SlideShare a Scribd company logo
1 of 7
- 1 -
CURRICULUM VITAE
GRAEME GARDNER
CURRICULUM VITAE
NAME: Allan Graeme Gardner
LOCATION Hartlepool
MAIN DISCIPLINE: Supervisor/Plater
SUMMARY: A highlyexperiencedandteam orientatedforeman/ supervisor with
extensive experience workinginthe Offshore Oil & Gas Sectors inthe
Uk, Offshore and Norway. Has validOffshore survival documentsand
experience inmanagingteams of 12 – 250 in a range ofdisciplines.
Experiencedinworking to targets and deadlinesas well as adheringand
enforcingstrict health & safety procedures.
QUALIFICATIONSAND
TRAINING:
 Offshore Medical –Exp 18/09/2017
 Offshore Survival- Exp09/03/2019 UK
 Offshore Survival–Exp 09/03/2019 Norway
 City& GuildsStructural Plate
 Basic & Parts i,ii & iii
 BA & FirstAidTrained
 Hydra TightSweeneyBoltTensioning
 Rigging/Lifting-Slinging/BanksmanLolerAwareness
 SabtekLock RingTrained
 Parkera Lock SystemTrained
 ISSOW Trained
 IOSH Certificate inManagingSafetyinEngineering& Construction
 GOC Trained(Guidance onCertification) QEDInternational
 PermitCo-ordinator
 Mist TrainingfromPSN May 2010
2
CURRICULUM VITAE
GRAEME GARDNER
CAREER HISTORY:
NES Globaltalent February2013 – Present
TOTAL Nigeria
AKPO FPSO
ConstructionWorks Leader (Superintendant)
 Responsible fororganizationof contractorsconstructionteamtoexecute various ,workscopes
to achieve asuccessful dayto dayrunningof maintenance andrepairworkforthe ECP
department onboardthe AKPOFPSO.
 EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box
talkswithall personnel
 Reportinganyissuesatthe daily handovermeetingwiththe ECPSite rep providingorganization
of dailypermitrequirements.
 Providinginformation tothe Onshore team regardingEQ`sTQ`s SMR`s for the engineering
departmentsreviewsof ECPworkscopes.
NES Globaltalent October2012 – December2012
TOTAL Nigeria
AKPO FPSO
Offshore ConstructionSupervisor
 Responsible forcontractorsconstructionteamtoexecute various ,workscopestoachieve a
successful completionof aFFSD2012 on board the AKPOFPSO.
 EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box
talkswithall personnel
 Reportinganyissuesatthe daily handovermeeting.
Cansco GreigEng May 2012 – September2012
FoinavenFPSO
Teekay Petrojarl Production AS
Offshore ConstructionSupervisor
 Responsible foraconstruction teamconsistingof blacktrade’swelder’splaters&riggersalso
Utilitytechs(joiners,plumbers,electricians&Hvactechs) conductingtwoworkfrontsto
enhance lifetimeintegrityof the FoinavenFPSO.
 Supervisingthe projects, whichwere Accommodationupgrade of 4locationsinto12 Bedrooms
withcommunal areas& bathrooms,andfittingof additional lifeboatsupportframeswith
modificationstothe existing structure.
 ProjectLiaison meetingsbetween client,OIM& engineeringdepartments viapersonal presence
on site & dailyvideoconference calls toonshore.
 EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box
talkswithall staff members
 Reportinganyissuesatthe dailyhandovermeeting&HandovertoNightshiftpersonnel.
 Liaise withDNV & HSE representativeswhenrequired.
3
CURRICULUM VITAE
GRAEME GARDNER
AgotnesSveisAS March 2012- May 2012
NordhagenProjects for Songa Offshore.AS
Sotra,Bergen.
FabricationSupervisor
 Responsible forafabricationteam onthe Under DeckStrengtheningof the SongaDee project
