MANAJEMEN MANUFAKTURING, minimum materi yang perlu dikuasai :
o Product/process know how
o Mentalitas Dasar
o Rantai Supply dan Aliran Proses Bisnis
o Sistem Manajemen Mutu ISO 9001, (ISO 14000, OHSAS)
o Manajemen Operasi / Produksi  TPS / Lean Mfg
o Production Planning and Inventory Control
o Pengendalian Kualitas
o Pengendalian Produktivitas
o Statistical Quality / Process Control
o Maintenance Management (Preventive and Predictive Maintenance)
o Problem solving Decision Making / Delapan Langkah Tujuh Alat
o Problem Identification and Corrective Action (PICA)
o Manajemen Tempat Kerja (5S/5R)
o 7 Waste
o Kaizen Continual Improvement
o Ke-HRD-an
PRODUKSI STORAGE
PROCURE MKT
PPIC
SUPPLIER CUSTOMER
WAREHOUSE
ENG
ALIRAN INFORMASI
ALIRAN MATERIAL
PRODUKSI DELIVERY
PROCURE MKT
PPIC
MAINTENANCE
WAREHOUSE
QA
HRD
TOP MANAGEMENT
ENG
•VERIFIKASI PROSES
•PROCESS INSPECTION
•KALIBRASI ALAT UKUR
•MATERIAL INCOMING
INSPECTION
•EVALUASI
MANPOWER SKILL
•PREVENTIVE & PREDICTIVE
MAINTENANCE
•EVALUASI AND
AUDIT SUPPLIER
•TINJAUAN KONTRAK
•PRODUCTION PREPARATION
•NEW PROJECT DEV. ATAU MODY •NON CONFORMING PRODUCT
•CUSTOMER QUALITY HANDLING
•POLICY MANAGEMENT
•QUALITY INTERNAL AUDIT
•REVIEW MANAGEMENT
•CONTINUAL IMPROVEMENT
•CORRECTIVE & PREVENTIVE ACTION
•SUPPLY CONTROL
•DELIVERY CONTROL
•PRODUCTION &
MATERIAL PLANNING
FINANCE
QC
QC
QC QC
QC
•VALIDASI DRAWING, SAMPEL & DJTF
QC
CUSTOMER MKT ENG PPIC PROD W/H
PROC SUPPLIER/
SUBKON
HRD
P/O, F/C
SHOP
DRAWING
MPP
FIN
MDJTF
MTL
WOS
INVOICE
REKRUT
PELATIHAN
PEMBAYARAN
DELIVERY
IK / SOP
MP
QC QC
QC
PRODUKSI
INQ
P/O
MATERIAL
INQ = Inquery
P/O = Purchase Order
F/C = Forecast
QUOT = Quotation
BOM = Bill of Material
MP = Man Power
MPP = Monthly Production Planning
WOS = Work Order Sheet
IK = Instruksi Kerja
SOP = Standar Ops Procedure
FG = Finished Goods
QC = Quality Control
SAMPEL
PRODUK BARU
MATERIAL
QA
INQ
SAMPEL
QUOT
QUOT
BOM
P/O
MATERIAL
P/O
MATERIAL
MATERIAL
P/O, F/C FG
TERIMA FG
PQCS
IRD
QC QC
SAMPEL
PQCS
IRD
PQCS
IRD
PQCS
IRD
BOM / PL
D
C
A P
D
C
A P
D
C
A P
D
C
A P
 DIPERCAYA
 PEMBERI SOLUSI
 HANDAL
 HARGA NYAMAN
 LOYAL
 CITRA W/H
 GLOBAL MFG.
• I T
• Sistem Produksi
• Manajemen Operasi
 ZEROCLAIM &
SIG SIGMA DEFECT
 VERY LOW COST
 DELIVERI ON TIME DAN
SANGAT PENDEK
 EXPOR LANGSUNG
 MAYORITAS PASAR
 MARKETING
 MAN
• Rekrutmen & Training
• Learning and Development
