SlideShare a Scribd company logo
1 of 48
Maximo Oil &
Gas 7.6.1
Maximo HSE
Manager 7.6.1
Application
Overview
Isolation
Management
Isolation
Management
Example use cases
1.Electrical isolation
2.Mechanical isolation
3.Process isolation
2
Process Flow
3
List View
4
Isolation
Certificate tab –
Upper half
5
Isolation Certificate
Header is read only
based on Permit
and Certificate Type
Isolation Certificate
Header is read only
based on Permit
and Certificate Type
Isolation
Certificate tab –
Lower half
6
Physical Location,
Area and Zone
are read only
based on
Location
Physical Location,
Area and Zone
are read only
based on
Location
This is the Work
Order or Task that
originated the
isolation certificate
This is the Work
Order or Task that
originated the
isolation certificate
A permit can be created
covering multiple Locations in
addition to the Primary
Location
A permit can be created
covering multiple Locations in
addition to the Primary
Location
Hazards tab – Risk
Assessment sub
tab
7
Hazards tab –
Hazard Review sub
tab
8
Hazard Review can be
used to perform a
checklist style of risk
assessment which can be
scored by use of Formula
or Automation Script
Hazard Review can be
used to perform a
checklist style of risk
assessment which can be
scored by use of Formula
or Automation Script
Each Review
Action can have
Review Items as
indicated by the
presence of the
icon
Each Review
Action can have
Review Items as
indicated by the
presence of the
icon
Hazards tab – Gas
Testing sub tab
9
These fields confirm
gas testing
requirement and
frequency
These fields confirm
gas testing
requirement and
frequency
Multiple gas test
results can be
added at any time
in the permit
lifecycle
Multiple gas test
results can be
added at any time
in the permit
lifecycle
Gas Test sub tab –
Details section
10
Hazards tab –
Condition for Work
sub tab
11
Conditions for Work
can be defined to
confirm the condition
of the plant for work
to be carried out and
also the type of
isolations required
Conditions for Work
can be defined to
confirm the condition
of the plant for work
to be carried out and
also the type of
isolations required
Isolations tab
12
Isolations can be added
directly on a permit but the
Isolation Management
application supports separate
Isolation Certificates,
sometimes referred to as
Isolation Confirmation
Certificates
Isolations can be added
directly on a permit but the
Isolation Management
application supports separate
Isolation Certificates,
sometimes referred to as
Isolation Confirmation
Certificates
Isolations tab –
Lock Out/Tag Out
Details
13
View showing the
detail of a Lock
Out/Tag Out record
View showing the
detail of a Lock
Out/Tag Out record
Multiple Lock Out/Tag Out
records can be added for
example to support
separate mechanical and
electrical isolation
Multiple Lock Out/Tag Out
records can be added for
example to support
separate mechanical and
electrical isolation
Isolations tab –
Lock Out/Tag Out
Operations Details
14
Each Lock Out/Tag
Out can have
multiple
operations.
Each Lock Out/Tag
Out can have
multiple
operations.
View of Details
section of a Lock
Out/Tag Out
Operation
View of Details
section of a Lock
Out/Tag Out
Operation
Isolations tab –
Lock Out/Tag Out
Operation Details
Isolation section
15
When the Isolation
Certificate is in
Approved status the
operations can be
marked as complete
When the Isolation
Certificate is in
Approved status the
operations can be
marked as complete
Isolation tab – Lock
Out/Tag Out
Operations Details
Test section
16
When the Isolation
Certificate is in Pending
Removal status the
operations can
sanctioned for test
When the Isolation
Certificate is in Pending
Removal status the
operations can
sanctioned for test
Isolation tab – Lock
Out/Tag Out
Operations Details
De-Isolation section
17
When the Isolation
Certificate is in
Pending Removal
status the operations
can be marked as
complete
When the Isolation
Certificate is in
Pending Removal
status the operations
can be marked as
complete
Isolation tab – Lock
Out/Tag Out
Operations Details
De-Isolation section
View Common
Isolations
18
View Common
Isolations can be set
up to run
automatically of by
manual action
View Common
Isolations can be set
up to run
automatically of by
manual action
Review and
Approval tab
19
Multiple Reviewers and
Approvers can be added
according to the type and
complexity of the isolation
certificate. Reviewers are
optional. Sometimes the
term Authorization is used
instead of Approval
Multiple Reviewers and
Approvers can be added
according to the type and
complexity of the isolation
certificate. Reviewers are
optional. Sometimes the
term Authorization is used
instead of Approval
Checklist tab
20
A general purpose
checklist capability to
add any type of
checklist to the
isolation certificate. In
this example a pre-
issue checklist
A general purpose
checklist capability to
add any type of
checklist to the
isolation certificate. In
this example a pre-
issue checklist
All actions can be
viewed in one
place by going to
Operational
Actions
All actions can be
viewed in one
place by going to
Operational
Actions
Site Checks and
Countersignatures
tab
21
Record each site
check here beyond
the initial site check
Record each site
check here beyond
the initial site check
Counter signature can be used
when adjacent operations require
a counter signature
Counter signature can be used
when adjacent operations require
a counter signature
Toolbox Talk tab –
Completion section
22
Use these fields to
capture free text notes
on the Toolbox talk
and confirm the talk