Semi-sub.
 Supervisingthe projectwhichrequired20+ personnel includingWelders,Platers,Riggersand
Mechanical Fitters,weld inspection&painters
 ProjectLiaisonMeetings between Client,Engineering&MainContractor via personal presence
on site
 EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box
talkswithall staff members
 Reportinganyissuesatthe daily handovermeetings&HandovertoNightshiftpersonnel &
supervisors.
 LiaisedwithDNV representativeswhenrequired
 Liaisedwith HS& E Officers responsible forHS&Eon Project.
Stavanger Contracting EngineeringAS
Talisman/Single Buoy MooringsYME MopupsterProject
Stavanger Norway
January 2011 - December2011
Construction Supervisor
 Responsible for20 - 250 menat anyone time
 Supervisionof the NightShiftof 250 staff includingWelders,Platers,RiggersandMechanical
Fitters
 OverseeingIKM.as Chemical FlushingTeamsviapersonalpresence onsite
 EnsuringstrictHealthand Safety Regulationswere adheredtoviavisual inspectionsandtool box
talkswithall staff members
 Reportinganyissuesatthe dailyhandover tothe hookup managerand day shiftsupervisors
 Liaisedwith DNV representatives whenrequired.
 Solelyresponsible forHS&Eonshift.
4
CURRICULUM VITAE
GRAEME GARDNER
PSN Ltd
Buzzard Hook-Up & Enhancement Projectof PS Platform
& AlepProjectfor Conoco Phillips (SouthernSector)
May 2010 - January 2011
StructuralForeman/Plater
 Responsible forateamof Platerscarryingoutall aspectsof structural steelwork,installationand
modificationrequiredforthe hookupcompletionworksonthe NexenBuzzardPSPlatform
 Liaisingwiththe Nexenengineeringteamforacceptance of workpacks
 Compilingtime sheets,productivityreportsandreportingprogress
 Signingoff of jobcards
 Orderingmaterials,permitsandconductingtoolbox talkswithinworkparty
 Ensuringall HSE procedureswere adheredtoatall times
 Resolvingclash potentialsonthe hookup
 Liaisingdirectlywiththe clientonissuessuchasstructural integrity
 One of six forementhatreportedtothe superintendentsoensuringastrongworking
relationshipwithothertradesforemenwasessential
 Workingon a gas sweeteningplatformthatisdue to go live in2012
 Workingunderstricttargets due to hookupcontract
 Builtstrongworkingrelationshipswithstaff tomaintainperformance levels.
Aker Kvaerner
Phase 1 & 2 of the Balmoral - Brenda Power GenerationProject
& Burghleyover Balmoral topside flowlinestie back installation
April 2007 - May 2010
General Foreman
 Topside flowlinestie backinstallation
 Line and level surveyof steelworkonafloatingplatform
 GeneratingPermits
 Completingriskassessments
 Meetingproductiontargets
 Certificationcloseoutof workpacks
 Organisationof 3rd party contractorsand vendors
 HSE and welfare of projectteam
 Workingcloselywiththe commissioningteamonprojectclose outaswell asday to day
responsibilities
 Supervisingamulti disciplinedteamof upto 30 men
 Buildingstrongrelationshipswithstaff toensure thatproductiontargetswere metandto
minimise conflictsonsite.
5
CURRICULUM VITAE
GRAEME GARDNER
RBG Ltd
Lundin Thistle AlphaReactivation Project
RDS/KCA Deutag
February 2007 - April 2007
MechanicalSupervisor
 Rejuvenationof drillingpackage
 Managing 20 Staff includingWelders,Platers,PipefittersandRiggers.
Aker Kvaerner
DecommissioningofThe MCP01 Total Platform Frigg Field
