Manuscript id. 371116084 www.ijstre.com Page 17
Experimental Analysis of an Regenerative Air Preheater In Boiler
TPS- 1 Expansion
S.Sudhakar*C.M.Raguraman
Department of Mechanical Engineering, Faculty of Engineering and Technology, Annamalai
University, Annamalai Nagar - 608002, India.
e-mail: sudhasaran09@gmail.com.
Abstract: An air pre-heater is a general term to describe any device designed to heat air before another
process (for example, combustion in a boiler) with the primary objective of increasing the thermal efficiency of
the process of the flue gas in a regenerative pre-heater. This project analysis how operation parameters of a
regenerative air preheater can be optimized in order to increase its efficiency and consequently the overall
efficiency of a boiler. As mention in phase-1 project the case study of RAPH is implemented in this work for the
reduction in air leakage by 30% and in order to improve the efficiency of RAPH-2 in Unit-I, TPS-I (Expansion)
of the Regenerative Air Pre-Heater was improved by reducing the leakage of air into flue gas in the RAPH, and
i t is minimized by replacing the ordinary radial seals into “Flexible Seals” and also by proper maintenance of
the RAPH and it is implemented for the experimental analysis. For this purpose, the RAPH in thermal power
station -1 expansion at neyveli is considered and studied for a period and suitable remedies have been
suggested.
Keywords—Air preheater, Regenerative air preheater, boiler, and sealing
I. INTRODUCTION
Modern high capacity boilers are always provided with an air preheater. Air pre-heater is an important
boiler auxiliary which primarily preheats the combustion air for rapid and efficient combustion in the furnace
serving as the last heat trap for the boiler system, a regenerative air preheater typically accounts for over 10% of
a plants thermal efficiency on a typical steam generator. Considering this, when evaluating the performance of
an air preheater one should take into account all of the process variables. A very good method to improve the
overall efficiency of a thermal power plant is to preheat the air. If the incoming air for combustion is not
preheated, then some energy must be supplied to heat the air to a temperature required to facilitate combustion.
As a result, more fuel will be consumed which increases the overall cost and decreases the efficiency. There are
many factors, which contribute to the deterioration of air preheater performance like high seal leakage,
deterioration of heat absorption characteristics of basket elements due to fouling or plugging. Close monitoring
of air preheater performance and proper instrumentation would enable timely detection of performance
degradation. The combustion air preheater for the large fuel-burning furnaces used to generate steam in thermal
power plants The organization of this paper is as follows: Section I gives an Introduction and an outlay of the
scope of the work. Proposed methodology is elaborated in Section II. Problem Identification is given in Section
III, Study On Performance Improvement Of Air Preheater are, Solution For Improving the Performance Of
Raph and are Experimental Analysis described in Section V followed by the conclusion in Section VI.
SCOPE THE WORK
After studying the journal papers mentioned above, it is understood that there are some leakages
development in the RAPH and maintenances of RAPH is to be considered for the improvement efficiency of the
boiler shell and tube air preheater. The project is planned with the following work scope. To identify the
problem and to give an suitable remedies for further increases in efficiency of the boiler with the help RAPH.
II. PROPOSED METHODOLOGY
The proposed methodology of the work are detailed discussed and mentioned as below and are shown
in Fig.
Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion
Manuscript id. 371116084 www.ijstre.com Page 18
III. Problem Identification
Excessive air heater leakage can cause any of the following additional problems:
 Severe degradation of the performance of downstream air pollution control equipment (electrostatic
precipitators, bag houses, and scrubbers). 
 Lowered primary air temperatures and consequent reduction of coal mill capacity—particularly in
the case of wet coals and Powder River Basin coals.
 Increased potential for mill fires or explosions. 
 Load limitations and missed power sales opportunities due to inadequate fan capacity, especially
during warm weather. 
 Increased NOx production and loss -on-ignition. 
 Poor flame stability at lower load and unattached flame ignition points, as well as flame pulsation. 
 Excessive desuperheating due to increased convective heat transfer caused by increased mass gas flow. 
 Increased heat rate and air heater plugging. 
 Increased rate of cold end air heater basket corrosion. 
Study On Performance Improvement Of Air Preheater
Steam generators uses rotary air preheaters to absorb the heat from the flue gas and release that heat to the
incoming combustion air.
Thus absorbing the waste heat from the flue gas the efficiency of the boiler in increased. It is estimated that
for every 20
0
C decrease in gas temperature, the efficiency of boiler goes up by 1%.
With increase in operation cost demand for power and pollution constraint today, every savings in boiler
efficiency results in the big money. Recollect the slogan ‗every MW saved is the MW generated‘.
Air preheaters are one of the major areas of concern for efficiency improvement. It is necessary that we
should go for renovation and modernization only for performance improvement.
Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion
Manuscript id. 371116084 www.ijstre.com Page 19
Even maintaining the ―Regenerative Air Preheater‖ in the correct way will result in the efficiency
improvement.
Sl.
DATA UNIT
No. 30-1-16 to16-02-2016
RAPHI RAPH2
1 Unit Load MW 209 210
