SlideShare a Scribd company logo
1 of 50
Maximo Oil and
Gas
Maximo HSE
Manager
Module
overview
Change
Management
Applications in
Module
This module comprises three applications:
•Management of Change (MOC) Requests
•Management of Change (MOC)
•Improvements
Each application is described in detail
more detail in the following slides. A
separate presentation covers initial set
up and configuration of these applications.
Process flow charts used in this
presentation are extracted from
Blueworks Live.
2
MOC Requests
Example use cases
1.It can be used as the first ‘request’
stage of the MOC process
2.It can be used to link a request for
change from Maximo to an external MOC
system
3.It may be the result of an improvement
process
3
MOC Request
Process
4
List view
5
MOC Request tab –
Upper half
6
MOC Request tab –
Lower half
7
Related Records
tab
8
Follow up MOC
created from
MOC Request
Follow up MOC
created from
MOC Request
Engineering
investigation
related to the
change
Engineering
investigation
related to the
change
Log tab
9
Manually
generated Work
Log entries
Manually
generated Work
Log entries
Communication Log
generated automatically
from Create Communication
or Workflow actions
Communication Log
generated automatically
from Create Communication
or Workflow actions
MOC Request
Actions
10
Workflow
SLAs
Create Actions
MOC Request
Actions
11
View MOC
Request History
View History
MOC use cases
Example use cases
1.Plant changes
2.Engineering changes
3.Process and procedural changes
4.Personnel changes
5.Work Order deferrals
12
MOC Process
Zoom to view details
13
MOC List tab and
available queries
14
MOC
Available
Queries
MOC
Available
Queries
MOC tab – Upper
half
15
MOC tab – Lower
half
16
Projects and Risks
tab
17
Use this section
to enter project
related details
Use this section
to enter project
related details
Use this section
to enter a link to
a Risk
Assessment
where required
Use this section
to enter a link to
a Risk
Assessment
where required
Review and Approve
tab
18
Pre-Start tab
19
Authorize tab
20
Pre-Start Safety
Review tab
21
Icon identifies
that additional
Review Items are
associated with
the Review
Action
Icon identifies
that additional
Review Items are
associated with
the Review
Action
Pre-Start Safety
Review – Review
Items
22
Post-Start tab
23
Go To Operational Actions
application to see Standard
Action status for all
applications in one place
Go To Operational Actions
application to see Standard
Action status for all
applications in one place
Closure tab –
Upper half
24
Closure tab –
Lower half
25
A separate checklist
of closure actions
can be included on
the Closure tab
A separate checklist
of closure actions
can be included on
the Closure tab
Related Records
tab
26
Initiating
MOC Request
Initiating
MOC Request
Work Order used
to implement
change
Work Order used
to implement
change
Log tab
27
Manual change
log includes
references from
related MOC
Request
Manual change
log includes
references from
related MOC
Request
Communication Log
generated automatically
from Create Communication
or Workflow actions
Communication Log
generated automatically
from Create Communication
or Workflow actions
Specifications tab
28
This tab can be used
to add additional
attribute data to the
MOC associated with
Classification
This tab can be used
to add additional
attribute data to the
MOC associated with
Classification
MOC Actions
29
Workflow
SLAs
Create Actions
MOC Actions
30
View MOC
History
View History
KPIs and Available
Queries embedded
for use with MOC
31
Note: Can be used to create Start Center Portlets as shown in following slides
These KPIs are
delivered out of
the box
These KPIs are
delivered out of
the box
These queries are
delivered out of
the box
These queries are
delivered out of
the box
32
Temporary MOC by
Location Start Center
portlet
Note: Created from Available Query
33
Deferred MOC by
Location Start Center
portlet
Note: Created from Available Query
34
MOC without risk
assessment Start
Center portlet
Note: Created from KPI
35
MOCs with Pre Start
Actions not completed
Start Center portletNote: Created from KPI
36
MOCs with Post Start
Actions not completed
Start Center PortletNote: Created from KPI
Improvements use
cases
1.Most types of continuous improvement
methodology
2.Defect elimination
3.Cost/Benefit Analysis
4.Ideas management
5.First stage of a management of change
process
37
Improvement
process
38
List View
39
Improvements tab
– upper half
40
Improvements tab
– lower half
41
Plans tab
42
Optionally more
complex improvements
can be separated into
Child Improvements
and Tasks
Optionally more
complex improvements
can be separated into
Child Improvements
and Tasks
Use this section
to enter project
related details
Use this section
to enter project
related details
Costs and Benefits
Details on Plans
tab
43
Editable fields to
identify basic
cost/benefit
estimates
Editable fields to
identify basic
cost/benefit
estimates
Reference data
from the impact
record
Reference data
from the impact
record
Related Records
44
Actuals tab
45
Actuals tab can be
used to track actual
benefits against
planned benefits
Actuals tab can be
used to track actual
benefits against
planned benefits
Project Details –
Upper half
46
Project Details –
Lower half
47
Use to identify team members
associated with an Action team
formed to eliminate a defect or
who are part of an
improvement initiative
Use to identify team members
associated with an Action team
formed to eliminate a defect or
who are part of an
improvement initiative
Embedded Defect Density
calculation
Embedded Defect Density
calculation
Log tab
48
Communication Log
generated automatically
from Create Communication
or Workflow actions
Communication Log
generated automatically
from Create Communication
or Workflow actions
Manual change
log
Manual change
log
Improvements
Actions
49
Workflow
SLAs
Create Actions
Improvements
Actions
50
View Benefits
View History
Use this action to view
summarised impact and cost
estimate information
Use this action to view
summarised impact and cost
estimate information