July 2006 - Jan 2007
Mechanical/StructuralSupervisor
 Taskedby Akertobe the mechanical /structural supervisoronsite due tomy pastsuccesson
contracts
 Generatingriskassessments
 Riskassessments
 Responsible forhealthandsafetyonsite
 Managing a multi disciplined teamof upto 20 staff
 Workingfor 2-3 weekswithstaff inthe engineeringdesignofficeinNorway.
Aker Kvaerner.
Bluewater F.P.S.OVessels
May 2006 - July 2006
ConstSupt
 VariousShutdowns,maintenance andmodification
Aker Kvaerner
BG-Armada Offshore
May 2004 - April 2006
General Foreman/ConstructionSupt
 Ops-Mods/maintenance- shutdownpermitcoordination.
 Day to day dutiesincludedsurveysforfuture projects.
 Resolvingpossible clashesforonshore Engineering.
 Close liaisonwithBGmanagement.
 SoloPermitco-ordinatorforaprojectinvolving400+ personnel..
Aker Kvaerner
BluewaterF.P.S.O. Vessels
February 2003 - May 2004
General Foreman
 Variousshutdowns,maintenance andmodifications.
6
CURRICULUM VITAE
GRAEME GARDNER
HeeremaLtd
Shell Bonga Project, TopsidesFor FPSO
October 2002 - January 2003
Plater
Aker Kvaerner
Elgin FranklinOffshore
September2002 - October 2002
Plater
Constructionof Lifeboat/MusterStation.
Aker / McNulty Offshore
Topside Hook for BP Valhall “A” Platform
August 2002 - September2002
Foreman Plater
Halliburton/ Brown & Root
Baines Project,Morecambe Bay Platform Offshore
April 2002 - August 2002
Plater
Aker Oil Gas TechologyUK Plc
Hannay Project,Buchan Alpha,Uisge Gorm FPSO,Kildrummy Project,
PiperBravo (Offshore)
September2001 - April 2002
Plater
IRS Ltd (SLP Engineering)
NAM K81 Project (Offshore)
August 2001 - September2001
Plater
CCL Ltd
VlaardingenOost Ship RepairYard, Rotterdam, Holland
June 2001 - August 2001
Plater
McNultyOffshore Ltd
Ensco 92, Jackup Installation,Refit
March 2001 - May 2001
Foreman Plater
PLS Fabrications Ltd
Corus Steelworks,ShopFabrications
February 2001 - March 2001
Plater
Torway ConstructionCo Ltd
Paradise Island,Nassau, Bahamas P.O. Box Ee-17458
Harbourside Timeshares
August 2000 - December2000
Construction Supervisor/SkillsInstructor
7
CURRICULUM VITAE
GRAEME GARDNER
 Fabricationof steelworkforconstructioncontractswithalarge and multi-nationalworkforce.
Hartlepool Erection Group
Shutdown,(Luton) Refitof Production Line
July 2000
Plater
 Fabricationof steel anderectionof pipe supports.
CaxiosPipeworkLtd
SaltendCo-GenerationProject,Hull
January 2000 - April 2000
Plater
 Fabricationanderection of structural steel andpipe supports,boilerfabrication.
CaxiosPipeworkLtd
Elf (Murco) RefineryShutdown,MillfordHaven, South Wales
November1999
Plater
 Fabricationof steel anderectionof pipe supports.
Aker Maritime Ltd
WestNavionDrill Ship For Smedvic,Norway
June 1999 - Sept 1999
Plater
Fabricationanderectionof structural steel andpipe supports.
Aker Maritime Ltd June 1999
Plater
 Offshore ShutdownOnThe “Janice”Semi-SubForKerr-Magee Ltd.
HeeremaUK
Offshore hook-upShell Shear WaterWell-headplatform
May 1999 - June 1999
Plater
Previous Employment Can be Produced as required, Apprentiship from 1983 – 1987
At F Peart & Sons Ltd, Baltic works Hartlepool,
.
References as Required
E-Mail graeme.gardner@yahoo.co.uk
graeme.gardner@hotmail.co.uk
UK Mobile 00447952364550
Nigerian Mobile 08109986230.