has been completed
Use these fields to
capture free text notes
on the Toolbox talk
and confirm the talk
has been completed
Toolbox talk is more often associated with a permit but the same capability is also made
available to support a Toolbox Talk associated with the isolation certificate
Toolbox Talk tab –
Toolbox Talk
Procedure sub tab
23
Can use an Operating
Procedure to create a
set of prompts for the
TBT
Can use an Operating
Procedure to create a
set of prompts for the
TBT
Toolbox Talk tab –
Hazard Checklist
sub tab
24
This is intended to
be the final check
on hazards before
work commences
This is intended to
be the final check
on hazards before
work commences
Editable Comment
field in Details section
if needed
Editable Comment
field in Details section
if needed
Toolbox Talk tab –
Work Party
Declaration sub
tab
25
Attendee does not
have to be a
Maximo user
Attendee does not
have to be a
Maximo user
Identifies that a new
member has joined the
work party after the
initial TBT
Identifies that a new
member has joined the
work party after the
initial TBT
Toolbox Talk tab –
Dynamic Risk
Assessment sub
tab
26
Dynamic Risk Review items can be
added to record a change in risk after
work has started
Dynamic Risk Review items can be
added to record a change in risk after
work has started
Handback and
Cancellation tab
27
Set of fields to sign off
the isolation certificate
on handback once the
isolation is no longer
required
Set of fields to sign off
the isolation certificate
on handback once the
isolation is no longer
required
Handback and
Cancelation tab –
Cancellation
Details
28
Use to record
details of any
review on
cancellation
Use to record
details of any
review on
cancellation
Use to identify that
the isolation
certificate requires
audit and provide link
to the Audit record
Use to identify that
the isolation
certificate requires
audit and provide link
to the Audit record
Related Records
tab
29
Identifies any permit
or isolation
certificate related to
this isolation
certificate
Identifies any permit
or isolation
certificate related to
this isolation
certificate
The originating or
related Work Order.
The originator is also
displayed on the
isolation certificate
tab.
The originating or
related Work Order.
The originator is also
displayed on the
isolation certificate
tab.
Emergency Actions
tab
30
Log tab
31
Communication Log
generated automatically from
Create Communication or
Workflow actions
Communication Log
generated automatically from
Create Communication or
Workflow actions
Manually
created log
entries
Manually
created log
entries
Actions – Workflow
and Create
32
Workflow
Create Actions
Actions – View
Isolation
Certificate History
33
Automatically tracks
changes in status and
ownership
Automatically tracks
changes in status and
ownership
Action – View
Simultaneous
Operations
34
Action – View
Common Isolations
35
Statuses
Request – First status of a permit
Draft – Working status of a permit used during permit
preparation
Approved – Used to identify approval on completion of
preparation
Isolation In Progress – If isolation is required identifies
that isolation has not yet been completed
Isolation Complete – All isolations have been confirmed
as completed.
Isolation Pending Removal – Isolation are pending
removal
Isolation Removed – All isolations have been removed
Cancelled – isolation is no longer required
Closed – The end of the isolation certificate cycle. It
can no longer be edited at this status
36
Status transitions
37
Job Plans –
Control of Work
sub tab
38
Identify multiple
types of permits and
certificates required
at the main Job Plan
level
Identify multiple
types of permits and
certificates required
at the main Job Plan
level
Job Plan Tasks –
Permit and Certificate
Type section
39
Can identify one
Permit and Certificate
Type per Task
Can identify one
Permit and Certificate
Type per Task
Work Order Tracking –
Control of Work sub
tab
40
Identify multiple types
of permit or certificate
required. This will cross
over from any Job Plan
used on the Work Order
Identify multiple types
of permit or certificate
required. This will cross
over from any Job Plan
used on the Work Order
Can identify permit
authorities for
planning purposes
Can identify permit
authorities for
planning purposes
Permit or Certificate
number can be referenced
here if you a not using the
Maximo Permit to Work
application
Permit or Certificate
number can be referenced
here if you a not using the
Maximo Permit to Work
application
Work Order Tasks –
Control of Work
section
41
Identify a single type of
permit or certificate per
task. This will cross over
from any Job Plan used
on the Work Order
Identify a single type of
permit or certificate per
task. This will cross over
from any Job Plan used
on the Work Order
If you are using Maximo
Permit to Work the
isolation certificate
created from this Task will
be referenced here
If you are using Maximo
Permit to Work the
isolation certificate
created from this Task will
be referenced herePermit or Certificate
number can be referenced
here if you a not using the
Maximo Permit to Work
application
Permit or Certificate
number can be referenced
here if you a not using the
Maximo Permit to Work
application
Work Order
Tracking – Create
Permits action
42
Work Order
Tracking – Related
Permits
43
Operator Log – View
Permit to Work and
Isolation
Certificate Details
44
Operator Log –
Daily Operations
Report
45
People – Details
tab
46
Organizations –
Permit to Work and
Isolation
Management
Options
47
Organizations –
Control of Work
options
48