More Related Content

What's hot

Maximo Oil and Gas 7.6.1 HSE: Benefits & Losses
Maximo Oil and Gas 7.6.1 HSE: Benefits & LossesMaximo Oil and Gas 7.6.1 HSE: Benefits & Losses
Maximo Oil and Gas 7.6.1 HSE: Benefits & LossesHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overviewMaximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overviewMaximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overviewMaximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module optionsMaximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module optionsHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Operating Policies
Maximo Oil and Gas 7.6.1 HSE: Operating PoliciesMaximo Oil and Gas 7.6.1 HSE: Operating Policies
Maximo Oil and Gas 7.6.1 HSE: Operating PoliciesHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Operator Log overview
Maximo Oil and Gas 7.6.1 HSE: Operator Log overviewMaximo Oil and Gas 7.6.1 HSE: Operator Log overview
Maximo Oil and Gas 7.6.1 HSE: Operator Log overviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix OverviewMaximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Certifications Overview
Maximo Oil and Gas 7.6.1 HSE: Certifications OverviewMaximo Oil and Gas 7.6.1 HSE: Certifications Overview
Maximo Oil and Gas 7.6.1 HSE: Certifications OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Audit & Survey Overview
Maximo Oil and Gas 7.6.1 HSE: Audit & Survey OverviewMaximo Oil and Gas 7.6.1 HSE: Audit & Survey Overview
Maximo Oil and Gas 7.6.1 HSE: Audit & Survey OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Investigations overview
Maximo Oil and Gas 7.6.1 HSE: Investigations overviewMaximo Oil and Gas 7.6.1 HSE: Investigations overview
Maximo Oil and Gas 7.6.1 HSE: Investigations overviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
 Maximo Oil and Gas 7.6.1 HSE: Solutions Overview Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
Maximo Oil and Gas 7.6.1 HSE: Solutions OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans OverviewMaximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Condition for Work Prioritization Matrix
 Maximo Oil and Gas 7.6.1 HSE: Condition for Work Prioritization Matrix Maximo Oil and Gas 7.6.1 HSE: Condition for Work Prioritization Matrix
Maximo Oil and Gas 7.6.1 HSE: Condition for Work Prioritization MatrixHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overview
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overviewMaximo Oil and Gas 7.6.1 HSE: Item master and purchasing overview
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work OverviewMaximo Oil and Gas 7.6.1 HSE: Permit to Work Overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Isolation Management Overview
Maximo Oil and Gas 7.6.1 HSE: Isolation Management OverviewMaximo Oil and Gas 7.6.1 HSE: Isolation Management Overview
Maximo Oil and Gas 7.6.1 HSE: Isolation Management OverviewHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesMaximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesHelen Fisher
 
Maximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best PracticesMaximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best PracticesHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overviewMaximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overviewHelen Fisher
 

What's hot (20)

Maximo Oil and Gas 7.6.1 HSE: Benefits & Losses
Maximo Oil and Gas 7.6.1 HSE: Benefits & LossesMaximo Oil and Gas 7.6.1 HSE: Benefits & Losses
Maximo Oil and Gas 7.6.1 HSE: Benefits & Losses
 
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overviewMaximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
Maximo Oil and Gas 7.6.1 HSE: Action Tracking & Operational Actions overview
 
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overviewMaximo Oil and Gas 7.6.1 HSE: Incident Management overview
Maximo Oil and Gas 7.6.1 HSE: Incident Management overview
 
