SlideShare a Scribd company logo
1 of 42
Anshu Chauhan
MS – Textile Dyeing & Finishing, Wuhan
Textile University (China)
Asst. Manager
(Marketing & Technical Services)
Colorant Limited
11th Sep,2015
Lean Management Concepts In Textiles
Contents
1. Lean Management: Introduction
2. Wastes & Its Types
3. Principles of Lean
4. Lean Tools
5. How to LEAN
6. LEAN Pros and Cons
7. Implementation in Textile industry
8. Conclusion
Lean Management: Introduction
A systematic approach in
identifying
and
eliminating waste,
or
non-value added-activities
through
continuous improvement
By
making products through
improved speed & flexibility
with
best quality & lowest cost
What is LEAN?
Value
Value - A capability provided to a customer at the
right time at an appropriate price, as defined by
the customer.
Value Add
- Anything that changes shape, form or function of a
product, sub-assembly, information or service into
something that the customer is willing to pay for.
Non Value Add
- Any activity that absorbs or consumes resources
without creating value.
Type 1 – can be eliminated immediately
Type 2 – due to current state, cannot yet be eliminated
Note: Usually 95% of the total processing time is Non
Value Add.
Wastes & Its Types
Waste
“Anything that adds
Cost
to the product
without adding
Value”
The 7 Wastes Of Manufacturing
Overproduction
Waiting
Inventory
Transportation
Motion
Over Processing
Rework
1
6
7
5 4
3
2
* One more added recently “Underutilization of people”
The 7 Wastes Of Manufacturing
Waste
Types
Causes Example Symptom
Over
production
Producing more
product than needed
Extent of warehouse space needed and used, Large engineering
costs/time associated with facility modifications
Inventory Any supply in excess
to produce product
Large buffer stocks within a manufacturing facility and also large
warehousing on the site; financially seen as a huge use of working
capital
Waiting Idle Operator or
machine time
Large amount of ‘work in progress’ held up in the manufacturing
process—often seen on the balance sheet and as ‘piles of inventory’
around the site
Motion Movement of people
or machine which
does not add value
Large teams of operators moving to and from the manufacturing unit
but less activity actually within the unit, Data entry being seen as a
problem within MRP systems
Transporta
tion
Any material
movement that
doesn’t support Value
added operation
Movement of pallets of intermediate product around a site or between
sites, Large warehousing and continual movement of intermediate
material on and off site rather than final product
Defects Making defective parts Missed or late orders, excessive overtime, increased operating costs
Extra
Processing
Any process that does
not add value to the
product
Reaction stage is typically complete within minutes yet we continue to
process for hours or days, We have in process controls which never
show a failure, delay of documents to accompany finished product
Understanding Waste
What would you be willing to pay for when ordering a hamburger?
___ Meat
___ Dough
___ Ketchup
___ Electricity to run ovens
___ Electricity to run outdoor
lights left on accidentally
___ Person paid to inspect take-
out orders
___ Cost of hamburgers not
sold
___ Distribution Center
___ Cost of radio, TV, web
ads
___ Cost of delivery truck
signs
___ Cost of store manager
___ Cost of cleaning
___ Cost of menus
___ Employee training
___ Profit
Principles of LEAN
Principles of Lean
1
2
3
4
5
 Specify value :
Specify value from the standpoint of the end
customer by product family.
 Identify the value stream :
Identify all the steps in the value stream for each
product family, eliminating whenever possible
those steps that do not create value.
 Create flow :
Make the value-creating steps occur in tight
sequence so the product will flow smoothly
toward the customer.
 Let the customer pull product through the value
stream:
Make only what the customer has ordered.
Cost Reduction Principle
 Traditional thinking dictates that you set your selling price by calculating
your cost and adding on a margin for profit
 In today’s competitive market the customer sets the price and you don’t
have the luxury of adding a profit margin
 The only way to remain profitable and grow your business is to eliminate
waste from your value stream, thereby reducing costs—cost reduction
principle
 Determine the price customers are willing to pay, and subtract your cost to
determine what your profit will be
 Eliminating waste is important because customers not only set the price, but
they also demand price reductions
Cost Reduction Principle
Price
Price
Traditional Thinking
Cost + profit = price
Cost
Profit
Price Price
Lean Thinking
Price – cost = profit
Lean Manufacturing Tools
Lean Manufacturing Tools
Tools Remarks
Standardized work Jobs are broken down into elements and examined to determine best and safest
method for each.
Workplace
Organisation (5S
concept)
Sort, Set-in-order, Shine, Standardize, Sustain
Visual Factory Information is made available ad understandable at a glance
Point-of-use-storage
(POUS)
Locate all parts, raw materials, tools and fixtures as close as possible
Quality at source Error proofing devices are used
Kanban An information system that controls required parts in required quantities at the
required time
One Piece Flow To minimize work in process, operators focus on completing one part through
operation before focusing on other
Total Productive
Maintenance
Consists of a company wide equipment maintenance program that covers the
equipment life cycle and requires participation by everyone
Value Stream
Mapping (VSM)
