SlideShare a Scribd company logo
1 of 12
JITENDRA P DHOLE
Address: 1376, Vighnaharta, Saraswatinagar, Near Sainik School, Vasumbe, Tehsil: Tasgaon, Dist:
Sangli. 416312, Maharashtra, India
Contact No.: +91 8390026313 / E-Mail: jitendra_dhole@yahoo.co.in jdhole634@gmail.com
April 05, 2016
Kind Attn;
Shine.com
Dear Sir/Madam,
A competent professional with nearly 13 years of experience in Technical, Project co-ordination,
Commissioning, Installation, Production Operations and Supply Chain Management.
.
I have been acknowledged by my understanding for:
 Proficient in managing production operations as per the defined time/ cost parameters &
standards as well as experience of developing procedures for operational excellence.
 Adept in ensuring compliances to production targets as per quality standards.
 A keen strategist and planner with skills in conceptualizing and effecting process initiatives
to enhance operational efficiency and productivity; expertise in Plant Erection &
Commissioning, Start-up, Shut-down & Expansion activities.
 Excellent understanding of Industrial Standards & Procedures, Health & Safety Standards,
Quality Management, Waste Control, Maintenance of Production Lines, etc.
 Effective communicator with excellent relationship, technical & interpersonal skills.
I seek an opportunity within your organization for the profile of “Name of the profile you are
applying for” where I can contribute with my knowledge gained during my education to fore.
Additional capabilities are listed in detail in the enclosed resume.
Looking forward to hearing from you regarding the above position.
Yours sincerely,
JITENDRA P DHOLE
Enclosures: 1)PROFILE, KEY SKILLS AND SO ON.....
3) DEGREE AND APPRECIATION CERTIFICATES. (Would Be Shown During Real time)
JITENDRA P DHOLE
Address: 1376, Vighnaharta, Saraswatinagar, Near Sainik School, Vasumbe, Tehsil: Tasgaon,
Dist: Sangli. 416312, Maharashtra, India
Contact No.: +91 8390026313 / E-Mail: jitendra_dhole@yahoo.co.in
Seeking challenging assignments in Production Planning,Plant Operations & Maintenance,
Quality Control and Techno-commercial Operations with an organization of high repute
PROFILE SNAPSHOT
 A competent professional with nearly 13 years of experience in Project co-ordination,
Commissioning, Installation, Production Operations and Supply Chain Management.
 Previously associated with Indofil Chemicals Company as Technical Executive, Engineer
(Superintendent.)
 Exposure in managing assignments viz., erection, installation, commissioning, troubleshooting
and maintenance of all the instruments in various plant projects as per various standards.
 Expert in leading with a record of contributions that streamline the operations related,
invigorated, heightened profitability with productivity and enhanced internal control at site
accordance with organization.
 Skilled of working with cross-functional teams using interactive leadership related activities.
 Abilities in managing maintenance operations for reducing breakdown / downtime and enhancing
operational effectiveness of equipment.
 An effective communicator with excellent relationship management skills and strong analytical,
technical, decision making, problem solving & organizational abilities.
KEY SKILLS
Operations & Maintenance Erection & Commissioning Production Operations
Quality Control Project Management Plant Operations
Process Improvement Techno-Commercial Operations Supply Chain Management
CAREER HIGHLIGHTS
 Appreciated for the project activities including maintenance and shut down within the scheduled
period as a part of the Project Peer Group along with a team member.
 Achieved certification of quality and production for the set target by managing hand to hand
laboratory and production related activities.
 Succeeded in making one of the major product named OPAQUE-621 successful with emphasis to
resolve some failure in quality is annotated as a citation.
 Initiated the idea of bringing back the product again for paint industry as a market leader.
 Successfully implemented the project for emulsion polymers process for manufacturing different
specialty chemicals in the industry.
 Played a key role in scheduling and monitoring inventory and managing the inbound activities as
well depending on the requirements for outbound locations if needed on priority and urgent basis.
 Took part in training program related to safety & ISO awareness.
 Used 1200 USGK Monomer to manufacture LMA and SMA for depressol petroleum industries.
ORGANIZATIONAL DETAILS
Since Aug 2006 Presently working with Small office and applying daily for opportunity.
.
Jan 1994-Jul 2006 Indofil Chemicals Company Technical
Executive, Engineer (Superintendent)
Key Result Areas:
 Directed production plans, arranged resources to ensure achievement of targets as per cost
parameters.
 Handled manufacturing, quality production and goal per set at site.
 Planned execution and commissioning of projects co-ordination, maintenance, shut down activity
of plant and its accessories including utilities, material handling systems for bulk materials,
storage tanks and its accessories of bulk monomers/chemicals.
 Monitored process in operations with PLC & DCS-Control System and resolved the issues on
time.
 Initiating new process concepts for production optimization and yield improvement.
 Developed schedule, performance operations to help sustain & grow programs, services as per
strategy.
 Analyzed various processes/ applications and recommended modifications or equipment
calibrations to enhance operational efficiency.
 Took part in meetings and in strategic activities, whenever needed as per organization.
 Planned and implemented the annual calendar of activities related to work areas as well as
special events, training & official administration acts.
 Created budget expenditure, prepared plan and meetings review whenever necessary to be
presented to the organization or senior management.
 Implemented the preventive and condition based periodic maintenance, defect analysis, break