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overviewMaximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
Maximo Oil and Gas 7.6.1 HSE: Regulatory Compliance overview
 
Maximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module optionsMaximo Oil and Gas 7.6.1 HSE: Change Module options
Maximo Oil and Gas 7.6.1 HSE: Change Module options
 
Maximo Oil and Gas 7.6.1 HSE: Operating Policies
Maximo Oil and Gas 7.6.1 HSE: Operating PoliciesMaximo Oil and Gas 7.6.1 HSE: Operating Policies
Maximo Oil and Gas 7.6.1 HSE: Operating Policies
 
Maximo Oil and Gas 7.6.1 HSE: Operator Log overview
Maximo Oil and Gas 7.6.1 HSE: Operator Log overviewMaximo Oil and Gas 7.6.1 HSE: Operator Log overview
Maximo Oil and Gas 7.6.1 HSE: Operator Log overview
 
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix OverviewMaximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
Maximo Oil and Gas 7.6.1 HSE: Risk Assessment Risk Matrix Overview
 
Maximo Oil and Gas 7.6.1 HSE: Certifications Overview
Maximo Oil and Gas 7.6.1 HSE: Certifications OverviewMaximo Oil and Gas 7.6.1 HSE: Certifications Overview
Maximo Oil and Gas 7.6.1 HSE: Certifications Overview
 
Maximo Oil and Gas 7.6.1 HSE: Audit & Survey Overview
Maximo Oil and Gas 7.6.1 HSE: Audit & Survey OverviewMaximo Oil and Gas 7.6.1 HSE: Audit & Survey Overview
Maximo Oil and Gas 7.6.1 HSE: Audit & Survey Overview
 
Maximo Oil and Gas 7.6.1 HSE: Investigations overview
Maximo Oil and Gas 7.6.1 HSE: Investigations overviewMaximo Oil and Gas 7.6.1 HSE: Investigations overview
Maximo Oil and Gas 7.6.1 HSE: Investigations overview
 
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
 Maximo Oil and Gas 7.6.1 HSE: Solutions Overview Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
Maximo Oil and Gas 7.6.1 HSE: Solutions Overview
 
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans OverviewMaximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
Maximo Oil and Gas 7.6.1 HSE: Work Orders Job Plans Overview
 
Maximo Oil and Gas 7.6.1 HSE: Condition for Work Prioritization Matrix
 Maximo Oil and Gas 7.6.1 HSE: Condition for Work Prioritization Matrix Maximo Oil and Gas 7.6.1 HSE: Condition for Work Prioritization Matrix
Maximo Oil and Gas 7.6.1 HSE: Condition for Work Prioritization Matrix
 
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overview
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overviewMaximo Oil and Gas 7.6.1 HSE: Item master and purchasing overview
Maximo Oil and Gas 7.6.1 HSE: Item master and purchasing overview
 
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work OverviewMaximo Oil and Gas 7.6.1 HSE: Permit to Work Overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Overview
 
Maximo Oil and Gas 7.6.1 HSE: Isolation Management Overview
Maximo Oil and Gas 7.6.1 HSE: Isolation Management OverviewMaximo Oil and Gas 7.6.1 HSE: Isolation Management Overview
Maximo Oil and Gas 7.6.1 HSE: Isolation Management Overview
 
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate TypesMaximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
Maximo Oil and Gas 7.6.1 HSE: Permit & Certificate Types
 
Maximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best PracticesMaximo - Management of Change (MOC) Implementation Best Practices
Maximo - Management of Change (MOC) Implementation Best Practices
 
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overviewMaximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
Maximo Oil and Gas 7.6.1 HSE: Permit to Work Options overview
 

Similar to Maximo Oil and Gas 7.6.1 HSE: Change Module Overview

Lesson 4 Homework 100 points totalDue Tuesday October 18th, .docx
Lesson 4 Homework 100 points totalDue  Tuesday October 18th, .docxLesson 4 Homework 100 points totalDue  Tuesday October 18th, .docx
Lesson 4 Homework 100 points totalDue Tuesday October 18th, .docxLaticiaGrissomzz
 
TOGAF-V9-M24-Phase-E-F-Opportunities Solutions Migration.ppt
TOGAF-V9-M24-Phase-E-F-Opportunities Solutions Migration.pptTOGAF-V9-M24-Phase-E-F-Opportunities Solutions Migration.ppt
TOGAF-V9-M24-Phase-E-F-Opportunities Solutions Migration.pptmambrino
 
software configuration management ppt
 software configuration management  ppt software configuration management  ppt
software configuration management pptYeshiwas Getachew
 