VSM is a method of visually mapping a product’s production path including material
and information flow, from dock to stock.
TAKT Time TAKT is the rate at which a customer requires the product and is computed as
TAKT time= (Available work time/Customer demand/day)
How to LEAN
How To “LEAN”
HOW TO MAKE LEAN
SUSTAINABLE ?
LEAN SYSTEM = Rules + Tools
LEAN = RULES NOT JUST TOOLS
LEAN STARTS WITH RULES NOT TOOLS
THE FOUR RULES
 Structure every activity
 Clearly connect each customer and supplier
 Specify and simplify every flow
 Improve through experimentation at the lowest
level possible - towards the ideal state
Rule 1 - Structure every activity
Lean Is A System Not An Event
Standardize everything that is done
Make it a way of life not a “flavor of the month”
Rule 2 – Clearly connect each
Customer and Supplier
 Internal – Each operation is the previous operation’s
customer
 External – Outside supplier base
LEAN = RULES NOT JUST TOOLS
Rule 3 – Specify and simplify every flow
 Product
 Material
 Information
Rule 4 – Improve Through Experimentation At The
Lowest Level Possible Towards The Ideal State
 See every problem as an opportunity to focus and move toward the ideal
state
 Decision making at the point of activity
LEAN = RULES NOT JUST TOOLS
Lean Pros And Cons
Forces Opposing and Driving A Change To ‘Lean’
LEAN and Profitability
Benefits of Being “LEAN”
Decreased lead times
for customers
Reduced inventories
for manufacturers
Improved knowledge
management
More robust processes
(as measured by less
errors and
therefore less rework).
Less Process Wastes Financial Savings
Lean In Textiles
Decisions—Decisions—Decisions
 Is my company too small for Lean Process Improvement?
 Isn’t Lean a manufacturing process? I am a service business.
 Can I afford to implement Lean Process Improvement?
All of these industries
have successfully
applied Lean to their
processes
How Chemical Processing Industry Can Benefit From
Lean Implementation
• Electronic Quality Management System: reduce the time, effort and cost of achieving
compliance to customer or industry requirements.
• Critical documents such as Material Safety Data Sheets (MSDS), always of the
correct revision level, are available in real-time to process personnel to prevent waste
and non-compliance due to procedural errors and their associated time delay.
• Quality improvement and waste reduction opportunities, identified via audits,
feedback from customers or process personnel, and results of process control
strategies are promptly identified
Quality
Management
• . A properly designed and implemented Six Sigma effort will integrate prioritization
and deployment of improvement opportunities and strategic business development
issues into the middle to upper levels of management, where they are inherently
aligned with the strategic business objectives.
• The Six Sigma approach for resource allocation, coupled with the DMAIC/DMADV
project methodology, builds buy-in within the key stakeholder groups, reducing the
time, effort and cost associated with achieving Quality System compliance, business
development and business performance improvements.
Six Sigma
Design &
Process
Improvement
• Statistical Process Control (SPC): provides rapid yet advanced real-time analysis of
process data, including: alerts to online and offline users; customized reporting,
including automated Certificates of Analysis, through Excel, Word templates, or a
secure access-controlled web interface for remote management, field operatives or
customers; and integration with process documentation and instructions.
Process
Capability,
validation And
Control
Implementation In Chemical Processing
 Availability of raw materials ( backward integration of process)
 To develop multi function workers so that labour requirement could be
trimmed and streamlined to avoid shortage of skilled manpower.
 Now companies are focusing more in keeping less inventory and developing
good vendor relations to minimize cost of production
 Reduction of waste is already in practice in chemical industries
 Escalation of cost due to excessive waste generation due to non organised
workplace
 Non Optimal plant layout
 High Work in Progress (WIP)
 Non availability of necessary spares and other accessories.
Problem Statement: Example
ABC Mill is facing problems in the areas of Visual Management, Waste
Management and Quality Aspects ultimately resulting in increased costs and
reduced profits.
Visual Management
ISSUES
1. Absence of proper identification and storage of materials.
PROBABLE SOLUTIONS
 Employing location labeling for
identification and storage.
 Material Identification
(colour) codes.
 Floor marking tapes
showing walkways and
restricted areas.
• Floor marking tapes
showing specific storage
areas.
2. Absence of an Organized and Structured work environment.
PROBABLE SOLUTIONS
 Systematic Cleaning
and Painting
Schedule.
 Introduction of 5S.
 Visual Displays:
 Recognizing performances of
employees.
 Visual Control:
 Signs such as Warning,
Danger signs, Safety
signs, etc
Reducing Textile Cutting waste
• Optimum, uniform width
• Maximum practical length
• Minimum defects
• Protective packaging, with clean, increased ends at beginning and end of roll
• Minimum shade variation
• Convert scrap fabric into yardage.
Conclusion
 Lean is a proven, company-wide systematic approach to
eliminate/minimize waste resulting in the production of a “good” or
“service” at the lowest possible cost
 It is not just a manufacturing program confined to shop floor employees
 Lean is every system, every process, and every employee within the
organization
Thank You

