SlideShare a Scribd company logo
1 of 4
Resume
Personal data
Name: István Tóth
Date of birth: 05.January 1981
Address: Derék Utca 68. 6/52,
Debrecen, 4031
Email: hutothi@gmail.com
Phone: + 36-30-415-0281
Education
• 2008 – 2011 Budapest University of Technology and Economics, Msc MBA
program, management faculty.
• 2000 – 2004 Budapest Technical College, Kando Electrical Engineering
department, within Automation and Digital instruments faculty.
• 1995 – 2000 Verebely Laszlo Electro technical school.
Employment history/Work experiences
NI Hungary Ltd. Debrecen, subsidiary of National Instruments Co.
• 2012 Január – ... Senior Product Engineer and Project Manager
- My first task was a brand new product implementation. I was the program
manager in Mfg who coordinated the Mfg support engineers and operation staff
during the project. My goal was that during the prototype runs gave feedback and
suggestion to RnD team in Austin to make the product more cheaper and easier
produce. The production process of the product contains SMT, hand Assy and test
operation steps. The date of the product introduction for customers was strictly
defined by marketing, and of course we had to solve all problems and issues until
that time. The product was presented on the annual customer event in Austin. We
had to design several Mfg fixtures, like assy fixtures or other tools, that was
coordinated by me.
- My main task is product transfer coordination and project management. My
biggest project was the product transfer to Hungarian facility because of the
shutdown of the mfg site at headquarters. I transferred more than 300 products
within 9 months that was 5 months earlier the planned shutdown and project
close, which resulted significant cost save for Mfg organization. I worked with 50
people during the project. The biggest challenge was the coordination of the
people at sender site, who knew their not positive prospect after the project. My
further subtask under transfer is to give suggestion and scenarios the management
about which products we need to transfer or pull back between facilities in
Malaysia and Hungary. All of these was considered based on grow, tolls and
equipment, capacity, transfer and investment, technology and RnD attendance at
the particular site.
- My third task in this position is RF product transfer and implementation
during an acquisition. The main challenge was the time, because I got 2 months
for the transfer. These products required absolutely new and different technology
than NI had before on assy and test side, otherwise the acquired company has
different production and documentation system. During the project I have had to
coordinate the production cell design and building, equipment transfer and
purchasing, knowledge transfer, finance and custom support, head count planning
and the communication between the two company.
• 2011 May - … Back_End Process Engineering Manager
I crated the BackEnd Process team and I was responsible the process and
technology management of the assembly, test and final inspection areas in
production. The team built up by 25 engineers. My main task to found the
process engineer team from the old Value team and integrate the necessary
process and industrial engineering knowledge. Furthermore I have made the
fusion of the test and process engineering team into one organization and sync the
tasks and responsibilities of the two teams. In this position I could try my new
knowledge from MBA like, knowledge management of engineers, human and
resource management of the team (cost center, carrier, information, people
development and reviews). With these new knowledge I reached the 86%
engagement and satisfaction level in the team.
My biggest project is the BackEnd area reengineering, based on Lean thinking
and it contains the vision of the possible layout of the manufacturing and
construction, the strategy of the process flow(material, product, information),
technology definition, process optimization, quality, quantity and efficiency
metrics and targets definition. Project management based on DMAIC method
from Six Sigma. With the new way of the production and improvements I could
handle 20% volume increase without and headcount investment.
From test engineering point of view, I created some new metrics to measure the
quality of the problem solving, solution and exploration of the recurrent failures,
lead the and on time delivery of the new test system implementation, and the
return benefit of the continuously improvement of the test systems. I could reduce
the number of the daily problems by 30% with the recurrent failures reductions
and improvements on test systems.
• 2010 August – 2011 April Value and Manufacturing Test Engineering
Manager
New role to reorganize the manufacturing test engineering and create the vision
and define the strategy of the team for the new tasks in the future. The biggest
challenge was to increase the engagement and satisfaction of the team, but it was
a successful project. The result jumped from 50% to 68%.
• 2008 August – 2010 August Value Engineering Manager
The team is a continuously improvement team to increase the efficiency of the
production and reduce cost of the production. Furthermore improve the quality of
the products and processes of the production. In this position I had a chance to
improve my people management skill, and got know and use the different quality
management tool. Otherwise I could work with management to got more
experience and because of this I had started the MBA course at the Budapest
University to get more knowledge about the professional management technics.
During this time I am working in a Lean foundation team to change the thinking
of the organization.
• 2006 January – 2008 July Tech Lead of the FVT(Functional Verification
Test) development team.
Coordinate the NPIs (New Products Implementation) and the projects of test
engineers in the test development team. Managing the test SW and HW
development projects and develop, improve test code for products. Furthermore
give technical support for engineers during the test development projects. In this
time period I was acting as FVT development team manager also for 6 months
and I had to work so close with the RnD engineers and managers in US. In this
period I had chance to improve my people and project manager skills.
• 2005 February – 2005 December, FVT(Functional Verification Test) test
support team lead.
Coordinate the FVT support team. The team contained 20-25 people, technicians
and engineers. I was responsible for coordination of the production support on the
test area. I had daily contact with the management, production and planning,
because of the priority set of the business. In this position I was able to do
technical and people and performance management roles. I planned and
coordinate the budget of the team.
• 2004 October – 2005 February, National Instruments Co. (Texas Austin)
I was on a technical and leader training course at the headquarters in US. During
this time I transferred products to Hungary and developed functional tests for a
couple of products with the RnD teams.
• 2004 Jun – 2004 October, FVT(Functional Verification Test) test engineer.
My main tasks were to support the production and handle the daily problems on
the shop floor. Furthermore I had to keep the contact with the Test development
engineers in US.
• 2003 September – 2004 Jun, Intern.
I was intern in test engineering. I was working on my thesis and production issues
with test engineers.
Skills and Competences
• Account/Cost center
management
• Quality management and tools
• Project management
• Human resource management
• Situational Leadership
• Lean management, philosophy
and tools
• New Product Implementation
• Process management
• Good communication in
Hun/Eng
• Computer SW-HW knowledge
more than user level (Office,
Oracle, P4, Agile)
• Computer programming
(LabView, C, Assembly)
• Electrical Engineering
• Production support management
• Project management
Other certifications and training
• B category driving license
• Advanced level English
• Project Management (Systemation)
• Situational Leadership (AD SIDERA)
• Lean foundation (Leonado Group)
• DMAIC as project management (E-Con Solution)
Hobbies
• Outdoor activities
• Fishing
• Model railway

