An Application of DMAIC Methodology for Increasing the Yarn
Quality in Textile Industry
Neha Gupta
(Mechanical Department, Integral University, India)
Abstract : This article presents a quality improvement study applied at a yarn manufacturing company based
on six sigma methodologies. More specifically, the DMAIC (Define, Measure, Analyze, Improve, and Control)
project management-methodology & various tools are utilized to streamline processes & enhance productivity.
Defects rate of textile product in the yarn manufacturing process is so important in industry point of view. It
plays a very important rate for the improvement of yield & financial conditions of any company. Actually
defects rate causes a direct effect on the profit margin of the product & decrease the quality cost during the
manufacturing of the product. By checking & inspection of defects of product at different point in production
where more defects are likely to happen. A thousand defects opportunities create in the final package of yarn.
That’s why it is decided to do work & implement DMAIC methodology in winding departments where the final
package of yarn is make.
Keywords - Six Sigma; DMAIC; Lean manufacturing; Yarn manufacturing.
I. INTRODUCTION AND BACKGROUND
Organizations look for ways to improve their production and management processes in order to remain
competitive in the market. This calls for ways to reduce production cost, enhance productivity and improve
product quality. Therefore, organizations must utilize all the available resources efficiently and effectively in
order to cater their customers with high quality products at a low price. For these reasons, researchers all over
the world proposed several improvement strategies and tools to satisfy organization’s needs. Such initiatives
include Total Quality Management, Quality Awards, Total Preventive Maintenance (TPM), Lean and Six
Sigma. The lean concept, which was initially referred to as the Toyota Production system, concentrates on the
flow of the entire processes rather than on the optimization of individual operations [13]. Womack (2002)
specified the main components of lean management system as follows:
 Identify process value from the customer perspective.
 Identify the value stream for each product and eliminate all types of wastes currently imbedded within the
production process.
 Try to develop a continuous production process.
 Develop the pull management technique within the production lines.
 Manage toward perfection.
The main thing of Six Sigma is to taking the existing product, process and improves them in a better way. It
is a very powerful approach to achieve the financial goals for the organization and improving the company’s
value by the following:
 Data driven
 Project based
 Disciplined and systematic
 Customers focused (internal & external)
Fig. 1: Six Sigma Methodology for improvement
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 51 | Page
Six Sigma, on the other hand, is a data driven methodology used to identify root causes for variations in a
production processes in order to achieve organizational excellence. Six Sigma management strategies require
process improvement through identifying problem, root causes, process redesign and reengineering, and process
management. Six Sigma follows a model known as DMAIC (Define, Measure, Analyze, Improve, and
Control). Therefore, Six Sigma starts by analyzing defects and lean initial focus is on customer, process flow,
and waste identifications [23]. However, using one of these tools has limitations. Since lean eliminates the use
of Six Sigma’s DMAIC cycle as a management structure to define required process capabilities to be truly lean.
On the other hand, Six Sigma eliminates defects but does not address how to optimize the process flow. Hence,
applying both Six Sigma and Lean tools sets results in far better improvements than could be achieved with
either one method alone [16].
DMAIC is a systematic six-sigma project management practice inspired by Deming's PDCA (Plan, Do,
Check, and Act) Cycle. The process consists of the five phases called Define, Measure, Analyze, Improve and
control.
Fig. 2: Six Sigma Methodology DMAIC
The Define phase concentrates on forming the team, defining the project's goals, mapping the process,
identifying customers, and identifying the high impact characteristics or the CTQs (Critical to Quality). The
Measure phase consists of defining and executing a systematic data collection plan for the key measures (CTQs)
for the targeted process. Data collected in the Measure phase are analyzed in the Analyze phase to identify the
root causes behind the gap between the current performance and the goals identified in the first phase by
defining the main type of wastes embedded within the production processes and the root causes for these wastes.
The Improve phase focuses on identifying expected solutions, suggest set of alternative solutions to enhance
performance, and implement some of these solutions according to the available budget and the expected cost for
each alternative. The Control phase concentrates on creating and implementing monitoring and response plans
for sustaining improvements, spread out the outcome and the methodology for the whole organization, insure
the establishment of a new culture within the organization. Moreover, operating standards and procedures are
documented and published in the Control phase.
Lean and Six Sigma have been implemented successfully in the manufacturing and service sectors to
optimize different performance measures. Both lean and Six Sigma methodologies have proven over that last
twenty years that it is possible to achieve dramatic improvements in cost, quality, and production time by
focusing on process performance. Linderman et al. (2003) pointed out that Six Sigma could be implemented to
the processes of producing manufacturing goods, business trade, executive management, and services. Recent
research papers include improving operational safety [5], reducing amount of waste [8], improving quality for
surveillance cameras to diminish related excess costs [10], enhancing the assembly efficiency of military
products [4], increasing customer loyalty in the banking sector for Bank of America and Citigroup [21, 22],
reducing patients’ waiting time and length of stay [3, 17, 29], reducing length of stay for Ophthalmology Day
Case Surgery [16], reducing lead-time [1], enhancing staff satisfaction [7], reducing clinical errors [20], process
improvement for both the radiology department and medication administration process [15], and process design
of compressor-housing machining process [25]. Others include [2, 6, 11, 12, 18, 19, 24, 26, 28, 29].
As a summary, both lean and six sigma methodologies have proven over that last twenty years that it is
possible to achieve dramatic improvements in cost, quality, and production time by focusing on process
performance. In this paper, a customized lean Six Sigma methodology is deployed at a local paper
manufacturing company to increase production rate, minimize waste and increase Overall Equipment
Effectiveness (OEE). The two tools have been used as complementary to each other, wherein DMAIC’s
roadmap has been used as a general framework for process improvement and lean tools have been embedded
within these phases. Furthermore, the research focuses on employee involvement and motivation that are
imperative to advance a new culture [9].
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 52 | Page
Sigma value increases the process performance in a better way. Another way of measure the process
capability and performance by the statistical measurements like Cp, Cpk, Pp and Ppk. The Six Sigma means a
3.4 % defects part per million or yield of 99.9997% (perfect parts). Following is the table 1 of comparison of
different Sigma values at different defects part per million and capability of process here [31].
Table 1. The Comparison of Different Sigma Values
SIGMA DPMO COPQ CAPABILITY
6 Sigma 3.4 <10% of sales World Class
5 Sigma 230 10 to 15% of sales
4 Sigma 6200 15 to 20% of sales Industry Average
3 Sigma 67000 20 to 30% of sales
2 Sigma 310,000 30 to 40% of sales Noncompetitive
1 Sigma
II. BRIEF INTRODUCTION OF YARN MNUFACTURING DEPARTMENTS
2.1 Blow room Process
Blow room is the initial stage in spinning process. The name blow room is given because of the “air
flow” And all process is done in blow room because of air flow. Blow room is consisting of different machines
to carry out the objectives of blow room. In blow room the tuft size of cotton becomes smaller and smaller.
Mixing of cotton is done separately as well as in blow room. Compressed layer of bale is also open in blow
room with the help of machine.
Fig. 3: Blow Room Department
2.2 Carding Process
Carding process is very important role in spinning mill. It helps us both way to open the tuft into a
single fiber and to remove the impurities and neps. Textile experts are convinced for the accuracy of following
statement.
“The card is the heart of spinning mill” and “well carded is well spun” (Vijykumar, 2007). [34]
Card feeding is done by two ways. One is manually and other is through chute feed system. In manual case the
lap which is produced in blow room and it is feed to the card. In chute feed the material is feed through air flow
system to card machine. It is important to say that lower the feed variation better is the carding quality. Lower
the feed variation then draft variation will also be less. Then yarn quality will be consistent. If the card is having
auto leveler then nominal draft should be selected properly. In some circumstances card also act as a cleaner and
remove a certain amount of short fiber. Approximately 90% cleaning efficiency is achieved with the help of
carding machine. [35]
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 53 | Page
Fig. 4: Carding Machine
2.3 Drawing frame Process
Draw frame is simple and cheap machine. In spinning regarding to quality point of view it play very
important role .If its setting is not done properly then it affects yarn strength and elongation. For improving
quality draw frame is final process in the spinning mill. It effects on quality especially on evenness of sliver. In
the spinning process there are chances of elimination of errors in draw frame machine. Draw frame play very
important role for the quality of yarn. Without it participation quality can never be improved. [4]Drafting
arrangement is the heart of the draw frame. Drafting arrangement should be simple, stable design, should have
ability to produce high quality product. It should have high fiber control. Auto leveler is also used to adjust and
to improve the linear density of the sliver. Without auto leveler it is very difficult to improve the quality of the
draw frame sliver. [36]
Fig. 5: Drawing Frame Department
2.4 Combing process
For getting high quality of yarn, one extra process is introduced which is called combing process. Combing
is an operation in which dirt and short fibers are removed from sliver lap by following ways.
 In specially designed jaws, a narrow lap of fiber is firmly gripped across its width.
 Closely spaced needles are passed through the fiber projecting from jaws.
Short fiber which we remove is called comber noil. The comber noil can be recycled in the production of carded
yarn. Yarn which is get from comber sliver is called comber yarn. Carded sliver are combine into comber lap in
a single continuous process stage. Flat sheet of fiber which is get from comber lap is fed into the comber in an
intermediate.
There are different ways by which value of combing is used in the manufacturing of cotton. By
spinning point of view combing process makes more uniformity in the yarn. Strength of yarn is also high
because in combing process short fiber are removed and only fiber having good strength remains. So it play very
important role for increasing the yarn strength. Because of straightened condition of fibers combing makes
possible spinning smoother and more lustrous yarn. In combing process length of fiber are strong so it need less
twist produced then carded yarn [53].
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 54 | Page
Fig. 6: Combing Department
2.5 Roving frame
It is an intermediate process in which fibers are converted into low twist lea called roving. The sliver which is
taken from draw frame is thicker so it is not suitable for manufacturing of yarn. Its purpose is to prepare input
package for next process. This package is to prepare on a small compact package called bobbins. Roving
machine is complicated, liable to fault, causes defect adds to the production costs and deliver the product. In this
winding operation that makes us roving frame complex. There are two main basic reasons for using roving
frame.
 The roving sliver is thick and untwisted. Because of it hairiness and fly is created. So draft is needed to
reduce the linear density of sliver. The ring drafting arrangement is not capable that it may process the
roving sliver to make the yarn.
 Draw frame can represent the worst conceivable mode of transport and presentation of feed material to the
ring spinning frame.
Fig. 7: Roving Machine
2.6 Ring Spinning Process
Ring Spinning machine is used in textile industry to twist the staple fibers into a yarn and wind on a
bobbin for storage and also input for the winding section for more precise the yarn to minimize the defects of
end yarn. Ring machine is very important due to yarn quality. Ring Spinning is the most costly step to convert