down drills, pre and post refit trails for improving the overall reliability & safety.
 Analyzed and confirmed the quality matters for final output and sustained the growth within
limited as per organization in actual required market segment.
 Delegated responsibilities for executions of organization strategies as a leading hand at work
areas and ensured growth business as per organizational instructions and needs.
 Performed installation and commissioning of:
 Pumps like feed pumps, moyno pumps, screw pumps, centrifugal pumps and other
combustion fuel pumps and other accessories like Rotary valves, Cyclones air heaters and fan
etc.
 Reactors, precipitation reactors, FRP tanks, storage tanks of capacities varied from lower
limit to higher 60 Metric Ton.
 Conveyors like tube chain conveyors, Sunekon Screw & Pneumatic Conveyors etc. for bulk
materials at plant.
 Utilities like cooling towers, inert gas generating plant ( In ox),dry air and wet air plant for
instruments and other plant respectively, chillers & demineralization plant needed for some
process plants.
 Executed troubleshooting and fault finding of mechanical equipment and systems during project
execution
 Conducted tests & inspections to ensure operational effectiveness of utilities.
 Involved in the manufacturing of agrochemicals and emulsion polymers, intermediates, specialty
chemicals for industrial and agriculture use.
 Implemented & followed up of ISO-9001as well as involved in ISO-1400 with their constant
compliance.
 Monitored availability and delivery of right quality materials at the right time, price and terms.
 Supervised manpower /work distribution to ensure that teams adhere to all the quality tool and
procedures.
ACADEMIC CREDENTIALS
1993 Bachelor of Engineering (Chemical) from PVPIT College Budhgaon, Shivaji University,
Sangli
PERSONAL DETAILS
Date of Birth 03/08/1971
Languages Known English, Hindi & Marathi
References Available on request
Summary of Achievements:(Few)
1) IndividuallyHandled andimplementedprojectincludeshazardouschemical transportationand
storage facilityunderinertatmosphere andachievedcostreductionobjectiveinitiative aswellas
implementedin3-4 monthswithtraining 10-15 workforce ensuringandcomplyingof safety,
environmentmeasuresandthusleading tocost savingof rupees3-5 Lakh perannum Thiswasdue to
versatile,problemsolving,leadershipandteambuilding andresultorientedqualities.
2) Implementedprojectactivitiesanddebottleneckingactivitiesincludingerection-installationand
commissioning tomake standard and fine tunedof processtosmoothrun withsome peergroupand
projectpeergroupand team
3) Implementedimprovementsandcostreductionandincreasedproductivityinsome product process
at site locationandone among thisimplementationisnarratedbelow;
Instance inshort of improvedprocess
Inscrutablemoment was the one incidentfor the organization for the few major products which left everybody in
lurch due to some off-specification properties which gained the ground after so many brown studies,delvingand
pondering on by us and especially consideringevery guild or peer member’s points for failureof the required
specification and these points of everybody really turned into shiningor consecrated in the outfield for the market
as organization a market leader that produces agrochemicalsand number of specialty chemicals for different
industrial usewith different properties likeAssay,MoistureContent, Active Ingredient, Wetting Out Time and so
on for agrochemicals aswell as Total Solids,PH,Clarity,Viscosity,Opacity,particleSize,Concentration Content and
so on for Specialty chemicals.Among these below one instanceof one product was made successful with emphasis
to resolvesome failurein quality is annotated as a citation.
For Instances;
One of the most and major productlikeOPAQUE-621with well properties demanded by a paintindustries found
failingin someof the properties likePH, Opacity.When we started delvingreason behind itand the most of
product opacity was below the par due to number of operation pitfallsincludingvery slightor even minute delay
duringprocess operation,some of the rawmaterial with very fraction of off-specification in shelf-lifeas well as the
inability of reactor material of construction after every consecutivebatches due to improper or lackingof wiping
out and cleaningof reactor MOC as PH of previous batches had been found getting added into next one.
(Opacity: Opacity is the property required for paintas additives for better viscosity and thickness and itshould not
be a transparentas well as dull as this isa very important whilepaintapplication.)
Ironing Out off-specification Opacity:
The most probablereasons were found and issuewas resolved with followingcrux or points as,
1) Followingthe process parameters from very firstand initial stageof batch as per checklistformed by our
team.
2) The reaction was to go in three stages includingaddingquality rawmaterial i nitiatingwith initiator and
acceleratingwith some additives called propagator and the final breakingthe reaction with every checks
at every smaller stages with proper controllingcoolingand strippingor heating.
3) Thoroughly wipingout or cleaningof main kettles or reactors and ensure the PH and clarity of de-
mineralized water required for next batches after givingsome short boil and ensure of PH is neutral of
boiled water atroom temperature.
4) Coolingand heating with proper backup without fail during reaction stagewith proper attention.
5) Ensuringthe holdingtime after completion of reaction is maintained properly without delay and packing
of the material once all quality checks arewithin specification withoutany further delay with precaution.
Conclusion:
What has been annotated above points is eventually really conferred with perfect and lifetime solution for
Opacity as a reward for us to bringthe product again for paintindustry as a market leader.
DEGREE CERTIFICATE AND OTHER APPRECIATION CERTIFICATES:
(Would Be Shown During Real Time)
JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016