More Related Content

What's hot

cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015Andrew De Jong
 
Graham Steele-CV-18NOV15
Graham Steele-CV-18NOV15Graham Steele-CV-18NOV15
Graham Steele-CV-18NOV15Graham Steele
 
Update CV 01.08.15
Update CV 01.08.15Update CV 01.08.15
Update CV 01.08.15Edmar Reso
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner UpdatedEric Viner
 
Shaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copyShaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copyShaun Rowe
 
QG CERT (1)
QG CERT (1)QG CERT (1)
QG CERT (1)ali asif
 
CV Kjartan Tobiassen_English
CV Kjartan Tobiassen_EnglishCV Kjartan Tobiassen_English
CV Kjartan Tobiassen_EnglishKjartan Tobiassen
 
Andy Crookes CV (2)
Andy Crookes CV (2)Andy Crookes CV (2)
Andy Crookes CV (2)Andy Crookes
 
Cs Presentation Rev5
Cs Presentation Rev5Cs Presentation Rev5
Cs Presentation Rev5jesse_11
 
Pacific_Region_Services_Brochure
Pacific_Region_Services_BrochurePacific_Region_Services_Brochure
Pacific_Region_Services_BrochureHardeep Singh
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson
 

What's hot (20)

cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015cv_de jong_Andrew July 2015
cv_de jong_Andrew July 2015
 
Graham Steele-CV-18NOV15
Graham Steele-CV-18NOV15Graham Steele-CV-18NOV15
Graham Steele-CV-18NOV15
 
Update CV 01.08.15
Update CV 01.08.15Update CV 01.08.15
Update CV 01.08.15
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner Updated
 
Offshore Excellence Awards Magazine (Grantec Engineering)
Offshore Excellence Awards Magazine (Grantec Engineering)Offshore Excellence Awards Magazine (Grantec Engineering)
Offshore Excellence Awards Magazine (Grantec Engineering)
 
Shaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copyShaun Rowe_Res may 16 the one copy
Shaun Rowe_Res may 16 the one copy
 
Dwain's Resume2016
Dwain's Resume2016Dwain's Resume2016
Dwain's Resume2016
 
QG CERT (1)
QG CERT (1)QG CERT (1)
QG CERT (1)
 
Resume 2014
Resume 2014Resume 2014
Resume 2014
 
CVbillyno3-
CVbillyno3-CVbillyno3-
CVbillyno3-
 
Jamie Wilson
Jamie Wilson Jamie Wilson
Jamie Wilson
 
CV Kjartan Tobiassen_English
CV Kjartan Tobiassen_EnglishCV Kjartan Tobiassen_English
CV Kjartan Tobiassen_English
 
Waqar Resume
Waqar ResumeWaqar Resume
Waqar Resume
 
Evan CV RSTC
Evan CV RSTCEvan CV RSTC
Evan CV RSTC
 
Andy Crookes CV (2)
Andy Crookes CV (2)Andy Crookes CV (2)
Andy Crookes CV (2)
 
Aaron's Resume 2014 new
Aaron's Resume 2014 newAaron's Resume 2014 new
Aaron's Resume 2014 new
 
Cs Presentation Rev5
Cs Presentation Rev5Cs Presentation Rev5
Cs Presentation Rev5
 
CV of KB.Smith
CV of KB.SmithCV of KB.Smith
CV of KB.Smith
 
Pacific_Region_Services_Brochure
Pacific_Region_Services_BrochurePacific_Region_Services_Brochure
Pacific_Region_Services_Brochure
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 

Similar to CURRICULUM VITAE 2015 GG

Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...The Images Group
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross
 
George Stark Boroscope CV
George Stark Boroscope CVGeorge Stark Boroscope CV
George Stark Boroscope CVGeorge Stark
 
James McSorley CV updated 20160729
James McSorley CV updated 20160729James McSorley CV updated 20160729
James McSorley CV updated 20160729Jim McSorley
 
Resume A Julius Linkedin
Resume A Julius LinkedinResume A Julius Linkedin
Resume A Julius LinkedinA Julius Achu
 
Alan Russell CV April 2015
Alan Russell CV April 2015Alan Russell CV April 2015
Alan Russell CV April 2015Alan Russell
 

Similar to CURRICULUM VITAE 2015 GG (20)

CV JMCNAB
CV JMCNABCV JMCNAB
CV JMCNAB
 
CV JMCNAB
CV JMCNABCV JMCNAB
CV JMCNAB
 
David_Wanless_CV
David_Wanless_CVDavid_Wanless_CV
David_Wanless_CV
 
WRS CV 05-15
WRS  CV 05-15WRS  CV 05-15
WRS CV 05-15
 
W Dave Minty CV
W Dave Minty CVW Dave Minty CV
W Dave Minty CV
 
CV
CVCV
CV
 
Michael Groarke Resume
Michael Groarke ResumeMichael Groarke Resume
Michael Groarke Resume
 