More Related Content

What's hot

Agile Product Management: Getting from Backlog to Value
Agile Product Management: Getting from Backlog to ValueAgile Product Management: Getting from Backlog to Value
Agile Product Management: Getting from Backlog to ValueLeadingAgile
Β 
An Overview of User Acceptance Testing (UAT)
An Overview of User Acceptance Testing (UAT)An Overview of User Acceptance Testing (UAT)
An Overview of User Acceptance Testing (UAT)Usersnap
Β 
How to Do a Gemba Walk
How to Do a Gemba WalkHow to Do a Gemba Walk
How to Do a Gemba WalkMichael Bremer
Β 
Iso 9001 2015 audit checklist
Iso 9001 2015 audit checklistIso 9001 2015 audit checklist
Iso 9001 2015 audit checklistHamid Ali
Β 
User Acceptance Testing (Uat)
User Acceptance Testing (Uat)User Acceptance Testing (Uat)
User Acceptance Testing (Uat)Thomas Martin
Β 
ISO 9001:2000 Audit Checklist2000
ISO 9001:2000 Audit Checklist2000ISO 9001:2000 Audit Checklist2000
ISO 9001:2000 Audit Checklist2000Dan Junkins
Β 
Sucessful implementation of JIRA and Confluence - tips and best practice
Sucessful implementation of JIRA and Confluence - tips and best practiceSucessful implementation of JIRA and Confluence - tips and best practice
Sucessful implementation of JIRA and Confluence - tips and best practiceschade_chr
Β 
7 Steps to a Successful ITSM Tool Implementation
7 Steps to a Successful ITSM Tool Implementation7 Steps to a Successful ITSM Tool Implementation
7 Steps to a Successful ITSM Tool ImplementationNavvia
Β 
What Does DevOps Culture Feel Like?
What Does DevOps Culture Feel Like?What Does DevOps Culture Feel Like?
What Does DevOps Culture Feel Like?Matthew Skelton
Β 
Test Automation Strategy
Test Automation StrategyTest Automation Strategy
Test Automation StrategyMartin Ruddy
Β 
The Product Owner Role
The Product Owner RoleThe Product Owner Role
The Product Owner RoleNigel Thurlow
Β 
ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)Flevy.com Best Practices
Β 
Software Testing Process, Testing Automation and Software Testing Trends
Software Testing Process, Testing Automation and Software Testing TrendsSoftware Testing Process, Testing Automation and Software Testing Trends
Software Testing Process, Testing Automation and Software Testing TrendsKMS Technology
Β 
Introduction to Agile Values & Principles
Introduction to Agile Values & PrinciplesIntroduction to Agile Values & Principles
Introduction to Agile Values & PrinciplesAndreea Visanoiu
Β 
Free help desk evaluation checklist
Free help desk evaluation checklistFree help desk evaluation checklist
Free help desk evaluation checklistIITSW Company
Β 

What's hot (20)