More Related Content

What's hot (20)

debasish_das_ resume maaden
debasish_das_ resume maadendebasish_das_ resume maaden
debasish_das_ resume maaden
 
LBG Updated CV-1
LBG Updated CV-1LBG Updated CV-1
LBG Updated CV-1
 
CV - K. Raja Narender Reddy
CV - K. Raja Narender ReddyCV - K. Raja Narender Reddy
CV - K. Raja Narender Reddy
 
Resume
ResumeResume
Resume
 
CV update Feb 2016
CV update Feb 2016CV update Feb 2016
CV update Feb 2016
 
Srinivasan Modified Resume 20.05.15 (1)
Srinivasan Modified Resume 20.05.15 (1)Srinivasan Modified Resume 20.05.15 (1)
Srinivasan Modified Resume 20.05.15 (1)
 
Baldwin Dias resume
Baldwin Dias resumeBaldwin Dias resume
Baldwin Dias resume
 
Chris Marsh operations resume
Chris Marsh operations resumeChris Marsh operations resume
Chris Marsh operations resume
 
CV
CVCV
CV
 
Muhammed First Draft CV_Updated
Muhammed First Draft CV_UpdatedMuhammed First Draft CV_Updated
Muhammed First Draft CV_Updated
 
Roger Banks: My Professional Resume
Roger Banks: My Professional ResumeRoger Banks: My Professional Resume
Roger Banks: My Professional Resume
 
MJonesMFG Production Resume
MJonesMFG Production ResumeMJonesMFG Production Resume
MJonesMFG Production Resume
 
Harikrishna AV
Harikrishna AVHarikrishna AV
Harikrishna AV
 
CV
CVCV
CV
 
RESUME KRISHNA
RESUME KRISHNARESUME KRISHNA
RESUME KRISHNA
 
Resume new Yogesh
Resume new YogeshResume new Yogesh
Resume new Yogesh
 
Resume - Copy
Resume - CopyResume - Copy
Resume - Copy
 
DPS-Resume
DPS-ResumeDPS-Resume
DPS-Resume
 
Resume - Mohammad Mousa Mabrouk
Resume - Mohammad Mousa MabroukResume - Mohammad Mousa Mabrouk
Resume - Mohammad Mousa Mabrouk
 
updated resume gaurav
updated resume gauravupdated resume gaurav
updated resume gaurav
 