• Spesialisasi, Multi Skill/Kompetensi
• Motivasi
• Leadership
 MANAJEMEN
• Organisasi
• Supervisory
• Man Management
• Lean Manufacturing, TPM
• QMS, QAS
 MESIN & TOOLS
 INFRASTRUKTUR
 MATERIAL
• Pengadaan & supply
• VA/VE, Substitusi / Ekivalen
 MEASUREMENT
 METODA
 COMPANY CULTURE
 TEKNOLOGI
• Product, Process & Production Eng.
• Material/Process Know How
• IT
• Production System
• Low Cost Automation
 FINANCIAL
• Profit & Cashflow
• Remunerasi & Benefit
 PLANNING & CONTROL
• PDCA role
 CUSTOMER SERVICES
S W O T
Q
C
D
S
M
Q
QUALITY
Q C D S
PRODUCT
QUALITY
COST DELIVERY SAFETY
M
MORALE
KESESUAIAN TERHADAP KEINGINAN
PELANGGAN
keseluruhan ciri atau
karakteristik produk
dalam tujuannya untuk
memenuhi kebutuhan dan
harapan pelanggan
Q
C
D
S
HIGH QUALITY
ON TIME DELIVERY
BEST PRICE
GOOD SAFETY
BAGAIMANA MENGENDALIKANNYA?
M HIGH MORALE
LOW PRICE
SHORT LEAD TIME
ZERO CLAIM
COST
• PENGERTIAN COST
 PRODUKTIVITAS
o COSTS + PROFIT = SALES PRICE
 SALES PRICE - PROFIT = COSTS
• KOMPONEN BIAYA
o Material
o Tenaga kerja
o Utility
o Makan, pengobatan, ATK
o Maintenance
o Transportasi
o Depresiasi mesin
o Sewa pabrik
o Dll.
o Marketing
o Administrasi
o Tenaga kerja office
o Dll.
o Selisih kurs
o Bunga bank
o Denda pajak
o Dll.
DO
CHECK
ACTION
3. MENENTUKAN FAKTOR-
FAKTOR PENYEBAB DOMINAN
1. MENEMUKAN PERSOALAN
2. MENCARI SEBAB TIMBULNYA
PERSOALAN
4. MERENCANAKAN TINDAKAN
PENANGGULANGAN
5. MELAKSANAKAN TINDAKAN
PENANGGULANGAN
7. STANDARISASI
8. MENENTUKAN TEMA
BERIKUTNYA
6. MEMERIKSA HASIL
PLAN
1
2
3
4
5
6
8
7
Siklus P-D-C-A (DEMING Cycle)
KAI = Perubahan
ZEN = Baik
KAIZEN = PERUBAHAN MENJADI LEBIH
BAIK
O P E R A T O R
L O W E R M A N A G E M E N T
M I D D L E M A N A G E M E N T
T O P M A N A G E M E N T
RUANG LINGKUP
TUGAS / FUNGSI
TOTAL
PEMBOROSAN
OPERASIONAL
EFEKTIF
WAKTU
MENUNGGU
TINGKAT
INVENTORI
TINGGI
GERAK
OVER
PRODUKSI
CACAT
PRODUKSI
TRANSPORTASI
PEMROSESAN
TOTAL
OPERASIONAL
PRODUKSI
13
TOTAL
LOSS TIME
WAKTU
KERJA
EFEKTIF
Tunggu
Instruksi
Minum,
Toilet,
Sholat
Telat
Masuk/
Bubar
Cepat
Persiapan
Awal
Administrasi
Cari Alat,
Material
Meeting
Pagi
TOTAL
WAKTU
KERJA
14
ENGINEERING ENGINEERING
ENGINEERING
ENGINEERING
ENGINEERING
MCL & WAREHOUSE
PPC
MTC & GA
HRD & PRODUKSI
ENG, MTC & QA
ENG & MTC
SEMUA BAGIAN
YANG TERLIBAT
PRODUKSI
QA
& SEMUA
BAGIAN
TERKAIT
FILTER/
SHIELD
CUSTOMER
SUPPLIER
STORAGE &
DELIVERY
PROSES HAV
PROSES PP
