4. Objective of this project
Prevent flood for the central of
HCM city, 3.393 ha, including 7
dist. (Dist. 1, 3, 10, Bình Thạnh,
Gò Vấp, Phú Nhuận, Tân Bình).
Improve the environmental
landscape in the canal Nhiêu
Lộc – Thị Nghè.
6. To control the water level
at the canal NL-TL,
increased by tide and
flood of the Saigon river
Improve drainage efficacy
of the rainy water
Keep the water level low
Function of the sluice gate
7. Illustration of the sluice gate
MÁY
BƠM 1
Cửa phẳng
MÁY
BƠM 2
MÁY
BƠM 3
MÁY
BƠM 4
H
Ầ
M
B
Ơ
M
CỐNG NGĂN
TRIỀU 1(Cửa sập)
MÁY
BƠM 5
Cửa phẳng
MÁY
BƠM 6
MÁY
BƠM 7
MÁY
BƠM 8
H
Ầ
M
B
Ơ
M
CỐNG NGĂN
TRIỀU 2(Cửa sập)
Hợp lưu Kênh NLTN, Rạch Văn Thánh
8. MẶT BẰNG TRẠM KST NL-TN
Khu vực nhà điều hành:
- Cấp II 2 tầng
- Kích thước nhà điều hành:7,2 x 14,4 m
Cầu trên cống;
- Tổng chiều dài : 112 m
Trạm biến áp 22 kV – 0,4 kV
- Công suất : 2 x 1500 kVA
Máy phát điện dự phòng.
- Công suất : 200 kVA
- Chiều rộng : 8 m
- Tải trọng: 300 KG/m2
9. Sewer system
wastewaterRain water
Pumping station
64.000 m3/h
Pumping station
64.000 m3/h
WWTPWWTP
Phase 1
Phase 2
Other sewer systemOther sewer system
2. Pumping station NLTN
11. Nhà điều hànhNhà điều hành
Nhà lược rácNhà lược rác
Trạm khử mùiTrạm khử mùi
Trạm cấp điện 1Trạm cấp điện 1
12 bơm chính12 bơm chính
Trạm cấp điện 2Trạm cấp điện 2
Bảo vệBảo vệ
Pumping station Nhiêu Lộc – Thị Nghè
12. Location: Xã Bình Hưng, huyện Bình Chánh, TP.HCM
Area: 47ha (phase 1: 14ha)
Capacity (phase 1): 141.000 m3
/ ngày
Advance activated slugde technology
Loans from Japan ODA, phase 1: 100 triệu USD
Completed on 12/2008
3. WWTP-Binh Hung
12
13. Wastewater treatment processWastewater treatment process
Sludge treatment
Coarse screen
Primary
sedimentation tank
Aerobic tank Secondary
sedimentation tank
Disinfection
CentrifugationConcentrating
Sludge tank
Mixed sludge tank Centrifuge dewatering
Bánh bùn
Xe chở bùn
NaClO
Bùn tươi
Sludge recycle (25%)
Bùn
dư Canal Tắc Bến Rô
influent
Effluent
Storage as
fertiliser
13
04/04/17
14. Year Area Population
Capacity
(m3
/day)
Quality of treated
water
Phase I 2008 824,8 ha 425.830 141.000 BOD ≤ 50 mg/L
SS ≤ 100 mg/L
Phase II 2015 2.791,6 ha 1.421.778 469.000 BOD ≤ 50 mg/L
SS ≤ 100 mg/L
Phase III 2020 2.791,6 ha 1.390.282 512.000 BOD ≤ 20 mg/L
SS ≤ 50 mg/L
Design parametersDesign parameters
14
16. Safety rules in WWTP
• Personal protective equipment
(helmet, cover shoe)
• Notice the sign
• No smoking
• All go together, and follow the
guide
• Donot use recycle water from
outside faucet. Only use water
in the main office
16
17. Keep calm
Assemble at safety point
Follow the guide/leader
Do not return the dangerous area
Emergency situation