Viewers also liked

Public safety personnel survey results 3.4.13
Public safety personnel survey results 3.4.13Public safety personnel survey results 3.4.13
Public safety personnel survey results 3.4.13cityofevanston
 
Diesel energy resources and Power Plants
Diesel energy resources and Power PlantsDiesel energy resources and Power Plants
Diesel energy resources and Power Plantsnagarjun150
 
Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015cityofevanston
 
Fellowship outline
Fellowship outlineFellowship outline
Fellowship outlineStephen Fish
 
Pitch Letter One Heart - FINAL
Pitch Letter One Heart - FINALPitch Letter One Heart - FINAL
Pitch Letter One Heart - FINALJustin Ullestad
 
Byline Issue 11PrintFINAL
Byline Issue 11PrintFINALByline Issue 11PrintFINAL
Byline Issue 11PrintFINALRob O'Sullivan
 
Byline Issue 8 PRINT (1)
Byline Issue 8 PRINT (1)Byline Issue 8 PRINT (1)
Byline Issue 8 PRINT (1)Rob O'Sullivan
 
Fisheries Management Plan for the Atlantic Bonito, Sarda sarda (Bloch, 1793) ...
Fisheries Management Plan for the Atlantic Bonito, Sarda sarda (Bloch, 1793) ...Fisheries Management Plan for the Atlantic Bonito, Sarda sarda (Bloch, 1793) ...
Fisheries Management Plan for the Atlantic Bonito, Sarda sarda (Bloch, 1793) ...Christopher Kalloo
 
«МИКС-2016»: Чернышов Виталий Николаевич
«МИКС-2016»: Чернышов Виталий Николаевич«МИКС-2016»: Чернышов Виталий Николаевич
«МИКС-2016»: Чернышов Виталий НиколаевичАКМР Corpmedia.ru
 
«МИКС-2016»: Перетрухин Илья Михайлович
«МИКС-2016»: Перетрухин Илья Михайлович«МИКС-2016»: Перетрухин Илья Михайлович
«МИКС-2016»: Перетрухин Илья МихайловичАКМР Corpmedia.ru
 
Carol Foy - CV
Carol Foy - CVCarol Foy - CV
Carol Foy - CVCarol Foy
 
Evaluation question#4
Evaluation question#4Evaluation question#4
Evaluation question#4HamimTak
 

Viewers also liked (19)

Public safety personnel survey results 3.4.13
Public safety personnel survey results 3.4.13Public safety personnel survey results 3.4.13
Public safety personnel survey results 3.4.13
 
Diesel energy resources and Power Plants
Diesel energy resources and Power PlantsDiesel energy resources and Power Plants
Diesel energy resources and Power Plants
 
Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015
 
Fellowship outline
Fellowship outlineFellowship outline
Fellowship outline
 
Byline Issue 12
Byline Issue 12Byline Issue 12
Byline Issue 12
 
Byline Issue 7 Print
Byline Issue 7 PrintByline Issue 7 Print
Byline Issue 7 Print
 
Pitch Letter One Heart - FINAL
Pitch Letter One Heart - FINALPitch Letter One Heart - FINAL
Pitch Letter One Heart - FINAL
 
Byline Issue 11PrintFINAL
Byline Issue 11PrintFINALByline Issue 11PrintFINAL
Byline Issue 11PrintFINAL
 
Byline Issue 9 PRINT
Byline Issue 9 PRINTByline Issue 9 PRINT
Byline Issue 9 PRINT
 
Maxima
MaximaMaxima
Maxima
 
Byline Issue 8 PRINT (1)
Byline Issue 8 PRINT (1)Byline Issue 8 PRINT (1)
Byline Issue 8 PRINT (1)
 
GreenFolio Presentation
GreenFolio PresentationGreenFolio Presentation
GreenFolio Presentation
 
PACT Employment Services
PACT Employment ServicesPACT Employment Services
PACT Employment Services
 
Fisheries Management Plan for the Atlantic Bonito, Sarda sarda (Bloch, 1793) ...
Fisheries Management Plan for the Atlantic Bonito, Sarda sarda (Bloch, 1793) ...Fisheries Management Plan for the Atlantic Bonito, Sarda sarda (Bloch, 1793) ...
Fisheries Management Plan for the Atlantic Bonito, Sarda sarda (Bloch, 1793) ...
 