Knud larsen
Knud larsenKnud larsen
Knud larsen
 
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
Rope Access Presentation from Abfad Limited, World Leaders in Rope Access Tec...
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1
 
Stephen McLaren CV
Stephen McLaren CVStephen McLaren CV
Stephen McLaren CV
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Glenn Ross CV .doc 1
Glenn Ross CV .doc 1Glenn Ross CV .doc 1
Glenn Ross CV .doc 1
 
Davide Ansaldi CV
Davide Ansaldi CVDavide Ansaldi CV
Davide Ansaldi CV
 
George Stark Boroscope CV
George Stark Boroscope CVGeorge Stark Boroscope CV
George Stark Boroscope CV
 
James McSorley CV updated 20160729
James McSorley CV updated 20160729James McSorley CV updated 20160729
James McSorley CV updated 20160729
 
CV
CVCV
CV
 
Resume A Julius Linkedin
Resume A Julius LinkedinResume A Julius Linkedin
Resume A Julius Linkedin
 
Alan Russell CV April 2015
Alan Russell CV April 2015Alan Russell CV April 2015
Alan Russell CV April 2015
 
Ian Entwistle CV
Ian Entwistle CVIan Entwistle CV
Ian Entwistle CV
 

CURRICULUM VITAE 2015 GG

  • 1. - 1 - CURRICULUM VITAE GRAEME GARDNER CURRICULUM VITAE NAME: Allan Graeme Gardner LOCATION Hartlepool MAIN DISCIPLINE: Supervisor/Plater SUMMARY: A highlyexperiencedandteam orientatedforeman/ supervisor with extensive experience workinginthe Offshore Oil & Gas Sectors inthe Uk, Offshore and Norway. Has validOffshore survival documentsand experience inmanagingteams of 12 – 250 in a range ofdisciplines. Experiencedinworking to targets and deadlinesas well as adheringand enforcingstrict health & safety procedures. QUALIFICATIONSAND TRAINING:  Offshore Medical –Exp 18/09/2017  Offshore Survival- Exp09/03/2019 UK  Offshore Survival–Exp 09/03/2019 Norway  City& GuildsStructural Plate  Basic & Parts i,ii & iii  BA & FirstAidTrained  Hydra TightSweeneyBoltTensioning  Rigging/Lifting-Slinging/BanksmanLolerAwareness  SabtekLock RingTrained  Parkera Lock SystemTrained  ISSOW Trained  IOSH Certificate inManagingSafetyinEngineering& Construction  GOC Trained(Guidance onCertification) QEDInternational  PermitCo-ordinator  Mist TrainingfromPSN May 2010
  • 2. 2 CURRICULUM VITAE GRAEME GARDNER CAREER HISTORY: NES Globaltalent February2013 – Present TOTAL Nigeria AKPO FPSO ConstructionWorks Leader (Superintendant)  Responsible fororganizationof contractorsconstructionteamtoexecute various ,workscopes to achieve asuccessful dayto dayrunningof maintenance andrepairworkforthe ECP department onboardthe AKPOFPSO.  EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box talkswithall personnel  Reportinganyissuesatthe daily handovermeetingwiththe ECPSite rep providingorganization of dailypermitrequirements.  Providinginformation tothe Onshore team regardingEQ`sTQ`s SMR`s for the engineering departmentsreviewsof ECPworkscopes. NES Globaltalent October2012 – December2012 TOTAL Nigeria AKPO FPSO Offshore ConstructionSupervisor  Responsible forcontractorsconstructionteamtoexecute various ,workscopestoachieve a successful completionof aFFSD2012 on board the AKPOFPSO.  EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box talkswithall personnel  Reportinganyissuesatthe daily handovermeeting. Cansco GreigEng May 2012 – September2012 FoinavenFPSO Teekay Petrojarl Production AS Offshore ConstructionSupervisor  Responsible foraconstruction teamconsistingof blacktrade’swelder’splaters&riggersalso Utilitytechs(joiners,plumbers,electricians&Hvactechs) conductingtwoworkfrontsto enhance lifetimeintegrityof the FoinavenFPSO.  Supervisingthe projects, whichwere Accommodationupgrade of 4locationsinto12 Bedrooms withcommunal areas& bathrooms,andfittingof additional lifeboatsupportframeswith modificationstothe existing structure.  ProjectLiaison meetingsbetween client,OIM& engineeringdepartments viapersonal presence on site & dailyvideoconference calls toonshore.  EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box talkswithall staff members  Reportinganyissuesatthe dailyhandovermeeting&HandovertoNightshiftpersonnel.  Liaise withDNV & HSE representativeswhenrequired.