fibers into yarn and approximately 85% yarn produced in ring spinning frame all over the world. It is made to
draft the roving into a desired count and impart the desired twist to produce the strength in the yarn. If twist is
increased, yarn strength is also increased at optimum limit.
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 55 | Page
Fig. 8: Ring Spinning Machine
2.7 Winding Section
It is the last section of yarn manufacturing process where auto cone machines are installed and take an
input material from ring spinning section as a yarn bobbin and give a yarn on paper cone after passing detecting
instrument as a output. In winding section, there are lot of heads in auto cone machines use to wound the yarn
from ring bobbin yarn to paper cone yarn. Now days, there are some companies to manufacturing these
machines and Savio company is one of them which produce a fully automatic machine for spinning industries.
In quality point of view, it is a very good machine and has also very low maintenance cost. Winding department
plays an important role in the production and quality of yarn and causes direct effect on them. The yarn which
made in ring section is not finish yarn and can’t sell to customer. After making the yarn in ring process, auto
cone section made it more even yarn by passing through the optical sensor which is installed in different heads
of machine. The yarn which is obtained from winding section is able to sell the customers.
Fig. 9: Winding Machine
III. PROBLEM STATEMENT
This paper is related to textile industry especially to Yarn manufacturing process. This paper identifies
the different problems occurring during manufacturing of yarn in the last process (winding), DMAIC tool is
applied by the practical examples which was applied in practical field. It is very complicated and important
process and it’s difficult to achieve the quality throughout the process.
The main reason is the raw material, which do not possess good properties such as maturity, degree of
reflectance, impurity and fiber strength and shade variation from bale to bale. The main thing in this paper is to
reduce the defects rate and also reduce fault opportunities in the final yarn, As in Six Sigma methodology, if we
decrease the opportunities in the final product then we can increase the Sigma value which shows that the
process improvement. We have also applied a basic tool of Six Sigma like DMAIC which highlighted the
different phases of tool with respect to process behavior and importance in the manufacturing of yarn. Winding
department where we have applied DMAIC tool is critical as compared to other departments in the process as it
cause an increase defects rate percentage in the final product of yarn.
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 56 | Page
In winding department, there is an Auto cone machine which winds the yarn on the cone and makes a
final package for the end customers. It’s better to implement DMAIC tool to eliminate or reduce the defects at
the last section of the department. After this section, we can’t improve the quality or reduce the defects in the
final product.
IV. RESEARCH METHODOLOGY
During production of different processes in the yarn manufacturing process, there are failures at many
stages. All such failures are recorded in the manufacturing plant. It was observed that worst defects % is at
winding stage. So it was decided to implement DMAIC tool in this process to eliminate a large variation in it.
During this it was focused in all three departments such as Quality, Maintenance and Production. I followed all
the standards which play important role for the satisfaction of the customer needs and expectations.
Maintenance play important role in every field. It play very important role regarding to quality.
Because of proper maintenance, quality of product will be better. So it was focus on maintenance department as
well. Winding section is a very critical department in yarn manufacturing process.
In this department there are a lot of chances of defects opportunities in the final yarn. It is the last
section of manufacturing process where defects can be minimized or eliminated. After manufacturing of yarn
from deferent departments in the preparatory process and ring department it is ready to make a shape into final
cone form so that it can be shipped to customer for use. During winding process of yarn following objectives are
met.
 Scanning and faults removing
Electric Scanners (uster) is used for checking and elimination of yarn faults during winding process. This
process is called Usterization of yarn. Such faults are called scan-cuts.
 Splicing of broken or cut yarn
Auto splicing is done for broken yarn pieces to eliminate yarn knots and bad piecing.
 Bigger package
Conversion of yarn from small ring bobbins to bigger yarn cones of different international standard or as per
requirement of customer.
During achieving above objectives or making of winding cones some faults are created during the
process. These faults need to be controlled through monitoring and continuous study. Most of the winding faults
are very dangerous for the next subsequent process which can be warping or knitting or doubling. We can face
complains from customer of breakage of yarn during unwinding process.
The following subsections illustrate how the DMAIC cycle is used to increase the quality and reduce the defects
rate in the yarn manufacturing company.
4.1 Define Phase
In this phase, define the process at different angles with the help of tools like Pareto chart, XY matrix
and cause and effect diagram. First of all there is a comparison of rejection rate of different departments given
below.
4.1.1 Rate of Rejection of Departments
Table 2. Comparison of Rejection Rate of Different Departments
Area Defects Production Defects % DPMO Sigma
level
B Grade 5303 4684800 0.11 1132 4.5
Final Inspection 0 4684800 0.00 0 6
Packing 1227 4684800 0.03 262 4.97
Doubling 494 494700 0.10 999 4.59
Winding 49752 4684800 1.06 10620 3.81
Ring 4852 4684800 0.10 1036 4.58
Simplex 14795 4684800 0.32 3158 4.54
Can & Lap 2660 4684800 0.06 568 4.76
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 57 | Page
Defects% Sigma level
B Grade 0.11 4.5
Final Inspection 0.00 6
Packing 0.03 4.97
Doubling 0.10 4.59
Winding 1.06 3.81
Ring 0.10 4.58
Simplex 0.32 4.54
Can & Lap 0.06 4.76
Fig. 10. Defects% age of Departments
4.1.2 SIPOC Diagram
As it is decided to work and analysis the defects in winding section, following SIPOC diagram is used to
understanding the clear relationship between customer and supplier relationship.
Table 3. SIPOC (SUPPLIER, INPUT, PROCESS, OUTPUT, CUSTOMER) Diagram
Supplier Input Process Output Customer
Roving
Department
Roving
Bobbin
Spinning Ring Yarn
Bobbin
Preparatory of
Winding Machine
Preparatory of
Winding Machine
Ring Yarn
Bobbin
End Finder Bobbin with end
at top
Winding Spindle
Winding Spindle Bobbin With
end at top
Winding Wound cone Auto doffer
Auto doffer Wound cone Auto doffing Doffed Cone Inspection Department
Inspection
Department
Doffed Cone Inspection Inspected Cone Packing
Inspection
Department
Inspected
Cone
Pallet Formation Cone on Pallet Packing
Packing Cone on Pallet Steaming Steamed Cone Packing
Packing Steamed Cone Repacking &
Inspection
Packed Cone on
Pallet
Packing and Quality
Control
Packing Packed Cone
on Pallet
Shrink
Wrapping
Packed Pallets Logistic, Quality Control
Logistic Packed Pallets Yarn Storage Ready for
Storage
Marketing, Quality Control
Logistic Stored Yarn Final Inspection Pass Pallets Marketing, Customer
Logistic, Marketing Pass Pallets Delivery to
customer
Delivered
Pallets
Customer
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 58 | Page
4.1.3 Winding Defects
There are many defects which are produced in winding section and show them in bar graph here.
Percentage% Defects
Stitch 53.3 20899
Shade 32.7 12807
Paper Damage 6.6 2604
Without tail 2.5 981
Contamintae 1.8 689
Without Lycra 1.5 569
Smoky 1.1 428
Winding fault 0.2 82
Fig. 11. Bar graph of Winding Defects
4.2 Measure Phase
To start the measurement phase a standard from has been designed and distributed to the DMAIC team,
from contain the necessary information that should be gathered to be analyzed at the next phase, these
information comprise from product type, raw materials type, machine parameters, type of wastes combined with
general comments. Measure the performance of the process by collecting the data and also write down the
importance of different critical defects regarding to customer value. In this phase there is different data analysis
here
 Cause and Effect Analysis
 Data Collection Plan
 Measurement system analysis
4.2.1 Cause & Effect Analysis
Rating Scale 1~9 (1 being lowest and 9 being highest)
1 2 3 4 5 6 7 8
Rating of Importance to
Customer
10 6 6 1 8 8 9 7
Key Process Outputs
DefectRate
Rework
BGrade
Yarn
HardWaste
Customer
Complain
Customer
Return
Customer
Claims
Final
Inspection
Failures
Process
Step
Process
Input
Total
1 Winding
Machine
Guide 9 9 1 3 3 3 3 1 235
Gas Kit 9 9 1 1 1 3 3 1 217
Disk 9 9 1 1 3 3 3 1 233
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 59 | Page
2 Personals Cradle Gauge 9 9 1 3 9 3 3 1 283
Suction
mouth gauge
9 9 1 9 9 6 6 1 340
Over Hauling 3 3 3 6 1 1 1 3 118
Inspection 9 9 1 6 9 9 9 1 388
3 Material Scan Cuts 9 9 9 9 9 9 3 6 420
4 Environ
ment
Temperature 3 3 3 6 3 3 3 3 168
Humidity 3 3 3 3 1 1 1 1 101
5 Product
plan
Yarn Type 3 3 3 3 1 1 1 1 101
Count 6 6 6 6 1 1 1 3 184
Speed 9 9 6 9 9 6 6 6 305
Machine
Change
3 3 1 3 3 1 1 1 105
Total 930 558 240 68 496 400 396 210
Fig.12. Cause & Effect Diagram
4.2.2 Data Collection Plan
There is different way where the data collect of the yarn manufacturing process. Following are the different
types of data which is collected from different source.
For identify the problem of cross stitch, there is data collected here.
 The system in a manufacturing plant is to collect a lot of data from department is already established.
 Date and month, Yarn type, Operator and his experience, yarn count, Shift, production, Machine type
and machine number, our hauling, scan cuts, Speed of machine, Temperature and humidity.
 Responsibilities of person is shown in data to highlight the clear understanding regarding to process
data and also take a data collection source like production and maintenance rejection report.
It is an especially design experiment to identify the variation in the measuring components. A measurement
system analysis considers the following things related to the process.
 Selection of correct measurement system and approach.
 Capability and assessing the measuring device.
 Assessing of operators and procedures implement in a process.
 Calculating the uncertainty in the measurement.
4.4.3 Measurement system analysis for Defective Yarn cones
At winding section, inspection of yarn cone is done manually and conducts a MSA of attribute data.
Sample Selection-
Sample Size = 50 cones
Winding
Process
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 60 | Page
Pass cones = 20
Fail Cones = 20
Borderline cones = 10
Number of operators=3
Number of trials / operator = 2
Overall %age appraiser = 82 %
Overall %age attribute= 76 %
 Appraiser %age of this sample selection shows that it should be needed to retrain the inspectors to
reduce the error.
 Attribute %age of this sample shows that it should be needed to improve the existing system and
redefine the defects parameters of winding section.
4.3 Analysis Phase
The analysis phase deals with identifying the root causes of the process whether it can be improved or
redesigned the process. To understand the defects stitch following studies & charts were produced to analyze
this problem from different angles.
4.3.1 Effect of over hauling, product change and shift on Stitch defect
Data shows that Evening shift has more defects as compared to morning and night shift. The night shift
has minimum defects during manufacturing process.
By deeply analyzing this problem, whenever change the product at machine or run the machine after
overhauling changes of Stitch defects increases in first shift. Up till second shift things get normalized.
All overhauling is done mostly in morning shift by the maintenance team and restart the machine in evening
shift.
The same case product change case, mostly product change in morning and evening shift. Top management are
absent in night shift and extra are avoided in night time.
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 61 | Page
Fig.13 Pie Chart of Shifts data
4.3.2 Effect of yarn type on Defect Stitch
In the yarn type, there are three types of yarn in relation to its end use.
 Weaving Yarn
 Knitting Yarn
 Stretch Yarn (Lycra Yarn)
According to different type of yarn, it is clear that the weaving yarn has more defect Stitch and then comes
Knitting and Lycra yarn.
Fig.14. Defects in Yarn Type
Data shows that the fine count like 100s has high defects rate than the course count like 26s. As the count is
going from fine to course, the defects rate goes down.
The same case in knitting yarn, knitting yarn of fine count has high defects rate than course counts and it is
gradually decreases from 40s to 26s count.
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 62 | Page
In lycra yarn, the same situation is also here but little bit difference because of lycra %age of different yarn as
per customer requirement.
Fig.15. Defects in Yarn Count
In all types of yarn Weaving, Knitting and Lycra have more defects percentage in finer and lower as it goes