2 Fuel consumption T/hr 210.59 210.59
3 O2 at Flue gas inlet % 3.6 4.0
4 O2 at Flue gas outlet % 5.6 4.7
Flue gas Inlet
5 Temperature 0 C 297 312
Flue gas outlet
6 Temperature 0 C 170 186
7
Air Inlet
Temperature 0 C 32.8 32.7
8
Air outlet
Temperature 0 C 289 312
9 Air Header Pressure mm WC 24.1 24.1
Air Pressure before
10 RAPH mm WC 30.1 26.1
11
Air Pressure after
RAPH mm WC 24 24.1
Pressure of flue gas
12 outlet mm WC 238 235
12 Draft RAPH inlet mm WC 5.2 4.6
13 Draft RAPH outlet mm WC 19.3 22
14 Air flow at inlet T/hr 500 309
15 Air flow at outlet T/hr 500 309
16 FD fan current Amps 67 54
17 ID fan current Amps 183 191
18
FD fan scoop
position % 50 90
19
ID fan scoop
position % 68 72
Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion
Manuscript id. 371116084 www.ijstre.com Page 20
AIR INGRESS IN PREHEATER
During the study, the operating parameters like pressure, temperature and oxygen percentage along the flue
gas path has been carried out. The study was conduct to analyze the performance of air heater and air ingress in
the air heater. Fig 4.8 shows the Graphical illustration of AIR Leakages in RAPH
The details are follows
% Leakage of air = (Gas out-Gas in)/Gas In
Table 1.2 Air Ingress in Preheater
FLUE GAS
EXCESS
TEMPERATURE
PRESSURE
,
AIR,
0 C
DESCRIPTIO
N OXYGEN
PROFILE
Mm WC
%
RAPH I & II 66 to 53 312 & 297 4.7 & 3.6 29.01 &
inlet 20.81
&
40 to 53.6
RAPH-I outlet 238 170 4.0 57.14
RAPH-II outlet 235 186 5.6 36.60
Table 1.3 % of air leakage in RAPH 1&2
AIR LEAKAGE % LEAKAGE
RAPH1 28.1
RAPH2 13.1
Fig 1.1 A graphical illustration of AIR Leakages in RAPH
Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion
Manuscript id. 371116084 www.ijstre.com Page 21
ADVANCEMENT IN SEALS:
The air preheater is a critical component of the boiler combustion air system. Evaluating and optimizing a
heater‘s performance is difficult with the entire combustion system and the lack of standardized calculation
tools.
The regenerative air heater or air preheater (APH) on a large utility boiler often accounts for about 10% of
the unit‘s thermal efficiency.
Its performance is so critical that just a 10F change in gas exit temperature can change the boiler efficiency
by a quarter of a percent. Reducing leakage by using modern seal technology will improve combustion
efficiency, maintain fan performance, and keeps the down stream air quality in control.
FLEXIBLE RADIAL SEALS: Flexible Radial seals are used to minimize the direct air to gas leakage that
occurs at the center section or sealing surfaces in the air heater. The seals are attached to each diaphragm of the
rotor to maintain close contact with the sealing surface that separates the air and gas streams
TYPE-1:
The type-1 radial seal incorporates a unique patented bellows architecture that ensures positive contact with
the sealing surface. When sealing edge wear occurs this type of seal can be simply adjusted, rather than
replaced.
TYPE-2:
This type-2 seal is a full contact flexible radial seal. This seal complements robust protection system,
augmenting the benefits and features found in the type-1 flexible full contact seal. They are highly erosive and
are exposed to high -pressure water washing, as well as air preheaters that have been enhanced with carbide
overlaid sector plates. These seals are typically recommended for larger rotor sizes (greater than 25) where the
aggressive rotor turndown encountered in these size rotors can be as large as 2-4 inches
EXPERIMENTAL ANALYSIS AIR PREHEATER PERFORMANCE CALCULATION:
(Readings as observed in the RAPH of a Thermal Station)
1. Before implementing flexible seal:
% of oxygen in the flue gas outlet: 5.6
% of oxygen in the flue gas inlet : 3.6 Leakage % in APH is given by
(% o2 out - % o2 in) / (21- % o2out). =(5.6-3.6) / (21-5.6)
=13.1%
2. After implementing the flexible seal:
% of oxygen in the flue gas outlet: 4.7 % of oxygen in the flue gas inlet : 4.02 Formula to
find leakage % is given by (% o2 out - % o2 in) / (21- % o2 out). =(4.7 -4.02) / (21-4.7)
=4%
Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion
Manuscript id. 371116084 www.ijstre.com Page 22
Fig 1.2 A Graphical illustration of Air leakage in RAPH
VII. CONCLUSION
By this paper it is concluded that the efficiency of the Regenerative Air Pre-Heater was improved by
reducing the leakage of air into flue gas in the RAPH, and it is minimized by replacing the ordinary radial seals
into
“Flexible Seals” and also by proper maintenance of the RAPH. Thus the air leakage is reduced 30% by using
RAPH-2
REFERENCE
[1.] Shah, R.K., Sekulic, D.P., ―Fundamentals of Heat Exchanger Design‖, John Wiley & Sons Inc., Canada, 2003.
[2.] Juangjandee, P. and Sucharitakul, T., ―Performance Evaluation of Cross Flow Heat Exchanger in Coal Fired Power
Plant under Particulate Condition‖, 18th Conference of Mechanical Engineering Network of Thailand, Khon Kaen
University, Thailand, 2004.
[3.] Juangjandee, P. and Sucharitakul, T., ―Performance Evaluation of Leakage Cross Flow Heat Exchanger in Coal Fired
Power Plant‖, 19th Conference of Mechanical Engineering Network of Thailand, Phuket, Thailand, 2005.
[4.] Juangjandee, P. and Sucharitakul, T., ―Effect of High Ash Content Lignite on Cross Flow Heat Exchanger Performance in
Mae Moh Lignite Fired Power Plant‖, HAPUA Fuel Procurement & Utilisation Forum, Kuala Lumpur, Malaysia, 2006
[5.] Juangjandee, P. and Sucharitakul, T., ―Air Heater Performance and Enhancement under Low Rank Coal‖, 16th
Conference of Electric Power Supply Industry, Mumbai, India, 2006.
[6.] Bostjan Drobnic, Janez Oman. ―A numerical model for the analyses of heat transfer and leakages in a rotary air
preheater‖ , International Journal of Heat and Mass Transfer 49,PP.5001–5009, 2006.
[7.] Pipat Juangjandee ―Performance Analysis of Primary Air Heater Under Particulate Condition in Lignite
FiredPower Plant‖ Engineering, Computing and Architecture, ‖ISSN 1934, 7197,vol 1,issue 2,2007