More Related Content

What's hot

Fabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysisFabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysisRumman Samrat
 
Kaizen presentation for garments
Kaizen presentation for garmentsKaizen presentation for garments
Kaizen presentation for garmentsKhalid Mehmood
 
Apparel Merchandising and Lean Manufacturing
Apparel Merchandising and Lean Manufacturing Apparel Merchandising and Lean Manufacturing
Apparel Merchandising and Lean Manufacturing SundasKhan23
 
Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.Sharif Bhuiyan
 
Fabric inspection-system
Fabric inspection-systemFabric inspection-system
Fabric inspection-systemMuhib Limon
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Mazedul Islam Soyeb
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and qualityMd. Mazadul Hasan Shishir
 
Waste Management in Garment Industries
Waste Management in Garment IndustriesWaste Management in Garment Industries
Waste Management in Garment IndustriesShubha Brota Raha
 
Value stream mapping in ethiopian garemnt industry
Value stream mapping in ethiopian garemnt industryValue stream mapping in ethiopian garemnt industry
Value stream mapping in ethiopian garemnt industrykibrom G
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshAriful Islam
 
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceStandard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceMazharul Islam
 
SOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSSOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSRabiul Hasan
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLDisha Pawar
 
How calculate Man to Machine Ratio in Garments Industries
How calculate Man to Machine Ratio in Garments IndustriesHow calculate Man to Machine Ratio in Garments Industries
How calculate Man to Machine Ratio in Garments IndustriesMozahidul Islam
 

What's hot (20)

Garment costing ppt
Garment costing pptGarment costing ppt
Garment costing ppt
 
Fabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysisFabric wastage and sewing fault analysis
Fabric wastage and sewing fault analysis
 
Kaizen presentation for garments
Kaizen presentation for garmentsKaizen presentation for garments
Kaizen presentation for garments
 
Wastage
Wastage Wastage
Wastage
 
Apparel Merchandising and Lean Manufacturing
Apparel Merchandising and Lean Manufacturing Apparel Merchandising and Lean Manufacturing
Apparel Merchandising and Lean Manufacturing
 
Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.Modern Quality Management System in Apparel Industries.
Modern Quality Management System in Apparel Industries.
 
Fabric inspection-system
Fabric inspection-systemFabric inspection-system
Fabric inspection-system
 
Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...Increasing the productivity and efficiency of a sewing line in an apparel man...
Increasing the productivity and efficiency of a sewing line in an apparel man...
 
Effect of work study & time study on production and quality
Effect of work study & time study on production and qualityEffect of work study & time study on production and quality
Effect of work study & time study on production and quality
 
Waste Management in Garment Industries
Waste Management in Garment IndustriesWaste Management in Garment Industries
Waste Management in Garment Industries
 
Value stream mapping in ethiopian garemnt industry
Value stream mapping in ethiopian garemnt industryValue stream mapping in ethiopian garemnt industry
Value stream mapping in ethiopian garemnt industry
 
Quality control
Quality controlQuality control
Quality control
 
Roll of IE in Garments in Bangladesh
Roll of IE in Garments in BangladeshRoll of IE in Garments in Bangladesh
Roll of IE in Garments in Bangladesh
 
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceStandard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
 
How can we use Supply Chain Management in Garments Industry.
 How can we use Supply Chain Management in Garments Industry. How can we use Supply Chain Management in Garments Industry.
How can we use Supply Chain Management in Garments Industry.
 
SOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLSSOP of Seven Zero System or Traffic Light System । TLS
SOP of Seven Zero System or Traffic Light System । TLS
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
How calculate Man to Machine Ratio in Garments Industries
How calculate Man to Machine Ratio in Garments IndustriesHow calculate Man to Machine Ratio in Garments Industries
How calculate Man to Machine Ratio in Garments Industries
 
Garment production systems
Garment production systemsGarment production systems
Garment production systems
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 

Viewers also liked

Lead time reduction in textile industry
Lead time reduction in textile industryLead time reduction in textile industry
Lead time reduction in textile industryAravind Balaji
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by LeanANITHA BALA
 
Indian Textile Industry
Indian Textile IndustryIndian Textile Industry
Indian Textile IndustryAnuj Diwakar
 
Betta or fighter fish ppt
Betta or fighter fish ppt Betta or fighter fish ppt
Betta or fighter fish ppt Chhaditya parikh
 
Presentation On Aarti International Ltd
Presentation On Aarti International LtdPresentation On Aarti International Ltd
Presentation On Aarti International Ltdsahil
 