towards course count. It is due to the finer count cone has more stay time on machine as compared to course
counts. So opportunities of having stitch defects in finer counts cone is more as compared to courser counts
cone. Whenever machine stopped for readjustment, overhauling and restarted it, then coming shift is critical to
stitch defects.
4.4 Improve Phase
The improvement of process is calculated by the help of Design of Experiment. In order to improve the
process, some settings are change which are the sever effect on the defects of final product.
In this normal plot, some significant factors are shown which causes major effects on the defects on the product
in the winding process.
 Scan cuts
 Speed of winding machine
 Disk of machine
 Suction mouth gauge
Fig.16. Normal plot of the standardized effects
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 63 | Page
4.4.1 Parameters
Speed is already slow so no big influence on defect. Scan-Cuts and Disk life are most important
factors. They need to be controlled to achieve optimum results best Scan-Cuts are below 40. Condition of Disk
should be good always and the suction mouth gauge should be less than 6 mm.
Table 4. Response Table for Defects
Level Value Scan Cuts Speed Disk Gauge
Initial 1.0 37.00 700.00 1 (Good) -1 (< 6mm)
Optimal 1.0 37.00 700.00 1 (Good) -1 (< 6mm)
1 1.0 40.2089 700.00 1 (Good) -1 (< 6mm)
Fig.17. Normal plot of Design of Experiment
4.5 Control Phase
In control phase, the process will be check by applying the control charts whether it is control or not.
Variation of whole process should be in control limits for control process.
Fig.18. X bar- R chart
4.5.1 Statistical process control
Statistical process control is used to monitoring the consistency of process and makes the process is
under control. Data of defects %age shows that the process is under control and there is not any point in this
graph which is out of control limits.
4.5.2 Design the speed limits
Speed of different yarn count on winding machine should be designed in different standard. The
training of operators should also conduct for the understanding of speed limits of different product.
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 64 | Page
4.5.3 Inspection procedure
Inspection procedure of maintenance department improved and checking of suction mouth gauge and
tension disk on daily basis and make the part of daily checking sheet form. For the improvement of
measurement system analysis following steps have been taken.
After categorization the stitch fault in the cone, it is included in the SOP as it was a great confusion among
operators to detect a stitch cone fault. All operators were trained according to the new portion of SOP. After one
month training of operators according to new portion of SOP, Measurement system analysis was conducted of
attribute data.
Sample Selection-
Total Sample size = 50 cones
Pass cones = 22
Fail cones = 22
Borderlines cones = 6
No of Operators = 3
No of trials/ operator = 2
Overall appraiser %age = 94%
Overall attribute %age = 90%
V. CONCLUSION
In this paper, we have achieved a lot of results regarding to process problems during manufacturing of
yarn in different departments. The main thing in our paper is to reduce the defects rate and also reduce fault
opportunities in the final yarn; we have worked in every department to reduce these opportunities and gave a
solution in the form of preventive action. As in Six Sigma methodology, if we decrease the opportunities in the
final product then we can increase the Sigma value which shows that the process improvement. We have also
applied a basic tool of Six Sigma like DMAIC in our thesis in which highlighted the different phases of tool
with respect to process behavior and importance in the manufacturing of yarn. Winding department where we
have applied DMAIC tool is critical as compared to other departments in the process as it cause an increase
defects rate percentage in the final product of yarn. In winding department, there is an Auto cone machine which
winds the yarn on the cone and makes a final package for the end customers. It’s better to implement DMAIC
tool to eliminate or reduce the defects at the last section of the department. After this section, we can’t improve
the quality or reduce the defects in the final product.
REFERENCES
[1] O. Al-Araidah, A. Momani, M. Khasawneh, and M. Momani, “Lead-Time Reduction Utilizing Lean Tools Applied to Healthcare:
The Inpatient Pharmacy at a Local Hospital,” Journal for Healthcare Quality, 2010, 32(1),pp. 59-66.
[2] M. Ali, “Six-sigma Design through Process Optimization using Robust Design Method,” Master Thesis at Concordia University,
Montreal, Canada, 2004.
[3] S. Bisgaard, and R. Does, “Quality Quandaries: Health Care Quality – Reducing the Length of Stay at a Hospital, Quality
Engineering”, 2009, 21, pp. 117-131.
[4] Y. H. Cheng, “The Improvement of Assembly Efficiency of Military Product by Six- Sigma,” NCUT Thesis Archive, Taiwan,
2005.
[5] M. E. Cournoyer, C. M. Renner, M. B. Lee, J. F. Kleinsteuber, C. M. Trujillo, E. W. Krieger, C. L. Kowalczyk, “Lean Six Sigma
tools, Part III: Input metrics for a Glovebox Glove Integrity Program,” Journal of Chemical Health and Safety, Article in press,
2010,pp. 412, 1-10.
[6] A. D. Desai, “Improving Customer Delivery Commitments the Six Sigma way: Case Study of an Indian Small Scale Industry,”
International Journal of Six Sigma and Competitive Advantage, 2006, 2(1), pp. 23-47.
[7] E. Dickson, S. Singh, D. Cheung, C. Wyatt, and A. Nugent, “Application of Lean Manufacturing Techniques in the Emergency
Department,” The Journal of Emergency Medicine, 2009, 37, pp. 177-182.
[8] J. Edgardo, V. Escalante, and A. Ricardo, “An application of Six Sigma methodology to the manufacture of coal products,” World
Class Applications of Six Sigma, 2006, 98-124.
[9] M. Hook, and L. Stehn, “Lean Principles in Industrialized Housing Production: the Need for a Cultural Change,” Lean
Construction Journal, 2008, pp.20-33.
[10] C. Huang, K. S. Chen, and T. Chang, “An application of DMADV Methodology for increasing the Yield Rate of Surveillance
Cameras, Microelectronics Reliability,” 2010, 50, pp. 266–272.
[11] R. Jain, and A. C. Lyons, “The Implementation of Lean Manufacturing in the UK Food and Drink Industry”, International Journal
of Services and Operations Management, 2009, pp. 5(4), 548-573.
[12] R. Krishna, G. S. Dangayach, J. Motwani and A. Y. Akbulut, “Implementation of Six Sigma in a Multinational Automotive Parts
Manufacturer in India: a Case Study,” International Journal of Services and Operations Management, 2008, 4(2), 246-276.
[13] Q. Lee,“The mental model: Lean Manufacturing Implementation”. Retrieved September 13, 2004, from
http://www.strategosinc.com/lean_implemntation1.htm
[14] K. Linderman, R. Schroeder, Z. Srilata, and A. Choo ,“Six Sigma: a Goal-Theoretic Perspective,” Journal of Operation
Management, 2003,21,pp.193–203.
[15] D. Lioyd and J. Holesnback,“The Use of Six Sigma in Health Care Operations: Application and Opportunity,” Academy of Health
Care Management Journal, 2006, 2,pp. 41-49.
[16] N. Mandahawi, O. Al-Araidah, A. Boran, and M. Khasawneh, “Application of Lean Six Sigma Tools to Minimize Length of Stay
for Ophthalmology Day Case Surgery,” International Journal of Six Sigma and Competitive Advantage, to appear, 2010.
An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry
www.iosrjournals.org 65 | Page
[17] N. Mandahawi, S. Al-Shihabi, A. A. Abdallah, and Y. M. Alfarah, “Reducing Waiting Time at an Emergency Department using
Design for Six Sigma and Discreet Event Simulation,” International Journal of Six Sigma and Competitive Advantage, 2010,
6(1/2), PP. 91-104.
[18] J. Mari, “Using Design for Six-Sigma to Design an Equipment Depot at a Hospital,” Master Thesis at Binghamton University,
State University of New York, USA, 2006.
[19] J. Miller, D. Ferrin, and J. Szymanski, “Simulating Six Sigma Improvement Ideas for a Hospital Emergency Department,
Proceedings of the 2003 Winter Simulation Conference,” 2003.
[20] S. S. Raab, C. Andrew-JaJa, J. Condel, and D. Dabbs, “Improving Papanicolaou Test Quality and Reducing Medical Errors by
Using Toyota Production System Methods,” American Journal of Obstetrics and Gynecology, 2006, 194, pp.57-64.
[21] C. M. Roberts, “Six Sigma Signals,” Credit Union Magazine 2004, 70 (1), pp.40–43.
[22] R. Rucker, “Citibank Increases Customer Loyalty with Defect-Free Processes, the Journal for Quality and Participation,” 2000, 23
(4), pp.32–36.
[23] M. Sampson, “Non Profit, Payload Process Improvement through Lean Management”. Ph.D. Dissertation, University of Colorado.
[24] K. Schon, “Implementing Six Sigma in a Non-American Culture,” International Journal of Six Sigma and Competitive Advantage,
2006, 2 (4), pp.404-428.
[25] M. Sokovic, D. Pavletic, and S. Fakin, “Application of Six Sigma Methodology for Process Design,” Journal of Materials
Processing Technology, 2005, PP. 162–163, 777–783.
[26] C. Su and C. Chou, “A Systematic Methodology for the Creation of Six Sigma Projects: A Case Study of Semiconductor Foundry,”
Expert Systems with Applications, 2008, 34,pp. 2693–2703.
[27] J. P. Womack, “The Right Sequence for Implementing Lean”, Lean Enterprise Institute, Accessed on February 13, 2003.
[28] H. Woodward, S. Scachitti, L. Mapa, C. Vanni, L. Brandford, and C. Cox, “Application of Lean Six Sigma Techniques to Optimize
Hospital Laboratory Emergency Department Turnaround Time Across a Multi- hospital System,” Proceedings of the Spring, 2007,
American Society for Engineering Education Illinois-Indiana Section Conference.
[29] Q. Yu, and K. Yang, “Hospital Registration Waiting Time Reduction through Process Redesign,” International Journal of Six
Sigma and Competitive Advantage, 2008, 4(3),pp. 240-253.
[30] Bourton Hall, Rugby, Warwickshire CV23 9SD, “The Six Sigma Group” 2010, Retrieved July 20.
[31] http://www.sixsigmagroup.co.uk/introduction/whatissixsigma.aspx
[32] Six Sigma. (n.d).Quality Resources for Achieving Six Sigma Results. Retrieved July 20, 2010 from isixsigma.com
http://www.isixsigma.com/index.php?option.com
[33] F. M. Ahmad, & A. Khan, “Internship Report on Gull Ahmad Textile Mill Report,” Retrieved July 22, 2010, from Gul Ahmad
Textile Mill: http://www.docstoc.com/docs/16936290/Spinning-report
[34] T. Vijykumar, “Report on experience with the Rieter C 60 CARD. Link ,”2007, 19 (51),pp. 3-6.
[35] Angelfire. (n.d.). Carding. Retrieved June 18, 2010, from Angelfire:http://www.angelfire.com/jazz/pakspinning/CARDING.htm
[36] Angelfire. (n.d.). Draw Frame. Retrieved June 27, 2010, from
Angelfire:http://www.angelfire.com/jazz/pakspinning/DRAWING%20PROCESS.htm
[37] S. Bashir, (2010, June 6). Blow Room. Retrieved June 2010, from Angelfire:
http://www.angelfire.com/jazz/pakspinning/BLOWROOM.htm
[38] Yarn Spinning Technology. (n.d.). Combed Yarn for Knittinig. Retrieved June 10, 2010, from Yarn Spinning Technology:
http://textiletechnology.bravehost.com/spinning/yarnquality.htm
[39] Textile Spinning. (n.d.). Defects in Blow room and causes. Retrieved June 15, 2010, from Textile Spinning:
http://www.textilespinning.co.cc/modernblowroom/Defects_in_Blow_Room.htm
[40] Purushothama, B. (n.d.). MODERN AUTO LEVELLER DRAW FRAMES. Retrieved July 05, 2010, from fibashion.com:
articles.fibashion.com/extraimage/article/document/Article_275.docx
[41] Textile Technology Spinning. (n.d.). PROCESS PARAMETERS IN DRAW FRAME. Retrieved July 02, 2010, from Textile
Technology Spinning: http://www.textiletechnology.co.cc/spinning/processpardrawing.htm
[42] Textile spinning. (n.d.). Defects in Card Sliver. Retrieved 2010, from Textile
spinning:http://www.textilespinning.co.cc/carding/DEFECTS_IN_CARD_SLIVER.htm
[43] Angelfirre. (n.d.). Comber. Retrieved July 12, 2010, from
Angelfire.com:http://www.angelfire.com/jazz/pakspinning/COMBING%20PROCESS.htm
[44] Angelfire. (n.d.). Roving Frame. Retrieved July 18, 2010, from
angelfire.com:http://www.angelfire.com/jazz/pakspinning/roving_frame.htm
[45] Textile Technology Spinning. (n.d.). Roving Frame. Retrieved July 18, 2010, from Textile Technology Spinning:
http://www.textiletechnology.co.cc/spinning/ROVINGFRAME.htm
[46] Textile Technology Spinning. (n.d.). Winding Spinning. Retrieved July 20, 2010, from Textile Technology Spinning: http://textile-
technology.blogspot.com/2008/04/winding-spinning.html
[47] Six Sigma . (n.d).Quality Resources for Achieving Six Sigma Results. Retrieved July 20, 2010 from isixsigma.com
http://www.isixsigma.com/index.php?option=com
[48] The Six Sigma Group. Bourton Hall, Rugby, Warwickshire CV23 9SD. Retrieved July
20,2010http://www.sixsigmagroup.co.uk/introduction/whatissixsigma.aspx
[49] Six Sigma.(n.d). Six Sigma Overview. Retrieved july 01, 2010. From
thequalityportal.comhttp://www.thequalityportal.com/q_6sigma.htm
[50] Pyzdek Thomas, “The Six Sigma handbook; a complete guide for green belts, black belts, and managers at all levels” (Published by:
New York McGraw-Hill, c2003) Chapter 1 Pages 4-5.
[51] Tennant Geoff, “SIX SIGMA: SPC and TQM in Manufacturing and Services” Gower Publishing, Ltd. (2001) Chapter 1 “The
development of quality” Pages 1-3
[52] Educational assessment: Interpreting test scores, Reliability and validity. Retrieved 15 july, 2010 Online available:
http://course1.winona.edu/lgray/el626/MandEtext3.html
[53] Peter R.Loard.”The Economies, Science and Technology of Yarn Production” The textile institute 10 Black friar Manchester,
England 1981, Chap.12 Pages. 149-171

