1. - 1 -
CURRICULUM VITAE
GRAEME GARDNER
CURRICULUM VITAE
NAME: Allan Graeme Gardner
LOCATION Hartlepool
MAIN DISCIPLINE: Supervisor/Plater
SUMMARY: A highlyexperiencedandteam orientatedforeman/ supervisor with
extensive experience workinginthe Offshore Oil & Gas Sectors inthe
Uk, Offshore and Norway. Has validOffshore survival documentsand
experience inmanagingteams of 12 – 250 in a range ofdisciplines.
Experiencedinworking to targets and deadlinesas well as adheringand
enforcingstrict health & safety procedures.
QUALIFICATIONSAND
TRAINING:
Offshore Medical –Exp 18/09/2017
Offshore Survival- Exp09/03/2019 UK
Offshore Survival–Exp 09/03/2019 Norway
City& GuildsStructural Plate
Basic & Parts i,ii & iii
BA & FirstAidTrained
Hydra TightSweeneyBoltTensioning
Rigging/Lifting-Slinging/BanksmanLolerAwareness
SabtekLock RingTrained
Parkera Lock SystemTrained
ISSOW Trained
IOSH Certificate inManagingSafetyinEngineering& Construction
GOC Trained(Guidance onCertification) QEDInternational
PermitCo-ordinator
Mist TrainingfromPSN May 2010
2. 2
CURRICULUM VITAE
GRAEME GARDNER
CAREER HISTORY:
NES Globaltalent February2013 – Present
TOTAL Nigeria
AKPO FPSO
ConstructionWorks Leader (Superintendant)
Responsible fororganizationof contractorsconstructionteamtoexecute various ,workscopes
to achieve asuccessful dayto dayrunningof maintenance andrepairworkforthe ECP
department onboardthe AKPOFPSO.
EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box
talkswithall personnel
Reportinganyissuesatthe daily handovermeetingwiththe ECPSite rep providingorganization
of dailypermitrequirements.
Providinginformation tothe Onshore team regardingEQ`sTQ`s SMR`s for the engineering
departmentsreviewsof ECPworkscopes.
NES Globaltalent October2012 – December2012
TOTAL Nigeria
AKPO FPSO
Offshore ConstructionSupervisor
Responsible forcontractorsconstructionteamtoexecute various ,workscopestoachieve a
successful completionof aFFSD2012 on board the AKPOFPSO.
EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box
talkswithall personnel
Reportinganyissuesatthe daily handovermeeting.
Cansco GreigEng May 2012 – September2012
FoinavenFPSO
Teekay Petrojarl Production AS
Offshore ConstructionSupervisor
Responsible foraconstruction teamconsistingof blacktrade’swelder’splaters&riggersalso
Utilitytechs(joiners,plumbers,electricians&Hvactechs) conductingtwoworkfrontsto
enhance lifetimeintegrityof the FoinavenFPSO.
Supervisingthe projects, whichwere Accommodationupgrade of 4locationsinto12 Bedrooms
withcommunal areas& bathrooms,andfittingof additional lifeboatsupportframeswith
modificationstothe existing structure.
ProjectLiaison meetingsbetween client,OIM& engineeringdepartments viapersonal presence
on site & dailyvideoconference calls toonshore.
EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box
talkswithall staff members
Reportinganyissuesatthe dailyhandovermeeting&HandovertoNightshiftpersonnel.
Liaise withDNV & HSE representativeswhenrequired.
3. 3
CURRICULUM VITAE
GRAEME GARDNER
AgotnesSveisAS March 2012- May 2012
NordhagenProjects for Songa Offshore.AS
Sotra,Bergen.
FabricationSupervisor
Responsible forafabricationteam onthe Under DeckStrengtheningof the SongaDee project
Semi-sub.
Supervisingthe projectwhichrequired20+ personnel includingWelders,Platers,Riggersand
Mechanical Fitters,weld inspection&painters
ProjectLiaisonMeetings between Client,Engineering&MainContractor via personal presence
on site
EnsuringstrictHealthand SafetyRegulationswere adheredtoviavisual inspectionsandtool box
talkswithall staff members
Reportinganyissuesatthe daily handovermeetings&HandovertoNightshiftpersonnel &
supervisors.
LiaisedwithDNV representativeswhenrequired
Liaisedwith HS& E Officers responsible forHS&Eon Project.
Stavanger Contracting EngineeringAS
Talisman/Single Buoy MooringsYME MopupsterProject
Stavanger Norway
January 2011 - December2011
Construction Supervisor
Responsible for20 - 250 menat anyone time
Supervisionof the NightShiftof 250 staff includingWelders,Platers,RiggersandMechanical
Fitters
OverseeingIKM.as Chemical FlushingTeamsviapersonalpresence onsite
EnsuringstrictHealthand Safety Regulationswere adheredtoviavisual inspectionsandtool box
talkswithall staff members
Reportinganyissuesatthe dailyhandover tothe hookup managerand day shiftsupervisors
Liaisedwith DNV representatives whenrequired.
Solelyresponsible forHS&Eonshift.
4. 4
CURRICULUM VITAE
GRAEME GARDNER
PSN Ltd
Buzzard Hook-Up & Enhancement Projectof PS Platform
& AlepProjectfor Conoco Phillips (SouthernSector)
May 2010 - January 2011
StructuralForeman/Plater
Responsible forateamof Platerscarryingoutall aspectsof structural steelwork,installationand
modificationrequiredforthe hookupcompletionworksonthe NexenBuzzardPSPlatform
Liaisingwiththe Nexenengineeringteamforacceptance of workpacks
Compilingtime sheets,productivityreportsandreportingprogress
Signingoff of jobcards
Orderingmaterials,permitsandconductingtoolbox talkswithinworkparty
Ensuringall HSE procedureswere adheredtoatall times
Resolvingclash potentialsonthe hookup
Liaisingdirectlywiththe clientonissuessuchasstructural integrity
One of six forementhatreportedtothe superintendentsoensuringastrongworking
relationshipwithothertradesforemenwasessential
Workingon a gas sweeteningplatformthatisdue to go live in2012
Workingunderstricttargets due to hookupcontract
Builtstrongworkingrelationshipswithstaff tomaintainperformance levels.