Agile Product Management: Getting from Backlog to Value
Agile Product Management: Getting from Backlog to ValueAgile Product Management: Getting from Backlog to Value
Agile Product Management: Getting from Backlog to Value
Β 
Checklist
ChecklistChecklist
Checklist
Β 
A3 Management
A3 ManagementA3 Management
A3 Management
Β 
An Overview of User Acceptance Testing (UAT)
An Overview of User Acceptance Testing (UAT)An Overview of User Acceptance Testing (UAT)
An Overview of User Acceptance Testing (UAT)
Β 
How to Do a Gemba Walk
How to Do a Gemba WalkHow to Do a Gemba Walk
How to Do a Gemba Walk
Β 
ISO 9001:2015 Audit Checklist Preview
ISO 9001:2015 Audit Checklist PreviewISO 9001:2015 Audit Checklist Preview
ISO 9001:2015 Audit Checklist Preview
Β 
TSA Office of Requirements and Capabilities Analysis
TSA Office of Requirements and Capabilities Analysis TSA Office of Requirements and Capabilities Analysis
TSA Office of Requirements and Capabilities Analysis
Β 
Iso 9001 2015 audit checklist
Iso 9001 2015 audit checklistIso 9001 2015 audit checklist
Iso 9001 2015 audit checklist
Β 
User Acceptance Testing (Uat)
User Acceptance Testing (Uat)User Acceptance Testing (Uat)
User Acceptance Testing (Uat)
Β 
ISO 9001:2000 Audit Checklist2000
ISO 9001:2000 Audit Checklist2000ISO 9001:2000 Audit Checklist2000
ISO 9001:2000 Audit Checklist2000
Β 
Sucessful implementation of JIRA and Confluence - tips and best practice
Sucessful implementation of JIRA and Confluence - tips and best practiceSucessful implementation of JIRA and Confluence - tips and best practice
Sucessful implementation of JIRA and Confluence - tips and best practice
Β 
8D Problem Solving Poster
8D Problem Solving Poster8D Problem Solving Poster
8D Problem Solving Poster
Β 
7 Steps to a Successful ITSM Tool Implementation
7 Steps to a Successful ITSM Tool Implementation7 Steps to a Successful ITSM Tool Implementation
7 Steps to a Successful ITSM Tool Implementation
Β 
What Does DevOps Culture Feel Like?
What Does DevOps Culture Feel Like?What Does DevOps Culture Feel Like?
What Does DevOps Culture Feel Like?
Β 
Test Automation Strategy
Test Automation StrategyTest Automation Strategy
Test Automation Strategy
Β 
The Product Owner Role
The Product Owner RoleThe Product Owner Role
The Product Owner Role
Β 
ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)ITIL Process Assessment - Service Design (XLS)
ITIL Process Assessment - Service Design (XLS)
Β 
Software Testing Process, Testing Automation and Software Testing Trends
Software Testing Process, Testing Automation and Software Testing TrendsSoftware Testing Process, Testing Automation and Software Testing Trends
Software Testing Process, Testing Automation and Software Testing Trends
Β 
Introduction to Agile Values & Principles
Introduction to Agile Values & PrinciplesIntroduction to Agile Values & Principles
Introduction to Agile Values & Principles
Β 
Free help desk evaluation checklist
Free help desk evaluation checklistFree help desk evaluation checklist
Free help desk evaluation checklist
Β 

Similar to Maximo Oil and Gas 7.6.1 HSE: Isolation Management Overview

Maximo Oil and Gas 7.6.1 HSE: Operator Log overview
Maximo Oil and Gas 7.6.1 HSE: Operator Log overviewMaximo Oil and Gas 7.6.1 HSE: Operator Log overview
Maximo Oil and Gas 7.6.1 HSE: Operator Log overviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overviewMaximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overviewMaximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Benefits & Losses
Maximo Oil and Gas 7.6.1 HSE: Benefits & LossesMaximo Oil and Gas 7.6.1 HSE: Benefits & Losses
Maximo Oil and Gas 7.6.1 HSE: Benefits & LossesHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Bypass Management Overview
Maximo Oil and Gas 7.6.1 HSE: Bypass Management OverviewMaximo Oil and Gas 7.6.1 HSE: Bypass Management Overview
Maximo Oil and Gas 7.6.1 HSE: Bypass Management OverviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Certifications Overview
Maximo Oil and Gas 7.6.1 HSE: Certifications OverviewMaximo Oil and Gas 7.6.1 HSE: Certifications Overview
Maximo Oil and Gas 7.6.1 HSE: Certifications OverviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview Helen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesMaximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Operating Policies
Maximo Oil and Gas 7.6.1 HSE: Operating PoliciesMaximo Oil and Gas 7.6.1 HSE: Operating Policies
Maximo Oil and Gas 7.6.1 HSE: Operating PoliciesHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Change Module Overview
Maximo Oil and Gas 7.6.1 HSE: Change Module OverviewMaximo Oil and Gas 7.6.1 HSE: Change Module Overview
Maximo Oil and Gas 7.6.1 HSE: Change Module OverviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overviewMaximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests
 Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests
Maximo Oil and Gas 7.6.1 HSE: Defects & Service RequestsHelen Fisher
Β 
Ccure 9000 Monitoring Station User's Manual
Ccure 9000 Monitoring Station User's ManualCcure 9000 Monitoring Station User's Manual
Ccure 9000 Monitoring Station User's ManualBill Kelly
Β 
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overview
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overviewMaximo Oil and Gas 7.6.1 HSE: Item master and purchasing overview
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overviewHelen Fisher
Β 
Preventive Maintenance System - Rig Maintenance
Preventive Maintenance System - Rig MaintenancePreventive Maintenance System - Rig Maintenance
Preventive Maintenance System - Rig Maintenancenfra erp
Β 
software_testing pdf.pdf
software_testing pdf.pdfsoftware_testing pdf.pdf
software_testing pdf.pdfCbhaSlide
Β 
Testing Tutorial PDF
Testing Tutorial PDFTesting Tutorial PDF
Testing Tutorial PDFRoopa slideshare
Β 
software_testing pdf.pdf
software_testing pdf.pdfsoftware_testing pdf.pdf
software_testing pdf.pdfRoopa slideshare
Β 
software_testing pdf.pdf
software_testing pdf.pdfsoftware_testing pdf.pdf
software_testing pdf.pdfCbhaSlide
Β 