More Related Content

What's hot

Kanban và ứng dụng trong thực tế sản xuất tại doanh nghiệp
Kanban và ứng dụng trong thực tế sản xuất tại doanh nghiệpKanban và ứng dụng trong thực tế sản xuất tại doanh nghiệp
Kanban và ứng dụng trong thực tế sản xuất tại doanh nghiệpHung Anh Nguyen
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing Marico Ltd.
 
Prioritizing Process Improvements
Prioritizing Process ImprovementsPrioritizing Process Improvements
Prioritizing Process ImprovementsGovind Ramu
 
Chương 4: Kiểm Đồ Thuộc Tính (Control Charts for Attributes)
Chương 4: Kiểm Đồ Thuộc Tính (Control Charts for Attributes) Chương 4: Kiểm Đồ Thuộc Tính (Control Charts for Attributes)
Chương 4: Kiểm Đồ Thuộc Tính (Control Charts for Attributes) Le Nguyen Truong Giang
 
Dock to Dock Time Management
Dock to Dock Time ManagementDock to Dock Time Management
Dock to Dock Time ManagementAbhishek Raj
 
Chương 3: MÔ HÌNH HÓA CÁC QUÁ TRÌNH VÀ PHÂN TÍCH DỮ LIỆU ĐẦU VÀO
Chương 3: MÔ HÌNH HÓA CÁC QUÁ TRÌNH VÀ PHÂN TÍCH DỮ LIỆU ĐẦU VÀOChương 3: MÔ HÌNH HÓA CÁC QUÁ TRÌNH VÀ PHÂN TÍCH DỮ LIỆU ĐẦU VÀO
Chương 3: MÔ HÌNH HÓA CÁC QUÁ TRÌNH VÀ PHÂN TÍCH DỮ LIỆU ĐẦU VÀOLe Nguyen Truong Giang
 
Chương 6: Kiểm tra chất lượng sản phẩm
Chương 6: Kiểm tra chất lượng sản phẩmChương 6: Kiểm tra chất lượng sản phẩm
Chương 6: Kiểm tra chất lượng sản phẩmLe Nguyen Truong Giang
 
Báo cáo tốt nghiệp Hoàn thiện quy trình sản xuất của Công ty TNHH Hòa Đường.pdf
Báo cáo tốt nghiệp Hoàn thiện quy trình sản xuất của Công ty TNHH Hòa Đường.pdfBáo cáo tốt nghiệp Hoàn thiện quy trình sản xuất của Công ty TNHH Hòa Đường.pdf
Báo cáo tốt nghiệp Hoàn thiện quy trình sản xuất của Công ty TNHH Hòa Đường.pdfhttps://www.facebook.com/garmentspace
 
Value stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolValue stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolbhanutomar
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxRoopaDNDandally
 
đề Tài kế toán nguyên vật liệu tại công ty xây lắp vật liệu xây dựng an dương
đề Tài kế toán nguyên vật liệu tại công ty xây lắp vật liệu xây dựng an dươngđề Tài kế toán nguyên vật liệu tại công ty xây lắp vật liệu xây dựng an dương
đề Tài kế toán nguyên vật liệu tại công ty xây lắp vật liệu xây dựng an dươngNhu Quynh
 
Chương 2: HƯỚNG DẪN SỬ DỤNG ARENA
Chương 2: HƯỚNG DẪN SỬ DỤNG ARENAChương 2: HƯỚNG DẪN SỬ DỤNG ARENA
Chương 2: HƯỚNG DẪN SỬ DỤNG ARENALe Nguyen Truong Giang
 
Chương 5: Tiêu chuẩn hóa và đo lường chất lượng
Chương 5: Tiêu chuẩn hóa và đo lường chất lượngChương 5: Tiêu chuẩn hóa và đo lường chất lượng
Chương 5: Tiêu chuẩn hóa và đo lường chất lượngLe Nguyen Truong Giang
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Exampleshekhar619
 

What's hot (20)

Kanban và ứng dụng trong thực tế sản xuất tại doanh nghiệp
Kanban và ứng dụng trong thực tế sản xuất tại doanh nghiệpKanban và ứng dụng trong thực tế sản xuất tại doanh nghiệp
Kanban và ứng dụng trong thực tế sản xuất tại doanh nghiệp
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Prioritizing Process Improvements
Prioritizing Process ImprovementsPrioritizing Process Improvements
Prioritizing Process Improvements
 
Thực trạng về kế toán nguyên vật liệu tại công ty cổ phần khánh an.
Thực trạng về kế toán nguyên vật liệu tại công ty cổ phần khánh an.Thực trạng về kế toán nguyên vật liệu tại công ty cổ phần khánh an.
Thực trạng về kế toán nguyên vật liệu tại công ty cổ phần khánh an.
 
Chương 4: Kiểm Đồ Thuộc Tính (Control Charts for Attributes)
Chương 4: Kiểm Đồ Thuộc Tính (Control Charts for Attributes) Chương 4: Kiểm Đồ Thuộc Tính (Control Charts for Attributes)
Chương 4: Kiểm Đồ Thuộc Tính (Control Charts for Attributes)
 
Dock to Dock Time Management
Dock to Dock Time ManagementDock to Dock Time Management
Dock to Dock Time Management
 
Chương 3: MÔ HÌNH HÓA CÁC QUÁ TRÌNH VÀ PHÂN TÍCH DỮ LIỆU ĐẦU VÀO
Chương 3: MÔ HÌNH HÓA CÁC QUÁ TRÌNH VÀ PHÂN TÍCH DỮ LIỆU ĐẦU VÀOChương 3: MÔ HÌNH HÓA CÁC QUÁ TRÌNH VÀ PHÂN TÍCH DỮ LIỆU ĐẦU VÀO
Chương 3: MÔ HÌNH HÓA CÁC QUÁ TRÌNH VÀ PHÂN TÍCH DỮ LIỆU ĐẦU VÀO
 
Wcm
WcmWcm
Wcm
 
Chương 6: Kiểm tra chất lượng sản phẩm
Chương 6: Kiểm tra chất lượng sản phẩmChương 6: Kiểm tra chất lượng sản phẩm
Chương 6: Kiểm tra chất lượng sản phẩm
 
Báo cáo tốt nghiệp Hoàn thiện quy trình sản xuất của Công ty TNHH Hòa Đường.pdf
Báo cáo tốt nghiệp Hoàn thiện quy trình sản xuất của Công ty TNHH Hòa Đường.pdfBáo cáo tốt nghiệp Hoàn thiện quy trình sản xuất của Công ty TNHH Hòa Đường.pdf
Báo cáo tốt nghiệp Hoàn thiện quy trình sản xuất của Công ty TNHH Hòa Đường.pdf
 
Value stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing toolValue stream mapping- lean manufacturing tool
Value stream mapping- lean manufacturing tool
 
Total Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptxTotal Quality Management_module 4_18ME734.pptx
Total Quality Management_module 4_18ME734.pptx
 
đề Tài kế toán nguyên vật liệu tại công ty xây lắp vật liệu xây dựng an dương
đề Tài kế toán nguyên vật liệu tại công ty xây lắp vật liệu xây dựng an dươngđề Tài kế toán nguyên vật liệu tại công ty xây lắp vật liệu xây dựng an dương
đề Tài kế toán nguyên vật liệu tại công ty xây lắp vật liệu xây dựng an dương
 
Quản Trị Mua Hàng
Quản Trị Mua HàngQuản Trị Mua Hàng
Quản Trị Mua Hàng
 
CTQ Matrix
CTQ MatrixCTQ Matrix
CTQ Matrix
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Chương 2: HƯỚNG DẪN SỬ DỤNG ARENA
Chương 2: HƯỚNG DẪN SỬ DỤNG ARENAChương 2: HƯỚNG DẪN SỬ DỤNG ARENA
Chương 2: HƯỚNG DẪN SỬ DỤNG ARENA
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Chương 5: Tiêu chuẩn hóa và đo lường chất lượng
Chương 5: Tiêu chuẩn hóa và đo lường chất lượngChương 5: Tiêu chuẩn hóa và đo lường chất lượng
Chương 5: Tiêu chuẩn hóa và đo lường chất lượng
 
Lean Production With Jaguar Example
Lean Production With Jaguar ExampleLean Production With Jaguar Example
Lean Production With Jaguar Example
 

Viewers also liked

PET-CT Last case efficiency BGebrewold
PET-CT Last case efficiency BGebrewoldPET-CT Last case efficiency BGebrewold
PET-CT Last case efficiency BGebrewoldBineyam Gebrewold
 
Mass to Lean to Six Sigma Path
Mass to Lean to Six Sigma PathMass to Lean to Six Sigma Path
Mass to Lean to Six Sigma PathJohnHamman
 
Lean-Six Sigma for Employees
Lean-Six Sigma for EmployeesLean-Six Sigma for Employees
Lean-Six Sigma for EmployeesHeinrich Edimo
 
Staffing strategies that cut cost
Staffing strategies that cut costStaffing strategies that cut cost
Staffing strategies that cut costCraig Albin
 
Case classic pen company with extension
Case classic pen company with extensionCase classic pen company with extension
Case classic pen company with extensionCaritAndersen
 
Strategic Project Selection in Oil &amp; Gas Industry
Strategic Project Selection in Oil &amp; Gas IndustryStrategic Project Selection in Oil &amp; Gas Industry
Strategic Project Selection in Oil &amp; Gas Industrynaveen_ncn
 
Healthcare Six Sigma Project
Healthcare Six Sigma ProjectHealthcare Six Sigma Project
Healthcare Six Sigma ProjectMichael Floriani
 
Improve performance through Lean - Six Sigma management
Improve performance through Lean - Six Sigma managementImprove performance through Lean - Six Sigma management
Improve performance through Lean - Six Sigma managementGhinea Rodica
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Eng Marzouk
 
Comparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM SystemsComparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM SystemsIOSR Journals
 
Intrusion Detection Systems By Anamoly-Based Using Neural Network
Intrusion Detection Systems By Anamoly-Based Using Neural NetworkIntrusion Detection Systems By Anamoly-Based Using Neural Network
Intrusion Detection Systems By Anamoly-Based Using Neural NetworkIOSR Journals
 
Effects Of Using Gagne’s Learning Hierarchy On Chemistry Students’ Academic A...
Effects Of Using Gagne’s Learning Hierarchy On Chemistry Students’ Academic A...Effects Of Using Gagne’s Learning Hierarchy On Chemistry Students’ Academic A...
Effects Of Using Gagne’s Learning Hierarchy On Chemistry Students’ Academic A...IOSR Journals
 
Dynamics of Twointeracting Electronsinthree-Dimensional Lattice
Dynamics of Twointeracting Electronsinthree-Dimensional LatticeDynamics of Twointeracting Electronsinthree-Dimensional Lattice
Dynamics of Twointeracting Electronsinthree-Dimensional LatticeIOSR Journals
 
Pest Control in Agricultural Plantations Using Image Processing
Pest Control in Agricultural Plantations Using Image ProcessingPest Control in Agricultural Plantations Using Image Processing
Pest Control in Agricultural Plantations Using Image ProcessingIOSR Journals
 
Security System Based on Ultrasonic Sensor Technology
Security System Based on Ultrasonic Sensor TechnologySecurity System Based on Ultrasonic Sensor Technology
Security System Based on Ultrasonic Sensor TechnologyIOSR Journals
 
Insulin like growth factor and risk of breast cancer
Insulin like growth factor and risk of breast cancerInsulin like growth factor and risk of breast cancer
Insulin like growth factor and risk of breast cancerIOSR Journals
 
Investigation of the Anodic Dissolution of Zinc in Sodium Chloride Electrolyt...
Investigation of the Anodic Dissolution of Zinc in Sodium Chloride Electrolyt...Investigation of the Anodic Dissolution of Zinc in Sodium Chloride Electrolyt...
Investigation of the Anodic Dissolution of Zinc in Sodium Chloride Electrolyt...IOSR Journals
 
Oil and Fatty Acids Composition in Glasswort (Salicornia Fruticosa) Seeds
Oil and Fatty Acids Composition in Glasswort (Salicornia Fruticosa) SeedsOil and Fatty Acids Composition in Glasswort (Salicornia Fruticosa) Seeds
Oil and Fatty Acids Composition in Glasswort (Salicornia Fruticosa) SeedsIOSR Journals
 
Design Technique of Bandpass FIR filter using Various Window Function
Design Technique of Bandpass FIR filter using Various Window FunctionDesign Technique of Bandpass FIR filter using Various Window Function
Design Technique of Bandpass FIR filter using Various Window FunctionIOSR Journals
 
Modeling & Analysis of Centrifugal Blower using Composite Material
Modeling & Analysis of Centrifugal Blower using Composite MaterialModeling & Analysis of Centrifugal Blower using Composite Material
Modeling & Analysis of Centrifugal Blower using Composite MaterialIOSR Journals
 

Viewers also liked (20)

PET-CT Last case efficiency BGebrewold
PET-CT Last case efficiency BGebrewoldPET-CT Last case efficiency BGebrewold
PET-CT Last case efficiency BGebrewold
 
Mass to Lean to Six Sigma Path
Mass to Lean to Six Sigma PathMass to Lean to Six Sigma Path
Mass to Lean to Six Sigma Path
 
Lean-Six Sigma for Employees
Lean-Six Sigma for EmployeesLean-Six Sigma for Employees
Lean-Six Sigma for Employees
 
Staffing strategies that cut cost
Staffing strategies that cut costStaffing strategies that cut cost
Staffing strategies that cut cost
 
Case classic pen company with extension
Case classic pen company with extensionCase classic pen company with extension
Case classic pen company with extension
 
Strategic Project Selection in Oil &amp; Gas Industry
Strategic Project Selection in Oil &amp; Gas IndustryStrategic Project Selection in Oil &amp; Gas Industry
Strategic Project Selection in Oil &amp; Gas Industry
 
Healthcare Six Sigma Project
Healthcare Six Sigma ProjectHealthcare Six Sigma Project
Healthcare Six Sigma Project
 
Improve performance through Lean - Six Sigma management
Improve performance through Lean - Six Sigma managementImprove performance through Lean - Six Sigma management
Improve performance through Lean - Six Sigma management
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...
 
Comparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM SystemsComparison of PMD Compensation in WDM Systems
Comparison of PMD Compensation in WDM Systems
 
Intrusion Detection Systems By Anamoly-Based Using Neural Network
Intrusion Detection Systems By Anamoly-Based Using Neural NetworkIntrusion Detection Systems By Anamoly-Based Using Neural Network
Intrusion Detection Systems By Anamoly-Based Using Neural Network
 
Effects Of Using Gagne’s Learning Hierarchy On Chemistry Students’ Academic A...
Effects Of Using Gagne’s Learning Hierarchy On Chemistry Students’ Academic A...Effects Of Using Gagne’s Learning Hierarchy On Chemistry Students’ Academic A...
Effects Of Using Gagne’s Learning Hierarchy On Chemistry Students’ Academic A...
 
Dynamics of Twointeracting Electronsinthree-Dimensional Lattice
Dynamics of Twointeracting Electronsinthree-Dimensional LatticeDynamics of Twointeracting Electronsinthree-Dimensional Lattice
Dynamics of Twointeracting Electronsinthree-Dimensional Lattice
 
Pest Control in Agricultural Plantations Using Image Processing
Pest Control in Agricultural Plantations Using Image ProcessingPest Control in Agricultural Plantations Using Image Processing
Pest Control in Agricultural Plantations Using Image Processing
 
Security System Based on Ultrasonic Sensor Technology
Security System Based on Ultrasonic Sensor TechnologySecurity System Based on Ultrasonic Sensor Technology
Security System Based on Ultrasonic Sensor Technology
 
Insulin like growth factor and risk of breast cancer
Insulin like growth factor and risk of breast cancerInsulin like growth factor and risk of breast cancer
Insulin like growth factor and risk of breast cancer
 
Investigation of the Anodic Dissolution of Zinc in Sodium Chloride Electrolyt...
Investigation of the Anodic Dissolution of Zinc in Sodium Chloride Electrolyt...Investigation of the Anodic Dissolution of Zinc in Sodium Chloride Electrolyt...
Investigation of the Anodic Dissolution of Zinc in Sodium Chloride Electrolyt...
 
Oil and Fatty Acids Composition in Glasswort (Salicornia Fruticosa) Seeds
Oil and Fatty Acids Composition in Glasswort (Salicornia Fruticosa) SeedsOil and Fatty Acids Composition in Glasswort (Salicornia Fruticosa) Seeds
Oil and Fatty Acids Composition in Glasswort (Salicornia Fruticosa) Seeds
 
Design Technique of Bandpass FIR filter using Various Window Function
Design Technique of Bandpass FIR filter using Various Window FunctionDesign Technique of Bandpass FIR filter using Various Window Function
Design Technique of Bandpass FIR filter using Various Window Function
 
Modeling & Analysis of Centrifugal Blower using Composite Material
Modeling & Analysis of Centrifugal Blower using Composite MaterialModeling & Analysis of Centrifugal Blower using Composite Material
Modeling & Analysis of Centrifugal Blower using Composite Material
 

Similar to An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry

6 sigma assignment
6 sigma assignment6 sigma assignment
6 sigma assignmentstudent
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)theijes
 
A Review: Six Sigma Implementation Practice in Manufacturing Industries
A Review: Six Sigma Implementation Practice in Manufacturing IndustriesA Review: Six Sigma Implementation Practice in Manufacturing Industries
A Review: Six Sigma Implementation Practice in Manufacturing IndustriesIJERA Editor
 
IRJET- Quality Audit of Public Building Project by using Six Sigma Techniques
IRJET- Quality Audit of Public Building Project by using Six Sigma TechniquesIRJET- Quality Audit of Public Building Project by using Six Sigma Techniques
IRJET- Quality Audit of Public Building Project by using Six Sigma TechniquesIRJET Journal
 
‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementationijtsrd
 
A LEAN SIX-SIGMA MANUFACTURING PROCESS CASE STUDY
A LEAN SIX-SIGMA MANUFACTURING PROCESS CASE STUDYA LEAN SIX-SIGMA MANUFACTURING PROCESS CASE STUDY
A LEAN SIX-SIGMA MANUFACTURING PROCESS CASE STUDYLinda Garcia
 
Adoption Of Six Sigma DMAIC To Reduce Cost Of Poor Quality
Adoption Of Six Sigma DMAIC To Reduce Cost Of Poor QualityAdoption Of Six Sigma DMAIC To Reduce Cost Of Poor Quality
Adoption Of Six Sigma DMAIC To Reduce Cost Of Poor QualitySabrina Baloi
 
Six sigma in automobile Industry
Six sigma in automobile IndustrySix sigma in automobile Industry
Six sigma in automobile IndustryVishnu Rajoriya
 
Elimination of rework in V Cap by Using Six Sigma Methodology
Elimination of rework in V Cap by Using Six Sigma MethodologyElimination of rework in V Cap by Using Six Sigma Methodology
Elimination of rework in V Cap by Using Six Sigma MethodologyIJERD Editor
 
Reducing delaysindeliveringgarmentsusingdmaic six
Reducing delaysindeliveringgarmentsusingdmaic sixReducing delaysindeliveringgarmentsusingdmaic six
Reducing delaysindeliveringgarmentsusingdmaic sixAdnan Hameed
 
Redesign and manufacturing by using dmadv method
Redesign and manufacturing by using dmadv methodRedesign and manufacturing by using dmadv method
Redesign and manufacturing by using dmadv methodeSAT Journals
 
The IUP Journal of Business Strategy, Vol. XIV, No. 2, 201740.docx
The IUP Journal of Business Strategy, Vol. XIV, No. 2, 201740.docxThe IUP Journal of Business Strategy, Vol. XIV, No. 2, 201740.docx
The IUP Journal of Business Strategy, Vol. XIV, No. 2, 201740.docxoreo10
 
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET Journal
 
Root Causes Analysis for Lean Maintenance Using Six Sigma Approach
Root Causes Analysis for Lean Maintenance Using Six Sigma ApproachRoot Causes Analysis for Lean Maintenance Using Six Sigma Approach
Root Causes Analysis for Lean Maintenance Using Six Sigma Approachtheijes
 
IRJET- Quality Improvement in Building Construction using Six Sigma
IRJET-  	  Quality Improvement in Building Construction using Six SigmaIRJET-  	  Quality Improvement in Building Construction using Six Sigma
IRJET- Quality Improvement in Building Construction using Six SigmaIRJET Journal
 
Six sigma essentials
Six sigma   essentialsSix sigma   essentials
Six sigma essentialsVidyavinutha
 
Six Sigma in Manufacturing Industries Barriers to Implementation.pdf
Six Sigma in Manufacturing Industries  Barriers to Implementation.pdfSix Sigma in Manufacturing Industries  Barriers to Implementation.pdf
Six Sigma in Manufacturing Industries Barriers to Implementation.pdfIslamAbdouAbbas1
 

Similar to An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry (20)

6 sigma assignment
6 sigma assignment6 sigma assignment
6 sigma assignment
 
The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
A Review: Six Sigma Implementation Practice in Manufacturing Industries
A Review: Six Sigma Implementation Practice in Manufacturing IndustriesA Review: Six Sigma Implementation Practice in Manufacturing Industries
A Review: Six Sigma Implementation Practice in Manufacturing Industries
 
IRJET- Quality Audit of Public Building Project by using Six Sigma Techniques
IRJET- Quality Audit of Public Building Project by using Six Sigma TechniquesIRJET- Quality Audit of Public Building Project by using Six Sigma Techniques
IRJET- Quality Audit of Public Building Project by using Six Sigma Techniques
 
‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation‘Six Sigma Technique’ A Journey Through its Implementation
‘Six Sigma Technique’ A Journey Through its Implementation
 
A LEAN SIX-SIGMA MANUFACTURING PROCESS CASE STUDY
A LEAN SIX-SIGMA MANUFACTURING PROCESS CASE STUDYA LEAN SIX-SIGMA MANUFACTURING PROCESS CASE STUDY
A LEAN SIX-SIGMA MANUFACTURING PROCESS CASE STUDY
 
Adoption Of Six Sigma DMAIC To Reduce Cost Of Poor Quality
Adoption Of Six Sigma DMAIC To Reduce Cost Of Poor QualityAdoption Of Six Sigma DMAIC To Reduce Cost Of Poor Quality
Adoption Of Six Sigma DMAIC To Reduce Cost Of Poor Quality
 
Six sigma in automobile Industry
Six sigma in automobile IndustrySix sigma in automobile Industry
Six sigma in automobile Industry
 
AN OVERVIEW ON SIX SIGMA: QUALITY IMPROVEMENT PROGRAM
AN OVERVIEW ON SIX SIGMA: QUALITY IMPROVEMENT PROGRAMAN OVERVIEW ON SIX SIGMA: QUALITY IMPROVEMENT PROGRAM
AN OVERVIEW ON SIX SIGMA: QUALITY IMPROVEMENT PROGRAM
 
Six Sigma.pptx
Six Sigma.pptxSix Sigma.pptx
Six Sigma.pptx
 
Elimination of rework in V Cap by Using Six Sigma Methodology
Elimination of rework in V Cap by Using Six Sigma MethodologyElimination of rework in V Cap by Using Six Sigma Methodology
Elimination of rework in V Cap by Using Six Sigma Methodology
 
Reducing delaysindeliveringgarmentsusingdmaic six
Reducing delaysindeliveringgarmentsusingdmaic sixReducing delaysindeliveringgarmentsusingdmaic six
Reducing delaysindeliveringgarmentsusingdmaic six
 
Redesign and manufacturing by using dmadv method
Redesign and manufacturing by using dmadv methodRedesign and manufacturing by using dmadv method
Redesign and manufacturing by using dmadv method
 
The IUP Journal of Business Strategy, Vol. XIV, No. 2, 201740.docx
The IUP Journal of Business Strategy, Vol. XIV, No. 2, 201740.docxThe IUP Journal of Business Strategy, Vol. XIV, No. 2, 201740.docx
The IUP Journal of Business Strategy, Vol. XIV, No. 2, 201740.docx
 
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
IRJET - Analysis of Process Re-Engineering to Reduce Lead Time in Apparel Ind...
 