  • 3. 3 CURRICULUM VITAE GRAEME GARDNER AgotnesSveisAS March 2012- May 2012 NordhagenProjects for Songa Offshore.AS Sotra,Bergen. FabricationSupervisor  Responsible forafabricationteam onthe Under DeckStrengtheningof the SongaDee project Semi-sub.  Supervisingthe projectwhichrequired20+ personnel includingWelders,Platers,Riggersand Mechanical Fitters,weld inspection&painters  ProjectLiaisonMeetings between Client,Engineering&MainContractor via personal presence on site  EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box talkswithall staff members  Reportinganyissuesatthe daily handovermeetings&HandovertoNightshiftpersonnel & supervisors.  LiaisedwithDNV representativeswhenrequired  Liaisedwith HS& E Officers responsible forHS&Eon Project. Stavanger Contracting EngineeringAS Talisman/Single Buoy MooringsYME MopupsterProject Stavanger Norway January 2011 - December2011 Construction Supervisor  Responsible for20 - 250 menat anyone time  Supervisionof the NightShiftof 250 staff includingWelders,Platers,RiggersandMechanical Fitters  OverseeingIKM.as Chemical FlushingTeamsviapersonalpresence onsite  EnsuringstrictHealthand Safety Regulationswere adheredtoviavisual inspectionsandtool box talkswithall staff members  Reportinganyissuesatthe dailyhandover tothe hookup managerand day shiftsupervisors  Liaisedwith DNV representatives whenrequired.  Solelyresponsible forHS&Eonshift.
  • 4. 4 CURRICULUM VITAE GRAEME GARDNER PSN Ltd Buzzard Hook-Up & Enhancement Projectof PS Platform & AlepProjectfor Conoco Phillips (SouthernSector) May 2010 - January 2011 StructuralForeman/Plater  Responsible forateamof Platerscarryingoutall aspectsof structural steelwork,installationand modificationrequiredforthe hookupcompletionworksonthe NexenBuzzardPSPlatform  Liaisingwiththe Nexenengineeringteamforacceptance of workpacks  Compilingtime sheets,productivityreportsandreportingprogress  Signingoff of jobcards  Orderingmaterials,permitsandconductingtoolbox talkswithinworkparty  Ensuringall HSE procedureswere adheredtoatall times  Resolvingclash potentialsonthe hookup  Liaisingdirectlywiththe clientonissuessuchasstructural integrity  One of six forementhatreportedtothe superintendentsoensuringastrongworking relationshipwithothertradesforemenwasessential  Workingon a gas sweeteningplatformthatisdue to go live in2012  Workingunderstricttargets due to hookupcontract  Builtstrongworkingrelationshipswithstaff tomaintainperformance levels. Aker Kvaerner Phase 1 & 2 of the Balmoral - Brenda Power GenerationProject & Burghleyover Balmoral topside flowlinestie back installation April 2007 - May 2010 General Foreman  Topside flowlinestie backinstallation  Line and level surveyof steelworkonafloatingplatform  GeneratingPermits  Completingriskassessments  Meetingproductiontargets  Certificationcloseoutof workpacks  Organisationof 3rd party contractorsand vendors  HSE and welfare of projectteam  Workingcloselywiththe commissioningteamonprojectclose outaswell asday to day responsibilities  Supervisingamulti disciplinedteamof upto 30 men  Buildingstrongrelationshipswithstaff toensure thatproductiontargetswere metandto minimise conflictsonsite.