Technology roadmap
Technology roadmapTechnology roadmap
Technology roadmapauspin
 
System Development Life Cycle
System Development Life CycleSystem Development Life Cycle
System Development Life CycleDoma Ngonie
 
Onlineshopping 121105040955-phpapp02
Onlineshopping 121105040955-phpapp02Onlineshopping 121105040955-phpapp02
Onlineshopping 121105040955-phpapp02Shuchi Singla
 
Onlineshoppingonline shopping
Onlineshoppingonline shoppingOnlineshoppingonline shopping
Onlineshoppingonline shoppingHardik Padhy
 
Implementing a New QMS Improvement System
Implementing a New QMS Improvement SystemImplementing a New QMS Improvement System
Implementing a New QMS Improvement SystemPECB
 
Ch 7 integrating quality activities in the projectlife cycle
Ch 7 integrating quality activities in the projectlife cycleCh 7 integrating quality activities in the projectlife cycle
Ch 7 integrating quality activities in the projectlife cycleKittitouch Suteeca
 
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...kndnewguade
 
Informing Program Performance with Technical Performance Measures (TPMs)
Informing Program Performance with Technical Performance Measures (TPMs)Informing Program Performance with Technical Performance Measures (TPMs)
Informing Program Performance with Technical Performance Measures (TPMs)Glen Alleman
 
Ch25-Software Engineering 9
Ch25-Software Engineering 9Ch25-Software Engineering 9
Ch25-Software Engineering 9Ian Sommerville
 
CaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LICaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LISean Cull
 
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...OmnaCool
 

Similar to Maximo Oil and Gas 7.6.1 HSE: Change Module Overview (20)

MOC2016_v2
MOC2016_v2MOC2016_v2
MOC2016_v2
 
Lesson 4 Homework 100 points totalDue Tuesday October 18th, .docx
Lesson 4 Homework 100 points totalDue  Tuesday October 18th, .docxLesson 4 Homework 100 points totalDue  Tuesday October 18th, .docx
Lesson 4 Homework 100 points totalDue Tuesday October 18th, .docx
 
TOGAF-V9-M24-Phase-E-F-Opportunities Solutions Migration.ppt
TOGAF-V9-M24-Phase-E-F-Opportunities Solutions Migration.pptTOGAF-V9-M24-Phase-E-F-Opportunities Solutions Migration.ppt
TOGAF-V9-M24-Phase-E-F-Opportunities Solutions Migration.ppt
 
software configuration management ppt
 software configuration management  ppt software configuration management  ppt
software configuration management ppt
 
Technology roadmap
Technology roadmapTechnology roadmap
Technology roadmap
 
System Development Life Cycle
System Development Life CycleSystem Development Life Cycle
System Development Life Cycle
 
Onlineshopping 121105040955-phpapp02
Onlineshopping 121105040955-phpapp02Onlineshopping 121105040955-phpapp02
Onlineshopping 121105040955-phpapp02
 
Onlineshoppingonline shopping
Onlineshoppingonline shoppingOnlineshoppingonline shopping
Onlineshoppingonline shopping
 
Software Configuration Management
Software Configuration ManagementSoftware Configuration Management
Software Configuration Management
 
Implementing a New QMS Improvement System
Implementing a New QMS Improvement SystemImplementing a New QMS Improvement System
Implementing a New QMS Improvement System
 
Ch 7 integrating quality activities in the projectlife cycle
Ch 7 integrating quality activities in the projectlife cycleCh 7 integrating quality activities in the projectlife cycle
Ch 7 integrating quality activities in the projectlife cycle
 
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
293504541-ict-its4-03-0811-assist-with-policy-development-for-client-support-...
 
Spc assignment
Spc assignmentSpc assignment
Spc assignment
 
Informing Program Performance with Technical Performance Measures (TPMs)
Informing Program Performance with Technical Performance Measures (TPMs)Informing Program Performance with Technical Performance Measures (TPMs)
Informing Program Performance with Technical Performance Measures (TPMs)
 
csc 510 Project
csc 510 Projectcsc 510 Project
csc 510 Project
 
Ch25-Software Engineering 9
Ch25-Software Engineering 9Ch25-Software Engineering 9
Ch25-Software Engineering 9
 
CaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LICaseStudy_MOC_PX_2015_LI
CaseStudy_MOC_PX_2015_LI
 
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
IS Change& knowledge Management Processes AwarnessTraining PPT June 2023-draf...
 
