An very experienced and qualified Project Manager within the building services sector (BMS
& Controls in particular), BMS work has covered works associated with bio-hazard
containment (DAFM , Backweston Campus, Ireland), air flow regimes, alarm prioritisation and
reporting) with strong commercial and technical awareness. Latterly, experience has been
gained in Environmental, Energy Reduction and Sustainability Projects (Wind Turbines,
Biomass boilers, CHP, PV, Voltage reduction) dealing with both feasibility studies and the
implementation (Project Management) of suitable projects. This breadth of experience in
sustainability/mechanical/electrical design issues permits a multi-disciplined and practical
approach to generating specifications & test documentation that work in conjunction with all
services and to resolving technical and on-site construction or scheduling issues (e.g. trouble-
shooting “difficult” air conditioning schemes) and project management issues, cross trade co-
ordination, H&S.
EDUCATION and QUALIFICATIONS
2003 Leeds Metropolitan
University
 BSc (Hons) (2-1) Project Management
1997 Leeds Polytechnic
 H.N.D. Mechanical Engineering, (1976),
 City and Guilds Certificate, 15th Edition I.E.E. wiring regs., Wakefield Polytechnic, 1989
 City and Guilds Certificate, 4351B, Computer Aided Drawing using AutoCAD versions 10
and 12.
 City and Guilds Certificates for several Water Hygiene (Legionella control) courses.
SC and CRB cleared. MAPM and MCIBSE. CSCS - black card.
Contact – 07904964559; Gerry.currie@ntlworld.com
CAREER HISTORY
Jan16 to Aug16 Contract Position Matrix Control Solutions
• Working on a large data centre in Holland as a project manager to the BMS trade
contractor (€8.5M value, 48 panels with Rockwell Automation PLCs), interfacing between
the management contractor (ISG - weekly progress meetings and reports), the client's
design team (points lists, FDS's) and the M&E trade contractors (plant dependency
schedules, Revitt 3D co-ordination)). Procurement management (valves, actuators,
servers, panels), commissioning management including all test documentation (FAT, SAT,
Loop Checks etc.), design management (ensuring the internal and external design
resources remained focussed and on schedule), planning (MS Project) for all activities,
management of the cost control and change control processes with the commercial
manager.
May 15 to Dec15 Staff Position (6 m. contract, ends Dec15) CBRE
• Carrying out site surveys, generate reports (on M&E services associated with CHP, solar
PV and LED lighting energy projects) on behalf of BUPA Care homes (>100 sites).
May 14 to May 15 Contract Position Honeywell Controls
• Currently working as a project manager on a live data centre refurbishment. including the
re-engineering of Motor Control Centres, selection of VSDs, electrical install
design/installation of BMS, Fire and Security; procurement, technical and H&S submissions,
FAT/SAT, documentation control, client liaison.
February 13 to May 14 Contract Position HAL – MottMacDonald
 Worked as a BMS Delivery Assurance Manager on the Terminal 2 project at Heathrow
airport on behalf of HAL, i.e. assuring that the BMS is installed and commissioned
correctly, including the interface between an absorption chiller (1.8MW) and a biomass
boiler system (6 MW), via the Energy Centre and Cooling Station. Duties include the
witnessing of SATs and FATs, review of FDO documentation etc. and compiling outstanding
works lists and progress reports into the HAL management systems (a high administration
overhead project). The project comprises of some 130 AHUs, 650 FCUs, smoke extract
systems, 12 wet plant rooms and 34 communication rooms (fitted out up-flow and down-
flow room cooling units).
December 10 – February13 Staff Position Total Gas & Power
 Energy Utilisation Engineer, project managing the energy saving projects that are awarded
to the Energy Services division of Total Gas & Power. Mainly CHP and PV systems, I have
had exposure to the ESCO contract for/with NHS trusts and feasibility studies for CHP
(including Tri-gen), PV and Biomass systems.
May 10 – December 10 Contract Position Honeywell Controls
 Working as a site based Commissioning Manager at Astra Zeneca, Alderley Edge
representing Honeywell Controls on a project for a new research facility, £1.2m controls
package (plus management of chiller change out work, pump control retro-fits)
Jan 10 to May 10 Contract Position Pihl-UK
 Aberdeen Schools Project, completing the design/co-ordination (external contractors and
consultants) and commissioning works that was started with GENEX/OPERON, prior to
going in to administration, £1.6m controls and installation package across 9 sites.
March 09 – Jan 10 Associate Director GENEX/OPERON
 Based at Harrogate as Associate Director, involved with the Design and subsequent
management of Energy/Carbon Reduction Projects and Control System related projects
and general Project & Commissioning Management/Commissioning Witnessing (Aberdeen
Schools Project), issue resolution/trouble shooting on various projects,
Nov 08 – March 09 Associate Director Tate Consulting
 Working for the newly formed Energy Division - involved with EPCs, Breeam, Low carbon
consultancy work, Energy Reduction projects including feasibility studies for Bio-mass
boilers, CHP, Solar Walls, intelligent lighting systems and Ground (Air) Source Heat Pumps
(including budgets and payback analysis) for the Asda Supermarket Distribution Centres
(ambient, chilled and frozen).