More Related Content

What's hot

FCS Resume 2016 English ENG
FCS Resume 2016 English ENGFCS Resume 2016 English ENG
FCS Resume 2016 English ENGFelipe Calleros
 
D Tindall Full Resume May 2015 V3
D Tindall Full Resume May 2015 V3D Tindall Full Resume May 2015 V3
D Tindall Full Resume May 2015 V3Doug Tindall
 
Damodar joshi resume
Damodar joshi resumeDamodar joshi resume
Damodar joshi resumeDAMODARJOSHI5
 
HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)Lee Hang Li
 
Ken McConahy Resume
Ken McConahy ResumeKen McConahy Resume
Ken McConahy ResumeKen McConahy
 
resume- Jase Parr
resume- Jase Parrresume- Jase Parr
resume- Jase ParrJase Parr
 
Scott Miller Resume
Scott Miller ResumeScott Miller Resume
Scott Miller ResumeScott Miller
 
Resume-Nagaraj V D -Test Management Architect
Resume-Nagaraj V D -Test Management ArchitectResume-Nagaraj V D -Test Management Architect
Resume-Nagaraj V D -Test Management ArchitectNagaraj V D
 
J Harry McGrath Resume ND.2.
J Harry McGrath Resume ND.2.J Harry McGrath Resume ND.2.
J Harry McGrath Resume ND.2.J Harry McGrath
 