Introduction to the advanced persistent threat and hactivism
Introduction to the advanced persistent threat and hactivismIntroduction to the advanced persistent threat and hactivism
Introduction to the advanced persistent threat and hactivismGlobal Micro Solutions
 
Textile quality control bangladesh
Textile quality control bangladeshTextile quality control bangladesh
Textile quality control bangladeshClive12
 
Who moved.my.cheese
Who moved.my.cheeseWho moved.my.cheese
Who moved.my.cheeseVinod Mehra
 
De escalation techniques in relationship
De escalation techniques in relationshipDe escalation techniques in relationship
De escalation techniques in relationshipMoshe Ratson
 
Final presentation on energy conservation in textile industry
Final presentation on energy conservation in textile industryFinal presentation on energy conservation in textile industry
Final presentation on energy conservation in textile industryICT COLLEGE (FORMELY UDCT),MUMBAI
 
Planning, Optimization and Lead time reduction by Localization of an Enterpri...
Planning, Optimization and Lead time reduction by Localization of an Enterpri...Planning, Optimization and Lead time reduction by Localization of an Enterpri...
Planning, Optimization and Lead time reduction by Localization of an Enterpri...Tasmiah Zilani
 
Using Advanced Threat Analytics to Prevent Privilege Escalation Attacks
Using Advanced Threat Analytics to Prevent Privilege Escalation AttacksUsing Advanced Threat Analytics to Prevent Privilege Escalation Attacks
Using Advanced Threat Analytics to Prevent Privilege Escalation AttacksBeyondTrust
 
Department:textile engineering, City University Bangladesh, topic: Geo textile
Department:textile engineering, City University Bangladesh, topic: Geo textileDepartment:textile engineering, City University Bangladesh, topic: Geo textile
Department:textile engineering, City University Bangladesh, topic: Geo textileAnik Deb
 
6 sigma assignment
6 sigma assignment6 sigma assignment
6 sigma assignmentstudent
 

Viewers also liked (20)

raj Textile project
raj Textile projectraj Textile project
raj Textile project
 
Lead time reduction in textile industry
Lead time reduction in textile industryLead time reduction in textile industry
Lead time reduction in textile industry
 
Improving Productivity by Lean
Improving Productivity by LeanImproving Productivity by Lean
Improving Productivity by Lean
 
Lean ppt
Lean pptLean ppt
Lean ppt
 
Indian Textile Industry
Indian Textile IndustryIndian Textile Industry
Indian Textile Industry
 
Erp
ErpErp
Erp
 
OMELET
OMELETOMELET
OMELET
 
Betta or fighter fish ppt
Betta or fighter fish ppt Betta or fighter fish ppt
Betta or fighter fish ppt
 
Presentation On Aarti International Ltd
Presentation On Aarti International LtdPresentation On Aarti International Ltd
Presentation On Aarti International Ltd
 
Introduction to the advanced persistent threat and hactivism
Introduction to the advanced persistent threat and hactivismIntroduction to the advanced persistent threat and hactivism
Introduction to the advanced persistent threat and hactivism
 
Textile quality control bangladesh
Textile quality control bangladeshTextile quality control bangladesh
Textile quality control bangladesh
 
Pacific World: Connecting you to a world of flavours!
Pacific World: Connecting you to a world of flavours!Pacific World: Connecting you to a world of flavours!
Pacific World: Connecting you to a world of flavours!
 
Who moved.my.cheese
Who moved.my.cheeseWho moved.my.cheese
Who moved.my.cheese
 
De escalation techniques in relationship
De escalation techniques in relationshipDe escalation techniques in relationship
De escalation techniques in relationship
 
Final presentation on energy conservation in textile industry
Final presentation on energy conservation in textile industryFinal presentation on energy conservation in textile industry
Final presentation on energy conservation in textile industry
 
Planning, Optimization and Lead time reduction by Localization of an Enterpri...
Planning, Optimization and Lead time reduction by Localization of an Enterpri...Planning, Optimization and Lead time reduction by Localization of an Enterpri...
Planning, Optimization and Lead time reduction by Localization of an Enterpri...
 
Using Advanced Threat Analytics to Prevent Privilege Escalation Attacks
Using Advanced Threat Analytics to Prevent Privilege Escalation AttacksUsing Advanced Threat Analytics to Prevent Privilege Escalation Attacks
Using Advanced Threat Analytics to Prevent Privilege Escalation Attacks
 
Department:textile engineering, City University Bangladesh, topic: Geo textile
Department:textile engineering, City University Bangladesh, topic: Geo textileDepartment:textile engineering, City University Bangladesh, topic: Geo textile
Department:textile engineering, City University Bangladesh, topic: Geo textile
 
6 sigma assignment
6 sigma assignment6 sigma assignment
6 sigma assignment
 
Textile Brochure
Textile BrochureTextile Brochure
Textile Brochure
 

Similar to Lean management in textile processing

Lean Fundamentals And Line Design 06 04 01
Lean  Fundamentals And  Line  Design 06 04 01Lean  Fundamentals And  Line  Design 06 04 01
Lean Fundamentals And Line Design 06 04 01Dan Junkins
 
Modern Facility Management
Modern Facility ManagementModern Facility Management
Modern Facility ManagementAdy Sadek E.
 