Jan 05 – Nov 08 Associate Director GENEX/OPERON
Projects included -
 Department of Transport Offices, London, energy/carbon reduction projects including
the upgrade of the existing ventilation systems to accommodate variable speed drives
coupled with intelligent adjustments to the environmental control parameters (including an
upgrade to the monitoring system). This resulted in a considerable decrease in energy
usage by the mechanical services at a cost of £180K with a payback period of 11 months.
 Foreign & Commonwealth Office, Hanslope Park, Milton Keynes which was oil fired and
incorporated 28 buildings each with its own separate boiler and cooling plant. This included
BMS and network upgrade, Carbon reduction study including bio-mass boilers, heat pumps
and wind turbines. I acted as project manager (liaising with contractors and external
consultants) and client’s representative for the facilities team. £260K consultancy fees.
 LifeScan Scotland Ltd. The projects with this client were concerned with Energy
Management and waste heat recovery; one of the projects included the design &
management of an aM&T system installation (automatic Monitoring and Targeting) allowing
the facilities managers to see where the energy was being used and identify where savings
could be made. We also produced feasibility studies on Co-and Tri-generation CHP
schemes. It was a project value of £1M+ incorporating over £100K in consultancy fees.
 Central Science Laboratories (CSL) York. GENEX had a number of ongoing projects,
concentrating on energy and carbon reduction strategies, e.g. installation of CHP (a 220kW
unit), installation of adiabatic humidification, installation of variable speed drives to the
main heating and cooling pumps (and the associated re-commissioning), installation of an
intelligent lighting control system and a feasibility study for a 6 MW wind farm. £1.8M
project with a 3year payback.
 DAFM Backweston, Celbridge, Co Dublin. GENEX/Operon were responsible for the FM
at this site and a new animal block was built and commissioned during my time. I assisted
with/witnessed the setting up of the containment pressure control regimes.
NB: All the above were supported with energy reduction & carbon reduction calculations
and the pump control changes resulted in a payback period measured in months.
2004 – 2005 Contract Position Honeywell Controls
Energy Centre, T5 Heathrow Airport, Project Manager,
 Duties included overseeing the production and approval of the design documentation,
£4.8m controls and installation package
 Overseeing the installation of the BMS and fire alarm systems and networks (LANs)
 Ensuring the low level integration design was managed and approved
 Ensuring the interface with the integration system (BSI) was managed efficiently
 Ensuring that BAA IT systems were comfortable with the integration proposals
 Ensuring CDM and safety practices were followed
 Planning, progress and project reporting to the clients (BAA) project managers
 Liaising with the client’s cost control team.
 Liaising with NTL on the configuration and installation of the site based LAN and WAN
systems
2002 – 2004 Contract Position Honeywell Controls
Wyeth Medica Ireland, Drug Substance Project
 Building Lead, Honeywell Automation 30 months, £22m controls and commissioning
package
 Duties included – acting as liaison between the instrumentation consultants (Jacobs) and
the instrumentation panel production contractor, site commissioning of QBMS (Plantscape)
and air systems, this included the associated MCCs and VFDs (Allen Bradley)
 Overseeing the site electrical and instrumentation installation teams
 Ensuring that the low level integration between the MCS and QBMS was carried out
effectively, including cGMP, GAMP practices,
 Playing a pro-active role in the Integrated Commissioning & Validation process that carried
on after the installation process (including discussions with the client’s FM team), in
particular the validation and commissioning of the building pressure control regimes (cGMP,
SATs, FATs, HFATs, validation and contamination control etc).
2001 – 2002 Contract Position NG Bailey (Major Projects)
NPL Teddington
 Working as a controls Engineer for NG Bailey & Co Ltd, Major Projects
 Duties included design and management of the BMS and control systems across the
laboratory and accommodation blocks (to within 0.1DegC), chilled water hydraulic and
control schemes
 Working from Room Data Sheets to collate the requirement for power and IT points, off-
site witnessing and testing of 3rd party control systems to ensure integration compatibility.
2000 – 2001 Contract Position Independent Building Solutions Ltd.
Global Switch, Amsterdam
 Employed as the Engineering Manager for Independent Building Solutions Ltd.
 Duties included control and submission of design documentation, including BMS wiring and
networking requirements
 Overseeing the electrical and mechanical installations
 Representing IBS at site meetings.
1998 – 2000 Contract Position Westminster Controls Ltd
Contracts Manager/Projects Engineer/Sales Engineer/Commissioning Engineer
 Duties included all aspects of design, commissioning and installation management as well
as full profit and loss responsibility on all projects that I was responsible for.
 Pleased to say that projects that started with a positive profit margin, were completed with
no reduction in profit margin.
1990 – 1998 Self-Employed
Controls System Design, Contracts, Projects and Commissioning Engineer
 Drummond Gate, London for E-Squared Ltd, office fit-out,