Aker Kvaerner
Phase 1 & 2 of the Balmoral - Brenda Power GenerationProject
& Burghleyover Balmoral topside flowlinestie back installation
April 2007 - May 2010
General Foreman
Topside flowlinestie backinstallation
Line and level surveyof steelworkonafloatingplatform
GeneratingPermits
Completingriskassessments
Meetingproductiontargets
Certificationcloseoutof workpacks
Organisationof 3rd party contractorsand vendors
HSE and welfare of projectteam
Workingcloselywiththe commissioningteamonprojectclose outaswell asday to day
responsibilities
Supervisingamulti disciplinedteamof upto 30 men
Buildingstrongrelationshipswithstaff toensure thatproductiontargetswere metandto
minimise conflictsonsite.
5. 5
CURRICULUM VITAE
GRAEME GARDNER
RBG Ltd
Lundin Thistle AlphaReactivation Project
RDS/KCA Deutag
February 2007 - April 2007
MechanicalSupervisor
Rejuvenationof drillingpackage
Managing 20 Staff includingWelders,Platers,PipefittersandRiggers.
Aker Kvaerner
DecommissioningofThe MCP01 Total Platform Frigg Field
July 2006 - Jan 2007
Mechanical/StructuralSupervisor
Taskedby Akertobe the mechanical /structural supervisoronsite due tomy pastsuccesson
contracts
Generatingriskassessments
Riskassessments
Responsible forhealthandsafetyonsite
Managing a multi disciplined teamof upto 20 staff
Workingfor 2-3 weekswithstaff inthe engineeringdesignofficeinNorway.
Aker Kvaerner.
Bluewater F.P.S.OVessels
May 2006 - July 2006
ConstSupt
VariousShutdowns,maintenance andmodification
Aker Kvaerner
BG-Armada Offshore
May 2004 - April 2006
General Foreman/ConstructionSupt
Ops-Mods/maintenance- shutdownpermitcoordination.
Day to day dutiesincludedsurveysforfuture projects.
Resolvingpossible clashesforonshore Engineering.
Close liaisonwithBGmanagement.
SoloPermitco-ordinatorforaprojectinvolving400+ personnel..
Aker Kvaerner
BluewaterF.P.S.O. Vessels
February 2003 - May 2004
General Foreman
Variousshutdowns,maintenance andmodifications.
6. 6
CURRICULUM VITAE
GRAEME GARDNER
HeeremaLtd
Shell Bonga Project, TopsidesFor FPSO
October 2002 - January 2003
Plater
Aker Kvaerner
Elgin FranklinOffshore
September2002 - October 2002
Plater
Constructionof Lifeboat/MusterStation.
Aker / McNulty Offshore
Topside Hook for BP Valhall “A” Platform
August 2002 - September2002
Foreman Plater
Halliburton/ Brown & Root
Baines Project,Morecambe Bay Platform Offshore
April 2002 - August 2002
Plater
Aker Oil Gas TechologyUK Plc
Hannay Project,Buchan Alpha,Uisge Gorm FPSO,Kildrummy Project,
PiperBravo (Offshore)
September2001 - April 2002
Plater
IRS Ltd (SLP Engineering)
NAM K81 Project (Offshore)
August 2001 - September2001
Plater
CCL Ltd
VlaardingenOost Ship RepairYard, Rotterdam, Holland
June 2001 - August 2001
Plater
McNultyOffshore Ltd
Ensco 92, Jackup Installation,Refit
March 2001 - May 2001
Foreman Plater
PLS Fabrications Ltd
Corus Steelworks,ShopFabrications
February 2001 - March 2001
Plater
Torway ConstructionCo Ltd
Paradise Island,Nassau, Bahamas P.O. Box Ee-17458
Harbourside Timeshares
August 2000 - December2000
Construction Supervisor/SkillsInstructor
7. 7
CURRICULUM VITAE
GRAEME GARDNER
Fabricationof steelworkforconstructioncontractswithalarge and multi-nationalworkforce.
Hartlepool Erection Group
Shutdown,(Luton) Refitof Production Line
July 2000
Plater
Fabricationof steel anderectionof pipe supports.
CaxiosPipeworkLtd
SaltendCo-GenerationProject,Hull
January 2000 - April 2000
Plater
Fabricationanderection of structural steel andpipe supports,boilerfabrication.
CaxiosPipeworkLtd
Elf (Murco) RefineryShutdown,MillfordHaven, South Wales
November1999
Plater
Fabricationof steel anderectionof pipe supports.
Aker Maritime Ltd
WestNavionDrill Ship For Smedvic,Norway
June 1999 - Sept 1999
Plater
Fabricationanderectionof structural steel andpipe supports.
Aker Maritime Ltd June 1999
Plater
Offshore ShutdownOnThe “Janice”Semi-SubForKerr-Magee Ltd.
HeeremaUK
Offshore hook-upShell Shear WaterWell-headplatform
May 1999 - June 1999
Plater
Previous Employment Can be Produced as required, Apprentiship from 1983 – 1987
At F Peart & Sons Ltd, Baltic works Hartlepool,
.
References as Required
E-Mail graeme.gardner@yahoo.co.uk
graeme.gardner@hotmail.co.uk
UK Mobile 00447952364550
Nigerian Mobile 08109986230.