Root Causes Analysis for Lean Maintenance Using Six Sigma Approach
Root Causes Analysis for Lean Maintenance Using Six Sigma ApproachRoot Causes Analysis for Lean Maintenance Using Six Sigma Approach
Root Causes Analysis for Lean Maintenance Using Six Sigma Approach
 
IRJET- Quality Improvement in Building Construction using Six Sigma
IRJET-  	  Quality Improvement in Building Construction using Six SigmaIRJET-  	  Quality Improvement in Building Construction using Six Sigma
IRJET- Quality Improvement in Building Construction using Six Sigma
 
Six sigma essentials
Six sigma   essentialsSix sigma   essentials
Six sigma essentials
 
Dl4301663673
Dl4301663673Dl4301663673
Dl4301663673
 
Six Sigma in Manufacturing Industries Barriers to Implementation.pdf
Six Sigma in Manufacturing Industries  Barriers to Implementation.pdfSix Sigma in Manufacturing Industries  Barriers to Implementation.pdf
Six Sigma in Manufacturing Industries Barriers to Implementation.pdf
 

More from IOSR Journals (20)

A011140104
A011140104A011140104
A011140104
 
M0111397100
M0111397100M0111397100
M0111397100
 
L011138596
L011138596L011138596
L011138596
 
K011138084
K011138084K011138084
K011138084
 
J011137479
J011137479J011137479
J011137479
 
I011136673
I011136673I011136673
I011136673
 
G011134454
G011134454G011134454
G011134454
 
H011135565
H011135565H011135565
H011135565
 
F011134043
F011134043F011134043
F011134043
 
E011133639
E011133639E011133639
E011133639
 
D011132635
D011132635D011132635
D011132635
 
C011131925
C011131925C011131925
C011131925
 
B011130918
B011130918B011130918
B011130918
 
A011130108
A011130108A011130108
A011130108
 
I011125160
I011125160I011125160
I011125160
 
H011124050
H011124050H011124050
H011124050
 
G011123539
G011123539G011123539
G011123539
 
F011123134
F011123134F011123134
F011123134
 
E011122530
E011122530E011122530
E011122530
 
D011121524
D011121524D011121524
D011121524
 

Recently uploaded

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry

  • 1. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684 Volume 6, Issue 1 (Mar. - Apr. 2013), PP 50-65 www.iosrjournals.org www.iosrjournals.org 50 | Page An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry Neha Gupta (Mechanical Department, Integral University, India) Abstract : This article presents a quality improvement study applied at a yarn manufacturing company based on six sigma methodologies. More specifically, the DMAIC (Define, Measure, Analyze, Improve, and Control) project management-methodology & various tools are utilized to streamline processes & enhance productivity. Defects rate of textile product in the yarn manufacturing process is so important in industry point of view. It plays a very important rate for the improvement of yield & financial conditions of any company. Actually defects rate causes a direct effect on the profit margin of the product & decrease the quality cost during the manufacturing of the product. By checking & inspection of defects of product at different point in production where more defects are likely to happen. A thousand defects opportunities create in the final package of yarn. That’s why it is decided to do work & implement DMAIC methodology in winding departments where the final package of yarn is make. Keywords - Six Sigma; DMAIC; Lean manufacturing; Yarn manufacturing. I. INTRODUCTION AND BACKGROUND Organizations look for ways to improve their production and management processes in order to remain competitive in the market. This calls for ways to reduce production cost, enhance productivity and improve product quality. Therefore, organizations must utilize all the available resources efficiently and effectively in order to cater their customers with high quality products at a low price. For these reasons, researchers all over the world proposed several improvement strategies and tools to satisfy organization’s needs. Such initiatives include Total Quality Management, Quality Awards, Total Preventive Maintenance (TPM), Lean and Six Sigma. The lean concept, which was initially referred to as the Toyota Production system, concentrates on the flow of the entire processes rather than on the optimization of individual operations [13]. Womack (2002) specified the main components of lean management system as follows:  Identify process value from the customer perspective.  Identify the value stream for each product and eliminate all types of wastes currently imbedded within the production process.  Try to develop a continuous production process.  Develop the pull management technique within the production lines.  Manage toward perfection. The main thing of Six Sigma is to taking the existing product, process and improves them in a better way. It is a very powerful approach to achieve the financial goals for the organization and improving the company’s value by the following:  Data driven  Project based  Disciplined and systematic  Customers focused (internal & external) Fig. 1: Six Sigma Methodology for improvement
  • 2. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 51 | Page Six Sigma, on the other hand, is a data driven methodology used to identify root causes for variations in a production processes in order to achieve organizational excellence. Six Sigma management strategies require process improvement through identifying problem, root causes, process redesign and reengineering, and process management. Six Sigma follows a model known as DMAIC (Define, Measure, Analyze, Improve, and Control). Therefore, Six Sigma starts by analyzing defects and lean initial focus is on customer, process flow, and waste identifications [23]. However, using one of these tools has limitations. Since lean eliminates the use of Six Sigma’s DMAIC cycle as a management structure to define required process capabilities to be truly lean. On the other hand, Six Sigma eliminates defects but does not address how to optimize the process flow. Hence, applying both Six Sigma and Lean tools sets results in far better improvements than could be achieved with either one method alone [16]. DMAIC is a systematic six-sigma project management practice inspired by Deming's PDCA (Plan, Do, Check, and Act) Cycle. The process consists of the five phases called Define, Measure, Analyze, Improve and control. Fig. 2: Six Sigma Methodology DMAIC The Define phase concentrates on forming the team, defining the project's goals, mapping the process, identifying customers, and identifying the high impact characteristics or the CTQs (Critical to Quality). The Measure phase consists of defining and executing a systematic data collection plan for the key measures (CTQs) for the targeted process. Data collected in the Measure phase are analyzed in the Analyze phase to identify the root causes behind the gap between the current performance and the goals identified in the first phase by defining the main type of wastes embedded within the production processes and the root causes for these wastes. The Improve phase focuses on identifying expected solutions, suggest set of alternative solutions to enhance performance, and implement some of these solutions according to the available budget and the expected cost for each alternative. The Control phase concentrates on creating and implementing monitoring and response plans for sustaining improvements, spread out the outcome and the methodology for the whole organization, insure the establishment of a new culture within the organization. Moreover, operating standards and procedures are documented and published in the Control phase. Lean and Six Sigma have been implemented successfully in the manufacturing and service sectors to optimize different performance measures. Both lean and Six Sigma methodologies have proven over that last twenty years that it is possible to achieve dramatic improvements in cost, quality, and production time by focusing on process performance. Linderman et al. (2003) pointed out that Six Sigma could be implemented to the processes of producing manufacturing goods, business trade, executive management, and services. Recent research papers include improving operational safety [5], reducing amount of waste [8], improving quality for surveillance cameras to diminish related excess costs [10], enhancing the assembly efficiency of military products [4], increasing customer loyalty in the banking sector for Bank of America and Citigroup [21, 22], reducing patients’ waiting time and length of stay [3, 17, 29], reducing length of stay for Ophthalmology Day Case Surgery [16], reducing lead-time [1], enhancing staff satisfaction [7], reducing clinical errors [20], process improvement for both the radiology department and medication administration process [15], and process design of compressor-housing machining process [25]. Others include [2, 6, 11, 12, 18, 19, 24, 26, 28, 29]. As a summary, both lean and six sigma methodologies have proven over that last twenty years that it is possible to achieve dramatic improvements in cost, quality, and production time by focusing on process performance. In this paper, a customized lean Six Sigma methodology is deployed at a local paper manufacturing company to increase production rate, minimize waste and increase Overall Equipment Effectiveness (OEE). The two tools have been used as complementary to each other, wherein DMAIC’s roadmap has been used as a general framework for process improvement and lean tools have been embedded within these phases. Furthermore, the research focuses on employee involvement and motivation that are imperative to advance a new culture [9].
  • 3. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 52 | Page Sigma value increases the process performance in a better way. Another way of measure the process capability and performance by the statistical measurements like Cp, Cpk, Pp and Ppk. The Six Sigma means a 3.4 % defects part per million or yield of 99.9997% (perfect parts). Following is the table 1 of comparison of different Sigma values at different defects part per million and capability of process here [31]. Table 1. The Comparison of Different Sigma Values SIGMA DPMO COPQ CAPABILITY 6 Sigma 3.4 <10% of sales World Class 5 Sigma 230 10 to 15% of sales 4 Sigma 6200 15 to 20% of sales Industry Average 3 Sigma 67000 20 to 30% of sales 2 Sigma 310,000 30 to 40% of sales Noncompetitive 1 Sigma II. BRIEF INTRODUCTION OF YARN MNUFACTURING DEPARTMENTS 2.1 Blow room Process Blow room is the initial stage in spinning process. The name blow room is given because of the “air flow” And all process is done in blow room because of air flow. Blow room is consisting of different machines to carry out the objectives of blow room. In blow room the tuft size of cotton becomes smaller and smaller. Mixing of cotton is done separately as well as in blow room. Compressed layer of bale is also open in blow room with the help of machine. Fig. 3: Blow Room Department 2.2 Carding Process Carding process is very important role in spinning mill. It helps us both way to open the tuft into a single fiber and to remove the impurities and neps. Textile experts are convinced for the accuracy of following statement. “The card is the heart of spinning mill” and “well carded is well spun” (Vijykumar, 2007). [34] Card feeding is done by two ways. One is manually and other is through chute feed system. In manual case the lap which is produced in blow room and it is feed to the card. In chute feed the material is feed through air flow system to card machine. It is important to say that lower the feed variation better is the carding quality. Lower the feed variation then draft variation will also be less. Then yarn quality will be consistent. If the card is having auto leveler then nominal draft should be selected properly. In some circumstances card also act as a cleaner and remove a certain amount of short fiber. Approximately 90% cleaning efficiency is achieved with the help of carding machine. [35]
  • 4. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 53 | Page Fig. 4: Carding Machine 2.3 Drawing frame Process Draw frame is simple and cheap machine. In spinning regarding to quality point of view it play very important role .If its setting is not done properly then it affects yarn strength and elongation. For improving quality draw frame is final process in the spinning mill. It effects on quality especially on evenness of sliver. In the spinning process there are chances of elimination of errors in draw frame machine. Draw frame play very important role for the quality of yarn. Without it participation quality can never be improved. [4]Drafting arrangement is the heart of the draw frame. Drafting arrangement should be simple, stable design, should have ability to produce high quality product. It should have high fiber control. Auto leveler is also used to adjust and to improve the linear density of the sliver. Without auto leveler it is very difficult to improve the quality of the draw frame sliver. [36] Fig. 5: Drawing Frame Department 2.4 Combing process For getting high quality of yarn, one extra process is introduced which is called combing process. Combing is an operation in which dirt and short fibers are removed from sliver lap by following ways.  In specially designed jaws, a narrow lap of fiber is firmly gripped across its width.  Closely spaced needles are passed through the fiber projecting from jaws. Short fiber which we remove is called comber noil. The comber noil can be recycled in the production of carded yarn. Yarn which is get from comber sliver is called comber yarn. Carded sliver are combine into comber lap in a single continuous process stage. Flat sheet of fiber which is get from comber lap is fed into the comber in an intermediate. There are different ways by which value of combing is used in the manufacturing of cotton. By spinning point of view combing process makes more uniformity in the yarn. Strength of yarn is also high because in combing process short fiber are removed and only fiber having good strength remains. So it play very important role for increasing the yarn strength. Because of straightened condition of fibers combing makes possible spinning smoother and more lustrous yarn. In combing process length of fiber are strong so it need less twist produced then carded yarn [53].