 LG South Wales, Wafer Fabrication Plant for BDP-AT, system design and development
 Fujitsu Durham, Fab 2, for Building Design Partnership, system design and development
 Leeds General Infirmary, Design and Co-ordination Engineer (E Squared Ltd)
 Euston 'B' Block, office fit-out
 Amdahl Ireland Ltd 1990-1991 Expansion, Site Project Engineer
 33 Grosvenor Place,SW1, Project Engineer, site based
 Water treatment works, Seville as part of Expo 92, co-ordination engineer,
 Bass Corporate H.Q., Burton on Trent, Project and Comm. Eng.
Duties included supervising the control and BMS network installations at the above sites.
This included the Mechanical and Electrical installation works, the writing of the "Functional
Specification", the production of the graphics and the operating software, overseeing the
commissioning and handover of the projects.
I have also worked along side the consultants to bring their designs through to completion,
offering control solutions where possible.
The project at Fujitsu involved design work around Allen Bradley PLCs and Elsag Bailey System
Six DCUs together with the associated instrumentation. This project had been put on hold, as
was the project at LG South Wales.
Feb 1990 – Aug 1990 Contract Position Haigh & Ringrose
 Working for Rohm & Haas at Grangemouth on a modifiers expansion project
 Duties included producing programmes from given "norms" and by dates, monitoring the
progress of these programmes by means of "take offs".
 This work experience gave me an insight to the petro-chem industry and project
management and planning.
1988 – Feb 1990 Senior Engineer Controls, FHP Partnership LEEDS
 Duties included all works associated with the automatic control systems for Mechanical
Plant. From Design brief
 Production of budget costs
 The writing of detailed Specifications
 The production of control schematics with referencing
 The production of panel to external wiring schematics and cable schedules
 Networking requirements
 Checking of tenders and involvement during on site.
 This time included cross discipline co-ordination for the first time.
1982 – 1988 Senior Contracts Engineer Staefa Control System Ltd
 Duties included the checking of Specification documents with quotations from both the
Technical and Commercial points of view
 Engineering the controls side of the project
 Ordering 3rd party equipment
 Organising site personnel
 Maintaining records of expenditure and technical changes
 Arranging the commissioning / handover and final account negotiations.
 Also spent a considerable time in getting to know the clients needs and realised that
“listening” was an important skill.
1979 – 1982 Internal Sales Engineer Monsun Hydraulics Ltd
 Duties included Sales, Sales support (included speaking to clients at all levels)
 Design and Servicing of Mobile Hydraulic control applications (valves and cylinders)
including hydraulic, pneumo-hydraulic and electro-hydraulic systems.
1977 – 1979 Research Technician University of Leeds
 Duties included the construction of test rigs for research into the combustion of heavy oils.
 This work covered all aspects of Engineering from welding to advanced gas analysis
techniques.
I have also worked along side the consultants to bring their designs through to completion,
offering control solutions where possible.
The project at Fujitsu involved design work around Allen Bradley PLCs and Elsag Bailey System
Six DCUs together with the associated instrumentation. This project had been put on hold, as
was the project at LG South Wales.
Feb 1990 – Aug 1990 Contract Position Haigh & Ringrose
 Working for Rohm & Haas at Grangemouth on a modifiers expansion project
 Duties included producing programmes from given "norms" and by dates, monitoring the
progress of these programmes by means of "take offs".
 This work experience gave me an insight to the petro-chem industry and project
management and planning.
1988 – Feb 1990 Senior Engineer Controls, FHP Partnership LEEDS
 Duties included all works associated with the automatic control systems for Mechanical
Plant. From Design brief
 Production of budget costs
 The writing of detailed Specifications
 The production of control schematics with referencing
 The production of panel to external wiring schematics and cable schedules
 Networking requirements
 Checking of tenders and involvement during on site.
 This time included cross discipline co-ordination for the first time.
1982 – 1988 Senior Contracts Engineer Staefa Control System Ltd
 Duties included the checking of Specification documents with quotations from both the
Technical and Commercial points of view
 Engineering the controls side of the project
 Ordering 3rd party equipment
 Organising site personnel
 Maintaining records of expenditure and technical changes
 Arranging the commissioning / handover and final account negotiations.
 Also spent a considerable time in getting to know the clients needs and realised that
“listening” was an important skill.
1979 – 1982 Internal Sales Engineer Monsun Hydraulics Ltd
 Duties included Sales, Sales support (included speaking to clients at all levels)
 Design and Servicing of Mobile Hydraulic control applications (valves and cylinders)
including hydraulic, pneumo-hydraulic and electro-hydraulic systems.
1977 – 1979 Research Technician University of Leeds
 Duties included the construction of test rigs for research into the combustion of heavy oils.
 This work covered all aspects of Engineering from welding to advanced gas analysis
techniques.