Similar to Maximo Oil and Gas 7.6.1 HSE: Isolation Management Overview (20)

Maximo Oil and Gas 7.6.1 HSE: Operator Log overview
Maximo Oil and Gas 7.6.1 HSE: Operator Log overviewMaximo Oil and Gas 7.6.1 HSE: Operator Log overview
Maximo Oil and Gas 7.6.1 HSE: Operator Log overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overviewMaximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overviewMaximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Benefits & Losses
Maximo Oil and Gas 7.6.1 HSE: Benefits & LossesMaximo Oil and Gas 7.6.1 HSE: Benefits & Losses
Maximo Oil and Gas 7.6.1 HSE: Benefits & Losses
Β 
Maximo Oil and Gas 7.6.1 HSE: Bypass Management Overview
Maximo Oil and Gas 7.6.1 HSE: Bypass Management OverviewMaximo Oil and Gas 7.6.1 HSE: Bypass Management Overview
Maximo Oil and Gas 7.6.1 HSE: Bypass Management Overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Certifications Overview
Maximo Oil and Gas 7.6.1 HSE: Certifications OverviewMaximo Oil and Gas 7.6.1 HSE: Certifications Overview
Maximo Oil and Gas 7.6.1 HSE: Certifications Overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview
Maximo Oil and Gas 7.6.1 HSE: Locations & Assets Overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesMaximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Β 
Maximo Oil and Gas 7.6.1 HSE: Operating Policies
Maximo Oil and Gas 7.6.1 HSE: Operating PoliciesMaximo Oil and Gas 7.6.1 HSE: Operating Policies
Maximo Oil and Gas 7.6.1 HSE: Operating Policies
Β 
Maximo Oil and Gas 7.6.1 HSE: Change Module Overview
Maximo Oil and Gas 7.6.1 HSE: Change Module OverviewMaximo Oil and Gas 7.6.1 HSE: Change Module Overview
Maximo Oil and Gas 7.6.1 HSE: Change Module Overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overviewMaximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
Maximo Oil and Gas 7.6.1 HSE: Standard Actions & Standard Action Groups overview
Β 
Confined space entry
Confined space entryConfined space entry
Confined space entry
Β 
Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests
 Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests
Maximo Oil and Gas 7.6.1 HSE: Defects & Service Requests
Β 
Ccure 9000 Monitoring Station User's Manual
Ccure 9000 Monitoring Station User's ManualCcure 9000 Monitoring Station User's Manual
Ccure 9000 Monitoring Station User's Manual
Β 
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overview
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overviewMaximo Oil and Gas 7.6.1 HSE: Item master and purchasing overview
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overview
Β 
Preventive Maintenance System - Rig Maintenance
Preventive Maintenance System - Rig MaintenancePreventive Maintenance System - Rig Maintenance
Preventive Maintenance System - Rig Maintenance
Β 
software_testing pdf.pdf
software_testing pdf.pdfsoftware_testing pdf.pdf
software_testing pdf.pdf
Β 
Testing Tutorial PDF
Testing Tutorial PDFTesting Tutorial PDF
Testing Tutorial PDF
Β 
software_testing pdf.pdf
software_testing pdf.pdfsoftware_testing pdf.pdf
software_testing pdf.pdf
Β 
software_testing pdf.pdf
software_testing pdf.pdfsoftware_testing pdf.pdf
software_testing pdf.pdf
Β 

More from Helen Fisher

MaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit SolutionMaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit SolutionHelen Fisher
Β 
MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018Helen Fisher
Β 
Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Helen Fisher
Β 
Watson IoT at Think 2018
Watson IoT at Think 2018Watson IoT at Think 2018
Watson IoT at Think 2018Helen Fisher
Β 
IBM Maximo and ISO 55000
IBM Maximo and ISO 55000IBM Maximo and ISO 55000
IBM Maximo and ISO 55000Helen Fisher
Β 
BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017Helen Fisher
Β 
Maximo 7.6.0.8
Maximo 7.6.0.8Maximo 7.6.0.8
Maximo 7.6.0.8Helen Fisher
Β 
IBM Maximo for utilities T&D
IBM Maximo for utilities T&DIBM Maximo for utilities T&D
IBM Maximo for utilities T&DHelen Fisher
Β 
Maximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industryMaximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industryHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overviewMaximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overviewMaximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE Reports
Maximo Oil and Gas 7.6.1 HSE ReportsMaximo Oil and Gas 7.6.1 HSE Reports
Maximo Oil and Gas 7.6.1 HSE ReportsHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module optionsMaximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module optionsHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
 Maximo Oil and Gas 7.6.1 HSE: Solutions Overview Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
Maximo Oil and Gas 7.6.1 HSE: Solutions OverviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix OverviewMaximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix OverviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List RoutesMaximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List RoutesHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overviewMaximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overviewHelen Fisher
Β 
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overview
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overviewMaximo Oil and Gas 7.6.1 HSE: Organizations & Products overview
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overviewHelen Fisher
Β 

