SlideShare a Scribd company logo
1 of 6
Download to read offline
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE)
e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 10, Issue 2 (Nov. - Dec. 2013), PP 47-52
www.iosrjournals.org
www.iosrjournals.org 47 | Page
A Comparative Reliability Analysis of Bulldozers arriving at
workshop in Eastern India: A Case Study.
1
ChetanDeka, 2
Dr SomnathChattopadhaya,
1
(Maintenance Engineering and Tribology, Department of M echanical Engineering, ISM, Dhanbad)
2
(Department of Mechanical Engg and Mining Machinery Engineering, ISM, Dhanbad)
ABSTRACT : Study of reliabilities of machinery used in any kind of production is of utmost necessity for
optimum use of man power and resources to make the process cost effective and with minimum downtime. This
is applicable for all large and small industries alike. But in small industries data is not accurately stored and it
becomes difficult to estimate product reliabilities. This paper focuses on a case study to estimate the reliabilities
of two competing machines, when the only available data is Time To Failure. The Weibull Parameters are
calculated using Microsoft Excel 2010. The results show that after knowing the reliabilities of both the
Bulldozers at different lengths of time, we can ascertain which of them is preferable to use at which time period.
Keywords :Characteristic Life, Reliability, Shape parameter, Time To Failure, Weibull Distribution,
I. Introduction
Product Reliabilities have always been of utmost interest in any industry. But when it comes to obtaining the
reliabilities of two or more products used in the same industry for the very same purpose, its impact can be
viewed on both the manpower management and economic aspect of the firm. This paper addresses the reliability
of Bulldozers which come for Survey off Grounding at a workshop in Eastern India. Bulldozers are the one of
the most widely used mining machines used to move large quantity of materials.
Reliability analysis helps us to ascertain maintenance intervals [1], and with correct decision making, maybe
even increase the length of the intervals and thus decrease maintenance costs. This has fueled many studies to be
performed in the field of reliability analysis of mining equipment [2-7]. In the inspiring work of Barabady, J;
2005 [7], the Time between Failures (TBF) data was used and it was possible to estimate the failure patterns and
hence decision making regarding timed and economic scheduling of maintenance activities. Again in [1] the
authors continued their work beautifully to include the TBF and Time to Repair (TTR) data to perform an
elaborate case study and hence calculate the reliability and availability characteristics.
However in an industry or firm where data are not systematically stored but only some raw uncensored data
like overall Time To Failure (TTF) is available it is much easier to go for a simple method to calculate reliability
of the competing machines(in this case, two Bulldozers- Type-I and Type-II). The main objectives of this paper
are-
 To calculate the Weibull Parameters- Shape Parameter β , Characteristic Life α ; and interpret the
results with the corresponding Bathtub Curves. Thus a complete Weibull analysis.
 To estimate the reliabilities of the Type-I and Type-II Bulldozers and compare these at the end of
different time intervals.
II. Approach and Methodology
The formula for Reliability assuming a Two Parameter Weibull Distribution is
𝑅 𝑥 = 𝑒
−
𝑥
𝛼
𝛽
where βis the Shape Parameter,α is the Characteristic Life and xis the Time to Failure
The most important process is the analysis and computation of collected data. We calculate the Median Rank
and the transformed median rank and so on. By performing a simple linear regression we can obtain parameter
estimates that will help us to infer the reliabilities of the concerned machinery; and thus are able to compare
them.
III. Case Study
We calculate and compare the reliabilities after different time intervals of the two main types of Bulldozers
arriving at the workshop. The Bulldozers, Type-I&Type-II are used in various mine fields for movement of
large quantities of materials. The Bulldozers that have been considered in this paper have been previously been
remade (repaired) at the workshop before being sent to the mine field. Since not much systematized and well
stored data was to be found, the TTF of 10 Bulldozers, from the 1st
quarter of 2013, each of Type-I and Type-
IIare considered, each having the same characteristics- a) Workshop remade and b) not usable any longer.
A Comparative Reliability Analysis Of Bulldozers arriving at workshop in Eastern India: A Case
www.iosrjournals.org 48 | Page
Similar considerations have been applied and similar characteristics have been considered while treating the
data of Dumpers as well. The beauty of this wonderfully detailed method by William M. Dorner [8], is that it is
very simple and easy to compute, and most importantly it gives a fair idea of the product reliabilities at the end.
3.1 Data Collection
The different failure data of Bulldozers were collected for a period of three months (January, February
and March) and ten of them have been considered amongst the ones which were Workshop remade and brought
for Survey off Grounding, to maintain uniformity and soundness in this study.
Table-1 TTF of Type-I andType-II Bulldozers
3.2 Data Analysis
3.2.1 Data Preparation and Computation
Two basic steps have been performed-
 We have prepared a different table for each of CAT and KOM Bulldozers, and arranged the data in
ascending order, ranking them in the process.
 The median ranks are then approximated using Bernard’s Approximation:
- F(t)=
𝑖−0.3
𝑛+0.4
where‘i’ is thecorresponding rank of the data and ‘n’ is the total number of samples (in this case 10).
Some corresponding values which are calculated using the median rank are tabulated alongside.
Table-2 Type-I
Type-I
No. Of Hours Run
Rank Median Rank 1/(1-Median
Rank)
ln(ln(1/(1-Median
Rank)))
ln(No. Of Hours
Run)
30 1 0.067 1.072 -2.663 3.401
1110 2 0.163 1.195 -1.723 7.012
2294 3 0.259 1.350 -1.202 7.738
4575 4 0.355 1.552 -0.821 8.428
13900 5 0.451 1.824 -0.508 9.539
13925 6 0.548 2.212 -0.230 9.541
15400 7 0.644 2.810 0.032 9.642
15811 8 0.740 3.851 0.299 9.668
16564 9 0.836 6.117 0.593 9.714
19120 10 0.932 14.857 0.992 9.858
Serial No. Type-I
No. of Hours Run
Type-II
No. of Hours Run
1 15811 7895
2 2294 11534
3 16564 4035
4 19120 7402
5 13900 6887
6 30 2986
7 13925 685
8 1110 487
9 4575 5975
10 15400 5002
A Comparative Reliability Analysis Of Bulldozers arriving at workshop in Eastern India: A Case
www.iosrjournals.org 49 | Page
Table-3 Type-II
Type-II
No. Of Hours Run