More Related Content

What's hot

Combined Heat and Power Engineering and Installation in the Pacific NW
Combined Heat and Power Engineering and Installation in the Pacific NWCombined Heat and Power Engineering and Installation in the Pacific NW
Combined Heat and Power Engineering and Installation in the Pacific NWmelanie_bissonnette
 
Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Nicholas Naing
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Nicholas Naing
 
Ashrae standards for energy efficiency in buildings
Ashrae standards for energy efficiency in buildingsAshrae standards for energy efficiency in buildings
Ashrae standards for energy efficiency in buildingsUNEP OzonAction
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioenergytrustor
 
Energy Modeling with ASHRAE 90.1-2016
Energy Modeling with ASHRAE 90.1-2016Energy Modeling with ASHRAE 90.1-2016
Energy Modeling with ASHRAE 90.1-2016Michael Brown
 
IES World Green Building Week Faculty Event
IES World Green Building Week Faculty Event IES World Green Building Week Faculty Event
IES World Green Building Week Faculty Event IES VE
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingGlobal CCS Institute
 
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...IES VE
 
Ashrae 90.1 2004 appendix g - performance rating method
Ashrae 90.1   2004 appendix g - performance rating methodAshrae 90.1   2004 appendix g - performance rating method
Ashrae 90.1 2004 appendix g - performance rating methodEduardo Miranda Cáceres
 
Building Grid Resilience
Building Grid ResilienceBuilding Grid Resilience
Building Grid ResilienceAdvisian
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Nicholas Naing
 
Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019Advisian
 
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...Shanti Pless
 
Rob Gagne Resume
Rob Gagne Resume Rob Gagne Resume
Rob Gagne Resume Rob Gagne
 
2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water SupplyAlliance To Save Energy
 
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Shanti Pless
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016Sher Chuhan
 

What's hot (20)

Combined Heat and Power Engineering and Installation in the Pacific NW
Combined Heat and Power Engineering and Installation in the Pacific NWCombined Heat and Power Engineering and Installation in the Pacific NW
Combined Heat and Power Engineering and Installation in the Pacific NW
 
Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1Mechanical Engineering Seminar 2017_1
Mechanical Engineering Seminar 2017_1
 
Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2Mechanical Engineering Seminar 2017_2
Mechanical Engineering Seminar 2017_2
 
Ashrae standards for energy efficiency in buildings
Ashrae standards for energy efficiency in buildingsAshrae standards for energy efficiency in buildings
Ashrae standards for energy efficiency in buildings
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudio
 
Energy Modeling with ASHRAE 90.1-2016
Energy Modeling with ASHRAE 90.1-2016Energy Modeling with ASHRAE 90.1-2016
Energy Modeling with ASHRAE 90.1-2016
 
IES World Green Building Week Faculty Event
IES World Green Building Week Faculty Event IES World Green Building Week Faculty Event
IES World Green Building Week Faculty Event
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modelling
 
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
Delivering an Energy Model for BREEAM and LEED – Exposing What Really Matters...
 