Value engineering practical
Value engineering practicalValue engineering practical
Value engineering practicalAbada Saad
 

What's hot (19)

BJ Fardi - Resume
BJ Fardi - ResumeBJ Fardi - Resume
BJ Fardi - Resume
 
FCS Resume 2016 English ENG
FCS Resume 2016 English ENGFCS Resume 2016 English ENG
FCS Resume 2016 English ENG
 
D Tindall Full Resume May 2015 V3
D Tindall Full Resume May 2015 V3D Tindall Full Resume May 2015 V3
D Tindall Full Resume May 2015 V3
 
Damodar joshi resume
Damodar joshi resumeDamodar joshi resume
Damodar joshi resume
 
HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)
 
CV_Apr_2016
CV_Apr_2016CV_Apr_2016
CV_Apr_2016
 
Ken McConahy Resume
Ken McConahy ResumeKen McConahy Resume
Ken McConahy Resume
 
Resume2017
Resume2017Resume2017
Resume2017
 
resume- Jase Parr
resume- Jase Parrresume- Jase Parr
resume- Jase Parr
 
Scott Miller Resume
Scott Miller ResumeScott Miller Resume
Scott Miller Resume
 
Resume-Nagaraj V D -Test Management Architect
Resume-Nagaraj V D -Test Management ArchitectResume-Nagaraj V D -Test Management Architect
Resume-Nagaraj V D -Test Management Architect
 
Daniel Lee
Daniel LeeDaniel Lee
Daniel Lee
 
Genell Palazola Resume
Genell Palazola ResumeGenell Palazola Resume
Genell Palazola Resume
 
JSReid
JSReidJSReid
JSReid
 
Vadim_Protasov_VP
Vadim_Protasov_VPVadim_Protasov_VP
Vadim_Protasov_VP
 
J Harry McGrath Resume ND.2.
J Harry McGrath Resume ND.2.J Harry McGrath Resume ND.2.
J Harry McGrath Resume ND.2.
 
akil R1.doc
akil R1.docakil R1.doc
akil R1.doc
 
Asanda Pearl Mtshizana CV
Asanda Pearl Mtshizana CVAsanda Pearl Mtshizana CV
Asanda Pearl Mtshizana CV
 
Value engineering practical
Value engineering practicalValue engineering practical
Value engineering practical
 

Viewers also liked

fica ta na mente -cedaspy
fica ta na mente -cedaspyfica ta na mente -cedaspy
fica ta na mente -cedaspycl-vinicius
 
sistesis avner greif
sistesis avner greifsistesis avner greif
sistesis avner greifrunnedtime
 
Enabling a Connected Education Ecosystem
Enabling a Connected Education EcosystemEnabling a Connected Education Ecosystem
Enabling a Connected Education EcosystemWSO2
 
Driving workforce enablement through it innovation - Digital at Rolls-Royce
Driving workforce enablement through it innovation - Digital at Rolls-RoyceDriving workforce enablement through it innovation - Digital at Rolls-Royce
Driving workforce enablement through it innovation - Digital at Rolls-RoyceMicrosoft UK
 
LIFE PAYT Launching Event: A utilização de Tecnologias de Informação e Comun...
LIFE PAYT Launching Event:  A utilização de Tecnologias de Informação e Comun...LIFE PAYT Launching Event:  A utilização de Tecnologias de Informação e Comun...
LIFE PAYT Launching Event: A utilização de Tecnologias de Informação e Comun...LIFE PAYT
 
Analysis of aircraft icing and its preventive measures
Analysis of aircraft icing and its preventive measuresAnalysis of aircraft icing and its preventive measures
Analysis of aircraft icing and its preventive measuresOnkar Upare
 
Actinomyces & nocardia
Actinomyces & nocardiaActinomyces & nocardia
Actinomyces & nocardiaIAU Dent
 

Viewers also liked (9)

1872 a reg___10__169g
1872 a reg___10__169g1872 a reg___10__169g
1872 a reg___10__169g
 
fica ta na mente -cedaspy
fica ta na mente -cedaspyfica ta na mente -cedaspy
fica ta na mente -cedaspy
 
sistesis avner greif
sistesis avner greifsistesis avner greif
sistesis avner greif
 