Rank Median Rank 1/(1-Median
Rank)
ln(ln(1/(1-Median
Rank)))
ln(No. Of Hours
Run)
487 1 0.067 1.072 -2.663 6.188
685 2 0.163 1.195 -1.723 6.529
2986 3 0.259 1.350 -1.202 8.001
4035 4 0.355 1.552 -0.821 8.302
5002 5 0.451 1.824 -0.508 8.517
5975 6 0.548 2.212 -0.230 8.695
6887 7 0.644 2.810 0.032 8.837
7402 8 0.740 3.851 0.299 8.909
7895 9 0.836 6.117 0.593 8.973
11534 10 0.932 14.857 0.992 9.353
3.2.2 Estimating the Weibull Parameters and Fitting a line to the data
As previously stated we will be using a Two-Parameter Weibull Distribution to calculate the required
reliabilities. Using the Regression function in Microsoft Excel software, the values are examined and the
Weibull Parameters are estimated. We also plot a graph between ln(No. Of Hours) versus Transformed Median
for both sets of data and the slope of the graph directly gives us the Shape Parameter.
Table-4
SUMMARY
OUTPUT
Type I
Regression
Statistics
Multiple R 0.913
R Square 0.834
Adjusted R Square 0.813
Standard Error 0.481
Observations 10
ANOVA
df SS MS F Significance F
Regression 1 9.338 9.338 40.358 0.0002
Residual 8 1.851 0.231
Total 9 11.189
Coefficients Standard Error t Stat P-value Lower 95% Upper 95% Lower 95.0% Upper 95.0%
Intercept -4.774 0.686 -6.957 0.0001 -6.356 -3.191 -6.356 -3.191
ln(No. Of Hours
Run)
0.502 0.079 6.352 0.0002 0.3203 0.685 0.320 0.685
β = 0.502
α= 13290.47
Fig.1 Fitting a line to the data of Type-I
A Comparative Reliability Analysis Of Bulldozers arriving at workshop in Eastern India: A Case
www.iosrjournals.org 50 | Page
Table-5
SUMMARY
OUTPUT
Type II
Regression Statistics
Multiple R 0.953
R Square 0.908
Adjusted R Square 0.897
Standard Error 0.357
Observations 10
ANOVA
df SS MS F Significance F
Regression 1 10.168 10.168 79.619 1.97E-05
Residual 8 1.021 0.127
Total 9 11.189
Coefficients Standard Error t Stat P-value Lower 95% Upper 95% Lower 95.0% Upper 95.0%
Intercept -8.796 0.934 -9.417 0.00011 -6.642 -6.642 -10.951 -6.642
ln(No. Of Hours Run) 1.005 0.112 8.922 0.000219933 1.265 1.265 0.745 1.265
β = 1.005
α= 6318.88
Fig.2 Fitting a line to the data of Type-II
Fig. 3 Graph for Failure Rate vs Time for Type-I Bulldozer(Infant Mortality Rate)
A Comparative Reliability Analysis Of Bulldozers arriving at workshop in Eastern India: A Case
www.iosrjournals.org 51 | Page
Fig. 4 Graph for Failure rate vs Time for Type-II(Constant Failure Rate)
We have computed β(Shape Parameter) and α(Characteristic Life) for both sets of data. The corresponding
failure rates are also plotted against time.
IV. Results and Discussion
The reliabilities of the Bulldozers and Dumpers are calculated and a graph is plotted between them to give us a
comparative overview among each of their types.
No. Of Hours Type-I Type-II
0 1.00 1.00
1000 0.76 0.85
2000 0.68 0.73
3000 0.62 0.62
4000 0.58 0.53
5000 0.54 0.45
6000 0.51 0.39
7000 0.48 0.33
8000 0.46 0.28
9000 0.44 0.24
10000 0.42 0.20
11000 0.40 0.17
12000 0.39 0.15
13000 0.37 0.13
14000 0.36 0.11
15000 0.35 0.09
16000 0.33 0.08
17000 0.32 0.07
18000 0.31 0.06
19000 0.30 0.05
20000 0.29 0.04
21000 0.28 0.04
22000 0.28 0.03
23000 0.27 0.03
24000 0.26 0.02
25000 0.25 0.02
26000 0.25 0.02
27000 0.24 0.01
28000 0.23 0.01
29000 0.23 0.00
30000 0.22 0.00
Table-6 Reliability Comparisons
A Comparative Reliability Analysis Of Bulldozers arriving at workshop in Eastern India: A Case
www.iosrjournals.org 52 | Page
Fig. 5- Graph showing the reliability comparisons of Bulldozers
We have calculated the values of Shape Parameter (β) and Characteristic Life (α) for both the Type-I and Type-
II Bulldozers.
β< 1 gives us a fair idea that most of the products in question has a decreasing failure rate. It is safe to say that
the Type-I Bulldozers fail during its ‘Burn-In’ period.
β> 1 indicates failure rate increases as time passes by. Since the value is only slightly greater than 1 (1.005 to
be precise) the increase in failure rate is very slow for the Type-II Bulldozers. In fact one can say the failure rate
is almost constant.
α = 13290.47 indicates that about 37% of the Type-I Bulldozers will survive at least 13290.47 hours.
α = 6318.88 indicates that about 37% of the Type-II Bulldozers will survive at least 6318.88 hours.
The results shown in Table-6 as well as in Fig. 5 give us a clear of the reliabilities of the two types of
Bulldozers. At less than 3000 hours Type-II Bulldozers have a greater reliability but after 3000 hours it is quite
clear that the Type-I Bulldozers have a greater reliability.
V. Conclusion
From this study one can observe that that even when there is very little data to work with, we can still get a
measure of the reliability of any equipment This case study shows that between the Type-I and Type-II
Bulldozers, the former one is to be preferred when usage is more than 3000 hours, while the later one is to be
preferred when expected usage is less than 3000 hours. We can definitively conclude that equipment reliability
can be properly stated only with respect to its time of usage. This will help us decrease the number of
breakdowns significantly.
It is often seen that that the Time To Failure data that fits a Weibull Distribution also fits a lognormal
distribution [9]. Thus there is further scope of using a Lognormal Distribution in reliability analysis and
comparing it with Weibull Distribution based on this type of data. Further we can also go for a availability and
maintainability analysis.
References
[1] Barabady J, Kumar U. Reliability Analysis of mining equipment: A case study of a crushing plant at Jajaram Bauxite Mine in Iran
[2] Kumar U, Klefsjo¨B, Granholm S. Reliability investigation for a fleet of load-haul-dump machines in a Swedish mine. ReliabEng
System Saf 1989;26(4).
[3] Kumar U, Klefsjo¨B. Reliability analysis of hydraulic system of LHD machine using the power low process model. ReliabEng
System Saf 1992;35(3):217–24..
[4] Samanta B, Sarkar B, Mukherjee SK. Reliability modeling and performance analyses of an LHD system in mining. J S AfrInst
Mining Metall 2004;104(1):1–8.
[5] Mandal SK. Evaluation of reliability index of longwall equipment systems for production contingency. Min Technol
1996;78(897):138–40
[6] Kumar U, Huang Y. Reliability analysis of a mine production system: a case study. In: Proceedings of the annual reliability and
maintainability symposium, USA, 1993 p. 167–72.
[7] Barabady J. Reliability and maintainability analysis of crushing plants in Jajarm Bauxite Mine of Iran. In: Proceedings of the annual
reliability and maintainability symposium, USA, 2005 p. 109–15.
[8] Dorner, William W. Using Microsoft Excel for Weibull Analysis. Quality Digest, 01/01/1999.
[9] Ebeling, C.E. An introduction to reliability and maintainability engineering. New York: McGraw-Hill 1997.