«МИКС-2016»: Чернышов Виталий Николаевич
«МИКС-2016»: Чернышов Виталий Николаевич«МИКС-2016»: Чернышов Виталий Николаевич
«МИКС-2016»: Чернышов Виталий Николаевич
 
«МИКС-2016»: Перетрухин Илья Михайлович
«МИКС-2016»: Перетрухин Илья Михайлович«МИКС-2016»: Перетрухин Илья Михайлович
«МИКС-2016»: Перетрухин Илья Михайлович
 
Factor humano
Factor humanoFactor humano
Factor humano
 
Carol Foy - CV
Carol Foy - CVCarol Foy - CV
Carol Foy - CV
 
Evaluation question#4
Evaluation question#4Evaluation question#4
Evaluation question#4
 

Similar to JITENDRA P DHOLE RESUME Updated 05042016

Similar to JITENDRA P DHOLE RESUME Updated 05042016 (20)

Resume ravikumar (4)
Resume ravikumar  (4)Resume ravikumar  (4)
Resume ravikumar (4)
 
debasish 2nd cv
debasish 2nd cvdebasish 2nd cv
debasish 2nd cv
 
RKS
RKSRKS
RKS
 
Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
 
Utpal bose resume
Utpal bose resumeUtpal bose resume
Utpal bose resume
 
Niranjana UCV
Niranjana UCVNiranjana UCV
Niranjana UCV
 
production engineer
production engineerproduction engineer
production engineer
 
Resume_ Santosh Shewale
Resume_ Santosh ShewaleResume_ Santosh Shewale
Resume_ Santosh Shewale
 
Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.
 
Gattu Hari
Gattu HariGattu Hari
Gattu Hari
 
resume_nivedita_planning
resume_nivedita_planningresume_nivedita_planning
resume_nivedita_planning
 
pankaj maniar
pankaj maniarpankaj maniar
pankaj maniar
 
Binay Kumar Sharma
Binay Kumar SharmaBinay Kumar Sharma
Binay Kumar Sharma
 
latestResume_Sushant
latestResume_SushantlatestResume_Sushant
latestResume_Sushant
 
Jagannath Adki
Jagannath AdkiJagannath Adki
Jagannath Adki
 
Thiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRPThiru CV 15 02 2016-FRP
Thiru CV 15 02 2016-FRP
 
CV_Rajeev_Bansal
CV_Rajeev_BansalCV_Rajeev_Bansal
CV_Rajeev_Bansal
 
Resume MilanRana
Resume MilanRanaResume MilanRana
Resume MilanRana
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 