More Related Content

What's hot

Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)Hammad Akber
 
INSTRUMENTATION AND PROCESS CONTROL - BOILER CONTROL
INSTRUMENTATION AND PROCESS CONTROL - BOILER CONTROLINSTRUMENTATION AND PROCESS CONTROL - BOILER CONTROL
INSTRUMENTATION AND PROCESS CONTROL - BOILER CONTROLno suhaila
 
Yokogawa Presantesation(1)
Yokogawa Presantesation(1)Yokogawa Presantesation(1)
Yokogawa Presantesation(1)Maulik kunjadiya
 
Boiler instrumentation-and-controls
Boiler instrumentation-and-controlsBoiler instrumentation-and-controls
Boiler instrumentation-and-controlsDARSHAN B S
 
Learningpowerplantbasics
LearningpowerplantbasicsLearningpowerplantbasics
Learningpowerplantbasicslovelyshree
 
Performance evaluation and optimization of air preheater in thermal power plant
Performance evaluation and optimization of air preheater in thermal power plantPerformance evaluation and optimization of air preheater in thermal power plant
Performance evaluation and optimization of air preheater in thermal power plantIAEME Publication
 
Basic controls for boilers
Basic controls for boilersBasic controls for boilers
Basic controls for boilersAasheesh Tandon
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheaterHOANG VAN DUC
 
Boiler Controls and Instrumentation
Boiler Controls and InstrumentationBoiler Controls and Instrumentation
Boiler Controls and InstrumentationDell Technologies
 
Experimental Analysis on Thermosyphon Heatpipe to Find Heat Transfer Coefficent
Experimental Analysis on Thermosyphon Heatpipe to Find Heat Transfer CoefficentExperimental Analysis on Thermosyphon Heatpipe to Find Heat Transfer Coefficent
Experimental Analysis on Thermosyphon Heatpipe to Find Heat Transfer CoefficentIRJET Journal
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
Steam Methane Reformer
Steam Methane ReformerSteam Methane Reformer
Steam Methane ReformerSoumya Ranjan
 
Evaluation of a Boiler performance
Evaluation of a Boiler performanceEvaluation of a Boiler performance
Evaluation of a Boiler performanceHashim Hasnain Hadi
 

What's hot (20)

Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)Gas Air Heater (Air Pre Heater)
Gas Air Heater (Air Pre Heater)
 
INSTRUMENTATION AND PROCESS CONTROL - BOILER CONTROL
INSTRUMENTATION AND PROCESS CONTROL - BOILER CONTROLINSTRUMENTATION AND PROCESS CONTROL - BOILER CONTROL
INSTRUMENTATION AND PROCESS CONTROL - BOILER CONTROL
 
Yokogawa Presantesation(1)
Yokogawa Presantesation(1)Yokogawa Presantesation(1)
Yokogawa Presantesation(1)
 
Boiler instrumentation-and-controls
Boiler instrumentation-and-controlsBoiler instrumentation-and-controls
Boiler instrumentation-and-controls
 
Combustion control
Combustion controlCombustion control
Combustion control
 
Learningpowerplantbasics
LearningpowerplantbasicsLearningpowerplantbasics
Learningpowerplantbasics
 
Performance evaluation and optimization of air preheater in thermal power plant
Performance evaluation and optimization of air preheater in thermal power plantPerformance evaluation and optimization of air preheater in thermal power plant
Performance evaluation and optimization of air preheater in thermal power plant
 
Basic controls for boilers
Basic controls for boilersBasic controls for boilers
Basic controls for boilers
 
Roshan preheater
Roshan preheaterRoshan preheater
Roshan preheater
 
Ganesh final report
Ganesh final reportGanesh final report
Ganesh final report
 
Training material for air preheater
Training material for air preheaterTraining material for air preheater
Training material for air preheater
 