Enabling a Connected Education Ecosystem
Enabling a Connected Education EcosystemEnabling a Connected Education Ecosystem
Enabling a Connected Education Ecosystem
 
Driving workforce enablement through it innovation - Digital at Rolls-Royce
Driving workforce enablement through it innovation - Digital at Rolls-RoyceDriving workforce enablement through it innovation - Digital at Rolls-Royce
Driving workforce enablement through it innovation - Digital at Rolls-Royce
 
LIFE PAYT Launching Event: A utilização de Tecnologias de Informação e Comun...
LIFE PAYT Launching Event:  A utilização de Tecnologias de Informação e Comun...LIFE PAYT Launching Event:  A utilização de Tecnologias de Informação e Comun...
LIFE PAYT Launching Event: A utilização de Tecnologias de Informação e Comun...
 
Analysis of aircraft icing and its preventive measures
Analysis of aircraft icing and its preventive measuresAnalysis of aircraft icing and its preventive measures
Analysis of aircraft icing and its preventive measures
 
Actinomyces & nocardia
Actinomyces & nocardiaActinomyces & nocardia
Actinomyces & nocardia
 
Actinomycetes
ActinomycetesActinomycetes
Actinomycetes
 

Similar to CV

Dan Lewis Resume 2015
Dan Lewis Resume 2015Dan Lewis Resume 2015
Dan Lewis Resume 2015Dan Lewis
 
Deb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management SpecialistDeb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management SpecialistDeborah Keefe
 
Brian D. Wilson resume 2014
Brian D. Wilson  resume 2014Brian D. Wilson  resume 2014
Brian D. Wilson resume 2014Brian Wilson
 
Vignesh Kumar Resume Latest
Vignesh Kumar Resume LatestVignesh Kumar Resume Latest
Vignesh Kumar Resume Latestvignesh kumar N
 
CV_AldoObregon_12282016
CV_AldoObregon_12282016CV_AldoObregon_12282016
CV_AldoObregon_12282016Aldo Obregón
 
Shiva J Asthana - Project Manager
Shiva J Asthana - Project ManagerShiva J Asthana - Project Manager
Shiva J Asthana - Project ManagerShiva Asthana
 
Wilson portfolio2013
Wilson portfolio2013Wilson portfolio2013
Wilson portfolio2013Brian Wilson
 
Sunay nagesh naik cv 3
Sunay nagesh naik  cv  3Sunay nagesh naik  cv  3
Sunay nagesh naik cv 3sunaynaik
 
Sunay nagesh naik cv 3
Sunay nagesh naik  cv  3Sunay nagesh naik  cv  3
Sunay nagesh naik cv 3sunaynaik
 
Sunay nagesh naik cv 3
Sunay nagesh naik  cv  3Sunay nagesh naik  cv  3
Sunay nagesh naik cv 3sunaynaik
 
Sunay nagesh naik cv 3
Sunay nagesh naik  cv  3Sunay nagesh naik  cv  3
Sunay nagesh naik cv 3sunaynaik
 

Similar to CV (20)

SJV Resume 2017
SJV Resume 2017SJV Resume 2017
SJV Resume 2017
 
Nantha Kumaran CV_1
Nantha Kumaran CV_1Nantha Kumaran CV_1
Nantha Kumaran CV_1
 
Dan Lewis Resume 2015
Dan Lewis Resume 2015Dan Lewis Resume 2015
Dan Lewis Resume 2015
 
Charles Findlay (3)
Charles Findlay (3)Charles Findlay (3)
Charles Findlay (3)
 
RESUME
RESUMERESUME
RESUME
 
Deb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management SpecialistDeb Keefe Resume_Sr. Configuration Management Specialist
Deb Keefe Resume_Sr. Configuration Management Specialist
 