Ashrae 90.1 2004 appendix g - performance rating method
Ashrae 90.1   2004 appendix g - performance rating methodAshrae 90.1   2004 appendix g - performance rating method
Ashrae 90.1 2004 appendix g - performance rating method
 
Building Grid Resilience
Building Grid ResilienceBuilding Grid Resilience
Building Grid Resilience
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3
 
Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019
 
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
NASA Net Zero Roadmap: Federal Utilities Partnership Working Group, November ...
 
Optimizing Existing Rooftop Unit Energy Efficiency
Optimizing Existing Rooftop Unit Energy EfficiencyOptimizing Existing Rooftop Unit Energy Efficiency
Optimizing Existing Rooftop Unit Energy Efficiency
 
Rob Gagne Resume
Rob Gagne Resume Rob Gagne Resume
Rob Gagne Resume
 
2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply2: Introduction to Energy Audit Methods in Water Supply
2: Introduction to Energy Audit Methods in Water Supply
 
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
Energy Exchange 2015: Track 7 session 5: Energy Performance Based Design Buil...
 
Usgbc leed
Usgbc leedUsgbc leed
Usgbc leed
 
Res Sher Chauhan general est Nov 2016
Res  Sher Chauhan general est Nov 2016Res  Sher Chauhan general est Nov 2016
Res Sher Chauhan general est Nov 2016
 

Similar to CV Aug16

Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt
 
Dr Callum Rae - A New Approach to Energy Centre Design
Dr Callum Rae -  A New Approach to Energy Centre DesignDr Callum Rae -  A New Approach to Energy Centre Design
Dr Callum Rae - A New Approach to Energy Centre DesignHurley Palmer Flatt
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Hayley Pallister
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016Smith Joshua
 
Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16John Coffman PMP
 
UPDATE in BIAS Shortform
UPDATE in BIAS ShortformUPDATE in BIAS Shortform
UPDATE in BIAS Shortformbrian williams
 
Tony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdfTony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdfTony Greenfield
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project ManagementJames Gilmore
 
Sustainable Design for life in general.pptx
Sustainable Design for life in general.pptxSustainable Design for life in general.pptx
Sustainable Design for life in general.pptxarjun212617
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Snyder
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEErik NEILSEN
 

Similar to CV Aug16 (20)

william-first-revision
william-first-revisionwilliam-first-revision
william-first-revision
 
william-second-revision (3)
william-second-revision (3)william-second-revision (3)
william-second-revision (3)
 
Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12
 
Dr Callum Rae - A New Approach to Energy Centre Design
Dr Callum Rae -  A New Approach to Energy Centre DesignDr Callum Rae -  A New Approach to Energy Centre Design
Dr Callum Rae - A New Approach to Energy Centre Design
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010
 
Alistair Haley CV
Alistair Haley CVAlistair Haley CV
Alistair Haley CV
 
Josh Resume 11_18_2016
Josh Resume 11_18_2016Josh Resume 11_18_2016
Josh Resume 11_18_2016
 
NS Resume S
NS  Resume SNS  Resume S
NS Resume S
 
Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16Resume John I Coffman AL 8-29-16
Resume John I Coffman AL 8-29-16
 
UPDATE in BIAS Shortform
UPDATE in BIAS ShortformUPDATE in BIAS Shortform
UPDATE in BIAS Shortform
 
Tony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdfTony Greenfield CV 23 March 2015 pdf
Tony Greenfield CV 23 March 2015 pdf
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 
John Castoro 091212
John Castoro 091212John Castoro 091212
John Castoro 091212
 
Sustainable Design for life in general.pptx
Sustainable Design for life in general.pptxSustainable Design for life in general.pptx
Sustainable Design for life in general.pptx
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PE
 