Boiler Controls and Instrumentation
Boiler Controls and InstrumentationBoiler Controls and Instrumentation
Boiler Controls and Instrumentation
 
Experimental Analysis on Thermosyphon Heatpipe to Find Heat Transfer Coefficent
Experimental Analysis on Thermosyphon Heatpipe to Find Heat Transfer CoefficentExperimental Analysis on Thermosyphon Heatpipe to Find Heat Transfer Coefficent
Experimental Analysis on Thermosyphon Heatpipe to Find Heat Transfer Coefficent
 
Spirax sarco the-steam-and-condensate-loop-block-1-14
Spirax sarco the-steam-and-condensate-loop-block-1-14Spirax sarco the-steam-and-condensate-loop-block-1-14
Spirax sarco the-steam-and-condensate-loop-block-1-14
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
Drum level
Drum levelDrum level
Drum level
 
Steam Methane Reformer
Steam Methane ReformerSteam Methane Reformer
Steam Methane Reformer
 
BOILER INSTRUMENTATION
BOILER INSTRUMENTATIONBOILER INSTRUMENTATION
BOILER INSTRUMENTATION
 
Evaluation of a Boiler performance
Evaluation of a Boiler performanceEvaluation of a Boiler performance
Evaluation of a Boiler performance
 
Air heater
Air heaterAir heater
Air heater
 

Similar to Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion

Compressor performance assessment and optimization
Compressor performance assessment and optimizationCompressor performance assessment and optimization
Compressor performance assessment and optimizationBilal Ahmad Hajam
 
Thermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine bladeThermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine bladeeSAT Publishing House
 
Thermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine bladeThermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine bladeeSAT Journals
 
Ammonia plant efficiency
Ammonia plant efficiencyAmmonia plant efficiency
Ammonia plant efficiencyHimanshu Sharma
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET Journal
 
IJSRED-V2I5P17
IJSRED-V2I5P17IJSRED-V2I5P17
IJSRED-V2I5P17IJSRED
 
Study & Review of Heat Recovery Systems for SO2 Gas Generation Process in Sug...
Study & Review of Heat Recovery Systems for SO2 Gas Generation Process in Sug...Study & Review of Heat Recovery Systems for SO2 Gas Generation Process in Sug...
Study & Review of Heat Recovery Systems for SO2 Gas Generation Process in Sug...IRJET Journal
 
96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbine96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbinemanojg1990
 
IRJET- CFD Analysis and Optimization of Heat Transfer Basket Element Profiles...
IRJET- CFD Analysis and Optimization of Heat Transfer Basket Element Profiles...IRJET- CFD Analysis and Optimization of Heat Transfer Basket Element Profiles...
IRJET- CFD Analysis and Optimization of Heat Transfer Basket Element Profiles...IRJET Journal
 
OPTIMIZATION OF COMPRESSED AIR IN THERMAL POWER PLANT-A NOVEL STUDY
OPTIMIZATION OF COMPRESSED AIR IN THERMAL POWER PLANT-A NOVEL STUDYOPTIMIZATION OF COMPRESSED AIR IN THERMAL POWER PLANT-A NOVEL STUDY
OPTIMIZATION OF COMPRESSED AIR IN THERMAL POWER PLANT-A NOVEL STUDYvishal laddha
 
Improving boiler efficiency by using air preheater
Improving boiler efficiency by using air preheaterImproving boiler efficiency by using air preheater
Improving boiler efficiency by using air preheaterNetha Jashuva
 
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass ValveIRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass ValveIRJET Journal
 
Key lessons to optimise ammonia plant
Key lessons to optimise ammonia plantKey lessons to optimise ammonia plant
Key lessons to optimise ammonia plantPRAVEEN SINGH
 
Paper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmizationPaper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmizationCANDHARE
 
Maximizing Gas Turbine and Combined Cycle Capacity and Ratings
Maximizing Gas Turbine and Combined Cycle Capacity and RatingsMaximizing Gas Turbine and Combined Cycle Capacity and Ratings
Maximizing Gas Turbine and Combined Cycle Capacity and RatingsCary Campbell
 
Report on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalReport on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalRazin Sazzad Molla
 

Similar to Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion (20)

Compressor performance assessment and optimization
Compressor performance assessment and optimizationCompressor performance assessment and optimization
Compressor performance assessment and optimization
 
Thermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine bladeThermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine blade
 
Thermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine bladeThermal analysis of cooling effect on gas turbine blade
Thermal analysis of cooling effect on gas turbine blade
 
Ammonia plant efficiency
Ammonia plant efficiencyAmmonia plant efficiency
Ammonia plant efficiency
 
IRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power PlantIRJET- Improve the Efficiency of Combined Cycle Power Plant
IRJET- Improve the Efficiency of Combined Cycle Power Plant
 
IJSRED-V2I5P17
IJSRED-V2I5P17IJSRED-V2I5P17
IJSRED-V2I5P17
 
Study & Review of Heat Recovery Systems for SO2 Gas Generation Process in Sug...
Study & Review of Heat Recovery Systems for SO2 Gas Generation Process in Sug...Study & Review of Heat Recovery Systems for SO2 Gas Generation Process in Sug...
Study & Review of Heat Recovery Systems for SO2 Gas Generation Process in Sug...
 