  • 5. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 54 | Page Fig. 6: Combing Department 2.5 Roving frame It is an intermediate process in which fibers are converted into low twist lea called roving. The sliver which is taken from draw frame is thicker so it is not suitable for manufacturing of yarn. Its purpose is to prepare input package for next process. This package is to prepare on a small compact package called bobbins. Roving machine is complicated, liable to fault, causes defect adds to the production costs and deliver the product. In this winding operation that makes us roving frame complex. There are two main basic reasons for using roving frame.  The roving sliver is thick and untwisted. Because of it hairiness and fly is created. So draft is needed to reduce the linear density of sliver. The ring drafting arrangement is not capable that it may process the roving sliver to make the yarn.  Draw frame can represent the worst conceivable mode of transport and presentation of feed material to the ring spinning frame. Fig. 7: Roving Machine 2.6 Ring Spinning Process Ring Spinning machine is used in textile industry to twist the staple fibers into a yarn and wind on a bobbin for storage and also input for the winding section for more precise the yarn to minimize the defects of end yarn. Ring machine is very important due to yarn quality. Ring Spinning is the most costly step to convert fibers into yarn and approximately 85% yarn produced in ring spinning frame all over the world. It is made to draft the roving into a desired count and impart the desired twist to produce the strength in the yarn. If twist is increased, yarn strength is also increased at optimum limit.
  • 6. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 55 | Page Fig. 8: Ring Spinning Machine 2.7 Winding Section It is the last section of yarn manufacturing process where auto cone machines are installed and take an input material from ring spinning section as a yarn bobbin and give a yarn on paper cone after passing detecting instrument as a output. In winding section, there are lot of heads in auto cone machines use to wound the yarn from ring bobbin yarn to paper cone yarn. Now days, there are some companies to manufacturing these machines and Savio company is one of them which produce a fully automatic machine for spinning industries. In quality point of view, it is a very good machine and has also very low maintenance cost. Winding department plays an important role in the production and quality of yarn and causes direct effect on them. The yarn which made in ring section is not finish yarn and can’t sell to customer. After making the yarn in ring process, auto cone section made it more even yarn by passing through the optical sensor which is installed in different heads of machine. The yarn which is obtained from winding section is able to sell the customers. Fig. 9: Winding Machine III. PROBLEM STATEMENT This paper is related to textile industry especially to Yarn manufacturing process. This paper identifies the different problems occurring during manufacturing of yarn in the last process (winding), DMAIC tool is applied by the practical examples which was applied in practical field. It is very complicated and important process and it’s difficult to achieve the quality throughout the process. The main reason is the raw material, which do not possess good properties such as maturity, degree of reflectance, impurity and fiber strength and shade variation from bale to bale. The main thing in this paper is to reduce the defects rate and also reduce fault opportunities in the final yarn, As in Six Sigma methodology, if we decrease the opportunities in the final product then we can increase the Sigma value which shows that the process improvement. We have also applied a basic tool of Six Sigma like DMAIC which highlighted the different phases of tool with respect to process behavior and importance in the manufacturing of yarn. Winding department where we have applied DMAIC tool is critical as compared to other departments in the process as it cause an increase defects rate percentage in the final product of yarn.
  • 7. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 56 | Page In winding department, there is an Auto cone machine which winds the yarn on the cone and makes a final package for the end customers. It’s better to implement DMAIC tool to eliminate or reduce the defects at the last section of the department. After this section, we can’t improve the quality or reduce the defects in the final product. IV. RESEARCH METHODOLOGY During production of different processes in the yarn manufacturing process, there are failures at many stages. All such failures are recorded in the manufacturing plant. It was observed that worst defects % is at winding stage. So it was decided to implement DMAIC tool in this process to eliminate a large variation in it. During this it was focused in all three departments such as Quality, Maintenance and Production. I followed all the standards which play important role for the satisfaction of the customer needs and expectations. Maintenance play important role in every field. It play very important role regarding to quality. Because of proper maintenance, quality of product will be better. So it was focus on maintenance department as well. Winding section is a very critical department in yarn manufacturing process. In this department there are a lot of chances of defects opportunities in the final yarn. It is the last section of manufacturing process where defects can be minimized or eliminated. After manufacturing of yarn from deferent departments in the preparatory process and ring department it is ready to make a shape into final cone form so that it can be shipped to customer for use. During winding process of yarn following objectives are met.  Scanning and faults removing Electric Scanners (uster) is used for checking and elimination of yarn faults during winding process. This process is called Usterization of yarn. Such faults are called scan-cuts.  Splicing of broken or cut yarn Auto splicing is done for broken yarn pieces to eliminate yarn knots and bad piecing.  Bigger package Conversion of yarn from small ring bobbins to bigger yarn cones of different international standard or as per requirement of customer. During achieving above objectives or making of winding cones some faults are created during the process. These faults need to be controlled through monitoring and continuous study. Most of the winding faults are very dangerous for the next subsequent process which can be warping or knitting or doubling. We can face complains from customer of breakage of yarn during unwinding process. The following subsections illustrate how the DMAIC cycle is used to increase the quality and reduce the defects rate in the yarn manufacturing company. 4.1 Define Phase In this phase, define the process at different angles with the help of tools like Pareto chart, XY matrix and cause and effect diagram. First of all there is a comparison of rejection rate of different departments given below. 4.1.1 Rate of Rejection of Departments Table 2. Comparison of Rejection Rate of Different Departments Area Defects Production Defects % DPMO Sigma level B Grade 5303 4684800 0.11 1132 4.5 Final Inspection 0 4684800 0.00 0 6 Packing 1227 4684800 0.03 262 4.97 Doubling 494 494700 0.10 999 4.59 Winding 49752 4684800 1.06 10620 3.81 Ring 4852 4684800 0.10 1036 4.58 Simplex 14795 4684800 0.32 3158 4.54 Can & Lap 2660 4684800 0.06 568 4.76
  • 8. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 57 | Page Defects% Sigma level B Grade 0.11 4.5 Final Inspection 0.00 6 Packing 0.03 4.97 Doubling 0.10 4.59 Winding 1.06 3.81 Ring 0.10 4.58 Simplex 0.32 4.54 Can & Lap 0.06 4.76 Fig. 10. Defects% age of Departments 4.1.2 SIPOC Diagram As it is decided to work and analysis the defects in winding section, following SIPOC diagram is used to understanding the clear relationship between customer and supplier relationship. Table 3. SIPOC (SUPPLIER, INPUT, PROCESS, OUTPUT, CUSTOMER) Diagram Supplier Input Process Output Customer Roving Department Roving Bobbin Spinning Ring Yarn Bobbin Preparatory of Winding Machine Preparatory of Winding Machine Ring Yarn Bobbin End Finder Bobbin with end at top Winding Spindle Winding Spindle Bobbin With end at top Winding Wound cone Auto doffer Auto doffer Wound cone Auto doffing Doffed Cone Inspection Department Inspection Department Doffed Cone Inspection Inspected Cone Packing Inspection Department Inspected Cone Pallet Formation Cone on Pallet Packing Packing Cone on Pallet Steaming Steamed Cone Packing Packing Steamed Cone Repacking & Inspection Packed Cone on Pallet Packing and Quality Control Packing Packed Cone on Pallet Shrink Wrapping Packed Pallets Logistic, Quality Control Logistic Packed Pallets Yarn Storage Ready for Storage Marketing, Quality Control Logistic Stored Yarn Final Inspection Pass Pallets Marketing, Customer Logistic, Marketing Pass Pallets Delivery to customer Delivered Pallets Customer
  • 9. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 58 | Page 4.1.3 Winding Defects There are many defects which are produced in winding section and show them in bar graph here. Percentage% Defects Stitch 53.3 20899 Shade 32.7 12807 Paper Damage 6.6 2604 Without tail 2.5 981 Contamintae 1.8 689 Without Lycra 1.5 569 Smoky 1.1 428 Winding fault 0.2 82 Fig. 11. Bar graph of Winding Defects 4.2 Measure Phase To start the measurement phase a standard from has been designed and distributed to the DMAIC team, from contain the necessary information that should be gathered to be analyzed at the next phase, these information comprise from product type, raw materials type, machine parameters, type of wastes combined with general comments. Measure the performance of the process by collecting the data and also write down the importance of different critical defects regarding to customer value. In this phase there is different data analysis here  Cause and Effect Analysis  Data Collection Plan  Measurement system analysis 4.2.1 Cause & Effect Analysis Rating Scale 1~9 (1 being lowest and 9 being highest) 1 2 3 4 5 6 7 8 Rating of Importance to Customer 10 6 6 1 8 8 9 7 Key Process Outputs DefectRate Rework BGrade Yarn HardWaste Customer Complain Customer Return Customer Claims Final Inspection Failures Process Step Process Input Total 1 Winding Machine Guide 9 9 1 3 3 3 3 1 235 Gas Kit 9 9 1 1 1 3 3 1 217 Disk 9 9 1 1 3 3 3 1 233
  • 10. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 59 | Page 2 Personals Cradle Gauge 9 9 1 3 9 3 3 1 283 Suction mouth gauge 9 9 1 9 9 6 6 1 340 Over Hauling 3 3 3 6 1 1 1 3 118 Inspection 9 9 1 6 9 9 9 1 388 3 Material Scan Cuts 9 9 9 9 9 9 3 6 420 4 Environ ment Temperature 3 3 3 6 3 3 3 3 168 Humidity 3 3 3 3 1 1 1 1 101 5 Product plan Yarn Type 3 3 3 3 1 1 1 1 101 Count 6 6 6 6 1 1 1 3 184 Speed 9 9 6 9 9 6 6 6 305 Machine Change 3 3 1 3 3 1 1 1 105 Total 930 558 240 68 496 400 396 210 Fig.12. Cause & Effect Diagram 4.2.2 Data Collection Plan There is different way where the data collect of the yarn manufacturing process. Following are the different types of data which is collected from different source. For identify the problem of cross stitch, there is data collected here.  The system in a manufacturing plant is to collect a lot of data from department is already established.  Date and month, Yarn type, Operator and his experience, yarn count, Shift, production, Machine type and machine number, our hauling, scan cuts, Speed of machine, Temperature and humidity.  Responsibilities of person is shown in data to highlight the clear understanding regarding to process data and also take a data collection source like production and maintenance rejection report. It is an especially design experiment to identify the variation in the measuring components. A measurement system analysis considers the following things related to the process.  Selection of correct measurement system and approach.  Capability and assessing the measuring device.  Assessing of operators and procedures implement in a process.  Calculating the uncertainty in the measurement. 4.4.3 Measurement system analysis for Defective Yarn cones At winding section, inspection of yarn cone is done manually and conducts a MSA of attribute data. Sample Selection- Sample Size = 50 cones Winding Process
  • 11. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 60 | Page Pass cones = 20 Fail Cones = 20 Borderline cones = 10 Number of operators=3 Number of trials / operator = 2 Overall %age appraiser = 82 % Overall %age attribute= 76 %  Appraiser %age of this sample selection shows that it should be needed to retrain the inspectors to reduce the error.  Attribute %age of this sample shows that it should be needed to improve the existing system and redefine the defects parameters of winding section. 4.3 Analysis Phase The analysis phase deals with identifying the root causes of the process whether it can be improved or redesigned the process. To understand the defects stitch following studies & charts were produced to analyze this problem from different angles. 4.3.1 Effect of over hauling, product change and shift on Stitch defect Data shows that Evening shift has more defects as compared to morning and night shift. The night shift has minimum defects during manufacturing process. By deeply analyzing this problem, whenever change the product at machine or run the machine after overhauling changes of Stitch defects increases in first shift. Up till second shift things get normalized. All overhauling is done mostly in morning shift by the maintenance team and restart the machine in evening shift. The same case product change case, mostly product change in morning and evening shift. Top management are absent in night shift and extra are avoided in night time.
  • 12. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 61 | Page Fig.13 Pie Chart of Shifts data 4.3.2 Effect of yarn type on Defect Stitch In the yarn type, there are three types of yarn in relation to its end use.  Weaving Yarn  Knitting Yarn  Stretch Yarn (Lycra Yarn) According to different type of yarn, it is clear that the weaving yarn has more defect Stitch and then comes Knitting and Lycra yarn. Fig.14. Defects in Yarn Type Data shows that the fine count like 100s has high defects rate than the course count like 26s. As the count is going from fine to course, the defects rate goes down. The same case in knitting yarn, knitting yarn of fine count has high defects rate than course counts and it is gradually decreases from 40s to 26s count.