Resume
ResumeResume
Resume
 
GRA16-8
GRA16-8GRA16-8
GRA16-8
 

CV Aug16

  • 1. GERRY CURRIE I.ENG, MCIBSE, MAPM Address Location: Leeds CANDIDATE PROFILE An very experienced and qualified Project Manager within the building services sector (BMS & Controls in particular), BMS work has covered works associated with bio-hazard containment (DAFM , Backweston Campus, Ireland), air flow regimes, alarm prioritisation and reporting) with strong commercial and technical awareness. Latterly, experience has been gained in Environmental, Energy Reduction and Sustainability Projects (Wind Turbines, Biomass boilers, CHP, PV, Voltage reduction) dealing with both feasibility studies and the implementation (Project Management) of suitable projects. This breadth of experience in sustainability/mechanical/electrical design issues permits a multi-disciplined and practical approach to generating specifications & test documentation that work in conjunction with all services and to resolving technical and on-site construction or scheduling issues (e.g. trouble- shooting “difficult” air conditioning schemes) and project management issues, cross trade co- ordination, H&S. EDUCATION and QUALIFICATIONS 2003 Leeds Metropolitan University  BSc (Hons) (2-1) Project Management 1997 Leeds Polytechnic  H.N.D. Mechanical Engineering, (1976),  City and Guilds Certificate, 15th Edition I.E.E. wiring regs., Wakefield Polytechnic, 1989  City and Guilds Certificate, 4351B, Computer Aided Drawing using AutoCAD versions 10 and 12.  City and Guilds Certificates for several Water Hygiene (Legionella control) courses. SC and CRB cleared. MAPM and MCIBSE. CSCS - black card. Contact – 07904964559; Gerry.currie@ntlworld.com CAREER HISTORY Jan16 to Aug16 Contract Position Matrix Control Solutions • Working on a large data centre in Holland as a project manager to the BMS trade contractor (€8.5M value, 48 panels with Rockwell Automation PLCs), interfacing between the management contractor (ISG - weekly progress meetings and reports), the client's design team (points lists, FDS's) and the M&E trade contractors (plant dependency schedules, Revitt 3D co-ordination)). Procurement management (valves, actuators, servers, panels), commissioning management including all test documentation (FAT, SAT, Loop Checks etc.), design management (ensuring the internal and external design resources remained focussed and on schedule), planning (MS Project) for all activities, management of the cost control and change control processes with the commercial manager.
  • 2. May 15 to Dec15 Staff Position (6 m. contract, ends Dec15) CBRE • Carrying out site surveys, generate reports (on M&E services associated with CHP, solar PV and LED lighting energy projects) on behalf of BUPA Care homes (>100 sites). May 14 to May 15 Contract Position Honeywell Controls • Currently working as a project manager on a live data centre refurbishment. including the re-engineering of Motor Control Centres, selection of VSDs, electrical install design/installation of BMS, Fire and Security; procurement, technical and H&S submissions, FAT/SAT, documentation control, client liaison. February 13 to May 14 Contract Position HAL – MottMacDonald  Worked as a BMS Delivery Assurance Manager on the Terminal 2 project at Heathrow airport on behalf of HAL, i.e. assuring that the BMS is installed and commissioned correctly, including the interface between an absorption chiller (1.8MW) and a biomass boiler system (6 MW), via the Energy Centre and Cooling Station. Duties include the witnessing of SATs and FATs, review of FDO documentation etc. and compiling outstanding works lists and progress reports into the HAL management systems (a high administration overhead project). The project comprises of some 130 AHUs, 650 FCUs, smoke extract systems, 12 wet plant rooms and 34 communication rooms (fitted out up-flow and down- flow room cooling units). December 10 – February13 Staff Position Total Gas & Power  Energy Utilisation Engineer, project managing the energy saving projects that are awarded to the Energy Services division of Total Gas & Power. Mainly CHP and PV systems, I have had exposure to the ESCO contract for/with NHS trusts and feasibility studies for CHP (including Tri-gen), PV and Biomass systems. May 10 – December 10 Contract Position Honeywell Controls  Working as a site based Commissioning Manager at Astra Zeneca, Alderley Edge representing Honeywell Controls on a project for a new research facility, £1.2m controls package (plus management of chiller change out work, pump control retro-fits) Jan 10 to May 10 Contract Position Pihl-UK  Aberdeen Schools Project, completing the design/co-ordination (external contractors and consultants) and commissioning works that was started with GENEX/OPERON, prior to going in to administration, £1.6m controls and installation package across 9 sites. March 09 – Jan 10 Associate Director GENEX/OPERON  Based at Harrogate as Associate Director, involved with the Design and subsequent management of Energy/Carbon Reduction Projects and Control System related projects and general Project & Commissioning Management/Commissioning Witnessing (Aberdeen Schools Project), issue resolution/trouble shooting on various projects, Nov 08 – March 09 Associate Director Tate Consulting  Working for the newly formed Energy Division - involved with EPCs, Breeam, Low carbon consultancy work, Energy Reduction projects including feasibility studies for Bio-mass boilers, CHP, Solar Walls, intelligent lighting systems and Ground (Air) Source Heat Pumps (including budgets and payback analysis) for the Asda Supermarket Distribution Centres (ambient, chilled and frozen).