C5693028319.pdf
C5693028319.pdfC5693028319.pdf
C5693028319.pdf
 
96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbine96924703 performance-monitoring-for-gas-turbine
96924703 performance-monitoring-for-gas-turbine
 
IRJET- CFD Analysis and Optimization of Heat Transfer Basket Element Profiles...
IRJET- CFD Analysis and Optimization of Heat Transfer Basket Element Profiles...IRJET- CFD Analysis and Optimization of Heat Transfer Basket Element Profiles...
IRJET- CFD Analysis and Optimization of Heat Transfer Basket Element Profiles...
 
OPTIMIZATION OF COMPRESSED AIR IN THERMAL POWER PLANT-A NOVEL STUDY
OPTIMIZATION OF COMPRESSED AIR IN THERMAL POWER PLANT-A NOVEL STUDYOPTIMIZATION OF COMPRESSED AIR IN THERMAL POWER PLANT-A NOVEL STUDY
OPTIMIZATION OF COMPRESSED AIR IN THERMAL POWER PLANT-A NOVEL STUDY
 
Improving boiler efficiency by using air preheater
Improving boiler efficiency by using air preheaterImproving boiler efficiency by using air preheater
Improving boiler efficiency by using air preheater
 
1q05 performancemonitoring
1q05 performancemonitoring1q05 performancemonitoring
1q05 performancemonitoring
 
Paper 11 icaer_2013modified
Paper 11 icaer_2013modifiedPaper 11 icaer_2013modified
Paper 11 icaer_2013modified
 
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass ValveIRJET- Fatigue Life Estimation of Turbine Bypass Valve
IRJET- Fatigue Life Estimation of Turbine Bypass Valve
 
Key lessons to optimise ammonia plant
Key lessons to optimise ammonia plantKey lessons to optimise ammonia plant
Key lessons to optimise ammonia plant
 
Paper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmizationPaper cid-furnace-feed-maxmization
Paper cid-furnace-feed-maxmization
 
Industrial heat pumps
Industrial heat pumpsIndustrial heat pumps
Industrial heat pumps
 
Maximizing Gas Turbine and Combined Cycle Capacity and Ratings
Maximizing Gas Turbine and Combined Cycle Capacity and RatingsMaximizing Gas Turbine and Combined Cycle Capacity and Ratings
Maximizing Gas Turbine and Combined Cycle Capacity and Ratings
 
Report on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine finalReport on improved efficiency of gas turbine final
Report on improved efficiency of gas turbine final
 

More from International journal of scientific and technical research in engineering (IJSTRE)

More from International journal of scientific and technical research in engineering (IJSTRE) (20)

COVID-19 Vaccine And Problematics In Children: A Literature Review
COVID-19 Vaccine And Problematics In Children: A Literature ReviewCOVID-19 Vaccine And Problematics In Children: A Literature Review
COVID-19 Vaccine And Problematics In Children: A Literature Review
 
The Challenges of Handling Dengue Hemorrhagic Fever during the COVID-19 Pande...
The Challenges of Handling Dengue Hemorrhagic Fever during the COVID-19 Pande...The Challenges of Handling Dengue Hemorrhagic Fever during the COVID-19 Pande...
The Challenges of Handling Dengue Hemorrhagic Fever during the COVID-19 Pande...
 
Development of Measuring technique for Electric Power of Wind turbine-Solar P...
Development of Measuring technique for Electric Power of Wind turbine-Solar P...Development of Measuring technique for Electric Power of Wind turbine-Solar P...
Development of Measuring technique for Electric Power of Wind turbine-Solar P...
 
Estimation of Speed Required for Palm Nut Shell Mass-Size Particle Reduction ...
Estimation of Speed Required for Palm Nut Shell Mass-Size Particle Reduction ...Estimation of Speed Required for Palm Nut Shell Mass-Size Particle Reduction ...
Estimation of Speed Required for Palm Nut Shell Mass-Size Particle Reduction ...
 
A comprehensive review of Chronic Kidney Disease of Unknown Etiology
A comprehensive review of Chronic Kidney Disease of Unknown EtiologyA comprehensive review of Chronic Kidney Disease of Unknown Etiology
A comprehensive review of Chronic Kidney Disease of Unknown Etiology
 
EVALUATION OF HEAVY METALS IN SEDIMENT OF SOME SELECTED DAMS FROM KATSINA STA...
EVALUATION OF HEAVY METALS IN SEDIMENT OF SOME SELECTED DAMS FROM KATSINA STA...EVALUATION OF HEAVY METALS IN SEDIMENT OF SOME SELECTED DAMS FROM KATSINA STA...
EVALUATION OF HEAVY METALS IN SEDIMENT OF SOME SELECTED DAMS FROM KATSINA STA...
 
Using Partitioned Design Matrices in Analyzing Nested-Factorial Experiments
Using Partitioned Design Matrices in Analyzing Nested-Factorial ExperimentsUsing Partitioned Design Matrices in Analyzing Nested-Factorial Experiments
Using Partitioned Design Matrices in Analyzing Nested-Factorial Experiments
 
Reasons for High Life Expectancy at Birth with Males in Hambantota District i...
Reasons for High Life Expectancy at Birth with Males in Hambantota District i...Reasons for High Life Expectancy at Birth with Males in Hambantota District i...
Reasons for High Life Expectancy at Birth with Males in Hambantota District i...
 