ENGINEERING
QC
INCOMING MATERIAL
•Sistem barcode
• Data Material
•Spec, MSDS, RoHS,
Millsheet
•SOP & Insp Standard
• Alert (material sering
defect atau khusus
• Claim Supplier
• Evaluasi Supplier
• Input hasil inspect.
• Policy dan 4M nya.
QC
ENGINEERING
• Validasi Drawing, Jig, Checker,
Tools & Fixture (DJCTF) dan
sample (sistem barcode)
• Data DJCTF
• SOP
• Inspection Standard
• IRD
• Quality Plan
• PQCS
• Dokumen Quality
• Alert (DJCTF sering masalah
atau khusus
• Policy dan 4M nya.
• Sistem barcode.
• Material & Spesifikasi
• Standar Inspeksi PP
• SOP PP & QA
• Data2 defektif dari Produksi & QA
• Data2 PICA yang belum/sudah close
• Sistem alert (info material/messin/
produk/sarana/ proses yang sering
bermasalahd atau yang perlu
perhatikan khusus
• Checklist Patrol
• Daftar “surat tilang”
• Laporan Patrol
• Data skill personil PP.
• Input bila ditemukan abnormality.
• Policy dan 4M nya.
QC PROSES HAV QC STORAGE & DEL
• Data claim QA
• PICA & follow up
• SOP
• IRD
• Dokumen Quality
• Data customer
• Alert (PICA yang belum close
atau khusus)
• Policy dan 4M nya.
QC
CUSTOMER
HANDLING
• Idem dengan PP hanya
datanya untuk HAV
• Idem dengan PP hanya
datanya untuk delivery
• Standar Penumpukan/
penyimpanan
QC PROSES PP
Proses
6
Proses
3
Proses
2
Proses
5
Proses
1
DIPPING
Proses
4
1 2 6
4
3 5
SIMULASI KAPASITAS
TIDAK
MENERIMA
DEFECT
TIDAK
MEMBUAT
DEFECT
TIDAK
MENERUSKAN
DEFECT
JIKA TERJADI ABNORMAL, STOP PROSES, HUBUNGI ATASAN
SETIAP PROSES DITUNTUT UNTUK MENGONTROL HASIL KERJANYA
SENDIRI.
• Menolak barang yang tidak sesuai standar
• Mengerjakan tgasnya dengan benar sesai standar
• Memeriksa/meneliti kembali hasil pekerjaannya sebelum meneruskan ke
proses berikutnya
• BUILT IN
QUALITY
5S
Seiri
Seiton
Seiso
Seiketsu
Shitsuke
Ringkas
Rapih
Resik
Rawat
Rajin
Sort
Set
Shine
Standardize
Sustain
Pemilahan
Perapihan
Kebersihan
Standarisasi
Konsistensi
• Meja, Rak, Box, Kompresor, Listrik, Lantai,
Dinding
• Mesin, Dies, Jig, Tools, Fixture, SOP, Standar-
standar
• Material, Work in Process, Finished Goods
P1
D
C
A
STANDAR-0
P2
D
C
A
P3
D
C
A
STANDAR-3
STANDAR-2
STANDAR-1
S1
D
C
A
S2
D
C
A
STANDAR-3 > STANDAR-2 > STANDAR-1 > STANDAR-0
STANDAR-0
STANDAR-1
STANDAR-2
PERBAIKAN
PERBAIKAN
PENINGKATAN
PENINGKATAN
PENYIMPANGAN
PENYIMPANGAN
STABIL
REENGINEERING/
BREAKTHROUGH/
INNOVASI/
INVESTASI
SEKARANG
VISI
P
D
C
A
P
D
C
A