More Related Content

What's hot

Optimization of CNC Machining
Optimization of CNC MachiningOptimization of CNC Machining
Optimization of CNC Machiningvivatechijri
 
Structural optimization of a powered industrial lift truck frame
Structural optimization of a powered industrial lift truck frameStructural optimization of a powered industrial lift truck frame
Structural optimization of a powered industrial lift truck frameIAEME Publication
 
A new technique near minimum material zone, to
A new technique   near minimum material zone, toA new technique   near minimum material zone, to
A new technique near minimum material zone, toeSAT Publishing House
 
Optimization of Assembly Line and Plant Layout in a Mass Production Industry...
	Optimization of Assembly Line and Plant Layout in a Mass Production Industry...	Optimization of Assembly Line and Plant Layout in a Mass Production Industry...
Optimization of Assembly Line and Plant Layout in a Mass Production Industry...inventionjournals
 
A comparative study of PSO, GSA and SCA in parameters optimization of surface...
A comparative study of PSO, GSA and SCA in parameters optimization of surface...A comparative study of PSO, GSA and SCA in parameters optimization of surface...
A comparative study of PSO, GSA and SCA in parameters optimization of surface...journalBEEI
 
Finite Element Analysis and Fatigue analysis of Crane Hook with Different Ma...
Finite Element Analysis and Fatigue  analysis of Crane Hook with Different Ma...Finite Element Analysis and Fatigue  analysis of Crane Hook with Different Ma...
Finite Element Analysis and Fatigue analysis of Crane Hook with Different Ma...IRJET Journal
 
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET Journal
 
SIMULATION OF THE DRILLING PROCESS IN GFRP COMPOSITES USING SYSTEM DYNAMICS A...
SIMULATION OF THE DRILLING PROCESS IN GFRP COMPOSITES USING SYSTEM DYNAMICS A...SIMULATION OF THE DRILLING PROCESS IN GFRP COMPOSITES USING SYSTEM DYNAMICS A...
SIMULATION OF THE DRILLING PROCESS IN GFRP COMPOSITES USING SYSTEM DYNAMICS A...IAEME Publication
 
IRJET-Design Optimization of Free Standing Communication Tower using Genetic ...
IRJET-Design Optimization of Free Standing Communication Tower using Genetic ...IRJET-Design Optimization of Free Standing Communication Tower using Genetic ...
IRJET-Design Optimization of Free Standing Communication Tower using Genetic ...IRJET Journal
 
Enhancing the Submersible Pump Rotor Performance by Taguchi Optimization Tech...
Enhancing the Submersible Pump Rotor Performance by Taguchi Optimization Tech...Enhancing the Submersible Pump Rotor Performance by Taguchi Optimization Tech...
Enhancing the Submersible Pump Rotor Performance by Taguchi Optimization Tech...IRJET Journal
 
Application of ANOVA and ANN Technique for Optimize Of CNC Machining Parameters
Application of ANOVA and ANN Technique for Optimize Of CNC Machining ParametersApplication of ANOVA and ANN Technique for Optimize Of CNC Machining Parameters
Application of ANOVA and ANN Technique for Optimize Of CNC Machining Parametersijiert bestjournal
 
IRJET - Optimization of Machining Parameters in a Turning Operation of Flyash...
IRJET - Optimization of Machining Parameters in a Turning Operation of Flyash...IRJET - Optimization of Machining Parameters in a Turning Operation of Flyash...
IRJET - Optimization of Machining Parameters in a Turning Operation of Flyash...IRJET Journal
 
A Simulation Based Approach for Studying the Effect of Buffers on the Perform...
A Simulation Based Approach for Studying the Effect of Buffers on the Perform...A Simulation Based Approach for Studying the Effect of Buffers on the Perform...
A Simulation Based Approach for Studying the Effect of Buffers on the Perform...inventionjournals
 

What's hot (17)

Ijetr011945
Ijetr011945Ijetr011945
Ijetr011945
 
Optimization of CNC Machining
Optimization of CNC MachiningOptimization of CNC Machining
Optimization of CNC Machining
 
Production Scheduling in a Job Shop Environment with consideration of Transpo...
Production Scheduling in a Job Shop Environment with consideration of Transpo...Production Scheduling in a Job Shop Environment with consideration of Transpo...
Production Scheduling in a Job Shop Environment with consideration of Transpo...
 
Structural optimization of a powered industrial lift truck frame
Structural optimization of a powered industrial lift truck frameStructural optimization of a powered industrial lift truck frame
Structural optimization of a powered industrial lift truck frame
 
A new technique near minimum material zone, to
A new technique   near minimum material zone, toA new technique   near minimum material zone, to
A new technique near minimum material zone, to
 
Research in large assembly management methods
Research in large assembly management methodsResearch in large assembly management methods
Research in large assembly management methods
 
Optimization of Assembly Line and Plant Layout in a Mass Production Industry...
	Optimization of Assembly Line and Plant Layout in a Mass Production Industry...	Optimization of Assembly Line and Plant Layout in a Mass Production Industry...
Optimization of Assembly Line and Plant Layout in a Mass Production Industry...
 
A comparative study of PSO, GSA and SCA in parameters optimization of surface...
A comparative study of PSO, GSA and SCA in parameters optimization of surface...A comparative study of PSO, GSA and SCA in parameters optimization of surface...
A comparative study of PSO, GSA and SCA in parameters optimization of surface...
 
Finite Element Analysis and Fatigue analysis of Crane Hook with Different Ma...
Finite Element Analysis and Fatigue  analysis of Crane Hook with Different Ma...Finite Element Analysis and Fatigue  analysis of Crane Hook with Different Ma...
Finite Element Analysis and Fatigue analysis of Crane Hook with Different Ma...
 
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix ApproachIRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
IRJET-Effective Improvement of a Plant Layout using Pugh Matrix Approach
 
SIMULATION OF THE DRILLING PROCESS IN GFRP COMPOSITES USING SYSTEM DYNAMICS A...
SIMULATION OF THE DRILLING PROCESS IN GFRP COMPOSITES USING SYSTEM DYNAMICS A...SIMULATION OF THE DRILLING PROCESS IN GFRP COMPOSITES USING SYSTEM DYNAMICS A...
SIMULATION OF THE DRILLING PROCESS IN GFRP COMPOSITES USING SYSTEM DYNAMICS A...
 