  • 3. Jan 05 – Nov 08 Associate Director GENEX/OPERON Projects included -  Department of Transport Offices, London, energy/carbon reduction projects including the upgrade of the existing ventilation systems to accommodate variable speed drives coupled with intelligent adjustments to the environmental control parameters (including an upgrade to the monitoring system). This resulted in a considerable decrease in energy usage by the mechanical services at a cost of £180K with a payback period of 11 months.  Foreign & Commonwealth Office, Hanslope Park, Milton Keynes which was oil fired and incorporated 28 buildings each with its own separate boiler and cooling plant. This included BMS and network upgrade, Carbon reduction study including bio-mass boilers, heat pumps and wind turbines. I acted as project manager (liaising with contractors and external consultants) and client’s representative for the facilities team. £260K consultancy fees.  LifeScan Scotland Ltd. The projects with this client were concerned with Energy Management and waste heat recovery; one of the projects included the design & management of an aM&T system installation (automatic Monitoring and Targeting) allowing the facilities managers to see where the energy was being used and identify where savings could be made. We also produced feasibility studies on Co-and Tri-generation CHP schemes. It was a project value of £1M+ incorporating over £100K in consultancy fees.  Central Science Laboratories (CSL) York. GENEX had a number of ongoing projects, concentrating on energy and carbon reduction strategies, e.g. installation of CHP (a 220kW unit), installation of adiabatic humidification, installation of variable speed drives to the main heating and cooling pumps (and the associated re-commissioning), installation of an intelligent lighting control system and a feasibility study for a 6 MW wind farm. £1.8M project with a 3year payback.  DAFM Backweston, Celbridge, Co Dublin. GENEX/Operon were responsible for the FM at this site and a new animal block was built and commissioned during my time. I assisted with/witnessed the setting up of the containment pressure control regimes. NB: All the above were supported with energy reduction & carbon reduction calculations and the pump control changes resulted in a payback period measured in months. 2004 – 2005 Contract Position Honeywell Controls Energy Centre, T5 Heathrow Airport, Project Manager,  Duties included overseeing the production and approval of the design documentation, £4.8m controls and installation package  Overseeing the installation of the BMS and fire alarm systems and networks (LANs)  Ensuring the low level integration design was managed and approved  Ensuring the interface with the integration system (BSI) was managed efficiently  Ensuring that BAA IT systems were comfortable with the integration proposals  Ensuring CDM and safety practices were followed  Planning, progress and project reporting to the clients (BAA) project managers  Liaising with the client’s cost control team.  Liaising with NTL on the configuration and installation of the site based LAN and WAN systems 2002 – 2004 Contract Position Honeywell Controls Wyeth Medica Ireland, Drug Substance Project  Building Lead, Honeywell Automation 30 months, £22m controls and commissioning package
  • 4.  Duties included – acting as liaison between the instrumentation consultants (Jacobs) and the instrumentation panel production contractor, site commissioning of QBMS (Plantscape) and air systems, this included the associated MCCs and VFDs (Allen Bradley)  Overseeing the site electrical and instrumentation installation teams  Ensuring that the low level integration between the MCS and QBMS was carried out effectively, including cGMP, GAMP practices,  Playing a pro-active role in the Integrated Commissioning & Validation process that carried on after the installation process (including discussions with the client’s FM team), in particular the validation and commissioning of the building pressure control regimes (cGMP, SATs, FATs, HFATs, validation and contamination control etc). 2001 – 2002 Contract Position NG Bailey (Major Projects) NPL Teddington  Working as a controls Engineer for NG Bailey & Co Ltd, Major Projects  Duties included design and management of the BMS and control systems across the laboratory and accommodation blocks (to within 0.1DegC), chilled water hydraulic and control schemes  Working from Room Data Sheets to collate the requirement for power and IT points, off- site witnessing and testing of 3rd party control systems to ensure integration compatibility. 2000 – 2001 Contract Position Independent Building Solutions Ltd. Global Switch, Amsterdam  Employed as the Engineering Manager for Independent Building Solutions Ltd.  Duties included control and submission of design documentation, including BMS wiring and networking requirements  Overseeing the electrical and mechanical installations  Representing IBS at site meetings. 1998 – 2000 Contract Position Westminster Controls Ltd Contracts Manager/Projects Engineer/Sales Engineer/Commissioning Engineer  Duties included all aspects of design, commissioning and installation management as well as full profit and loss responsibility on all projects that I was responsible for.  Pleased to say that projects that started with a positive profit margin, were completed with no reduction in profit margin. 