  • 5. 5 CURRICULUM VITAE GRAEME GARDNER RBG Ltd Lundin Thistle AlphaReactivation Project RDS/KCA Deutag February 2007 - April 2007 MechanicalSupervisor  Rejuvenationof drillingpackage  Managing 20 Staff includingWelders,Platers,PipefittersandRiggers. Aker Kvaerner DecommissioningofThe MCP01 Total Platform Frigg Field July 2006 - Jan 2007 Mechanical/StructuralSupervisor  Taskedby Akertobe the mechanical /structural supervisoronsite due tomy pastsuccesson contracts  Generatingriskassessments  Riskassessments  Responsible forhealthandsafetyonsite  Managing a multi disciplined teamof upto 20 staff  Workingfor 2-3 weekswithstaff inthe engineeringdesignofficeinNorway. Aker Kvaerner. Bluewater F.P.S.OVessels May 2006 - July 2006 ConstSupt  VariousShutdowns,maintenance andmodification Aker Kvaerner BG-Armada Offshore May 2004 - April 2006 General Foreman/ConstructionSupt  Ops-Mods/maintenance- shutdownpermitcoordination.  Day to day dutiesincludedsurveysforfuture projects.  Resolvingpossible clashesforonshore Engineering.  Close liaisonwithBGmanagement.  SoloPermitco-ordinatorforaprojectinvolving400+ personnel.. Aker Kvaerner BluewaterF.P.S.O. Vessels February 2003 - May 2004 General Foreman  Variousshutdowns,maintenance andmodifications.
  • 6. 6 CURRICULUM VITAE GRAEME GARDNER HeeremaLtd Shell Bonga Project, TopsidesFor FPSO October 2002 - January 2003 Plater Aker Kvaerner Elgin FranklinOffshore September2002 - October 2002 Plater Constructionof Lifeboat/MusterStation. Aker / McNulty Offshore Topside Hook for BP Valhall “A” Platform August 2002 - September2002 Foreman Plater Halliburton/ Brown & Root Baines Project,Morecambe Bay Platform Offshore April 2002 - August 2002 Plater Aker Oil Gas TechologyUK Plc Hannay Project,Buchan Alpha,Uisge Gorm FPSO,Kildrummy Project, PiperBravo (Offshore) September2001 - April 2002 Plater IRS Ltd (SLP Engineering) NAM K81 Project (Offshore) August 2001 - September2001 Plater CCL Ltd VlaardingenOost Ship RepairYard, Rotterdam, Holland June 2001 - August 2001 Plater McNultyOffshore Ltd Ensco 92, Jackup Installation,Refit March 2001 - May 2001 Foreman Plater PLS Fabrications Ltd Corus Steelworks,ShopFabrications February 2001 - March 2001 Plater Torway ConstructionCo Ltd Paradise Island,Nassau, Bahamas P.O. Box Ee-17458 Harbourside Timeshares August 2000 - December2000 Construction Supervisor/SkillsInstructor
  • 7. 7 CURRICULUM VITAE GRAEME GARDNER  Fabricationof steelworkforconstructioncontractswithalarge and multi-nationalworkforce. Hartlepool Erection Group Shutdown,(Luton) Refitof Production Line July 2000 Plater  Fabricationof steel anderectionof pipe supports. CaxiosPipeworkLtd SaltendCo-GenerationProject,Hull January 2000 - April 2000 Plater  Fabricationanderection of structural steel andpipe supports,boilerfabrication. CaxiosPipeworkLtd Elf (Murco) RefineryShutdown,MillfordHaven, South Wales November1999 Plater  Fabricationof steel anderectionof pipe supports. Aker Maritime Ltd WestNavionDrill Ship For Smedvic,Norway June 1999 - Sept 1999 Plater Fabricationanderectionof structural steel andpipe supports. Aker Maritime Ltd June 1999 Plater  Offshore ShutdownOnThe “Janice”Semi-SubForKerr-Magee Ltd. HeeremaUK Offshore hook-upShell Shear WaterWell-headplatform May 1999 - June 1999 Plater Previous Employment Can be Produced as required, Apprentiship from 1983 – 1987 At F Peart & Sons Ltd, Baltic works Hartlepool, . References as Required E-Mail graeme.gardner@yahoo.co.uk graeme.gardner@hotmail.co.uk UK Mobile 00447952364550 Nigerian Mobile 08109986230.