More Related Content

Similar to PENGENALAN MANUFACTURING MANAGEMENT (PPT)

Advanced Product Quality Planning And Control Plans Based On APQP 2 Nd Edition
Advanced Product Quality Planning And Control Plans Based On APQP 2 Nd EditionAdvanced Product Quality Planning And Control Plans Based On APQP 2 Nd Edition
Advanced Product Quality Planning And Control Plans Based On APQP 2 Nd EditionScott Faria
 
Guidelines to Audit Validation Packages_RGA
Guidelines to Audit Validation Packages_RGAGuidelines to Audit Validation Packages_RGA
Guidelines to Audit Validation Packages_RGARosnelma García
 
Portfolio_Mukesh Kumar
Portfolio_Mukesh KumarPortfolio_Mukesh Kumar
Portfolio_Mukesh KumarMukesh Kumar
 
Presentation Fundamentals of V&V
Presentation Fundamentals of V&VPresentation Fundamentals of V&V
Presentation Fundamentals of V&Vmelmaan
 
Veriquality Presentation
Veriquality PresentationVeriquality Presentation
Veriquality PresentationCharles_lai
 
Quality_standard_organization_chart_plant1
Quality_standard_organization_chart_plant1Quality_standard_organization_chart_plant1
Quality_standard_organization_chart_plant1sarah Benmerzouk
 
Quality standards -ISO 9000
Quality standards -ISO 9000Quality standards -ISO 9000
Quality standards -ISO 9000PAYEL DASGUPTA
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1SelvaBabu2
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resumeMarty Howard
 
GMP Training: Process validation
GMP Training: Process validation GMP Training: Process validation
GMP Training: Process validation Dr. Amsavel A
 

Similar to PENGENALAN MANUFACTURING MANAGEMENT (PPT) (20)

Quality r (2) (2)
Quality r (2) (2)Quality r (2) (2)
Quality r (2) (2)
 
Advanced Product Quality Planning And Control Plans Based On APQP 2 Nd Edition
Advanced Product Quality Planning And Control Plans Based On APQP 2 Nd EditionAdvanced Product Quality Planning And Control Plans Based On APQP 2 Nd Edition
Advanced Product Quality Planning And Control Plans Based On APQP 2 Nd Edition
 
Guidelines to Audit Validation Packages_RGA
Guidelines to Audit Validation Packages_RGAGuidelines to Audit Validation Packages_RGA
Guidelines to Audit Validation Packages_RGA
 
Portfolio_Mukesh Kumar
Portfolio_Mukesh KumarPortfolio_Mukesh Kumar
Portfolio_Mukesh Kumar
 
Get Relief for Your PPAP Grief
Get Relief for Your PPAP GriefGet Relief for Your PPAP Grief
Get Relief for Your PPAP Grief
 
Presentation Fundamentals of V&V
Presentation Fundamentals of V&VPresentation Fundamentals of V&V
Presentation Fundamentals of V&V
 
Veriquality Presentation
Veriquality PresentationVeriquality Presentation
Veriquality Presentation
 
Validation boot camp 4
Validation boot camp 4Validation boot camp 4
Validation boot camp 4
 
Validation boot camp 4
Validation boot camp 4Validation boot camp 4
Validation boot camp 4
 
Apqp process flow
Apqp process flowApqp process flow
Apqp process flow
 
Quality_standard_organization_chart_plant1
Quality_standard_organization_chart_plant1Quality_standard_organization_chart_plant1
Quality_standard_organization_chart_plant1
 
Quality standards -ISO 9000
Quality standards -ISO 9000Quality standards -ISO 9000
Quality standards -ISO 9000
 
CV_Arvind Pandey
CV_Arvind PandeyCV_Arvind Pandey
CV_Arvind Pandey
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1
TQM UNIT-V.ppt TOTAL QUALITY MANAGEMENT1
 
Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015Bruce Pfeffer Resume May 2015
Bruce Pfeffer Resume May 2015
 
1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume1 marty howard_asq_qm_qe_resume
1 marty howard_asq_qm_qe_resume
 
Carlton R. Albritton QE 1
Carlton R. Albritton QE 1Carlton R. Albritton QE 1
Carlton R. Albritton QE 1
 
GMP Training: Process validation
GMP Training: Process validation GMP Training: Process validation
GMP Training: Process validation
 