Developing A Continuous Improvement Environment August 2009
Developing A Continuous Improvement Environment   August 2009Developing A Continuous Improvement Environment   August 2009
Developing A Continuous Improvement Environment August 2009Harvey_Schiller
 
Awareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsAwareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsNilesh Sawant
 
Alternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionAlternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionHarold Philbrick
 
QUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerQUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerSamantha Abalos
 
Morrisons session 3
Morrisons session 3Morrisons session 3
Morrisons session 3philg2
 
Process Approach in Total Quality Management
Process Approach in Total Quality ManagementProcess Approach in Total Quality Management
Process Approach in Total Quality ManagementJess Henson
 
Integrated Logistics Management
Integrated Logistics ManagementIntegrated Logistics Management
Integrated Logistics ManagementMD SALMAN ANJUM
 
Process design focuses on.pdf
 Process design focuses on.pdf Process design focuses on.pdf
Process design focuses on.pdfaludin007
 
Unit 5 E-BUSINESS OPERATIONS AND PROCESSES
Unit 5 E-BUSINESS OPERATIONS AND PROCESSESUnit 5 E-BUSINESS OPERATIONS AND PROCESSES
Unit 5 E-BUSINESS OPERATIONS AND PROCESSESNishant Pahad
 

Similar to Lean management in textile processing (20)

Lean Fundamentals And Line Design 06 04 01
Lean  Fundamentals And  Line  Design 06 04 01Lean  Fundamentals And  Line  Design 06 04 01
Lean Fundamentals And Line Design 06 04 01
 
Modern Facility Management
Modern Facility ManagementModern Facility Management
Modern Facility Management
 
Hourly Lean Introduction
Hourly Lean IntroductionHourly Lean Introduction
Hourly Lean Introduction
 
3 lean thinking & jit
3 lean thinking & jit3 lean thinking & jit
3 lean thinking & jit
 
Quality manegment
Quality manegmentQuality manegment
Quality manegment
 
Developing A Continuous Improvement Environment August 2009
Developing A Continuous Improvement Environment   August 2009Developing A Continuous Improvement Environment   August 2009
Developing A Continuous Improvement Environment August 2009
 
Awareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc ToolsAwareness To Lean & 7 Qc Tools
Awareness To Lean & 7 Qc Tools
 
Alternate Hourly Lean Introduction
Alternate Hourly Lean IntroductionAlternate Hourly Lean Introduction
Alternate Hourly Lean Introduction
 
lean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptxlean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptx
 
lean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptxlean-091119135641-phpapp01.pptx
lean-091119135641-phpapp01.pptx
 
General Lean approach
General Lean approachGeneral Lean approach
General Lean approach
 
QUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 ReviewerQUALMAN QUIZ # 1 Reviewer
QUALMAN QUIZ # 1 Reviewer
 
Morrisons session 3
Morrisons session 3Morrisons session 3
Morrisons session 3
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Process Approach in Total Quality Management
Process Approach in Total Quality ManagementProcess Approach in Total Quality Management
Process Approach in Total Quality Management
 
Integrated Logistics Management
Integrated Logistics ManagementIntegrated Logistics Management
Integrated Logistics Management
 
Lean management
Lean managementLean management
Lean management
 
Process design focuses on.pdf
 Process design focuses on.pdf Process design focuses on.pdf
Process design focuses on.pdf
 
Unit 5 E-BUSINESS OPERATIONS AND PROCESSES
Unit 5 E-BUSINESS OPERATIONS AND PROCESSESUnit 5 E-BUSINESS OPERATIONS AND PROCESSES
Unit 5 E-BUSINESS OPERATIONS AND PROCESSES
 
The Process Of Bpm
The Process Of BpmThe Process Of Bpm
The Process Of Bpm
 

More from IEI GSC

DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...
DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...
DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...IEI GSC
 
Flexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsFlexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsIEI GSC
 
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...IEI GSC
 
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONS
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONSCOMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONS
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONSIEI GSC
 
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...IEI GSC
 
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRC
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRCENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRC
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRCIEI GSC
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusIEI GSC
 
Evaluation of durability properties of recycled aggregate concrete incorporat...
Evaluation of durability properties of recycled aggregate concrete incorporat...Evaluation of durability properties of recycled aggregate concrete incorporat...
Evaluation of durability properties of recycled aggregate concrete incorporat...IEI GSC
 
Precast infastructure
Precast infastructurePrecast infastructure
Precast infastructureIEI GSC
 
Advances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forwardAdvances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forwardIEI GSC
 
