1. Abaya 17St apr 52, Atyrau
Phone : +7(7122)304512
Mob : + 7 7754955712
MAGRIPA TULEPOVA
QA/QC Engineer of Coating & Insulation & Receiving
PROFILE
I am looking for permanent Company position in QA/QC Department where I can offer my knowledge in fire
proofing, hot and cold insulation, corrosion-resistant painting of steel structures and pipe . I have worked with the
following materials:
Pyrocrite № .241, Fendolite M II and Painting systemIntumescent M-90,
International fire retardant (Intumescent), Intumescent nulyfire system-E,
Ameron, Hempel, Sherwin Williams,Sigma. Fiberglass Pipe Insulation,
Elastomeric Rubber Pipe Insulation, Polyethylene Pipe Insulation, Calcium
Silicate Pipe Insulation, Cellular Glass/Foamglas, Mineral Wool Pipe
Insulation.Hot and cold insulation-1) Therma jacket with epoxy primer.
2)Three layers polyethylene coating. 3)Amercoat 391 PC epoxy coating. 3)
Band polymer coating. 4)Bitum pipe coating. 5) Polyurethane coating for
pipe.6) Mastic coating(powder).
My goal is to work honestly and diligently in accordance with company’s objectives to reach its goals and gain a
great deal of working experience, so that I may increase the level of my position . I am ready to study, learn, and
contribute. Ready for difficult work and to expand work experience and use my knowledge.
EDUCATION
2006-2010 Kazakh Academy of Transport and Communication named M Tynyshpayev:
Qualification – Mechanical Engineer
1990-1992 Russian, Kazan : Qualification- management –marketing.
Work Exsperience
Fluor : Tengizchevroil (TCO) Future Growth Project / Wellhead Management Project
(FGPWPMP) 3GP/3GI Expansion Project - Tengiz
2014/07/02-2016/03/11 QA/QC Engineer ofCoating –Insulation and Receiving Activities.
Follow the painting and coating activities in all its phases;
Review the received documents and elaborate the input data related to the
coating, painting and insulation works;
Select the suitable coating, painting and insulation material and systems;
Prepare the technical qualifications related to the coating, painting and
insulation;
Prepare the specifications and technical requisitions related to the supply of
the coating, painting and insulation materials and services;
Perform the technical evaluation of the offers received from Vendors related
to the supply of the coating, painting and insulation materials and services;
2. Review the documentation prepared by painting, coating and insulation
Subcontractors;
Perform the technical audits of the Subcontractor coating, painting and
insulation facilities;
Witness the Pre-Qualification Test performed by Subcontractors related to
the coating, painting and insulation;
Supervise the coating and painting works on the work site;
Solve the technical problems related to the coating, painting and insulation
works.
Painting/Insulation Inspectorand Supervisor
- Verification of drawings, procedure reviewing, supervision and inspection
work of corrosion, coating, painting, insulation and fireproofing work.
- Coordinate with other sections of contractorsuch as piping, civil, structures,
equipments installation etc to minimize interfacing problems.
- Perform inspection and supervision of quality of work for painting, coating,
insulation and fire proofing to meet project specifications.
- Supervise and coordinate the painting / coating, insulation and fire proofing
activities to ensure work schedule meets dateline.
- Perform surveillance, activities monitoring, and witness and verify all aspects
with regards to painting, thermal coating etc from pre treatment, surface
preparation, and application, pre-inspection with contractoror subcontractor
before final inspection.
- Witness and verify all aspects with regards to insulation from material take
off from drawings, line and area check to identify insulation requirement,
material quality during delivery, and fabrication of foam glass,calcium silicate
etc for installation of cold and hot insulation.
- Ensure proper implementation of Quality Control system. Ensure that
installation conforms to the quality requirement of the company and that of the
customers.
- Prepare site audit plan, schedule and report. Conduct analysis on site defects
as well as to ensure that all sites meets its quality standard.
- Familiar with relevant codes and standards,oil and gas industry construction
practices and procedure i.e. NACE, SSPC, ISO, ASTM, AP1, CINI, ASME,
ANSI, BS.
- Monitor defects and scraps and highlight such activities to contractor and
ensure the defect is rectified.
- Ensure safety and quality procedures are being effectively and consistently
implemented by the contractor or subcontractors.
