1. Curriculum Vitae
Of
INDERPAL SINGH (QA/QC Inspector-Insulation)
Nationality : Indian
Date of Birth : 06/09/1986.
Position : QA/QC Inspector -Insulation
Total Work Experience : 4 Years
Educational Qualification : Higher Secondary in English Medium.
Computer Literacy : Experienced in all Microsoft office software
Details of Experience:
Global Suhaimi Company
Designation: QA/QC Inspector –Insulation
Project -1:
GS Construction Co.Ltd Sipchem-EVA Plant (Jubail) – Hot and Cold Insulation works for piping and
Equipment.
Manage site works in terms of quality and safety and optimum utilization of available resources.
Follow the implementation of the Project Quality Plan.
Follow PIP Standards and Specifications.
Responsible for preparation of ITP and QCP’s with respect to Insulation activities and the works are
carried out.
Follow Inspection check List which are as follow:
1. All required testing is completed and systems released for insulation by the appropriate authority.
2. The surface to be insulated is clean and dry.
3. The surface to be insulated has been coated and released for insulation by the appropriate authority.
4. Heat tracing has been installed, inspected and released for insulation by the appropriate authority.
5. Existing installed insulation is protected from damage.
6. All supports are installed properly.
7. Insulation support rings are installed.
8. The insulation is the correct thickness and number of layers.
GLOBAL SUHAIMI COMPANY.
PO Box 665, JUBAIL 31951, KSA.
Ph: +966-3-362 1968
2. 9. All joints are correctly staggered.
10. Joints are cut and fit to maximum of 1/8 inch.
11. The insulation securement is correct.
12. Vapor barrier is correctly installed and undamaged.
13. All joints are sealed / buttered.
14. Expansion joints are installed and spaced correctly.
15. The extent of insulation is correct.
16. Expansion or contraction springs are used as specified.
Carry out quality control activities including inspection, examination and testing to verify the quality
of the construction operations comply with project specifications.
Implement the preparation of Inspection and Test Plans (ITP) by CONTRACTORS and monitoring
of ITP's.
Daily observation of the coherence of the works with the plans and specifications of the project and
the compliance of the contractors with the quality requirements.
Coordination with quality control intervention points on the inspection and test plans, ITP
(Surveillance, witness and mandatory inspection).
Project -2:
E-Tec Arabia Ltd- SIPCHEM -EA Plant and Port Facilities Projects – Hot, Cold Insulation and Fire
Proofing works for piping and Equipment.
Manage site works in terms of quality and safety and optimum utilization of available resources.
Follow the implementation of the Project Quality Plan.
Follow PIP Standards and Specifications.
Responsible for preparation of ITP and QCP’s with respect to Insulation activities and the works are
carried out.
Carry out quality control activities including inspection, examination and testing to verify the quality
of the construction operations comply with project specifications.
Implement the preparation of Inspection and Test Plans (ITP) by CONTRACTORS and monitoring
of ITP's.
Daily observation of the coherence of the works with the plans and specifications of the project and
the compliance of the contractors with the quality requirements.
Coordination with quality control intervention points on the inspection and test plans, ITP
(Surveillance, witness and mandatory inspection).
Follow Inspection check List as per the SIPCHEM Standards.
3. Working Skills:
Familiar with various codes and standards such as ASME Section II
Well conversant with Insulation Standard applicable for PIP Standard.
Motivated, able to work under pressure and to meet deadlines and effective team player.
Indentifying what quality control task are needed insulation thickness, fixing of PIR materials, laying
of aluminum sheets, fixing of screws, washers, sealants and final cleaning prior to inspection.
Scheduling and controlling the tasks required.
Ensuring that all contractual quality standards and inspection are met.
Preparation of quality documents.
Prior to application checking of Rockwool, Calcium Silicate and Cellular Glass Insulation thickness
according to client specifications.
Checking of size and thickness of Aluminum Sheets prior to insulation.
To co-ordinate and conduct inspection at various stages of insulation works.
Certify acceptance of work, whose testing was completed and accepted by client.
Submit reports and recommendations.
Maintain files, charts and reports.
Inspection of insulation and cladding works and workmanship as per Inspection Test Plan for
conference and maintain records.
Project -3: August 2011-May 2012
Client : HYUNDAI HEAVY INDUSTRIES CO.LTD
Designation: QA/QC Inspector-Insulation
Project : DHURMA PP11 Project-RIYADH
Project -4:
Yanbu Aramco Sinopec Refining Project (YASREF) –EPC 2 CRUDE PACKAGE – Hot, Cold Insulation
for piping and Equipment.
Manage site works in terms of quality and safety and optimum utilization of available resources.
Follow the implementation of the Project Quality Plan.
Follow PIP Standards and Specifications.
Responsible for preparation of ITP and QCP’s with respect to Insulation activities and the works are
carried out.
Carry out quality control activities including inspection, examination and testing to verify the quality
of the construction operations comply with project specifications.
4. Implement the preparation of Inspection and Test Plans (ITP) by CONTRACTORS and monitoring
of ITP's.
Daily observation of the coherence of the works with the plans and specifications of the project and
the compliance of the contractors with the quality requirements.
Coordination with quality control intervention points on the inspection and test plans, ITP
(Surveillance, witness and mandatory inspection).
Follow Inspection check List as per the YASREF Standards.