A Study of the Refractory Properties of Selected Clay deposit in Chavakali, K...
A Study of the Refractory Properties of Selected Clay deposit in Chavakali, K...A Study of the Refractory Properties of Selected Clay deposit in Chavakali, K...
A Study of the Refractory Properties of Selected Clay deposit in Chavakali, K...
 
Cause Investigation of Failure of the Challenge to World Record of Human-Powe...
Cause Investigation of Failure of the Challenge to World Record of Human-Powe...Cause Investigation of Failure of the Challenge to World Record of Human-Powe...
Cause Investigation of Failure of the Challenge to World Record of Human-Powe...
 
Status of Geological Disasters in Jiaozuo City and Countermeasures for Preven...
Status of Geological Disasters in Jiaozuo City and Countermeasures for Preven...Status of Geological Disasters in Jiaozuo City and Countermeasures for Preven...
Status of Geological Disasters in Jiaozuo City and Countermeasures for Preven...
 
Experimental Study on Toxic Gas Produced during Pipeline Gas Explosions
Experimental Study on Toxic Gas Produced during Pipeline Gas ExplosionsExperimental Study on Toxic Gas Produced during Pipeline Gas Explosions
Experimental Study on Toxic Gas Produced during Pipeline Gas Explosions
 
The influence of the entry speed to flow field above water surface on the wat...
The influence of the entry speed to flow field above water surface on the wat...The influence of the entry speed to flow field above water surface on the wat...
The influence of the entry speed to flow field above water surface on the wat...
 
Geological Hazards in Pingdingshan Coal Mine District and Controlling Counter...
Geological Hazards in Pingdingshan Coal Mine District and Controlling Counter...Geological Hazards in Pingdingshan Coal Mine District and Controlling Counter...
Geological Hazards in Pingdingshan Coal Mine District and Controlling Counter...
 
Is There any Change from Magma Mixing in Kelud Characteristics?
Is There any Change from Magma Mixing in Kelud Characteristics? Is There any Change from Magma Mixing in Kelud Characteristics?
Is There any Change from Magma Mixing in Kelud Characteristics?
 
Improving Properties of Black Cotton Soil with Quarry Dust
Improving Properties of Black Cotton Soil with Quarry DustImproving Properties of Black Cotton Soil with Quarry Dust
Improving Properties of Black Cotton Soil with Quarry Dust
 
Study Charge the Floods Evaluated From Morphometry and Mitigasi Arau Padang C...
Study Charge the Floods Evaluated From Morphometry and Mitigasi Arau Padang C...Study Charge the Floods Evaluated From Morphometry and Mitigasi Arau Padang C...
Study Charge the Floods Evaluated From Morphometry and Mitigasi Arau Padang C...
 
Histochemical Characteristics of Ricinodedron Heudelotii (Baill, Pierre Ex Pa...
Histochemical Characteristics of Ricinodedron Heudelotii (Baill, Pierre Ex Pa...Histochemical Characteristics of Ricinodedron Heudelotii (Baill, Pierre Ex Pa...
Histochemical Characteristics of Ricinodedron Heudelotii (Baill, Pierre Ex Pa...
 
Formation Sensitivity Assessment of the Gbaran Field, Niger Delta Basin, Nigeria
Formation Sensitivity Assessment of the Gbaran Field, Niger Delta Basin, NigeriaFormation Sensitivity Assessment of the Gbaran Field, Niger Delta Basin, Nigeria
Formation Sensitivity Assessment of the Gbaran Field, Niger Delta Basin, Nigeria
 
The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...
The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...
The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...
 

Recently uploaded

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Recently uploaded (20)

