & Off Take for the year 2016-17 Area Coal (M Te) OB(M m3) Off Take (M Te) Amrapali OCP 08 12 08 Magadh OCP 07 11 07 TOTAL 15 23 15
  • 7. Monsoon Preparation for the Year 2016  Mine Dewatering will be done by the contractor (Outsourcing).  Existing Garland Drains are to be cleaned wherever necessary.  New Garland Drains of around 02 km are to be prepared in each Project.  One Dozer, one Grader & one small capacity Backhoe are needed for each Project.  Two numbers of 15 HP (Diesel Operated) pumps are required for each Project for dewatering of small pocket deposit of water. PHYSICAL POSSESSION OF LAND Land Tenancy (Ha) GMK & GMA(Ha) Forest (Ha) Total Existing Reqd. Existing Reqd. Existing Reqd. AmrapaliOCP (12 MTY) 4.85 235.81 44.92 49.53 531.64 432.59 1299.34 Magadh OCP (20 MTY) 17.00 739.35 0.00 28.87 96.72 805.60 1687.54  Out of 96.72 Ha of released Forest Land at Magadh OCP, only 19.20 Ha Notified Forest will be handed over by DFO (South) Chatra after Pillaring.
  • 8. Infrastructure:  Construction of 100 Mts. PCC Road at Tandwa.  Construction of Earthen Moorum Road at Gulitand.  Construction of PCC Road at Binglat Village.  Construction of Boundary Wall at Binglat Primary School.  Construction of Hume Pipe Culverts at Honhe, Kumurangkala and Kumurangkhurd villages. Drinking Water:  Construction of Well at Honhe, Binglat, Pokla, Kumurangkala, Garilaung, Kundi, Saradu, Devalgada, Masilaung, Arra, Chamatu and Fulbasia Villages.  Construction of Deep Borewell at Kamta, Kumurangkala, Kumurangkhurd, Honhe, Tandwa and Saradu villages.  Distribution of RO Drinking Water to all house-holds falling under Amrapali Project.
  • 9. Skill Development/Social Empowerment:  Skill training to 90 youths from Magadh-Amrapali Project in Electrician and Welder trade.  ITI- 8 youths from Magadh-Amrapali Project have been selected for 2 year ITI Programme.  Mining Sirdar- 6 youths from Magadh-Amrapali Area have been selected for 3 years Mining Sirdar Programme. Environment:  Construction of Check Dam at Kumurangkala, Soparan, Koed and Arra.  Construction of Ponds at Pokla, Honhe and Fulbasia villages.  Installation of Solar Street Lights for different villages of Magadh-Amrapali Area. Sports and Culture:  Football kit has been distributed to 12 Village teams of Magadh and Amrapali Projects.
  • 10. Education:  203 numbers of Desk, Benches has been distributed in 13 Schools falling under Magadh & Amrapali Area.  7 Children from socially weaker sections of Magadh- Amrapali Project has been adopted for education. Health Care:  Health Care Camps are organized in a routine manner at villages falling under Magadh-Amrapali Area.  8393 Patients from the villages falling under Magadh- Amrapali Area were examined in 2014-16 and free medicines were distributed among them.  Health Care Camps at Kundi, Saradu, Kumrangkala, Kumrangkhurd, Ursu, Honhe, Masilaung, Binglat and Arra were organized.  Dispensary has been established at Honhe Village.
  • 11. Glimpses of CSR activities Construction of Pond at Fulbasiya (Magadh Project) Handpump at Fulbasiya (Magadh Project)
  • 12. RO Water Supply to each Household (Amrapali Project) Deep Borewell with control room and Tank – Kumrang Khurd (Amrapali Project)
  • 13. Sports Ground at Chamatu (Magadh Project) Drinking Water supply with Water Tanker (Magadh Project)