Rangaraj Resume_SCM
Rangaraj Resume_SCMRangaraj Resume_SCM
Rangaraj Resume_SCM
 

Recently uploaded

Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Studentskannan348865
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdfVinayVadlagattu
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxrajjais1221
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptamrabdallah9
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...archanaece3
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxMustafa Ahmed
 
Introduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxIntroduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxProfASKolap
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfEr.Sonali Nasikkar
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfJNTUA
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...AshwaniAnuragi1
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxMustafa Ahmed
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/FootingEr. Suman Jyoti
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfJNTUA
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfSkNahidulIslamShrabo
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentationsj9399037128
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsVIEW
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样A
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailingAshishSingh1301
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 

Recently uploaded (20)

Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
Databricks Generative AI Fundamentals .pdf
Databricks Generative AI Fundamentals  .pdfDatabricks Generative AI Fundamentals  .pdf
Databricks Generative AI Fundamentals .pdf
 
DBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptxDBMS-Report on Student management system.pptx
DBMS-Report on Student management system.pptx
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Introduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptxIntroduction-to- Metrology and Quality.pptx
Introduction-to- Metrology and Quality.pptx
 
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
01-vogelsanger-stanag-4178-ed-2-the-new-nato-standard-for-nitrocellulose-test...
 
Autodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptxAutodesk Construction Cloud (Autodesk Build).pptx
Autodesk Construction Cloud (Autodesk Build).pptx
 
Presentation on Slab, Beam, Column, and Foundation/Footing
Presentation on Slab,  Beam, Column, and Foundation/FootingPresentation on Slab,  Beam, Column, and Foundation/Footing
Presentation on Slab, Beam, Column, and Foundation/Footing
 
Diploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdfDiploma Engineering Drawing Qp-2024 Ece .pdf
Diploma Engineering Drawing Qp-2024 Ece .pdf
 
Working Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdfWorking Principle of Echo Sounder and Doppler Effect.pdf
Working Principle of Echo Sounder and Doppler Effect.pdf
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
一比一原版(NEU毕业证书)东北大学毕业证成绩单原件一模一样
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 

PENGENALAN MANUFACTURING MANAGEMENT (PPT)