Lauren Putthoff Resume
Lauren Putthoff ResumeLauren Putthoff Resume
Lauren Putthoff Resume
 
resume
resumeresume
resume
 
Brian D. Wilson resume 2014
Brian D. Wilson  resume 2014Brian D. Wilson  resume 2014
Brian D. Wilson resume 2014
 
Vignesh Kumar Resume Latest
Vignesh Kumar Resume LatestVignesh Kumar Resume Latest
Vignesh Kumar Resume Latest
 
CV_AldoObregon_12282016
CV_AldoObregon_12282016CV_AldoObregon_12282016
CV_AldoObregon_12282016
 
Shiva J Asthana - Project Manager
Shiva J Asthana - Project ManagerShiva J Asthana - Project Manager
Shiva J Asthana - Project Manager
 
Gulshan_resume
Gulshan_resumeGulshan_resume
Gulshan_resume
 
Kumar_Anish
Kumar_AnishKumar_Anish
Kumar_Anish
 
Praveen Sudarsan
Praveen SudarsanPraveen Sudarsan
Praveen Sudarsan
 
Wilson portfolio2013
Wilson portfolio2013Wilson portfolio2013
Wilson portfolio2013
 
Sunay nagesh naik cv 3
Sunay nagesh naik  cv  3Sunay nagesh naik  cv  3
Sunay nagesh naik cv 3
 
Sunay nagesh naik cv 3
Sunay nagesh naik  cv  3Sunay nagesh naik  cv  3
Sunay nagesh naik cv 3
 
Sunay nagesh naik cv 3
Sunay nagesh naik  cv  3Sunay nagesh naik  cv  3
Sunay nagesh naik cv 3
 
Sunay nagesh naik cv 3
Sunay nagesh naik  cv  3Sunay nagesh naik  cv  3
Sunay nagesh naik cv 3
 