Effect of Waste Foundry Sand on Durability Properties of Concrete
Effect of Waste Foundry Sand on Durability Properties of ConcreteEffect of Waste Foundry Sand on Durability Properties of Concrete
Effect of Waste Foundry Sand on Durability Properties of ConcreteIEI GSC
 
Flexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsFlexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsIEI GSC
 
Future of civil engineering
Future of civil engineering Future of civil engineering
Future of civil engineering IEI GSC
 
Dr. Jaikrishna Memorial Lecture on Evolution of Bridges
Dr. Jaikrishna Memorial Lecture on Evolution of BridgesDr. Jaikrishna Memorial Lecture on Evolution of Bridges
Dr. Jaikrishna Memorial Lecture on Evolution of BridgesIEI GSC
 
Structural Safety in India
Structural Safety in India Structural Safety in India
Structural Safety in India IEI GSC
 
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGIONGEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGIONIEI GSC
 
Use of GeoTextiles in Civil Engineering : Work on NH 150, Manipur
Use of GeoTextiles in Civil Engineering : Work on NH 150, ManipurUse of GeoTextiles in Civil Engineering : Work on NH 150, Manipur
Use of GeoTextiles in Civil Engineering : Work on NH 150, ManipurIEI GSC
 
Textiles & GeoTextile Composites
Textiles & GeoTextile CompositesTextiles & GeoTextile Composites
Textiles & GeoTextile CompositesIEI GSC
 
Presentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalPresentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalIEI GSC
 
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...IEI GSC
 

More from IEI GSC (20)

DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...
DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...
DIAGNOSTIC ANALYSIS OF DISTRESSED HYDRAULIC STRUCTURES: CASE STUDIES OF GUJAR...
 
Flexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsFlexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beams
 
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...
MIXTURE DESIGN OF FLY ASH & SLAG BASED ALKALI ACTIVATED CONCRETE FOR PRECAST ...
 
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONS
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONSCOMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONS
COMPARATIVE STUDY OF OUTRIGGER STRUCTURE WITH DIFFERENT CONFIGURATIONS
 
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...
Laboratory Investigation on the Mechanical Behavior of Concrete Containing St...
 
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRC
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRCENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRC
ENHANCEMENT OF SEISMIC PERFORMANCE OF STRUCTURES USING HyFRC
 
Prefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed ImpetusPrefabricated construction systems in India- Precast Status and needed Impetus
Prefabricated construction systems in India- Precast Status and needed Impetus
 
Evaluation of durability properties of recycled aggregate concrete incorporat...
Evaluation of durability properties of recycled aggregate concrete incorporat...Evaluation of durability properties of recycled aggregate concrete incorporat...
Evaluation of durability properties of recycled aggregate concrete incorporat...
 
Precast infastructure
Precast infastructurePrecast infastructure
Precast infastructure
 
Advances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forwardAdvances in Hydraulic Structures, Rubber Dam-A way forward
Advances in Hydraulic Structures, Rubber Dam-A way forward
 
Effect of Waste Foundry Sand on Durability Properties of Concrete
Effect of Waste Foundry Sand on Durability Properties of ConcreteEffect of Waste Foundry Sand on Durability Properties of Concrete
Effect of Waste Foundry Sand on Durability Properties of Concrete
 
Flexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beamsFlexure Behaviour of Ferrocement Strengthened RC beams
Flexure Behaviour of Ferrocement Strengthened RC beams
 
Future of civil engineering
Future of civil engineering Future of civil engineering
Future of civil engineering
 
Dr. Jaikrishna Memorial Lecture on Evolution of Bridges
Dr. Jaikrishna Memorial Lecture on Evolution of BridgesDr. Jaikrishna Memorial Lecture on Evolution of Bridges
Dr. Jaikrishna Memorial Lecture on Evolution of Bridges
 
Structural Safety in India
Structural Safety in India Structural Safety in India
Structural Safety in India
 
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGIONGEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
GEO TEXTILES FOR DEVELOPMENT OF NORTH EASTERN REGION
 
Use of GeoTextiles in Civil Engineering : Work on NH 150, Manipur
Use of GeoTextiles in Civil Engineering : Work on NH 150, ManipurUse of GeoTextiles in Civil Engineering : Work on NH 150, Manipur
Use of GeoTextiles in Civil Engineering : Work on NH 150, Manipur
 
Textiles & GeoTextile Composites
Textiles & GeoTextile CompositesTextiles & GeoTextile Composites
Textiles & GeoTextile Composites
 
Presentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canalPresentation application-of-geosynthetics-in-canal
Presentation application-of-geosynthetics-in-canal
 
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...
Presentation: Comparative Evaluation Of Epoxy Treated Reinforcement And Ename...
 