IRJET-Design Optimization of Free Standing Communication Tower using Genetic ...
IRJET-Design Optimization of Free Standing Communication Tower using Genetic ...IRJET-Design Optimization of Free Standing Communication Tower using Genetic ...
IRJET-Design Optimization of Free Standing Communication Tower using Genetic ...
 
Enhancing the Submersible Pump Rotor Performance by Taguchi Optimization Tech...
Enhancing the Submersible Pump Rotor Performance by Taguchi Optimization Tech...Enhancing the Submersible Pump Rotor Performance by Taguchi Optimization Tech...
Enhancing the Submersible Pump Rotor Performance by Taguchi Optimization Tech...
 
Application of ANOVA and ANN Technique for Optimize Of CNC Machining Parameters
Application of ANOVA and ANN Technique for Optimize Of CNC Machining ParametersApplication of ANOVA and ANN Technique for Optimize Of CNC Machining Parameters
Application of ANOVA and ANN Technique for Optimize Of CNC Machining Parameters
 
30120130405014
3012013040501430120130405014
30120130405014
 
IRJET - Optimization of Machining Parameters in a Turning Operation of Flyash...
IRJET - Optimization of Machining Parameters in a Turning Operation of Flyash...IRJET - Optimization of Machining Parameters in a Turning Operation of Flyash...
IRJET - Optimization of Machining Parameters in a Turning Operation of Flyash...
 
A Simulation Based Approach for Studying the Effect of Buffers on the Perform...
A Simulation Based Approach for Studying the Effect of Buffers on the Perform...A Simulation Based Approach for Studying the Effect of Buffers on the Perform...
A Simulation Based Approach for Studying the Effect of Buffers on the Perform...
 

Viewers also liked

Analysis of Impact of Channel Error Rate on Average PSNR in Multimedia Traffic
Analysis of Impact of Channel Error Rate on Average PSNR in Multimedia TrafficAnalysis of Impact of Channel Error Rate on Average PSNR in Multimedia Traffic
Analysis of Impact of Channel Error Rate on Average PSNR in Multimedia TrafficIOSR Journals
 
An Intermediate Service Composer Architecture for Dynamic Discovery and Invoc...
An Intermediate Service Composer Architecture for Dynamic Discovery and Invoc...An Intermediate Service Composer Architecture for Dynamic Discovery and Invoc...
An Intermediate Service Composer Architecture for Dynamic Discovery and Invoc...IOSR Journals
 
Public Transport Accessibility Index for Thiruvananthapuram Urban Area
Public Transport Accessibility Index for Thiruvananthapuram Urban AreaPublic Transport Accessibility Index for Thiruvananthapuram Urban Area
Public Transport Accessibility Index for Thiruvananthapuram Urban AreaIOSR Journals
 
An On-Situ Study of Stability Analysis on Slopes Using Undrained Shear Streng...
An On-Situ Study of Stability Analysis on Slopes Using Undrained Shear Streng...An On-Situ Study of Stability Analysis on Slopes Using Undrained Shear Streng...
An On-Situ Study of Stability Analysis on Slopes Using Undrained Shear Streng...IOSR Journals
 
Seminar and Project Manager and Resourceful Trainer(SMART)
Seminar and Project Manager and Resourceful Trainer(SMART)Seminar and Project Manager and Resourceful Trainer(SMART)
Seminar and Project Manager and Resourceful Trainer(SMART)IOSR Journals
 
“Analysis of Physiological Fitness of Government and Private Residential Seco...
“Analysis of Physiological Fitness of Government and Private Residential Seco...“Analysis of Physiological Fitness of Government and Private Residential Seco...
“Analysis of Physiological Fitness of Government and Private Residential Seco...IOSR Journals
 
The Impact of Trade and Debt on Nigeria Agribusiness Sector Output (1970-2010)
The Impact of Trade and Debt on Nigeria Agribusiness Sector Output (1970-2010)The Impact of Trade and Debt on Nigeria Agribusiness Sector Output (1970-2010)
The Impact of Trade and Debt on Nigeria Agribusiness Sector Output (1970-2010)IOSR Journals
 
Design of Conformal Helical Antenna with Selective Bands
Design of Conformal Helical Antenna with Selective BandsDesign of Conformal Helical Antenna with Selective Bands
Design of Conformal Helical Antenna with Selective BandsIOSR Journals
 
Development of Emulsion Paint from Trimethylol Urea/Polystyrene waste Copolym...
Development of Emulsion Paint from Trimethylol Urea/Polystyrene waste Copolym...Development of Emulsion Paint from Trimethylol Urea/Polystyrene waste Copolym...
Development of Emulsion Paint from Trimethylol Urea/Polystyrene waste Copolym...IOSR Journals
 
Review on Design Optimization of Liquid Carrier Tanker for Reduction of Slosh...
Review on Design Optimization of Liquid Carrier Tanker for Reduction of Slosh...Review on Design Optimization of Liquid Carrier Tanker for Reduction of Slosh...
Review on Design Optimization of Liquid Carrier Tanker for Reduction of Slosh...IOSR Journals
 
Torsional evaluation of Tapered Composite Cone using Finite Element Analysis
Torsional evaluation of Tapered Composite Cone using Finite Element AnalysisTorsional evaluation of Tapered Composite Cone using Finite Element Analysis
Torsional evaluation of Tapered Composite Cone using Finite Element AnalysisIOSR Journals
 
Impact on integration of Lean Manufacturing and Six Sigma in various applicat...
Impact on integration of Lean Manufacturing and Six Sigma in various applicat...Impact on integration of Lean Manufacturing and Six Sigma in various applicat...
Impact on integration of Lean Manufacturing and Six Sigma in various applicat...IOSR Journals
 
Practices and Cultural Consumption among Tunisians School Youth
Practices and Cultural Consumption among Tunisians School YouthPractices and Cultural Consumption among Tunisians School Youth
Practices and Cultural Consumption among Tunisians School YouthIOSR Journals
 
A Study of Heart Rate Recovery Following Exercise in Healthy Young Adult Male
A Study of Heart Rate Recovery Following Exercise in Healthy Young Adult MaleA Study of Heart Rate Recovery Following Exercise in Healthy Young Adult Male
A Study of Heart Rate Recovery Following Exercise in Healthy Young Adult MaleIOSR Journals
 
Imparting the skills in the young minds- Employability skills and armor to wi...
Imparting the skills in the young minds- Employability skills and armor to wi...Imparting the skills in the young minds- Employability skills and armor to wi...
Imparting the skills in the young minds- Employability skills and armor to wi...IOSR Journals
 
Developing Organic Processed Food Entrepreneurial Intention: Study On Women F...
Developing Organic Processed Food Entrepreneurial Intention: Study On Women F...Developing Organic Processed Food Entrepreneurial Intention: Study On Women F...
Developing Organic Processed Food Entrepreneurial Intention: Study On Women F...IOSR Journals
 