More from Helen Fisher (18)

MaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit SolutionMaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit Solution
Β 
MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018
Β 
Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201
Β 
Watson IoT at Think 2018
Watson IoT at Think 2018Watson IoT at Think 2018
Watson IoT at Think 2018
Β 
IBM Maximo and ISO 55000
IBM Maximo and ISO 55000IBM Maximo and ISO 55000
IBM Maximo and ISO 55000
Β 
BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017
Β 
Maximo 7.6.0.8
Maximo 7.6.0.8Maximo 7.6.0.8
Maximo 7.6.0.8
Β 
IBM Maximo for utilities T&D
IBM Maximo for utilities T&DIBM Maximo for utilities T&D
IBM Maximo for utilities T&D
Β 
Maximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industryMaximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industry
Β 
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overviewMaximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overviewMaximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Maximo Oil and Gas 7.6.1 HSE: Drilling and Completion Run Log overview
Β 
Maximo Oil and Gas 7.6.1 HSE Reports
Maximo Oil and Gas 7.6.1 HSE ReportsMaximo Oil and Gas 7.6.1 HSE Reports
Maximo Oil and Gas 7.6.1 HSE Reports
Β 
Maximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module optionsMaximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module options
Β 
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
 Maximo Oil and Gas 7.6.1 HSE: Solutions Overview Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix OverviewMaximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List RoutesMaximo Oil and Gas 7.6.1 HSE: Asset List Routes
Maximo Oil and Gas 7.6.1 HSE: Asset List Routes
Β 
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overviewMaximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Β 
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overview
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overviewMaximo Oil and Gas 7.6.1 HSE: Organizations & Products overview
Maximo Oil and Gas 7.6.1 HSE: Organizations & Products overview
Β 

Recently uploaded

why an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfwhy an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfjoe51371421
Β 
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...kellynguyen01
Β 
Test Automation Strategy for Frontend and Backend
Test Automation Strategy for Frontend and BackendTest Automation Strategy for Frontend and Backend
Test Automation Strategy for Frontend and BackendArshad QA
Β 
DNT_Corporate presentation know about us
DNT_Corporate presentation know about usDNT_Corporate presentation know about us
DNT_Corporate presentation know about usDynamic Netsoft
Β 
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...OnePlan Solutions
Β 
Right Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsRight Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsJhone kinadey
Β 
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AISyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AIABDERRAOUF MEHENNI
Β 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)OPEN KNOWLEDGE GmbH
Β 
Software Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsSoftware Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsArshad QA
Β 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantAxelRicardoTrocheRiq
Β 
A Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxA Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxComplianceQuest1
Β 
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVOptimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVshikhaohhpro
Β 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comFatema Valibhai
Β 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...MyIntelliSource, Inc.
Β 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideChristina Lin
Β 
Russian Call Girls in Karol Bagh Aasnvi ➑️ 8264348440 πŸ’‹πŸ“ž Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➑️ 8264348440 πŸ’‹πŸ“ž Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➑️ 8264348440 πŸ’‹πŸ“ž Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➑️ 8264348440 πŸ’‹πŸ“ž Independent Escort S...soniya singh
Β 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfkalichargn70th171
Β 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...MyIntelliSource, Inc.
Β 

Recently uploaded (20)

Call Girls In Mukherjee Nagar πŸ“± 9999965857 🀩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar πŸ“±  9999965857  🀩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...Call Girls In Mukherjee Nagar πŸ“±  9999965857  🀩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar πŸ“± 9999965857 🀩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Β 
why an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdfwhy an Opensea Clone Script might be your perfect match.pdf
why an Opensea Clone Script might be your perfect match.pdf
Β 
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Β 
Test Automation Strategy for Frontend and Backend
Test Automation Strategy for Frontend and BackendTest Automation Strategy for Frontend and Backend
Test Automation Strategy for Frontend and Backend
Β 
DNT_Corporate presentation know about us
DNT_Corporate presentation know about usDNT_Corporate presentation know about us
DNT_Corporate presentation know about us
Β 
Exploring iOS App Development: Simplifying the Process
Exploring iOS App Development: Simplifying the ProcessExploring iOS App Development: Simplifying the Process
Exploring iOS App Development: Simplifying the Process
Β 
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Β 
Right Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsRight Money Management App For Your Financial Goals
Right Money Management App For Your Financial Goals
Β 
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AISyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
Β 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)
Β 
Software Quality Assurance Interview Questions
Software Quality Assurance Interview QuestionsSoftware Quality Assurance Interview Questions
Software Quality Assurance Interview Questions
Β 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service Consultant
Β 
A Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxA Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docx
Β 
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVOptimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTV
Β 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
Β 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Β 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Β 
Russian Call Girls in Karol Bagh Aasnvi ➑️ 8264348440 πŸ’‹πŸ“ž Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➑️ 8264348440 πŸ’‹πŸ“ž Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➑️ 8264348440 πŸ’‹πŸ“ž Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➑️ 8264348440 πŸ’‹πŸ“ž Independent Escort S...
Β 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
Β 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Β 