Recently uploaded

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Recently uploaded (20)

Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 

Lean management in textile processing

  • 1. Anshu Chauhan MS – Textile Dyeing & Finishing, Wuhan Textile University (China) Asst. Manager (Marketing & Technical Services) Colorant Limited 11th Sep,2015 Lean Management Concepts In Textiles
  • 2. Contents 1. Lean Management: Introduction 2. Wastes & Its Types 3. Principles of Lean 4. Lean Tools 5. How to LEAN 6. LEAN Pros and Cons 7. Implementation in Textile industry 8. Conclusion
  • 4. A systematic approach in identifying and eliminating waste, or non-value added-activities through continuous improvement By making products through improved speed & flexibility with best quality & lowest cost What is LEAN?
  • 5. Value Value - A capability provided to a customer at the right time at an appropriate price, as defined by the customer. Value Add - Anything that changes shape, form or function of a product, sub-assembly, information or service into something that the customer is willing to pay for. Non Value Add - Any activity that absorbs or consumes resources without creating value. Type 1 – can be eliminated immediately Type 2 – due to current state, cannot yet be eliminated Note: Usually 95% of the total processing time is Non Value Add.
  • 6. Wastes & Its Types
  • 7. Waste “Anything that adds Cost to the product without adding Value”
  • 8. The 7 Wastes Of Manufacturing Overproduction Waiting Inventory Transportation Motion Over Processing Rework 1 6 7 5 4 3 2 * One more added recently “Underutilization of people”
  • 9. The 7 Wastes Of Manufacturing Waste Types Causes Example Symptom Over production Producing more product than needed Extent of warehouse space needed and used, Large engineering costs/time associated with facility modifications Inventory Any supply in excess to produce product Large buffer stocks within a manufacturing facility and also large warehousing on the site; financially seen as a huge use of working capital Waiting Idle Operator or machine time Large amount of ‘work in progress’ held up in the manufacturing process—often seen on the balance sheet and as ‘piles of inventory’ around the site Motion Movement of people or machine which does not add value Large teams of operators moving to and from the manufacturing unit but less activity actually within the unit, Data entry being seen as a problem within MRP systems Transporta tion Any material movement that doesn’t support Value added operation Movement of pallets of intermediate product around a site or between sites, Large warehousing and continual movement of intermediate material on and off site rather than final product Defects Making defective parts Missed or late orders, excessive overtime, increased operating costs Extra Processing Any process that does not add value to the product Reaction stage is typically complete within minutes yet we continue to process for hours or days, We have in process controls which never show a failure, delay of documents to accompany finished product
  • 10. Understanding Waste What would you be willing to pay for when ordering a hamburger? ___ Meat ___ Dough ___ Ketchup ___ Electricity to run ovens ___ Electricity to run outdoor lights left on accidentally ___ Person paid to inspect take- out orders ___ Cost of hamburgers not sold ___ Distribution Center ___ Cost of radio, TV, web ads ___ Cost of delivery truck signs ___ Cost of store manager ___ Cost of cleaning ___ Cost of menus ___ Employee training ___ Profit
  • 12. Principles of Lean 1 2 3 4 5  Specify value : Specify value from the standpoint of the end customer by product family.  Identify the value stream : Identify all the steps in the value stream for each product family, eliminating whenever possible those steps that do not create value.  Create flow : Make the value-creating steps occur in tight sequence so the product will flow smoothly toward the customer.  Let the customer pull product through the value stream: Make only what the customer has ordered.
  • 13. Cost Reduction Principle  Traditional thinking dictates that you set your selling price by calculating your cost and adding on a margin for profit  In today’s competitive market the customer sets the price and you don’t have the luxury of adding a profit margin  The only way to remain profitable and grow your business is to eliminate waste from your value stream, thereby reducing costs—cost reduction principle  Determine the price customers are willing to pay, and subtract your cost to determine what your profit will be  Eliminating waste is important because customers not only set the price, but they also demand price reductions
  • 14. Cost Reduction Principle Price Price Traditional Thinking Cost + profit = price Cost Profit Price Price Lean Thinking Price – cost = profit
  • 16. Lean Manufacturing Tools Tools Remarks Standardized work Jobs are broken down into elements and examined to determine best and safest method for each. Workplace Organisation (5S concept) Sort, Set-in-order, Shine, Standardize, Sustain Visual Factory Information is made available ad understandable at a glance Point-of-use-storage (POUS) Locate all parts, raw materials, tools and fixtures as close as possible Quality at source Error proofing devices are used Kanban An information system that controls required parts in required quantities at the required time One Piece Flow To minimize work in process, operators focus on completing one part through operation before focusing on other Total Productive Maintenance Consists of a company wide equipment maintenance program that covers the equipment life cycle and requires participation by everyone Value Stream Mapping (VSM) VSM is a method of visually mapping a product’s production path including material and information flow, from dock to stock. TAKT Time TAKT is the rate at which a customer requires the product and is computed as TAKT time= (Available work time/Customer demand/day)