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 

Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion

  • 1. International journal of scientific and technical research in engineering (IJSTRE) www.ijstre.com Volume 1 Issue 3 ǁ June 2016. Manuscript id. 371116084 www.ijstre.com Page 17 Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion S.Sudhakar*C.M.Raguraman Department of Mechanical Engineering, Faculty of Engineering and Technology, Annamalai University, Annamalai Nagar - 608002, India. e-mail: sudhasaran09@gmail.com. Abstract: An air pre-heater is a general term to describe any device designed to heat air before another process (for example, combustion in a boiler) with the primary objective of increasing the thermal efficiency of the process of the flue gas in a regenerative pre-heater. This project analysis how operation parameters of a regenerative air preheater can be optimized in order to increase its efficiency and consequently the overall efficiency of a boiler. As mention in phase-1 project the case study of RAPH is implemented in this work for the reduction in air leakage by 30% and in order to improve the efficiency of RAPH-2 in Unit-I, TPS-I (Expansion) of the Regenerative Air Pre-Heater was improved by reducing the leakage of air into flue gas in the RAPH, and i t is minimized by replacing the ordinary radial seals into “Flexible Seals” and also by proper maintenance of the RAPH and it is implemented for the experimental analysis. For this purpose, the RAPH in thermal power station -1 expansion at neyveli is considered and studied for a period and suitable remedies have been suggested. Keywords—Air preheater, Regenerative air preheater, boiler, and sealing I. INTRODUCTION Modern high capacity boilers are always provided with an air preheater. Air pre-heater is an important boiler auxiliary which primarily preheats the combustion air for rapid and efficient combustion in the furnace serving as the last heat trap for the boiler system, a regenerative air preheater typically accounts for over 10% of a plants thermal efficiency on a typical steam generator. Considering this, when evaluating the performance of an air preheater one should take into account all of the process variables. A very good method to improve the overall efficiency of a thermal power plant is to preheat the air. If the incoming air for combustion is not preheated, then some energy must be supplied to heat the air to a temperature required to facilitate combustion. As a result, more fuel will be consumed which increases the overall cost and decreases the efficiency. There are many factors, which contribute to the deterioration of air preheater performance like high seal leakage, deterioration of heat absorption characteristics of basket elements due to fouling or plugging. Close monitoring of air preheater performance and proper instrumentation would enable timely detection of performance degradation. The combustion air preheater for the large fuel-burning furnaces used to generate steam in thermal power plants The organization of this paper is as follows: Section I gives an Introduction and an outlay of the scope of the work. Proposed methodology is elaborated in Section II. Problem Identification is given in Section III, Study On Performance Improvement Of Air Preheater are, Solution For Improving the Performance Of Raph and are Experimental Analysis described in Section V followed by the conclusion in Section VI. SCOPE THE WORK After studying the journal papers mentioned above, it is understood that there are some leakages development in the RAPH and maintenances of RAPH is to be considered for the improvement efficiency of the boiler shell and tube air preheater. The project is planned with the following work scope. To identify the problem and to give an suitable remedies for further increases in efficiency of the boiler with the help RAPH. II. PROPOSED METHODOLOGY The proposed methodology of the work are detailed discussed and mentioned as below and are shown in Fig.
  • 2. Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion Manuscript id. 371116084 www.ijstre.com Page 18 III. Problem Identification Excessive air heater leakage can cause any of the following additional problems:  Severe degradation of the performance of downstream air pollution control equipment (electrostatic precipitators, bag houses, and scrubbers).   Lowered primary air temperatures and consequent reduction of coal mill capacity—particularly in the case of wet coals and Powder River Basin coals.  Increased potential for mill fires or explosions.   Load limitations and missed power sales opportunities due to inadequate fan capacity, especially during warm weather.   Increased NOx production and loss -on-ignition.   Poor flame stability at lower load and unattached flame ignition points, as well as flame pulsation.   Excessive desuperheating due to increased convective heat transfer caused by increased mass gas flow.   Increased heat rate and air heater plugging.   Increased rate of cold end air heater basket corrosion.  Study On Performance Improvement Of Air Preheater Steam generators uses rotary air preheaters to absorb the heat from the flue gas and release that heat to the incoming combustion air. Thus absorbing the waste heat from the flue gas the efficiency of the boiler in increased. It is estimated that for every 20 0 C decrease in gas temperature, the efficiency of boiler goes up by 1%. With increase in operation cost demand for power and pollution constraint today, every savings in boiler efficiency results in the big money. Recollect the slogan ‗every MW saved is the MW generated‘. Air preheaters are one of the major areas of concern for efficiency improvement. It is necessary that we should go for renovation and modernization only for performance improvement.