Discovery of superluminal velocities of X-rays and Bharat Radiation challengi...
Discovery of superluminal velocities of X-rays and Bharat Radiation challengi...Discovery of superluminal velocities of X-rays and Bharat Radiation challengi...
Discovery of superluminal velocities of X-rays and Bharat Radiation challengi...IOSR Journals
 
X-Ray Line Profile Analysis of Chemically Deposited Nanostructured PBS Films
X-Ray Line Profile Analysis of Chemically Deposited Nanostructured PBS FilmsX-Ray Line Profile Analysis of Chemically Deposited Nanostructured PBS Films
X-Ray Line Profile Analysis of Chemically Deposited Nanostructured PBS FilmsIOSR Journals
 
Industrial Process Management Using LabVIEW
Industrial Process Management Using LabVIEWIndustrial Process Management Using LabVIEW
Industrial Process Management Using LabVIEWIOSR Journals
 
Users’ Perceptions, Attitudes and Continuance Intentions of Facebook: Insight...
Users’ Perceptions, Attitudes and Continuance Intentions of Facebook: Insight...Users’ Perceptions, Attitudes and Continuance Intentions of Facebook: Insight...
Users’ Perceptions, Attitudes and Continuance Intentions of Facebook: Insight...IOSR Journals
 

Viewers also liked (20)

Analysis of Impact of Channel Error Rate on Average PSNR in Multimedia Traffic
Analysis of Impact of Channel Error Rate on Average PSNR in Multimedia TrafficAnalysis of Impact of Channel Error Rate on Average PSNR in Multimedia Traffic
Analysis of Impact of Channel Error Rate on Average PSNR in Multimedia Traffic
 
An Intermediate Service Composer Architecture for Dynamic Discovery and Invoc...
An Intermediate Service Composer Architecture for Dynamic Discovery and Invoc...An Intermediate Service Composer Architecture for Dynamic Discovery and Invoc...
An Intermediate Service Composer Architecture for Dynamic Discovery and Invoc...
 
Public Transport Accessibility Index for Thiruvananthapuram Urban Area
Public Transport Accessibility Index for Thiruvananthapuram Urban AreaPublic Transport Accessibility Index for Thiruvananthapuram Urban Area
Public Transport Accessibility Index for Thiruvananthapuram Urban Area
 
An On-Situ Study of Stability Analysis on Slopes Using Undrained Shear Streng...
An On-Situ Study of Stability Analysis on Slopes Using Undrained Shear Streng...An On-Situ Study of Stability Analysis on Slopes Using Undrained Shear Streng...
An On-Situ Study of Stability Analysis on Slopes Using Undrained Shear Streng...
 
Seminar and Project Manager and Resourceful Trainer(SMART)
Seminar and Project Manager and Resourceful Trainer(SMART)Seminar and Project Manager and Resourceful Trainer(SMART)
Seminar and Project Manager and Resourceful Trainer(SMART)
 
“Analysis of Physiological Fitness of Government and Private Residential Seco...
“Analysis of Physiological Fitness of Government and Private Residential Seco...“Analysis of Physiological Fitness of Government and Private Residential Seco...
“Analysis of Physiological Fitness of Government and Private Residential Seco...
 
The Impact of Trade and Debt on Nigeria Agribusiness Sector Output (1970-2010)
The Impact of Trade and Debt on Nigeria Agribusiness Sector Output (1970-2010)The Impact of Trade and Debt on Nigeria Agribusiness Sector Output (1970-2010)
The Impact of Trade and Debt on Nigeria Agribusiness Sector Output (1970-2010)
 
Design of Conformal Helical Antenna with Selective Bands
Design of Conformal Helical Antenna with Selective BandsDesign of Conformal Helical Antenna with Selective Bands
Design of Conformal Helical Antenna with Selective Bands
 
Development of Emulsion Paint from Trimethylol Urea/Polystyrene waste Copolym...
Development of Emulsion Paint from Trimethylol Urea/Polystyrene waste Copolym...Development of Emulsion Paint from Trimethylol Urea/Polystyrene waste Copolym...
Development of Emulsion Paint from Trimethylol Urea/Polystyrene waste Copolym...
 
Review on Design Optimization of Liquid Carrier Tanker for Reduction of Slosh...
Review on Design Optimization of Liquid Carrier Tanker for Reduction of Slosh...Review on Design Optimization of Liquid Carrier Tanker for Reduction of Slosh...
Review on Design Optimization of Liquid Carrier Tanker for Reduction of Slosh...
 
Torsional evaluation of Tapered Composite Cone using Finite Element Analysis
Torsional evaluation of Tapered Composite Cone using Finite Element AnalysisTorsional evaluation of Tapered Composite Cone using Finite Element Analysis
Torsional evaluation of Tapered Composite Cone using Finite Element Analysis
 
Impact on integration of Lean Manufacturing and Six Sigma in various applicat...
Impact on integration of Lean Manufacturing and Six Sigma in various applicat...Impact on integration of Lean Manufacturing and Six Sigma in various applicat...
Impact on integration of Lean Manufacturing and Six Sigma in various applicat...
 
Practices and Cultural Consumption among Tunisians School Youth
Practices and Cultural Consumption among Tunisians School YouthPractices and Cultural Consumption among Tunisians School Youth
Practices and Cultural Consumption among Tunisians School Youth
 
A Study of Heart Rate Recovery Following Exercise in Healthy Young Adult Male
A Study of Heart Rate Recovery Following Exercise in Healthy Young Adult MaleA Study of Heart Rate Recovery Following Exercise in Healthy Young Adult Male
A Study of Heart Rate Recovery Following Exercise in Healthy Young Adult Male
 
Imparting the skills in the young minds- Employability skills and armor to wi...
Imparting the skills in the young minds- Employability skills and armor to wi...Imparting the skills in the young minds- Employability skills and armor to wi...
Imparting the skills in the young minds- Employability skills and armor to wi...
 
Developing Organic Processed Food Entrepreneurial Intention: Study On Women F...
Developing Organic Processed Food Entrepreneurial Intention: Study On Women F...Developing Organic Processed Food Entrepreneurial Intention: Study On Women F...
Developing Organic Processed Food Entrepreneurial Intention: Study On Women F...
 
Discovery of superluminal velocities of X-rays and Bharat Radiation challengi...
Discovery of superluminal velocities of X-rays and Bharat Radiation challengi...Discovery of superluminal velocities of X-rays and Bharat Radiation challengi...
Discovery of superluminal velocities of X-rays and Bharat Radiation challengi...
 