  • 13. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 62 | Page In lycra yarn, the same situation is also here but little bit difference because of lycra %age of different yarn as per customer requirement. Fig.15. Defects in Yarn Count In all types of yarn Weaving, Knitting and Lycra have more defects percentage in finer and lower as it goes towards course count. It is due to the finer count cone has more stay time on machine as compared to course counts. So opportunities of having stitch defects in finer counts cone is more as compared to courser counts cone. Whenever machine stopped for readjustment, overhauling and restarted it, then coming shift is critical to stitch defects. 4.4 Improve Phase The improvement of process is calculated by the help of Design of Experiment. In order to improve the process, some settings are change which are the sever effect on the defects of final product. In this normal plot, some significant factors are shown which causes major effects on the defects on the product in the winding process.  Scan cuts  Speed of winding machine  Disk of machine  Suction mouth gauge Fig.16. Normal plot of the standardized effects
  • 14. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 63 | Page 4.4.1 Parameters Speed is already slow so no big influence on defect. Scan-Cuts and Disk life are most important factors. They need to be controlled to achieve optimum results best Scan-Cuts are below 40. Condition of Disk should be good always and the suction mouth gauge should be less than 6 mm. Table 4. Response Table for Defects Level Value Scan Cuts Speed Disk Gauge Initial 1.0 37.00 700.00 1 (Good) -1 (< 6mm) Optimal 1.0 37.00 700.00 1 (Good) -1 (< 6mm) 1 1.0 40.2089 700.00 1 (Good) -1 (< 6mm) Fig.17. Normal plot of Design of Experiment 4.5 Control Phase In control phase, the process will be check by applying the control charts whether it is control or not. Variation of whole process should be in control limits for control process. Fig.18. X bar- R chart 4.5.1 Statistical process control Statistical process control is used to monitoring the consistency of process and makes the process is under control. Data of defects %age shows that the process is under control and there is not any point in this graph which is out of control limits. 4.5.2 Design the speed limits Speed of different yarn count on winding machine should be designed in different standard. The training of operators should also conduct for the understanding of speed limits of different product.
  • 15. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 64 | Page 4.5.3 Inspection procedure Inspection procedure of maintenance department improved and checking of suction mouth gauge and tension disk on daily basis and make the part of daily checking sheet form. For the improvement of measurement system analysis following steps have been taken. After categorization the stitch fault in the cone, it is included in the SOP as it was a great confusion among operators to detect a stitch cone fault. All operators were trained according to the new portion of SOP. After one month training of operators according to new portion of SOP, Measurement system analysis was conducted of attribute data. Sample Selection- Total Sample size = 50 cones Pass cones = 22 Fail cones = 22 Borderlines cones = 6 No of Operators = 3 No of trials/ operator = 2 Overall appraiser %age = 94% Overall attribute %age = 90% V. CONCLUSION In this paper, we have achieved a lot of results regarding to process problems during manufacturing of yarn in different departments. The main thing in our paper is to reduce the defects rate and also reduce fault opportunities in the final yarn; we have worked in every department to reduce these opportunities and gave a solution in the form of preventive action. As in Six Sigma methodology, if we decrease the opportunities in the final product then we can increase the Sigma value which shows that the process improvement. We have also applied a basic tool of Six Sigma like DMAIC in our thesis in which highlighted the different phases of tool with respect to process behavior and importance in the manufacturing of yarn. Winding department where we have applied DMAIC tool is critical as compared to other departments in the process as it cause an increase defects rate percentage in the final product of yarn. In winding department, there is an Auto cone machine which winds the yarn on the cone and makes a final package for the end customers. It’s better to implement DMAIC tool to eliminate or reduce the defects at the last section of the department. After this section, we can’t improve the quality or reduce the defects in the final product. REFERENCES [1] O. Al-Araidah, A. Momani, M. Khasawneh, and M. Momani, “Lead-Time Reduction Utilizing Lean Tools Applied to Healthcare: The Inpatient Pharmacy at a Local Hospital,” Journal for Healthcare Quality, 2010, 32(1),pp. 59-66. [2] M. Ali, “Six-sigma Design through Process Optimization using Robust Design Method,” Master Thesis at Concordia University, Montreal, Canada, 2004. [3] S. Bisgaard, and R. Does, “Quality Quandaries: Health Care Quality – Reducing the Length of Stay at a Hospital, Quality Engineering”, 2009, 21, pp. 117-131. [4] Y. H. Cheng, “The Improvement of Assembly Efficiency of Military Product by Six- Sigma,” NCUT Thesis Archive, Taiwan, 2005. [5] M. E. Cournoyer, C. M. Renner, M. B. Lee, J. F. Kleinsteuber, C. M. Trujillo, E. W. Krieger, C. L. Kowalczyk, “Lean Six Sigma tools, Part III: Input metrics for a Glovebox Glove Integrity Program,” Journal of Chemical Health and Safety, Article in press, 2010,pp. 412, 1-10. [6] A. D. Desai, “Improving Customer Delivery Commitments the Six Sigma way: Case Study of an Indian Small Scale Industry,” International Journal of Six Sigma and Competitive Advantage, 2006, 2(1), pp. 23-47. [7] E. Dickson, S. Singh, D. Cheung, C. Wyatt, and A. Nugent, “Application of Lean Manufacturing Techniques in the Emergency Department,” The Journal of Emergency Medicine, 2009, 37, pp. 177-182. [8] J. Edgardo, V. Escalante, and A. Ricardo, “An application of Six Sigma methodology to the manufacture of coal products,” World Class Applications of Six Sigma, 2006, 98-124. [9] M. Hook, and L. Stehn, “Lean Principles in Industrialized Housing Production: the Need for a Cultural Change,” Lean Construction Journal, 2008, pp.20-33. [10] C. Huang, K. S. Chen, and T. Chang, “An application of DMADV Methodology for increasing the Yield Rate of Surveillance Cameras, Microelectronics Reliability,” 2010, 50, pp. 266–272. [11] R. Jain, and A. C. Lyons, “The Implementation of Lean Manufacturing in the UK Food and Drink Industry”, International Journal of Services and Operations Management, 2009, pp. 5(4), 548-573. [12] R. Krishna, G. S. Dangayach, J. Motwani and A. Y. Akbulut, “Implementation of Six Sigma in a Multinational Automotive Parts Manufacturer in India: a Case Study,” International Journal of Services and Operations Management, 2008, 4(2), 246-276. [13] Q. Lee,“The mental model: Lean Manufacturing Implementation”. Retrieved September 13, 2004, from http://www.strategosinc.com/lean_implemntation1.htm [14] K. Linderman, R. Schroeder, Z. Srilata, and A. Choo ,“Six Sigma: a Goal-Theoretic Perspective,” Journal of Operation Management, 2003,21,pp.193–203. [15] D. Lioyd and J. Holesnback,“The Use of Six Sigma in Health Care Operations: Application and Opportunity,” Academy of Health Care Management Journal, 2006, 2,pp. 41-49. [16] N. Mandahawi, O. Al-Araidah, A. Boran, and M. Khasawneh, “Application of Lean Six Sigma Tools to Minimize Length of Stay for Ophthalmology Day Case Surgery,” International Journal of Six Sigma and Competitive Advantage, to appear, 2010.
  • 16. An Application of DMAIC Methodology for Increasing the Yarn Quality in Textile Industry www.iosrjournals.org 65 | Page [17] N. Mandahawi, S. Al-Shihabi, A. A. Abdallah, and Y. M. Alfarah, “Reducing Waiting Time at an Emergency Department using Design for Six Sigma and Discreet Event Simulation,” International Journal of Six Sigma and Competitive Advantage, 2010, 6(1/2), PP. 91-104. [18] J. Mari, “Using Design for Six-Sigma to Design an Equipment Depot at a Hospital,” Master Thesis at Binghamton University, State University of New York, USA, 2006. [19] J. Miller, D. Ferrin, and J. Szymanski, “Simulating Six Sigma Improvement Ideas for a Hospital Emergency Department, Proceedings of the 2003 Winter Simulation Conference,” 2003. [20] S. S. Raab, C. Andrew-JaJa, J. Condel, and D. Dabbs, “Improving Papanicolaou Test Quality and Reducing Medical Errors by Using Toyota Production System Methods,” American Journal of Obstetrics and Gynecology, 2006, 194, pp.57-64. [21] C. M. Roberts, “Six Sigma Signals,” Credit Union Magazine 2004, 70 (1), pp.40–43. [22] R. Rucker, “Citibank Increases Customer Loyalty with Defect-Free Processes, the Journal for Quality and Participation,” 2000, 23 (4), pp.32–36. [23] M. Sampson, “Non Profit, Payload Process Improvement through Lean Management”. Ph.D. Dissertation, University of Colorado. [24] K. Schon, “Implementing Six Sigma in a Non-American Culture,” International Journal of Six Sigma and Competitive Advantage, 2006, 2 (4), pp.404-428. [25] M. Sokovic, D. Pavletic, and S. Fakin, “Application of Six Sigma Methodology for Process Design,” Journal of Materials Processing Technology, 2005, PP. 162–163, 777–783. [26] C. Su and C. Chou, “A Systematic Methodology for the Creation of Six Sigma Projects: A Case Study of Semiconductor Foundry,” Expert Systems with Applications, 2008, 34,pp. 2693–2703. [27] J. P. Womack, “The Right Sequence for Implementing Lean”, Lean Enterprise Institute, Accessed on February 13, 2003. [28] H. Woodward, S. Scachitti, L. Mapa, C. Vanni, L. Brandford, and C. Cox, “Application of Lean Six Sigma Techniques to Optimize Hospital Laboratory Emergency Department Turnaround Time Across a Multi- hospital System,” Proceedings of the Spring, 2007, American Society for Engineering Education Illinois-Indiana Section Conference. [29] Q. Yu, and K. Yang, “Hospital Registration Waiting Time Reduction through Process Redesign,” International Journal of Six Sigma and Competitive Advantage, 2008, 4(3),pp. 240-253. [30] Bourton Hall, Rugby, Warwickshire CV23 9SD, “The Six Sigma Group” 2010, Retrieved July 20. [31] http://www.sixsigmagroup.co.uk/introduction/whatissixsigma.aspx [32] Six Sigma. (n.d).Quality Resources for Achieving Six Sigma Results. Retrieved July 20, 2010 from isixsigma.com http://www.isixsigma.com/index.php?option.com [33] F. M. Ahmad, & A. Khan, “Internship Report on Gull Ahmad Textile Mill Report,” Retrieved July 22, 2010, from Gul Ahmad Textile Mill: http://www.docstoc.com/docs/16936290/Spinning-report [34] T. Vijykumar, “Report on experience with the Rieter C 60 CARD. Link ,”2007, 19 (51),pp. 3-6. [35] Angelfire. (n.d.). Carding. Retrieved June 18, 2010, from Angelfire:http://www.angelfire.com/jazz/pakspinning/CARDING.htm [36] Angelfire. (n.d.). Draw Frame. Retrieved June 27, 2010, from Angelfire:http://www.angelfire.com/jazz/pakspinning/DRAWING%20PROCESS.htm [37] S. Bashir, (2010, June 6). Blow Room. Retrieved June 2010, from Angelfire: http://www.angelfire.com/jazz/pakspinning/BLOWROOM.htm [38] Yarn Spinning Technology. (n.d.). Combed Yarn for Knittinig. Retrieved June 10, 2010, from Yarn Spinning Technology: http://textiletechnology.bravehost.com/spinning/yarnquality.htm [39] Textile Spinning. (n.d.). Defects in Blow room and causes. Retrieved June 15, 2010, from Textile Spinning: http://www.textilespinning.co.cc/modernblowroom/Defects_in_Blow_Room.htm [40] Purushothama, B. (n.d.). MODERN AUTO LEVELLER DRAW FRAMES. Retrieved July 05, 2010, from fibashion.com: articles.fibashion.com/extraimage/article/document/Article_275.docx [41] Textile Technology Spinning. (n.d.). PROCESS PARAMETERS IN DRAW FRAME. Retrieved July 02, 2010, from Textile Technology Spinning: http://www.textiletechnology.co.cc/spinning/processpardrawing.htm [42] Textile spinning. (n.d.). Defects in Card Sliver. Retrieved 2010, from Textile spinning:http://www.textilespinning.co.cc/carding/DEFECTS_IN_CARD_SLIVER.htm [43] Angelfirre. (n.d.). Comber. Retrieved July 12, 2010, from Angelfire.com:http://www.angelfire.com/jazz/pakspinning/COMBING%20PROCESS.htm [44] Angelfire. (n.d.). Roving Frame. Retrieved July 18, 2010, from angelfire.com:http://www.angelfire.com/jazz/pakspinning/roving_frame.htm [45] Textile Technology Spinning. (n.d.). Roving Frame. Retrieved July 18, 2010, from Textile Technology Spinning: http://www.textiletechnology.co.cc/spinning/ROVINGFRAME.htm [46] Textile Technology Spinning. (n.d.). Winding Spinning. Retrieved July 20, 2010, from Textile Technology Spinning: http://textile- technology.blogspot.com/2008/04/winding-spinning.html [47] Six Sigma . (n.d).Quality Resources for Achieving Six Sigma Results. Retrieved July 20, 2010 from isixsigma.com http://www.isixsigma.com/index.php?option=com [48] The Six Sigma Group. Bourton Hall, Rugby, Warwickshire CV23 9SD. Retrieved July 20,2010http://www.sixsigmagroup.co.uk/introduction/whatissixsigma.aspx [49] Six Sigma.(n.d). Six Sigma Overview. Retrieved july 01, 2010. From thequalityportal.comhttp://www.thequalityportal.com/q_6sigma.htm [50] Pyzdek Thomas, “The Six Sigma handbook; a complete guide for green belts, black belts, and managers at all levels” (Published by: New York McGraw-Hill, c2003) Chapter 1 Pages 4-5. [51] Tennant Geoff, “SIX SIGMA: SPC and TQM in Manufacturing and Services” Gower Publishing, Ltd. (2001) Chapter 1 “The development of quality” Pages 1-3 [52] Educational assessment: Interpreting test scores, Reliability and validity. Retrieved 15 july, 2010 Online available: http://course1.winona.edu/lgray/el626/MandEtext3.html [53] Peter R.Loard.”The Economies, Science and Technology of Yarn Production” The textile institute 10 Black friar Manchester, England 1981, Chap.12 Pages. 149-171