CV

  • 1. Resume Personal data Name: István Tóth Date of birth: 05.January 1981 Address: Derék Utca 68. 6/52, Debrecen, 4031 Email: hutothi@gmail.com Phone: + 36-30-415-0281 Education • 2008 – 2011 Budapest University of Technology and Economics, Msc MBA program, management faculty. • 2000 – 2004 Budapest Technical College, Kando Electrical Engineering department, within Automation and Digital instruments faculty. • 1995 – 2000 Verebely Laszlo Electro technical school. Employment history/Work experiences NI Hungary Ltd. Debrecen, subsidiary of National Instruments Co. • 2012 Január – ... Senior Product Engineer and Project Manager - My first task was a brand new product implementation. I was the program manager in Mfg who coordinated the Mfg support engineers and operation staff during the project. My goal was that during the prototype runs gave feedback and suggestion to RnD team in Austin to make the product more cheaper and easier produce. The production process of the product contains SMT, hand Assy and test operation steps. The date of the product introduction for customers was strictly defined by marketing, and of course we had to solve all problems and issues until that time. The product was presented on the annual customer event in Austin. We had to design several Mfg fixtures, like assy fixtures or other tools, that was coordinated by me. - My main task is product transfer coordination and project management. My biggest project was the product transfer to Hungarian facility because of the shutdown of the mfg site at headquarters. I transferred more than 300 products within 9 months that was 5 months earlier the planned shutdown and project close, which resulted significant cost save for Mfg organization. I worked with 50 people during the project. The biggest challenge was the coordination of the people at sender site, who knew their not positive prospect after the project. My further subtask under transfer is to give suggestion and scenarios the management about which products we need to transfer or pull back between facilities in
  • 2. Malaysia and Hungary. All of these was considered based on grow, tolls and equipment, capacity, transfer and investment, technology and RnD attendance at the particular site. - My third task in this position is RF product transfer and implementation during an acquisition. The main challenge was the time, because I got 2 months for the transfer. These products required absolutely new and different technology than NI had before on assy and test side, otherwise the acquired company has different production and documentation system. During the project I have had to coordinate the production cell design and building, equipment transfer and purchasing, knowledge transfer, finance and custom support, head count planning and the communication between the two company. • 2011 May - … Back_End Process Engineering Manager I crated the BackEnd Process team and I was responsible the process and technology management of the assembly, test and final inspection areas in production. The team built up by 25 engineers. My main task to found the process engineer team from the old Value team and integrate the necessary process and industrial engineering knowledge. Furthermore I have made the fusion of the test and process engineering team into one organization and sync the tasks and responsibilities of the two teams. In this position I could try my new knowledge from MBA like, knowledge management of engineers, human and resource management of the team (cost center, carrier, information, people development and reviews). With these new knowledge I reached the 86% engagement and satisfaction level in the team. My biggest project is the BackEnd area reengineering, based on Lean thinking and it contains the vision of the possible layout of the manufacturing and construction, the strategy of the process flow(material, product, information), technology definition, process optimization, quality, quantity and efficiency metrics and targets definition. Project management based on DMAIC method from Six Sigma. With the new way of the production and improvements I could handle 20% volume increase without and headcount investment. From test engineering point of view, I created some new metrics to measure the quality of the problem solving, solution and exploration of the recurrent failures, lead the and on time delivery of the new test system implementation, and the return benefit of the continuously improvement of the test systems. I could reduce the number of the daily problems by 30% with the recurrent failures reductions and improvements on test systems. • 2010 August – 2011 April Value and Manufacturing Test Engineering Manager New role to reorganize the manufacturing test engineering and create the vision and define the strategy of the team for the new tasks in the future. The biggest challenge was to increase the engagement and satisfaction of the team, but it was a successful project. The result jumped from 50% to 68%.
  • 3. • 2008 August – 2010 August Value Engineering Manager The team is a continuously improvement team to increase the efficiency of the production and reduce cost of the production. Furthermore improve the quality of the products and processes of the production. In this position I had a chance to improve my people management skill, and got know and use the different quality management tool. Otherwise I could work with management to got more experience and because of this I had started the MBA course at the Budapest University to get more knowledge about the professional management technics. During this time I am working in a Lean foundation team to change the thinking of the organization. • 2006 January – 2008 July Tech Lead of the FVT(Functional Verification Test) development team. Coordinate the NPIs (New Products Implementation) and the projects of test engineers in the test development team. Managing the test SW and HW development projects and develop, improve test code for products. Furthermore give technical support for engineers during the test development projects. In this time period I was acting as FVT development team manager also for 6 months and I had to work so close with the RnD engineers and managers in US. In this period I had chance to improve my people and project manager skills. • 2005 February – 2005 December, FVT(Functional Verification Test) test support team lead. Coordinate the FVT support team. The team contained 20-25 people, technicians and engineers. I was responsible for coordination of the production support on the test area. I had daily contact with the management, production and planning, because of the priority set of the business. In this position I was able to do technical and people and performance management roles. I planned and coordinate the budget of the team. • 2004 October – 2005 February, National Instruments Co. (Texas Austin) I was on a technical and leader training course at the headquarters in US. During this time I transferred products to Hungary and developed functional tests for a couple of products with the RnD teams. • 2004 Jun – 2004 October, FVT(Functional Verification Test) test engineer. My main tasks were to support the production and handle the daily problems on the shop floor. Furthermore I had to keep the contact with the Test development engineers in US. • 2003 September – 2004 Jun, Intern. I was intern in test engineering. I was working on my thesis and production issues with test engineers. Skills and Competences • Account/Cost center management • Quality management and tools • Project management • Human resource management • Situational Leadership
  • 4. • Lean management, philosophy and tools • New Product Implementation • Process management • Good communication in Hun/Eng • Computer SW-HW knowledge more than user level (Office, Oracle, P4, Agile) • Computer programming (LabView, C, Assembly) • Electrical Engineering • Production support management • Project management Other certifications and training • B category driving license • Advanced level English • Project Management (Systemation) • Situational Leadership (AD SIDERA) • Lean foundation (Leonado Group) • DMAIC as project management (E-Con Solution) Hobbies • Outdoor activities • Fishing • Model railway