X-Ray Line Profile Analysis of Chemically Deposited Nanostructured PBS Films
X-Ray Line Profile Analysis of Chemically Deposited Nanostructured PBS FilmsX-Ray Line Profile Analysis of Chemically Deposited Nanostructured PBS Films
X-Ray Line Profile Analysis of Chemically Deposited Nanostructured PBS Films
 
Industrial Process Management Using LabVIEW
Industrial Process Management Using LabVIEWIndustrial Process Management Using LabVIEW
Industrial Process Management Using LabVIEW
 
Users’ Perceptions, Attitudes and Continuance Intentions of Facebook: Insight...
Users’ Perceptions, Attitudes and Continuance Intentions of Facebook: Insight...Users’ Perceptions, Attitudes and Continuance Intentions of Facebook: Insight...
Users’ Perceptions, Attitudes and Continuance Intentions of Facebook: Insight...
 

Similar to A Comparative Reliability Analysis of Bulldozers arriving at workshop in Eastern India: A Case Study.

Application of Reliability Analysis for Predicting Failures in Cement Industry
Application of Reliability Analysis for Predicting Failures in Cement IndustryApplication of Reliability Analysis for Predicting Failures in Cement Industry
Application of Reliability Analysis for Predicting Failures in Cement Industrytheijes
 
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWSTUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWIAEME Publication
 
Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...eSAT Journals
 
Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...eSAT Publishing House
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET Journal
 
IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...
IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...
IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...IRJET Journal
 
Structural and Modal Analysis of Crane Hook with Different Materials using Fea
Structural and Modal Analysis of Crane Hook with Different Materials using FeaStructural and Modal Analysis of Crane Hook with Different Materials using Fea
Structural and Modal Analysis of Crane Hook with Different Materials using FeaIRJET Journal
 
IRJET- Determination of Time Period and Evaluation of Seismic Response of...
IRJET-  	  Determination of Time Period and Evaluation of Seismic Response of...IRJET-  	  Determination of Time Period and Evaluation of Seismic Response of...
IRJET- Determination of Time Period and Evaluation of Seismic Response of...IRJET Journal
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET Journal
 
Non linear analysis and optimization of flywheel
Non linear analysis and optimization of flywheelNon linear analysis and optimization of flywheel
Non linear analysis and optimization of flywheelIRJET Journal
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFijsrd.com
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET Journal
 
Performance of metaheuristic methods for loop
Performance of metaheuristic methods for loopPerformance of metaheuristic methods for loop
Performance of metaheuristic methods for loopIAEME Publication
 
Suitability of Composite Material for Flywheel Analysis
Suitability of Composite Material for Flywheel Analysis Suitability of Composite Material for Flywheel Analysis
Suitability of Composite Material for Flywheel Analysis IJMER
 
Design out maintenance on frequent failure of motor ball bearings-2-3
Design out maintenance on frequent failure of motor ball bearings-2-3Design out maintenance on frequent failure of motor ball bearings-2-3
Design out maintenance on frequent failure of motor ball bearings-2-3IAEME Publication
 
Statistical analysis of various sub systems of panel
Statistical analysis of various sub systems of panelStatistical analysis of various sub systems of panel
Statistical analysis of various sub systems of paneleSAT Publishing House
 

Similar to A Comparative Reliability Analysis of Bulldozers arriving at workshop in Eastern India: A Case Study. (20)

Application of Reliability Analysis for Predicting Failures in Cement Industry
Application of Reliability Analysis for Predicting Failures in Cement IndustryApplication of Reliability Analysis for Predicting Failures in Cement Industry
Application of Reliability Analysis for Predicting Failures in Cement Industry
 
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWSTUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
 
Published 1
Published 1Published 1
Published 1
 
K012556370
K012556370K012556370
K012556370
 
K012556370
K012556370K012556370
K012556370
 
Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...
 
Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
 
IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...
IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...
IRJET- Preventive Maintenance of Utility Equipments at MANMUL, Gejjalagere Ma...
 
Structural and Modal Analysis of Crane Hook with Different Materials using Fea
Structural and Modal Analysis of Crane Hook with Different Materials using FeaStructural and Modal Analysis of Crane Hook with Different Materials using Fea
Structural and Modal Analysis of Crane Hook with Different Materials using Fea
 
IRJET- Determination of Time Period and Evaluation of Seismic Response of...
IRJET-  	  Determination of Time Period and Evaluation of Seismic Response of...IRJET-  	  Determination of Time Period and Evaluation of Seismic Response of...
IRJET- Determination of Time Period and Evaluation of Seismic Response of...
 
PhD
PhDPhD
PhD
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
Non linear analysis and optimization of flywheel
Non linear analysis and optimization of flywheelNon linear analysis and optimization of flywheel
Non linear analysis and optimization of flywheel
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
 
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean PrinciplesIRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
IRJET-Productivity Improvement in a Pressure Vessel using Lean Principles
 
Performance of metaheuristic methods for loop
Performance of metaheuristic methods for loopPerformance of metaheuristic methods for loop
Performance of metaheuristic methods for loop
 
Suitability of Composite Material for Flywheel Analysis
Suitability of Composite Material for Flywheel Analysis Suitability of Composite Material for Flywheel Analysis
Suitability of Composite Material for Flywheel Analysis
 
Design out maintenance on frequent failure of motor ball bearings-2-3
Design out maintenance on frequent failure of motor ball bearings-2-3Design out maintenance on frequent failure of motor ball bearings-2-3
Design out maintenance on frequent failure of motor ball bearings-2-3
 
Statistical analysis of various sub systems of panel
Statistical analysis of various sub systems of panelStatistical analysis of various sub systems of panel
Statistical analysis of various sub systems of panel
 

More from IOSR Journals (20)

A011140104
A011140104A011140104
A011140104
 
M0111397100
M0111397100M0111397100
M0111397100
 
L011138596
L011138596L011138596
L011138596
 
K011138084
K011138084K011138084
K011138084
 
J011137479
J011137479J011137479
J011137479
 
I011136673
I011136673I011136673
I011136673
 
G011134454
G011134454G011134454
G011134454
 
H011135565
H011135565H011135565
H011135565
 
F011134043
F011134043F011134043
F011134043
 
E011133639
E011133639E011133639
E011133639
 
D011132635
D011132635D011132635
D011132635
 
C011131925
C011131925C011131925
C011131925
 
B011130918
B011130918B011130918
B011130918
 
A011130108
A011130108A011130108
A011130108
 
I011125160
I011125160I011125160
I011125160
 
H011124050
H011124050H011124050
H011124050
 
G011123539
G011123539G011123539
G011123539
 
F011123134
F011123134F011123134
F011123134
 
E011122530
E011122530E011122530
E011122530
 
D011121524
D011121524D011121524
D011121524
 

Recently uploaded

High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 

A Comparative Reliability Analysis of Bulldozers arriving at workshop in Eastern India: A Case Study.