  • 19. HOW TO MAKE LEAN SUSTAINABLE ? LEAN SYSTEM = Rules + Tools
  • 20. LEAN = RULES NOT JUST TOOLS LEAN STARTS WITH RULES NOT TOOLS THE FOUR RULES  Structure every activity  Clearly connect each customer and supplier  Specify and simplify every flow  Improve through experimentation at the lowest level possible - towards the ideal state
  • 21. Rule 1 - Structure every activity Lean Is A System Not An Event Standardize everything that is done Make it a way of life not a “flavor of the month” Rule 2 – Clearly connect each Customer and Supplier  Internal – Each operation is the previous operation’s customer  External – Outside supplier base LEAN = RULES NOT JUST TOOLS
  • 22. Rule 3 – Specify and simplify every flow  Product  Material  Information Rule 4 – Improve Through Experimentation At The Lowest Level Possible Towards The Ideal State  See every problem as an opportunity to focus and move toward the ideal state  Decision making at the point of activity LEAN = RULES NOT JUST TOOLS
  • 24. Forces Opposing and Driving A Change To ‘Lean’
  • 26. Benefits of Being “LEAN” Decreased lead times for customers Reduced inventories for manufacturers Improved knowledge management More robust processes (as measured by less errors and therefore less rework). Less Process Wastes Financial Savings
  • 28. Decisions—Decisions—Decisions  Is my company too small for Lean Process Improvement?  Isn’t Lean a manufacturing process? I am a service business.  Can I afford to implement Lean Process Improvement? All of these industries have successfully applied Lean to their processes
  • 29. How Chemical Processing Industry Can Benefit From Lean Implementation • Electronic Quality Management System: reduce the time, effort and cost of achieving compliance to customer or industry requirements. • Critical documents such as Material Safety Data Sheets (MSDS), always of the correct revision level, are available in real-time to process personnel to prevent waste and non-compliance due to procedural errors and their associated time delay. • Quality improvement and waste reduction opportunities, identified via audits, feedback from customers or process personnel, and results of process control strategies are promptly identified Quality Management • . A properly designed and implemented Six Sigma effort will integrate prioritization and deployment of improvement opportunities and strategic business development issues into the middle to upper levels of management, where they are inherently aligned with the strategic business objectives. • The Six Sigma approach for resource allocation, coupled with the DMAIC/DMADV project methodology, builds buy-in within the key stakeholder groups, reducing the time, effort and cost associated with achieving Quality System compliance, business development and business performance improvements. Six Sigma Design & Process Improvement • Statistical Process Control (SPC): provides rapid yet advanced real-time analysis of process data, including: alerts to online and offline users; customized reporting, including automated Certificates of Analysis, through Excel, Word templates, or a secure access-controlled web interface for remote management, field operatives or customers; and integration with process documentation and instructions. Process Capability, validation And Control
  • 30. Implementation In Chemical Processing  Availability of raw materials ( backward integration of process)  To develop multi function workers so that labour requirement could be trimmed and streamlined to avoid shortage of skilled manpower.  Now companies are focusing more in keeping less inventory and developing good vendor relations to minimize cost of production  Reduction of waste is already in practice in chemical industries  Escalation of cost due to excessive waste generation due to non organised workplace  Non Optimal plant layout  High Work in Progress (WIP)  Non availability of necessary spares and other accessories.
  • 31. Problem Statement: Example ABC Mill is facing problems in the areas of Visual Management, Waste Management and Quality Aspects ultimately resulting in increased costs and reduced profits.
  • 33. ISSUES 1. Absence of proper identification and storage of materials.
  • 34. PROBABLE SOLUTIONS  Employing location labeling for identification and storage.
  • 36.  Floor marking tapes showing walkways and restricted areas. • Floor marking tapes showing specific storage areas.
  • 37. 2. Absence of an Organized and Structured work environment.
  • 38. PROBABLE SOLUTIONS  Systematic Cleaning and Painting Schedule.  Introduction of 5S.
  • 39.  Visual Displays:  Recognizing performances of employees.  Visual Control:  Signs such as Warning, Danger signs, Safety signs, etc
  • 40. Reducing Textile Cutting waste • Optimum, uniform width • Maximum practical length • Minimum defects • Protective packaging, with clean, increased ends at beginning and end of roll • Minimum shade variation • Convert scrap fabric into yardage.
  • 41. Conclusion  Lean is a proven, company-wide systematic approach to eliminate/minimize waste resulting in the production of a “good” or “service” at the lowest possible cost  It is not just a manufacturing program confined to shop floor employees  Lean is every system, every process, and every employee within the organization

Editor's Notes

  1. Show left hand side first, 1. Determine Cost to produce an item 2. Add profit you want 3. This gives you Price to the customer If you want to increase your profit under this system, how do you do it? --->>> Raise the price to the customer. reveal right hand side This is what most companies operated in the 60’s and 70’s, just pass the cost along to the customer. But as the markets get more and more competitive, do you think this strategy will still work?? NO!! So if Cascade wants to increase their profits now a days, how could they do it?? Discussion Transition to next slide...