QA/QC Site Engineer Receiving Incoming control
Preparation of inspection checklists for critical items
Inspection of quality of painting and coatings - including pre-cast concrete
piles
Carry out receipt inspections of critical equipment for verification for
compliance with TCO project standards and purchase order requirements
Preparation of material receipt inspection reports
Review of supplier documentation and QC data packages
Identification of items non-complying with project requirements and
initiation of Material Deficiency Reports
Verifying that agreed resolutions for non-conforming items are implemented.
3. Carry out surveillance inspections and preparation of reports
Perform regular audits of items in storage to verify storage arrangements
comply with purchase orders, vendor recommendations and project standards
Preparation of monthly storage audit reports
Perform inspections in accordance with Notifications for Inspections (NFIs),
and report inspection results
Attendance at weekly team and contractormeetings
Promote quality policy and awareness in all dealings with the project team
and contractors
Working in accordance with project QAQC procedures and Site Quality
Manual
Assuring that safety procedures are followed and making safety observations
and entering BBS safety reports
«Bureau Veritas KIS» QA/QC Site Engineer ofCoating and insulation
2011-2014
More than 8 years of experiences in Oil and Gas, Petrochemical construction
industries as a
Painting/Insulation Inspectorand Supervisor
- Verification of drawings, procedure reviewing, supervision and inspection
work of corrosion, coating, painting, insulation and fireproofing work.
- Coordinate with other sections of contractorsuch as piping, civil, structures,
equipments installation etc to minimize interfacing problems.
- Perform inspection and supervision of quality of work for painting, coating,
insulation and fire proofing to meet project specifications.
- Supervise and coordinate the painting / coating, insulation and fire proofing
activities to ensure work schedule meets dateline.
- Perform surveillance, activities monitoring, and witness and verify all aspects
with regards to painting, thermal coating etc from pre treatment, surface
preparation, and application, pre-inspection with contractoror subcontractor
before final inspection.
- Witness and verify all aspects with regards to insulation from material take
off from drawings, line and area check to identify insulation requirement,
material quality during delivery, and fabrication of foam glass,calcium silicate
etc for installation of cold and hot insulation.
- Ensure proper implementation of Quality Control system. Ensure that
installation conforms to the quality requirement of the company and that of the
customers.
- Prepare site audit plan, schedule and report. Conduct analysis on site defects
as well as to ensure that all sites meets its quality standard.
- Familiar with relevant codes and standards,oil and gas industry construction
practices and procedure i.e. NACE, SSPC, ISO, ASTM, AP1, CINI, ASME,
ANSI, BS.
- Monitor defects and scraps and highlight such activities to contractor and
ensure the defect is rectified.
- Ensure safety and quality procedures are being effectively and consistently
implemented by the contractor or subcontractors.
“CCEPC” Consolidated Contracting
Engineering and Procurement Company QA/QC Site Engineer ofCoating and Insulation
2009- 2011
Worked in accordance with company approved method statements and
QA QC procedures.
Fully conversant with a diverse range of coatings paints, paint, techniques,
and specialized coatings such as; Spray Applied Coatings, Pipe Coatings,
Fireproofing
Check tests of concrete before start of application on the steel structural or pipe
4. Responsible to issue Request for Inspection (RFI) and relevant Acts.
Inspected parts using micrometers, calipers, and gauges, special for thickness,
humidity , dew point , and temperature.
Responsibilities for training new employees
Responsible for in-process , visual and final inspection
Performed quality assurances tests on materials , products and issued
Acts of defects if applicable.
Responsible to issue Request for Materials (RFM).
Completed final inspection prior to transfer.
Utilized computer to complete packaging and shipping information.
Identified and eliminated surface defects.
Labeled final product per job order specifications.
Participated in team meetings to discuss quality issues.
Weighed final product in order to determine shipping method.
Power Comm LLC
2006-2009 QA/QC Site Engineer
Worked in accordance with company approved method statement and
QAQC procedures.
Responsible for in process,visual and final inspection
Performed quality assurance tests on materials, products and issued
Acts of defects if applicable.
Responsible to issue Request for Materials (RFM).
Completed final inspection prior to transfer.
Utilized computer to complete packaging and shipping information.
Identified and eliminated surface defects.
Participated in team meetings to discuss quality issues.
Weighed final product in order to determine shipping method.
2005-2006 Receiving QA/QC Inspector
Material Delivery Expediting to Contractor
Storage in Base , Material Registr , MaterialDatabase list updateand creation.
Solving problems with delivery dates , certificates , material and documentation
Discrepancy, reporting dates to contract and other departments.
Work with Supply Chain, and Suppliers
2002-2004 Tengiz DorStroi
Receiving Inspector.