Maximo Oil and Gas 7.6.1 HSE: Isolation Management Overview

  • 1. Maximo Oil & Gas 7.6.1 Maximo HSE Manager 7.6.1 Application Overview Isolation Management
  • 2. Isolation Management Example use cases 1.Electrical isolation 2.Mechanical isolation 3.Process isolation 2
  • 5. Isolation Certificate tab – Upper half 5 Isolation Certificate Header is read only based on Permit and Certificate Type Isolation Certificate Header is read only based on Permit and Certificate Type
  • 6. Isolation Certificate tab – Lower half 6 Physical Location, Area and Zone are read only based on Location Physical Location, Area and Zone are read only based on Location This is the Work Order or Task that originated the isolation certificate This is the Work Order or Task that originated the isolation certificate A permit can be created covering multiple Locations in addition to the Primary Location A permit can be created covering multiple Locations in addition to the Primary Location
  • 7. Hazards tab – Risk Assessment sub tab 7
  • 8. Hazards tab – Hazard Review sub tab 8 Hazard Review can be used to perform a checklist style of risk assessment which can be scored by use of Formula or Automation Script Hazard Review can be used to perform a checklist style of risk assessment which can be scored by use of Formula or Automation Script Each Review Action can have Review Items as indicated by the presence of the icon Each Review Action can have Review Items as indicated by the presence of the icon
  • 9. Hazards tab – Gas Testing sub tab 9 These fields confirm gas testing requirement and frequency These fields confirm gas testing requirement and frequency Multiple gas test results can be added at any time in the permit lifecycle Multiple gas test results can be added at any time in the permit lifecycle
  • 10. Gas Test sub tab – Details section 10
  • 11. Hazards tab – Condition for Work sub tab 11 Conditions for Work can be defined to confirm the condition of the plant for work to be carried out and also the type of isolations required Conditions for Work can be defined to confirm the condition of the plant for work to be carried out and also the type of isolations required
  • 12. Isolations tab 12 Isolations can be added directly on a permit but the Isolation Management application supports separate Isolation Certificates, sometimes referred to as Isolation Confirmation Certificates Isolations can be added directly on a permit but the Isolation Management application supports separate Isolation Certificates, sometimes referred to as Isolation Confirmation Certificates
  • 13. Isolations tab – Lock Out/Tag Out Details 13 View showing the detail of a Lock Out/Tag Out record View showing the detail of a Lock Out/Tag Out record Multiple Lock Out/Tag Out records can be added for example to support separate mechanical and electrical isolation Multiple Lock Out/Tag Out records can be added for example to support separate mechanical and electrical isolation
  • 14. Isolations tab – Lock Out/Tag Out Operations Details 14 Each Lock Out/Tag Out can have multiple operations. Each Lock Out/Tag Out can have multiple operations. View of Details section of a Lock Out/Tag Out Operation View of Details section of a Lock Out/Tag Out Operation
  • 15. Isolations tab – Lock Out/Tag Out Operation Details Isolation section 15 When the Isolation Certificate is in Approved status the operations can be marked as complete When the Isolation Certificate is in Approved status the operations can be marked as complete
  • 16. Isolation tab – Lock Out/Tag Out Operations Details Test section 16 When the Isolation Certificate is in Pending Removal status the operations can sanctioned for test When the Isolation Certificate is in Pending Removal status the operations can sanctioned for test
  • 17. Isolation tab – Lock Out/Tag Out Operations Details De-Isolation section 17 When the Isolation Certificate is in Pending Removal status the operations can be marked as complete When the Isolation Certificate is in Pending Removal status the operations can be marked as complete
  • 18. Isolation tab – Lock Out/Tag Out Operations Details De-Isolation section View Common Isolations 18 View Common Isolations can be set up to run automatically of by manual action View Common Isolations can be set up to run automatically of by manual action
  • 19. Review and Approval tab 19 Multiple Reviewers and Approvers can be added according to the type and complexity of the isolation certificate. Reviewers are optional. Sometimes the term Authorization is used instead of Approval Multiple Reviewers and Approvers can be added according to the type and complexity of the isolation certificate. Reviewers are optional. Sometimes the term Authorization is used instead of Approval
  • 20. Checklist tab 20 A general purpose checklist capability to add any type of checklist to the isolation certificate. In this example a pre- issue checklist A general purpose checklist capability to add any type of checklist to the isolation certificate. In this example a pre- issue checklist All actions can be viewed in one place by going to Operational Actions All actions can be viewed in one place by going to Operational Actions
  • 21. Site Checks and Countersignatures tab 21 Record each site check here beyond the initial site check Record each site check here beyond the initial site check Counter signature can be used when adjacent operations require a counter signature Counter signature can be used when adjacent operations require a counter signature