JITENDRA P DHOLE RESUME Updated 05042016

  • 1. JITENDRA P DHOLE Address: 1376, Vighnaharta, Saraswatinagar, Near Sainik School, Vasumbe, Tehsil: Tasgaon, Dist: Sangli. 416312, Maharashtra, India Contact No.: +91 8390026313 / E-Mail: jitendra_dhole@yahoo.co.in jdhole634@gmail.com April 05, 2016 Kind Attn; Shine.com Dear Sir/Madam, A competent professional with nearly 13 years of experience in Technical, Project co-ordination, Commissioning, Installation, Production Operations and Supply Chain Management. . I have been acknowledged by my understanding for:  Proficient in managing production operations as per the defined time/ cost parameters & standards as well as experience of developing procedures for operational excellence.  Adept in ensuring compliances to production targets as per quality standards.  A keen strategist and planner with skills in conceptualizing and effecting process initiatives to enhance operational efficiency and productivity; expertise in Plant Erection & Commissioning, Start-up, Shut-down & Expansion activities.  Excellent understanding of Industrial Standards & Procedures, Health & Safety Standards, Quality Management, Waste Control, Maintenance of Production Lines, etc.  Effective communicator with excellent relationship, technical & interpersonal skills. I seek an opportunity within your organization for the profile of “Name of the profile you are applying for” where I can contribute with my knowledge gained during my education to fore. Additional capabilities are listed in detail in the enclosed resume. Looking forward to hearing from you regarding the above position. Yours sincerely, JITENDRA P DHOLE Enclosures: 1)PROFILE, KEY SKILLS AND SO ON..... 3) DEGREE AND APPRECIATION CERTIFICATES. (Would Be Shown During Real time)
  • 2. JITENDRA P DHOLE Address: 1376, Vighnaharta, Saraswatinagar, Near Sainik School, Vasumbe, Tehsil: Tasgaon, Dist: Sangli. 416312, Maharashtra, India Contact No.: +91 8390026313 / E-Mail: jitendra_dhole@yahoo.co.in Seeking challenging assignments in Production Planning,Plant Operations & Maintenance, Quality Control and Techno-commercial Operations with an organization of high repute PROFILE SNAPSHOT  A competent professional with nearly 13 years of experience in Project co-ordination, Commissioning, Installation, Production Operations and Supply Chain Management.  Previously associated with Indofil Chemicals Company as Technical Executive, Engineer (Superintendent.)  Exposure in managing assignments viz., erection, installation, commissioning, troubleshooting and maintenance of all the instruments in various plant projects as per various standards.  Expert in leading with a record of contributions that streamline the operations related, invigorated, heightened profitability with productivity and enhanced internal control at site accordance with organization.  Skilled of working with cross-functional teams using interactive leadership related activities.  Abilities in managing maintenance operations for reducing breakdown / downtime and enhancing operational effectiveness of equipment.  An effective communicator with excellent relationship management skills and strong analytical, technical, decision making, problem solving & organizational abilities. KEY SKILLS Operations & Maintenance Erection & Commissioning Production Operations Quality Control Project Management Plant Operations Process Improvement Techno-Commercial Operations Supply Chain Management CAREER HIGHLIGHTS  Appreciated for the project activities including maintenance and shut down within the scheduled period as a part of the Project Peer Group along with a team member.  Achieved certification of quality and production for the set target by managing hand to hand laboratory and production related activities.  Succeeded in making one of the major product named OPAQUE-621 successful with emphasis to resolve some failure in quality is annotated as a citation.  Initiated the idea of bringing back the product again for paint industry as a market leader.  Successfully implemented the project for emulsion polymers process for manufacturing different specialty chemicals in the industry.  Played a key role in scheduling and monitoring inventory and managing the inbound activities as well depending on the requirements for outbound locations if needed on priority and urgent basis.  Took part in training program related to safety & ISO awareness.  Used 1200 USGK Monomer to manufacture LMA and SMA for depressol petroleum industries.
  • 3. ORGANIZATIONAL DETAILS Since Aug 2006 Presently working with Small office and applying daily for opportunity. . Jan 1994-Jul 2006 Indofil Chemicals Company Technical Executive, Engineer (Superintendent) Key Result Areas:  Directed production plans, arranged resources to ensure achievement of targets as per cost parameters.  Handled manufacturing, quality production and goal per set at site.  Planned execution and commissioning of projects co-ordination, maintenance, shut down activity of plant and its accessories including utilities, material handling systems for bulk materials, storage tanks and its accessories of bulk monomers/chemicals.  Monitored process in operations with PLC & DCS-Control System and resolved the issues on time.  Initiating new process concepts for production optimization and yield improvement.  Developed schedule, performance operations to help sustain & grow programs, services as per strategy.  Analyzed various processes/ applications and recommended modifications or equipment calibrations to enhance operational efficiency.  Took part in meetings and in strategic activities, whenever needed as per organization.  Planned and implemented the annual calendar of activities related to work areas as well as special events, training & official administration acts.  Created budget expenditure, prepared plan and meetings review whenever necessary to be presented to the organization or senior management.  