  • 1.
  • 2.
  • 3. MANAJEMEN MANUFAKTURING, minimum materi yang perlu dikuasai : o Product/process know how o Mentalitas Dasar o Rantai Supply dan Aliran Proses Bisnis o Sistem Manajemen Mutu ISO 9001, (ISO 14000, OHSAS) o Manajemen Operasi / Produksi  TPS / Lean Mfg o Production Planning and Inventory Control o Pengendalian Kualitas o Pengendalian Produktivitas o Statistical Quality / Process Control o Maintenance Management (Preventive and Predictive Maintenance) o Problem solving Decision Making / Delapan Langkah Tujuh Alat o Problem Identification and Corrective Action (PICA) o Manajemen Tempat Kerja (5S/5R) o 7 Waste o Kaizen Continual Improvement o Ke-HRD-an
  • 4. PRODUKSI STORAGE PROCURE MKT PPIC SUPPLIER CUSTOMER WAREHOUSE ENG ALIRAN INFORMASI ALIRAN MATERIAL
  • 5. PRODUKSI DELIVERY PROCURE MKT PPIC MAINTENANCE WAREHOUSE QA HRD TOP MANAGEMENT ENG •VERIFIKASI PROSES •PROCESS INSPECTION •KALIBRASI ALAT UKUR •MATERIAL INCOMING INSPECTION •EVALUASI MANPOWER SKILL •PREVENTIVE & PREDICTIVE MAINTENANCE •EVALUASI AND AUDIT SUPPLIER •TINJAUAN KONTRAK •PRODUCTION PREPARATION •NEW PROJECT DEV. ATAU MODY •NON CONFORMING PRODUCT •CUSTOMER QUALITY HANDLING •POLICY MANAGEMENT •QUALITY INTERNAL AUDIT •REVIEW MANAGEMENT •CONTINUAL IMPROVEMENT •CORRECTIVE & PREVENTIVE ACTION •SUPPLY CONTROL •DELIVERY CONTROL •PRODUCTION & MATERIAL PLANNING FINANCE QC QC QC QC QC •VALIDASI DRAWING, SAMPEL & DJTF QC
  • 6. CUSTOMER MKT ENG PPIC PROD W/H PROC SUPPLIER/ SUBKON HRD P/O, F/C SHOP DRAWING MPP FIN MDJTF MTL WOS INVOICE REKRUT PELATIHAN PEMBAYARAN DELIVERY IK / SOP MP QC QC QC PRODUKSI INQ P/O MATERIAL INQ = Inquery P/O = Purchase Order F/C = Forecast QUOT = Quotation BOM = Bill of Material MP = Man Power MPP = Monthly Production Planning WOS = Work Order Sheet IK = Instruksi Kerja SOP = Standar Ops Procedure FG = Finished Goods QC = Quality Control SAMPEL PRODUK BARU MATERIAL QA INQ SAMPEL QUOT QUOT BOM P/O MATERIAL P/O MATERIAL MATERIAL P/O, F/C FG TERIMA FG PQCS IRD QC QC SAMPEL PQCS IRD PQCS IRD PQCS IRD BOM / PL
  • 7. D C A P D C A P D C A P D C A P  DIPERCAYA  PEMBERI SOLUSI  HANDAL  HARGA NYAMAN  LOYAL  CITRA W/H  GLOBAL MFG. • I T • Sistem Produksi • Manajemen Operasi  ZEROCLAIM & SIG SIGMA DEFECT  VERY LOW COST  DELIVERI ON TIME DAN SANGAT PENDEK  EXPOR LANGSUNG  MAYORITAS PASAR  MARKETING  MAN • Rekrutmen & Training • Learning and Development • Spesialisasi, Multi Skill/Kompetensi • Motivasi • Leadership  MANAJEMEN • Organisasi • Supervisory • Man Management • Lean Manufacturing, TPM • QMS, QAS  MESIN & TOOLS  INFRASTRUKTUR  MATERIAL • Pengadaan & supply • VA/VE, Substitusi / Ekivalen  MEASUREMENT  METODA  COMPANY CULTURE  TEKNOLOGI • Product, Process & Production Eng. • Material/Process Know How • IT • Production System • Low Cost Automation  FINANCIAL • Profit & Cashflow • Remunerasi & Benefit  PLANNING & CONTROL • PDCA role  CUSTOMER SERVICES S W O T Q C D S M
  • 8. Q QUALITY Q C D S PRODUCT QUALITY COST DELIVERY SAFETY M MORALE KESESUAIAN TERHADAP KEINGINAN PELANGGAN keseluruhan ciri atau karakteristik produk dalam tujuannya untuk memenuhi kebutuhan dan harapan pelanggan
  • 9. Q C D S HIGH QUALITY ON TIME DELIVERY BEST PRICE GOOD SAFETY BAGAIMANA MENGENDALIKANNYA? M HIGH MORALE LOW PRICE SHORT LEAD TIME ZERO CLAIM