  • 22. Toolbox Talk tab – Completion section 22 Use these fields to capture free text notes on the Toolbox talk and confirm the talk has been completed Use these fields to capture free text notes on the Toolbox talk and confirm the talk has been completed Toolbox talk is more often associated with a permit but the same capability is also made available to support a Toolbox Talk associated with the isolation certificate
  • 23. Toolbox Talk tab – Toolbox Talk Procedure sub tab 23 Can use an Operating Procedure to create a set of prompts for the TBT Can use an Operating Procedure to create a set of prompts for the TBT
  • 24. Toolbox Talk tab – Hazard Checklist sub tab 24 This is intended to be the final check on hazards before work commences This is intended to be the final check on hazards before work commences Editable Comment field in Details section if needed Editable Comment field in Details section if needed
  • 25. Toolbox Talk tab – Work Party Declaration sub tab 25 Attendee does not have to be a Maximo user Attendee does not have to be a Maximo user Identifies that a new member has joined the work party after the initial TBT Identifies that a new member has joined the work party after the initial TBT
  • 26. Toolbox Talk tab – Dynamic Risk Assessment sub tab 26 Dynamic Risk Review items can be added to record a change in risk after work has started Dynamic Risk Review items can be added to record a change in risk after work has started
  • 27. Handback and Cancellation tab 27 Set of fields to sign off the isolation certificate on handback once the isolation is no longer required Set of fields to sign off the isolation certificate on handback once the isolation is no longer required
  • 28. Handback and Cancelation tab – Cancellation Details 28 Use to record details of any review on cancellation Use to record details of any review on cancellation Use to identify that the isolation certificate requires audit and provide link to the Audit record Use to identify that the isolation certificate requires audit and provide link to the Audit record
  • 29. Related Records tab 29 Identifies any permit or isolation certificate related to this isolation certificate Identifies any permit or isolation certificate related to this isolation certificate The originating or related Work Order. The originator is also displayed on the isolation certificate tab. The originating or related Work Order. The originator is also displayed on the isolation certificate tab.
  • 31. Log tab 31 Communication Log generated automatically from Create Communication or Workflow actions Communication Log generated automatically from Create Communication or Workflow actions Manually created log entries Manually created log entries
  • 32. Actions – Workflow and Create 32 Workflow Create Actions
  • 33. Actions – View Isolation Certificate History 33 Automatically tracks changes in status and ownership Automatically tracks changes in status and ownership
  • 35. Action – View Common Isolations 35
  • 36. Statuses Request – First status of a permit Draft – Working status of a permit used during permit preparation Approved – Used to identify approval on completion of preparation Isolation In Progress – If isolation is required identifies that isolation has not yet been completed Isolation Complete – All isolations have been confirmed as completed. Isolation Pending Removal – Isolation are pending removal Isolation Removed – All isolations have been removed Cancelled – isolation is no longer required Closed – The end of the isolation certificate cycle. It can no longer be edited at this status 36
  • 38. Job Plans – Control of Work sub tab 38 Identify multiple types of permits and certificates required at the main Job Plan level Identify multiple types of permits and certificates required at the main Job Plan level
  • 39. Job Plan Tasks – Permit and Certificate Type section 39 Can identify one Permit and Certificate Type per Task Can identify one Permit and Certificate Type per Task
  • 40. Work Order Tracking – Control of Work sub tab 40 Identify multiple types of permit or certificate required. This will cross over from any Job Plan used on the Work Order Identify multiple types of permit or certificate required. This will cross over from any Job Plan used on the Work Order Can identify permit authorities for planning purposes Can identify permit authorities for planning purposes Permit or Certificate number can be referenced here if you a not using the Maximo Permit to Work application Permit or Certificate number can be referenced here if you a not using the Maximo Permit to Work application
  • 41. Work Order Tasks – Control of Work section 41 Identify a single type of permit or certificate per task. This will cross over from any Job Plan used on the Work Order Identify a single type of permit or certificate per task. This will cross over from any Job Plan used on the Work Order If you are using Maximo Permit to Work the isolation certificate created from this Task will be referenced here If you are using Maximo Permit to Work the isolation certificate created from this Task will be referenced herePermit or Certificate number can be referenced here if you a not using the Maximo Permit to Work application Permit or Certificate number can be referenced here if you a not using the Maximo Permit to Work application
  • 42. Work Order Tracking – Create Permits action 42
  • 43. Work Order Tracking – Related Permits 43
  • 44. Operator Log – View Permit to Work and Isolation Certificate Details 44
  • 45. Operator Log – Daily Operations Report 45
  • 47. Organizations – Permit to Work and Isolation Management Options 47