  • 3. Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion Manuscript id. 371116084 www.ijstre.com Page 19 Even maintaining the ―Regenerative Air Preheater‖ in the correct way will result in the efficiency improvement. Sl. DATA UNIT No. 30-1-16 to16-02-2016 RAPHI RAPH2 1 Unit Load MW 209 210 2 Fuel consumption T/hr 210.59 210.59 3 O2 at Flue gas inlet % 3.6 4.0 4 O2 at Flue gas outlet % 5.6 4.7 Flue gas Inlet 5 Temperature 0 C 297 312 Flue gas outlet 6 Temperature 0 C 170 186 7 Air Inlet Temperature 0 C 32.8 32.7 8 Air outlet Temperature 0 C 289 312 9 Air Header Pressure mm WC 24.1 24.1 Air Pressure before 10 RAPH mm WC 30.1 26.1 11 Air Pressure after RAPH mm WC 24 24.1 Pressure of flue gas 12 outlet mm WC 238 235 12 Draft RAPH inlet mm WC 5.2 4.6 13 Draft RAPH outlet mm WC 19.3 22 14 Air flow at inlet T/hr 500 309 15 Air flow at outlet T/hr 500 309 16 FD fan current Amps 67 54 17 ID fan current Amps 183 191 18 FD fan scoop position % 50 90 19 ID fan scoop position % 68 72
  • 4. Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion Manuscript id. 371116084 www.ijstre.com Page 20 AIR INGRESS IN PREHEATER During the study, the operating parameters like pressure, temperature and oxygen percentage along the flue gas path has been carried out. The study was conduct to analyze the performance of air heater and air ingress in the air heater. Fig 4.8 shows the Graphical illustration of AIR Leakages in RAPH The details are follows % Leakage of air = (Gas out-Gas in)/Gas In Table 1.2 Air Ingress in Preheater FLUE GAS EXCESS TEMPERATURE PRESSURE , AIR, 0 C DESCRIPTIO N OXYGEN PROFILE Mm WC % RAPH I & II 66 to 53 312 & 297 4.7 & 3.6 29.01 & inlet 20.81 & 40 to 53.6 RAPH-I outlet 238 170 4.0 57.14 RAPH-II outlet 235 186 5.6 36.60 Table 1.3 % of air leakage in RAPH 1&2 AIR LEAKAGE % LEAKAGE RAPH1 28.1 RAPH2 13.1 Fig 1.1 A graphical illustration of AIR Leakages in RAPH
  • 5. Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion Manuscript id. 371116084 www.ijstre.com Page 21 ADVANCEMENT IN SEALS: The air preheater is a critical component of the boiler combustion air system. Evaluating and optimizing a heater‘s performance is difficult with the entire combustion system and the lack of standardized calculation tools. The regenerative air heater or air preheater (APH) on a large utility boiler often accounts for about 10% of the unit‘s thermal efficiency. Its performance is so critical that just a 10F change in gas exit temperature can change the boiler efficiency by a quarter of a percent. Reducing leakage by using modern seal technology will improve combustion efficiency, maintain fan performance, and keeps the down stream air quality in control. FLEXIBLE RADIAL SEALS: Flexible Radial seals are used to minimize the direct air to gas leakage that occurs at the center section or sealing surfaces in the air heater. The seals are attached to each diaphragm of the rotor to maintain close contact with the sealing surface that separates the air and gas streams TYPE-1: The type-1 radial seal incorporates a unique patented bellows architecture that ensures positive contact with the sealing surface. When sealing edge wear occurs this type of seal can be simply adjusted, rather than replaced. TYPE-2: This type-2 seal is a full contact flexible radial seal. This seal complements robust protection system, augmenting the benefits and features found in the type-1 flexible full contact seal. They are highly erosive and are exposed to high -pressure water washing, as well as air preheaters that have been enhanced with carbide overlaid sector plates. These seals are typically recommended for larger rotor sizes (greater than 25) where the aggressive rotor turndown encountered in these size rotors can be as large as 2-4 inches EXPERIMENTAL ANALYSIS AIR PREHEATER PERFORMANCE CALCULATION: (Readings as observed in the RAPH of a Thermal Station) 1. Before implementing flexible seal: % of oxygen in the flue gas outlet: 5.6 % of oxygen in the flue gas inlet : 3.6 Leakage % in APH is given by (% o2 out - % o2 in) / (21- % o2out). =(5.6-3.6) / (21-5.6) =13.1% 2. After implementing the flexible seal: % of oxygen in the flue gas outlet: 4.7 % of oxygen in the flue gas inlet : 4.02 Formula to find leakage % is given by (% o2 out - % o2 in) / (21- % o2 out). =(4.7 -4.02) / (21-4.7) =4%
  • 6. Experimental Analysis of an Regenerative Air Preheater In Boiler TPS- 1 Expansion Manuscript id. 371116084 www.ijstre.com Page 22 Fig 1.2 A Graphical illustration of Air leakage in RAPH VII. CONCLUSION By this paper it is concluded that the efficiency of the Regenerative Air Pre-Heater was improved by reducing the leakage of air into flue gas in the RAPH, and it is minimized by replacing the ordinary radial seals into “Flexible Seals” and also by proper maintenance of the RAPH. Thus the air leakage is reduced 30% by using RAPH-2 REFERENCE [1.] Shah, R.K., Sekulic, D.P., ―Fundamentals of Heat Exchanger Design‖, John Wiley & Sons Inc., Canada, 2003. [2.] Juangjandee, P. and Sucharitakul, T., ―Performance Evaluation of Cross Flow Heat Exchanger in Coal Fired Power Plant under Particulate Condition‖, 18th Conference of Mechanical Engineering Network of Thailand, Khon Kaen University, Thailand, 2004. [3.] Juangjandee, P. and Sucharitakul, T., ―Performance Evaluation of Leakage Cross Flow Heat Exchanger in Coal Fired Power Plant‖, 19th Conference of Mechanical Engineering Network of Thailand, Phuket, Thailand, 2005. [4.] Juangjandee, P. and Sucharitakul, T., ―Effect of High Ash Content Lignite on Cross Flow Heat Exchanger Performance in Mae Moh Lignite Fired Power Plant‖, HAPUA Fuel Procurement & Utilisation Forum, Kuala Lumpur, Malaysia, 2006 [5.] Juangjandee, P. and Sucharitakul, T., ―Air Heater Performance and Enhancement under Low Rank Coal‖, 16th Conference of Electric Power Supply Industry, Mumbai, India, 2006. [6.] Bostjan Drobnic, Janez Oman. ―A numerical model for the analyses of heat transfer and leakages in a rotary air preheater‖ , International Journal of Heat and Mass Transfer 49,PP.5001–5009, 2006. [7.] Pipat Juangjandee ―Performance Analysis of Primary Air Heater Under Particulate Condition in Lignite FiredPower Plant‖ Engineering, Computing and Architecture, ‖ISSN 1934, 7197,vol 1,issue 2,2007