Coso Monitoring - Templates
Coso Monitoring - TemplatesCoso Monitoring - Templates
Coso Monitoring - Templates
 
DENR Semi Annual Report (CMR) Form
DENR Semi Annual Report (CMR) FormDENR Semi Annual Report (CMR) Form
DENR Semi Annual Report (CMR) Form
 

More from Helen Fisher

MaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit SolutionMaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit SolutionHelen Fisher
 
MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018Helen Fisher
 
Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Helen Fisher
 
Watson IoT at Think 2018
Watson IoT at Think 2018Watson IoT at Think 2018
Watson IoT at Think 2018Helen Fisher
 
IBM Maximo and ISO 55000
IBM Maximo and ISO 55000IBM Maximo and ISO 55000
IBM Maximo and ISO 55000Helen Fisher
 
BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017Helen Fisher
 
IBM Maximo for utilities T&D
IBM Maximo for utilities T&DIBM Maximo for utilities T&D
IBM Maximo for utilities T&DHelen Fisher
 
Maximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industryMaximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industryHelen Fisher
 
Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview Helen Fisher
 

More from Helen Fisher (10)

MaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit SolutionMaxTECH Technical Training - Maximo Custom Audit Solution
MaxTECH Technical Training - Maximo Custom Audit Solution
 
MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018MaxTECH Technical Training Presentation from MaximoWorld 2018
MaxTECH Technical Training Presentation from MaximoWorld 2018
 
Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201Canadian Maximo User Group Technical Training - Maximo Reporting 201
Canadian Maximo User Group Technical Training - Maximo Reporting 201
 
Watson IoT at Think 2018
Watson IoT at Think 2018Watson IoT at Think 2018
Watson IoT at Think 2018
 
IBM Maximo and ISO 55000
IBM Maximo and ISO 55000IBM Maximo and ISO 55000
IBM Maximo and ISO 55000
 
BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017BPD Zenith AMUG Presentation 2017
BPD Zenith AMUG Presentation 2017
 
Maximo 7.6.0.8
Maximo 7.6.0.8Maximo 7.6.0.8
Maximo 7.6.0.8
 
IBM Maximo for utilities T&D
IBM Maximo for utilities T&DIBM Maximo for utilities T&D
IBM Maximo for utilities T&D
 
Maximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industryMaximo mobile work management in the hospitality industry
Maximo mobile work management in the hospitality industry
 
Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview Maximo Oil and Gas 7.6.1 HSE: Overview
Maximo Oil and Gas 7.6.1 HSE: Overview
 

Recently uploaded

BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEOrtus Solutions, Corp
 
Xen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdfXen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdfStefano Stabellini
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmSujith Sukumaran
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEEVICTOR MAESTRE RAMIREZ
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio, Inc.
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样umasea
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based projectAnoyGreter
 
Introduction Computer Science - Software Design.pdf
Introduction Computer Science - Software Design.pdfIntroduction Computer Science - Software Design.pdf
Introduction Computer Science - Software Design.pdfFerryKemperman
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackVICTOR MAESTRE RAMIREZ
 
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...stazi3110
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityNeo4j
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024StefanoLambiase
 
Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...
Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...
Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...OnePlan Solutions
 
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in NoidaBuds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in Noidabntitsolutionsrishis
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...Christina Lin
 
What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....kzayra69
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideChristina Lin
 
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...Matt Ray
 

Recently uploaded (20)

BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
 
2.pdf Ejercicios de programación competitiva
2.pdf Ejercicios de programación competitiva2.pdf Ejercicios de programación competitiva
2.pdf Ejercicios de programación competitiva
 
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Patel Nagar🔝 9953056974 🔝 escort Service
 
Xen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdfXen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdf
 
Intelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalmIntelligent Home Wi-Fi Solutions | ThinkPalm
Intelligent Home Wi-Fi Solutions | ThinkPalm
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEE
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based project
 
Introduction Computer Science - Software Design.pdf
Introduction Computer Science - Software Design.pdfIntroduction Computer Science - Software Design.pdf
Introduction Computer Science - Software Design.pdf
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStack
 
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered Sustainability
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
 
Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...
Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...
Maximizing Efficiency and Profitability with OnePlan’s Professional Service A...
 
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in NoidaBuds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
 
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
ODSC - Batch to Stream workshop - integration of Apache Spark, Cassandra, Pos...
 
What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....What are the key points to focus on before starting to learn ETL Development....
What are the key points to focus on before starting to learn ETL Development....
 
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop SlideBuilding Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
Building Real-Time Data Pipelines: Stream & Batch Processing workshop Slide
 
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
Open Source Summit NA 2024: Open Source Cloud Costs - OpenCost's Impact on En...
 

Maximo Oil and Gas 7.6.1 HSE: Change Module Overview