  • 1. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 10, Issue 2 (Nov. - Dec. 2013), PP 47-52 www.iosrjournals.org www.iosrjournals.org 47 | Page A Comparative Reliability Analysis of Bulldozers arriving at workshop in Eastern India: A Case Study. 1 ChetanDeka, 2 Dr SomnathChattopadhaya, 1 (Maintenance Engineering and Tribology, Department of M echanical Engineering, ISM, Dhanbad) 2 (Department of Mechanical Engg and Mining Machinery Engineering, ISM, Dhanbad) ABSTRACT : Study of reliabilities of machinery used in any kind of production is of utmost necessity for optimum use of man power and resources to make the process cost effective and with minimum downtime. This is applicable for all large and small industries alike. But in small industries data is not accurately stored and it becomes difficult to estimate product reliabilities. This paper focuses on a case study to estimate the reliabilities of two competing machines, when the only available data is Time To Failure. The Weibull Parameters are calculated using Microsoft Excel 2010. The results show that after knowing the reliabilities of both the Bulldozers at different lengths of time, we can ascertain which of them is preferable to use at which time period. Keywords :Characteristic Life, Reliability, Shape parameter, Time To Failure, Weibull Distribution, I. Introduction Product Reliabilities have always been of utmost interest in any industry. But when it comes to obtaining the reliabilities of two or more products used in the same industry for the very same purpose, its impact can be viewed on both the manpower management and economic aspect of the firm. This paper addresses the reliability of Bulldozers which come for Survey off Grounding at a workshop in Eastern India. Bulldozers are the one of the most widely used mining machines used to move large quantity of materials. Reliability analysis helps us to ascertain maintenance intervals [1], and with correct decision making, maybe even increase the length of the intervals and thus decrease maintenance costs. This has fueled many studies to be performed in the field of reliability analysis of mining equipment [2-7]. In the inspiring work of Barabady, J; 2005 [7], the Time between Failures (TBF) data was used and it was possible to estimate the failure patterns and hence decision making regarding timed and economic scheduling of maintenance activities. Again in [1] the authors continued their work beautifully to include the TBF and Time to Repair (TTR) data to perform an elaborate case study and hence calculate the reliability and availability characteristics. However in an industry or firm where data are not systematically stored but only some raw uncensored data like overall Time To Failure (TTF) is available it is much easier to go for a simple method to calculate reliability of the competing machines(in this case, two Bulldozers- Type-I and Type-II). The main objectives of this paper are-  To calculate the Weibull Parameters- Shape Parameter β , Characteristic Life α ; and interpret the results with the corresponding Bathtub Curves. Thus a complete Weibull analysis.  To estimate the reliabilities of the Type-I and Type-II Bulldozers and compare these at the end of different time intervals. II. Approach and Methodology The formula for Reliability assuming a Two Parameter Weibull Distribution is 𝑅 𝑥 = 𝑒 − 𝑥 𝛼 𝛽 where βis the Shape Parameter,α is the Characteristic Life and xis the Time to Failure The most important process is the analysis and computation of collected data. We calculate the Median Rank and the transformed median rank and so on. By performing a simple linear regression we can obtain parameter estimates that will help us to infer the reliabilities of the concerned machinery; and thus are able to compare them. III. Case Study We calculate and compare the reliabilities after different time intervals of the two main types of Bulldozers arriving at the workshop. The Bulldozers, Type-I&Type-II are used in various mine fields for movement of large quantities of materials. The Bulldozers that have been considered in this paper have been previously been remade (repaired) at the workshop before being sent to the mine field. Since not much systematized and well stored data was to be found, the TTF of 10 Bulldozers, from the 1st quarter of 2013, each of Type-I and Type- IIare considered, each having the same characteristics- a) Workshop remade and b) not usable any longer.
  • 2. A Comparative Reliability Analysis Of Bulldozers arriving at workshop in Eastern India: A Case www.iosrjournals.org 48 | Page Similar considerations have been applied and similar characteristics have been considered while treating the data of Dumpers as well. The beauty of this wonderfully detailed method by William M. Dorner [8], is that it is very simple and easy to compute, and most importantly it gives a fair idea of the product reliabilities at the end. 3.1 Data Collection The different failure data of Bulldozers were collected for a period of three months (January, February and March) and ten of them have been considered amongst the ones which were Workshop remade and brought for Survey off Grounding, to maintain uniformity and soundness in this study. Table-1 TTF of Type-I andType-II Bulldozers 3.2 Data Analysis 3.2.1 Data Preparation and Computation Two basic steps have been performed-  We have prepared a different table for each of CAT and KOM Bulldozers, and arranged the data in ascending order, ranking them in the process.  The median ranks are then approximated using Bernard’s Approximation: - F(t)= 𝑖−0.3 𝑛+0.4 where‘i’ is thecorresponding rank of the data and ‘n’ is the total number of samples (in this case 10). Some corresponding values which are calculated using the median rank are tabulated alongside. Table-2 Type-I Type-I No. Of Hours Run Rank Median Rank 1/(1-Median Rank) ln(ln(1/(1-Median Rank))) ln(No. Of Hours Run) 30 1 0.067 1.072 -2.663 3.401 1110 2 0.163 1.195 -1.723 7.012 2294 3 0.259 1.350 -1.202 7.738 4575 4 0.355 1.552 -0.821 8.428 13900 5 0.451 1.824 -0.508 9.539 13925 6 0.548 2.212 -0.230 9.541 15400 7 0.644 2.810 0.032 9.642 15811 8 0.740 3.851 0.299 9.668 16564 9 0.836 6.117 0.593 9.714 19120 10 0.932 14.857 0.992 9.858 Serial No. Type-I No. of Hours Run Type-II No. of Hours Run 1 15811 7895 2 2294 11534 3 16564 4035 4 19120 7402 5 13900 6887 6 30 2986 7 13925 685 8 1110 487 9 4575 5975 10 15400 5002