Implemented the preventive and condition based periodic maintenance, defect analysis, break down drills, pre and post refit trails for improving the overall reliability & safety.  Analyzed and confirmed the quality matters for final output and sustained the growth within limited as per organization in actual required market segment.  Delegated responsibilities for executions of organization strategies as a leading hand at work areas and ensured growth business as per organizational instructions and needs.  Performed installation and commissioning of:  Pumps like feed pumps, moyno pumps, screw pumps, centrifugal pumps and other combustion fuel pumps and other accessories like Rotary valves, Cyclones air heaters and fan etc.  Reactors, precipitation reactors, FRP tanks, storage tanks of capacities varied from lower limit to higher 60 Metric Ton.  Conveyors like tube chain conveyors, Sunekon Screw & Pneumatic Conveyors etc. for bulk materials at plant.  Utilities like cooling towers, inert gas generating plant ( In ox),dry air and wet air plant for instruments and other plant respectively, chillers & demineralization plant needed for some process plants.  Executed troubleshooting and fault finding of mechanical equipment and systems during project execution  Conducted tests & inspections to ensure operational effectiveness of utilities.
  • 4.  Involved in the manufacturing of agrochemicals and emulsion polymers, intermediates, specialty chemicals for industrial and agriculture use.  Implemented & followed up of ISO-9001as well as involved in ISO-1400 with their constant compliance.  Monitored availability and delivery of right quality materials at the right time, price and terms.  Supervised manpower /work distribution to ensure that teams adhere to all the quality tool and procedures. ACADEMIC CREDENTIALS 1993 Bachelor of Engineering (Chemical) from PVPIT College Budhgaon, Shivaji University, Sangli PERSONAL DETAILS Date of Birth 03/08/1971 Languages Known English, Hindi & Marathi References Available on request Summary of Achievements:(Few)
  • 5. 1) IndividuallyHandled andimplementedprojectincludeshazardouschemical transportationand storage facilityunderinertatmosphere andachievedcostreductionobjectiveinitiative aswellas implementedin3-4 monthswithtraining 10-15 workforce ensuringandcomplyingof safety, environmentmeasuresandthusleading tocost savingof rupees3-5 Lakh perannum Thiswasdue to versatile,problemsolving,leadershipandteambuilding andresultorientedqualities. 2) Implementedprojectactivitiesanddebottleneckingactivitiesincludingerection-installationand commissioning tomake standard and fine tunedof processtosmoothrun withsome peergroupand projectpeergroupand team 3) Implementedimprovementsandcostreductionandincreasedproductivityinsome product process at site locationandone among thisimplementationisnarratedbelow; Instance inshort of improvedprocess Inscrutablemoment was the one incidentfor the organization for the few major products which left everybody in lurch due to some off-specification properties which gained the ground after so many brown studies,delvingand pondering on by us and especially consideringevery guild or peer member’s points for failureof the required specification and these points of everybody really turned into shiningor consecrated in the outfield for the market as organization a market leader that produces agrochemicalsand number of specialty chemicals for different industrial usewith different properties likeAssay,MoistureContent, Active Ingredient, Wetting Out Time and so on for agrochemicals aswell as Total Solids,PH,Clarity,Viscosity,Opacity,particleSize,Concentration Content and so on for Specialty chemicals.Among these below one instanceof one product was made successful with emphasis to resolvesome failurein quality is annotated as a citation. For Instances; One of the most and major productlikeOPAQUE-621with well properties demanded by a paintindustries found failingin someof the properties likePH, Opacity.When we started delvingreason behind itand the most of product opacity was below the par due to number of operation pitfallsincludingvery slightor even minute delay duringprocess operation,some of the rawmaterial with very fraction of off-specification in shelf-lifeas well as the inability of reactor material of construction after every consecutivebatches due to improper or lackingof wiping out and cleaningof reactor MOC as PH of previous batches had been found getting added into next one. (Opacity: Opacity is the property required for paintas additives for better viscosity and thickness and itshould not be a transparentas well as dull as this isa very important whilepaintapplication.) Ironing Out off-specification Opacity: The most probablereasons were found and issuewas resolved with followingcrux or points as, 1) Followingthe process parameters from very firstand initial stageof batch as per checklistformed by our team. 2) The reaction was to go in three stages includingaddingquality rawmaterial i nitiatingwith initiator and acceleratingwith some additives called propagator and the final breakingthe reaction with every checks at every smaller stages with proper controllingcoolingand strippingor heating.
  • 6. 3) Thoroughly wipingout or cleaningof main kettles or reactors and ensure the PH and clarity of de- mineralized water required for next batches after givingsome short boil and ensure of PH is neutral of boiled water atroom temperature. 4) Coolingand heating with proper backup without fail during reaction stagewith proper attention. 5) Ensuringthe holdingtime after completion of reaction is maintained properly without delay and packing of the material once all quality checks arewithin specification withoutany further delay with precaution. Conclusion: What has been annotated above points is eventually really conferred with perfect and lifetime solution for Opacity as a reward for us to bringthe product again for paintindustry as a market leader.
  • 7. DEGREE CERTIFICATE AND OTHER APPRECIATION CERTIFICATES: (Would Be Shown During Real Time)