1990 – 1998 Self-Employed Controls System Design, Contracts, Projects and Commissioning Engineer  Drummond Gate, London for E-Squared Ltd, office fit-out,  LG South Wales, Wafer Fabrication Plant for BDP-AT, system design and development  Fujitsu Durham, Fab 2, for Building Design Partnership, system design and development  Leeds General Infirmary, Design and Co-ordination Engineer (E Squared Ltd)  Euston 'B' Block, office fit-out  Amdahl Ireland Ltd 1990-1991 Expansion, Site Project Engineer  33 Grosvenor Place,SW1, Project Engineer, site based  Water treatment works, Seville as part of Expo 92, co-ordination engineer,  Bass Corporate H.Q., Burton on Trent, Project and Comm. Eng. Duties included supervising the control and BMS network installations at the above sites. This included the Mechanical and Electrical installation works, the writing of the "Functional Specification", the production of the graphics and the operating software, overseeing the commissioning and handover of the projects.
  • 5. I have also worked along side the consultants to bring their designs through to completion, offering control solutions where possible. The project at Fujitsu involved design work around Allen Bradley PLCs and Elsag Bailey System Six DCUs together with the associated instrumentation. This project had been put on hold, as was the project at LG South Wales. Feb 1990 – Aug 1990 Contract Position Haigh & Ringrose  Working for Rohm & Haas at Grangemouth on a modifiers expansion project  Duties included producing programmes from given "norms" and by dates, monitoring the progress of these programmes by means of "take offs".  This work experience gave me an insight to the petro-chem industry and project management and planning. 1988 – Feb 1990 Senior Engineer Controls, FHP Partnership LEEDS  Duties included all works associated with the automatic control systems for Mechanical Plant. From Design brief  Production of budget costs  The writing of detailed Specifications  The production of control schematics with referencing  The production of panel to external wiring schematics and cable schedules  Networking requirements  Checking of tenders and involvement during on site.  This time included cross discipline co-ordination for the first time. 1982 – 1988 Senior Contracts Engineer Staefa Control System Ltd  Duties included the checking of Specification documents with quotations from both the Technical and Commercial points of view  Engineering the controls side of the project  Ordering 3rd party equipment  Organising site personnel  Maintaining records of expenditure and technical changes  Arranging the commissioning / handover and final account negotiations.  Also spent a considerable time in getting to know the clients needs and realised that “listening” was an important skill. 1979 – 1982 Internal Sales Engineer Monsun Hydraulics Ltd  Duties included Sales, Sales support (included speaking to clients at all levels)  Design and Servicing of Mobile Hydraulic control applications (valves and cylinders) including hydraulic, pneumo-hydraulic and electro-hydraulic systems. 1977 – 1979 Research Technician University of Leeds  Duties included the construction of test rigs for research into the combustion of heavy oils.  This work covered all aspects of Engineering from welding to advanced gas analysis techniques.
  • 6. I have also worked along side the consultants to bring their designs through to completion, offering control solutions where possible. The project at Fujitsu involved design work around Allen Bradley PLCs and Elsag Bailey System Six DCUs together with the associated instrumentation. This project had been put on hold, as was the project at LG South Wales. Feb 1990 – Aug 1990 Contract Position Haigh & Ringrose  Working for Rohm & Haas at Grangemouth on a modifiers expansion project  Duties included producing programmes from given "norms" and by dates, monitoring the progress of these programmes by means of "take offs".  This work experience gave me an insight to the petro-chem industry and project management and planning. 1988 – Feb 1990 Senior Engineer Controls, FHP Partnership LEEDS  Duties included all works associated with the automatic control systems for Mechanical Plant. From Design brief  Production of budget costs  The writing of detailed Specifications  The production of control schematics with referencing  The production of panel to external wiring schematics and cable schedules  Networking requirements  Checking of tenders and involvement during on site.  This time included cross discipline co-ordination for the first time. 1982 – 1988 Senior Contracts Engineer Staefa Control System Ltd  Duties included the checking of Specification documents with quotations from both the Technical and Commercial points of view  Engineering the controls side of the project  Ordering 3rd party equipment  Organising site personnel  Maintaining records of expenditure and technical changes  Arranging the commissioning / handover and final account negotiations.  Also spent a considerable time in getting to know the clients needs and realised that “listening” was an important skill. 1979 – 1982 Internal Sales Engineer Monsun Hydraulics Ltd  Duties included Sales, Sales support (included speaking to clients at all levels)  Design and Servicing of Mobile Hydraulic control applications (valves and cylinders) including hydraulic, pneumo-hydraulic and electro-hydraulic systems. 1977 – 1979 Research Technician University of Leeds  Duties included the construction of test rigs for research into the combustion of heavy oils.  This work covered all aspects of Engineering from welding to advanced gas analysis techniques.