  • 10. COST • PENGERTIAN COST  PRODUKTIVITAS o COSTS + PROFIT = SALES PRICE  SALES PRICE - PROFIT = COSTS • KOMPONEN BIAYA o Material o Tenaga kerja o Utility o Makan, pengobatan, ATK o Maintenance o Transportasi o Depresiasi mesin o Sewa pabrik o Dll. o Marketing o Administrasi o Tenaga kerja office o Dll. o Selisih kurs o Bunga bank o Denda pajak o Dll.
  • 11. DO CHECK ACTION 3. MENENTUKAN FAKTOR- FAKTOR PENYEBAB DOMINAN 1. MENEMUKAN PERSOALAN 2. MENCARI SEBAB TIMBULNYA PERSOALAN 4. MERENCANAKAN TINDAKAN PENANGGULANGAN 5. MELAKSANAKAN TINDAKAN PENANGGULANGAN 7. STANDARISASI 8. MENENTUKAN TEMA BERIKUTNYA 6. MEMERIKSA HASIL PLAN 1 2 3 4 5 6 8 7 Siklus P-D-C-A (DEMING Cycle)
  • 12. KAI = Perubahan ZEN = Baik KAIZEN = PERUBAHAN MENJADI LEBIH BAIK O P E R A T O R L O W E R M A N A G E M E N T M I D D L E M A N A G E M E N T T O P M A N A G E M E N T RUANG LINGKUP TUGAS / FUNGSI
  • 15. ENGINEERING ENGINEERING ENGINEERING ENGINEERING ENGINEERING MCL & WAREHOUSE PPC MTC & GA HRD & PRODUKSI ENG, MTC & QA ENG & MTC SEMUA BAGIAN YANG TERLIBAT PRODUKSI QA & SEMUA BAGIAN TERKAIT FILTER/ SHIELD
  • 16. CUSTOMER SUPPLIER STORAGE & DELIVERY PROSES HAV PROSES PP ENGINEERING QC INCOMING MATERIAL •Sistem barcode • Data Material •Spec, MSDS, RoHS, Millsheet •SOP & Insp Standard • Alert (material sering defect atau khusus • Claim Supplier • Evaluasi Supplier • Input hasil inspect. • Policy dan 4M nya. QC ENGINEERING • Validasi Drawing, Jig, Checker, Tools & Fixture (DJCTF) dan sample (sistem barcode) • Data DJCTF • SOP • Inspection Standard • IRD • Quality Plan • PQCS • Dokumen Quality • Alert (DJCTF sering masalah atau khusus • Policy dan 4M nya. • Sistem barcode. • Material & Spesifikasi • Standar Inspeksi PP • SOP PP & QA • Data2 defektif dari Produksi & QA • Data2 PICA yang belum/sudah close • Sistem alert (info material/messin/ produk/sarana/ proses yang sering bermasalahd atau yang perlu perhatikan khusus • Checklist Patrol • Daftar “surat tilang” • Laporan Patrol • Data skill personil PP. • Input bila ditemukan abnormality. • Policy dan 4M nya. QC PROSES HAV QC STORAGE & DEL • Data claim QA • PICA & follow up • SOP • IRD • Dokumen Quality • Data customer • Alert (PICA yang belum close atau khusus) • Policy dan 4M nya. QC CUSTOMER HANDLING • Idem dengan PP hanya datanya untuk HAV • Idem dengan PP hanya datanya untuk delivery • Standar Penumpukan/ penyimpanan QC PROSES PP
  • 18. TIDAK MENERIMA DEFECT TIDAK MEMBUAT DEFECT TIDAK MENERUSKAN DEFECT JIKA TERJADI ABNORMAL, STOP PROSES, HUBUNGI ATASAN SETIAP PROSES DITUNTUT UNTUK MENGONTROL HASIL KERJANYA SENDIRI. • Menolak barang yang tidak sesuai standar • Mengerjakan tgasnya dengan benar sesai standar • Memeriksa/meneliti kembali hasil pekerjaannya sebelum meneruskan ke proses berikutnya • BUILT IN QUALITY
  • 19. 5S Seiri Seiton Seiso Seiketsu Shitsuke Ringkas Rapih Resik Rawat Rajin Sort Set Shine Standardize Sustain Pemilahan Perapihan Kebersihan Standarisasi Konsistensi • Meja, Rak, Box, Kompresor, Listrik, Lantai, Dinding • Mesin, Dies, Jig, Tools, Fixture, SOP, Standar- standar • Material, Work in Process, Finished Goods
  • 20. P1 D C A STANDAR-0 P2 D C A P3 D C A STANDAR-3 STANDAR-2 STANDAR-1 S1 D C A S2 D C A STANDAR-3 > STANDAR-2 > STANDAR-1 > STANDAR-0 STANDAR-0 STANDAR-1 STANDAR-2 PERBAIKAN PERBAIKAN PENINGKATAN PENINGKATAN PENYIMPANGAN PENYIMPANGAN STABIL