  • 3. A Comparative Reliability Analysis Of Bulldozers arriving at workshop in Eastern India: A Case www.iosrjournals.org 49 | Page Table-3 Type-II Type-II No. Of Hours Run Rank Median Rank 1/(1-Median Rank) ln(ln(1/(1-Median Rank))) ln(No. Of Hours Run) 487 1 0.067 1.072 -2.663 6.188 685 2 0.163 1.195 -1.723 6.529 2986 3 0.259 1.350 -1.202 8.001 4035 4 0.355 1.552 -0.821 8.302 5002 5 0.451 1.824 -0.508 8.517 5975 6 0.548 2.212 -0.230 8.695 6887 7 0.644 2.810 0.032 8.837 7402 8 0.740 3.851 0.299 8.909 7895 9 0.836 6.117 0.593 8.973 11534 10 0.932 14.857 0.992 9.353 3.2.2 Estimating the Weibull Parameters and Fitting a line to the data As previously stated we will be using a Two-Parameter Weibull Distribution to calculate the required reliabilities. Using the Regression function in Microsoft Excel software, the values are examined and the Weibull Parameters are estimated. We also plot a graph between ln(No. Of Hours) versus Transformed Median for both sets of data and the slope of the graph directly gives us the Shape Parameter. Table-4 SUMMARY OUTPUT Type I Regression Statistics Multiple R 0.913 R Square 0.834 Adjusted R Square 0.813 Standard Error 0.481 Observations 10 ANOVA df SS MS F Significance F Regression 1 9.338 9.338 40.358 0.0002 Residual 8 1.851 0.231 Total 9 11.189 Coefficients Standard Error t Stat P-value Lower 95% Upper 95% Lower 95.0% Upper 95.0% Intercept -4.774 0.686 -6.957 0.0001 -6.356 -3.191 -6.356 -3.191 ln(No. Of Hours Run) 0.502 0.079 6.352 0.0002 0.3203 0.685 0.320 0.685 β = 0.502 α= 13290.47 Fig.1 Fitting a line to the data of Type-I
  • 4. A Comparative Reliability Analysis Of Bulldozers arriving at workshop in Eastern India: A Case www.iosrjournals.org 50 | Page Table-5 SUMMARY OUTPUT Type II Regression Statistics Multiple R 0.953 R Square 0.908 Adjusted R Square 0.897 Standard Error 0.357 Observations 10 ANOVA df SS MS F Significance F Regression 1 10.168 10.168 79.619 1.97E-05 Residual 8 1.021 0.127 Total 9 11.189 Coefficients Standard Error t Stat P-value Lower 95% Upper 95% Lower 95.0% Upper 95.0% Intercept -8.796 0.934 -9.417 0.00011 -6.642 -6.642 -10.951 -6.642 ln(No. Of Hours Run) 1.005 0.112 8.922 0.000219933 1.265 1.265 0.745 1.265 β = 1.005 α= 6318.88 Fig.2 Fitting a line to the data of Type-II Fig. 3 Graph for Failure Rate vs Time for Type-I Bulldozer(Infant Mortality Rate)
  • 5. A Comparative Reliability Analysis Of Bulldozers arriving at workshop in Eastern India: A Case www.iosrjournals.org 51 | Page Fig. 4 Graph for Failure rate vs Time for Type-II(Constant Failure Rate) We have computed β(Shape Parameter) and α(Characteristic Life) for both sets of data. The corresponding failure rates are also plotted against time. IV. Results and Discussion The reliabilities of the Bulldozers and Dumpers are calculated and a graph is plotted between them to give us a comparative overview among each of their types. No. Of Hours Type-I Type-II 0 1.00 1.00 1000 0.76 0.85 2000 0.68 0.73 3000 0.62 0.62 4000 0.58 0.53 5000 0.54 0.45 6000 0.51 0.39 7000 0.48 0.33 8000 0.46 0.28 9000 0.44 0.24 10000 0.42 0.20 11000 0.40 0.17 12000 0.39 0.15 13000 0.37 0.13 14000 0.36 0.11 15000 0.35 0.09 16000 0.33 0.08 17000 0.32 0.07 18000 0.31 0.06 19000 0.30 0.05 20000 0.29 0.04 21000 0.28 0.04 22000 0.28 0.03 23000 0.27 0.03 24000 0.26 0.02 25000 0.25 0.02 26000 0.25 0.02 27000 0.24 0.01 28000 0.23 0.01 29000 0.23 0.00 30000 0.22 0.00 Table-6 Reliability Comparisons
  • 6. A Comparative Reliability Analysis Of Bulldozers arriving at workshop in Eastern India: A Case www.iosrjournals.org 52 | Page Fig. 5- Graph showing the reliability comparisons of Bulldozers We have calculated the values of Shape Parameter (β) and Characteristic Life (α) for both the Type-I and Type- II Bulldozers. β< 1 gives us a fair idea that most of the products in question has a decreasing failure rate. It is safe to say that the Type-I Bulldozers fail during its ‘Burn-In’ period. β> 1 indicates failure rate increases as time passes by. Since the value is only slightly greater than 1 (1.005 to be precise) the increase in failure rate is very slow for the Type-II Bulldozers. In fact one can say the failure rate is almost constant. α = 13290.47 indicates that about 37% of the Type-I Bulldozers will survive at least 13290.47 hours. α = 6318.88 indicates that about 37% of the Type-II Bulldozers will survive at least 6318.88 hours. The results shown in Table-6 as well as in Fig. 5 give us a clear of the reliabilities of the two types of Bulldozers. At less than 3000 hours Type-II Bulldozers have a greater reliability but after 3000 hours it is quite clear that the Type-I Bulldozers have a greater reliability. V. Conclusion From this study one can observe that that even when there is very little data to work with, we can still get a measure of the reliability of any equipment This case study shows that between the Type-I and Type-II Bulldozers, the former one is to be preferred when usage is more than 3000 hours, while the later one is to be preferred when expected usage is less than 3000 hours. We can definitively conclude that equipment reliability can be properly stated only with respect to its time of usage. This will help us decrease the number of breakdowns significantly. It is often seen that that the Time To Failure data that fits a Weibull Distribution also fits a lognormal distribution [9]. Thus there is further scope of using a Lognormal Distribution in reliability analysis and comparing it with Weibull Distribution based on this type of data. Further we can also go for a availability and maintainability analysis. References [1] Barabady J, Kumar U. Reliability Analysis of mining equipment: A case study of a crushing plant at Jajaram Bauxite Mine in Iran [2] Kumar U, Klefsjo¨B, Granholm S. Reliability investigation for a fleet of load-haul-dump machines in a Swedish mine. ReliabEng System Saf 1989;26(4). [3] Kumar U, Klefsjo¨B. Reliability analysis of hydraulic system of LHD machine using the power low process model. ReliabEng System Saf 1992;35(3):217–24.. [4] Samanta B, Sarkar B, Mukherjee SK. Reliability modeling and performance analyses of an LHD system in mining. J S AfrInst Mining Metall 2004;104(1):1–8. [5] Mandal SK. Evaluation of reliability index of longwall equipment systems for production contingency. Min Technol 1996;78(897):138–40 [6] Kumar U, Huang Y. Reliability analysis of a mine production system: a case study. In: Proceedings of the annual reliability and maintainability symposium, USA, 1993 p. 167–72. [7] Barabady J. Reliability and maintainability analysis of crushing plants in Jajarm Bauxite Mine of Iran. In: Proceedings of the annual reliability and maintainability symposium, USA, 2005 p. 109–15. [8] Dorner, William W. Using Microsoft Excel for Weibull Analysis. Quality Digest, 01/01/1999. [9] Ebeling, C.E. An introduction to reliability and maintainability engineering. New York: McGraw-Hill 1997.