Preparation of inspection checklists for critical items
Inspection of quality of painting and coatings - including pre-cast concrete
piles
Carry out receipt inspections of critical equipment for verification for
compliance with TCO project standards and purchase order requirements
Preparation of material receipt inspection reports
Review of supplier documentation and QC data packages
Identification of items non-complying with project requirements and
initiation of Material Deficiency Reports
Verifying that agreed resolutions for non-conforming items are implemented.
Carry out surveillance inspections and preparation of reports
Perform regular audits of items in storage to verify storage arrangements
comply with purchase orders, vendor recommendations and project standards
Preparation of monthly storage audit reports
Perform inspections in accordance with Notifications for Inspections (NFIs),
and report inspection results
Attendance at weekly team and contractormeetings
Promote quality policy and awareness in all dealings with the project team
and contractors
Working in accordance with project QAQC procedures and Site Quality
Manual
5. Assuring that safety procedures are followed and making safety observations
and entering BBS safety reports
.
LLP Balkan Bekhtel-Enka
1998-1999 Site Superviser
Prepared forms for payroll and sending to client. Checked and
corrected titles done by subcontractors foroil and gas lease to
be paid. Preparing legal document pertaining to oil and gas
leasing. Adding information to spreadsheet and keeping up to
date with leasehold. Entered information into the ELPR
(Electronic Lease Prepared Report). Updating maps with leasehold
to which the landowner is leased. Entered data into 1099s and
year-to-date forms for subcontractors. Searching oil and gas
reservations in real estate titles in Potter County to 1890s.
Answered the telephone and represented the company in a
professionaland businesslike manner. Data entered into
Microsoft Office (Word, Excel).
LLP Tengiz Dor Stroi
1993-1997 Superviser
Supervised and scheduled new construction and repairs works.
Ensured that all assigned works are completed on time with total emphasis on
Safety and Quality.
Prepared Cost estimates of Works and interpreting Contracts.
Executed construction work with coordination of mechanical, electrical and
instrumentation disciplines.
Coordinated inter and intra Department Supervisors and Contractors for smooth
function of work.
Ensured proper preparation and presentation of timesheets, records and reports.
LLP Tengiz
1992-1993 Store Receiving Inspector .
An ethical, loyal, energetic, "make-it-happen" professionalable to accelerate sales
growth and positively impact the bottomline through effective product education
and extensive relationship building. Respected for integrity.
Persistent in pursuit to build sales and provide solutions according to identified
customer needs.Strong customer-service orientation, demonstrated by established
credibility and leverage with healthcare clients.
Possess an unshakable determination when challenged with strong personalities,
demanding deadlines, and the rigorous assimilation of technical information.
Successfulin autonomous and collaborative settings.
LLP Tengiz Oil Gas
1989-1990 Site Assistent
Prepare and mail out invoices daily.
Organize and track purchase orders.
Assist with processing payments.
Handle delivery queries.
Liaise with customers and suppliers.
Create and maintain customer databases.
Prepare correspondence,memos and quotes.
Send out email marketing campaigns.
Receive and assist customers and visitors.
Assist with the organization of promotions and events.
Other Skills
6. Languages
Kazak, Russian, English - Fluent
I T Skills
PC: MS (Word , Excel, Outlook SAP, Advanced PC user, Microsoft Office, Adobe Acrobat,
Professional, Internet.
Training
Certificate for 1C (accounting)
Recommendation letter from LLC INECO Atyrau
Leigh Paints England certificate Firetex M 90 , Epoxy Passive Fire Protection System
Bosiet OFFSHOR Certificate
Agip Personnel HSE Passport.
TCO Certificate of quality control № 290 from 11/02/2014
TCO Certificate of Industrial safety № 13P/1987/01 from 12/02/2014 till 12.02.2017
TCO Certificate of Fire safety & ANSUL extinguisher from 27/02/2014 till 27/02/2019
TCO Certificate of Lifting and Rigging Operations from 06/06/2014 till 06/06/2017
TCO Certificate of Isolation of Hazardous Energy from03/03/2014 till 03/03/2017
TCO Certificate of Confined Space Entry from 01/03/2014 till 01/03/2017
TCO Certificate of Safety Excavation Practices Overview Course from 01/03/2014 till 01/03/2017
TCO Certificate of Working at heights from 04/03/2014 till 04/03/2017
TCO Certificate of PTW & JHA from 25/04/14 till 25/04/17
TCO Certificate of Respirator Protection Equipment training from 28/02/14 till 28/02/17