∗ Telecommunication Engineering and Construction
∗ Water Supply & Sewerage
∗ Power (Substation, Transmission & Distribution
Systems)
∗ Roads & Bridges
∗ Civil
∗ Piling
∗ Services of Organization
Services they provide
3
Vision
To be the preferred infrastructure development partner
in the region.
Mission
∗Exceptional performance in all aspects of our industry.
∗Outstanding customer service.
∗ Unparalleled value.
4
∗ Project : Reverina hotel project
Location : Moragalla, Beruwala
Client : LOLC
Main Contractor : Sierra construction company
Architect : Mr .Vinod Jayasinghe
Consultants – Structural : NCD consultants pvt ltd
Project Cost : Rs. 6 billion
Project Manager :Mr. Saman Polhengoda
Site Manager (Engineering) : MR.Thusitha
PROFILE OF THE PROJECT
5
Project location
6
Site Organization Chart
7
∗ Site management is the process of interrelation of major
functions such as planning, organizing, controlling and
leading. Those things are directed in the achievement of
objectives and goals of the project.
∗ so it is important to have proper management at the
construction site .
To finish the work quickly as possible and in a good
quality.
8
In this company all workers must follow the health and
safety rules. Also this company provide good welfare
services to their workers.
Health safety & welfare
9
10
EXPERIENCE GAINED
First four months at the site
Reinforcement
I had to work as a supervisor in this site
11
FORMWORK
12
Leveling works
13
CONCRETING
14
15
TAKING OFF QUANTITIES
Taking Quantities Referring Drawings
Make bar schedules, concrete quantities. Also measure form work quantities
using structural drawings
16
Preparation of bar schedules
Preparing Monthly Progress Charts, Weather Reports , monthly bill, &
Interim payments
17
18
Problems and Challenges
Conflict with workers
Unfamiliarity of Environment
Lack of technical knowledge
Incompleteness of monthly bills
Incompleteness of the Drawings
19
THANK YOU !

More Related Content

What's hot (20)

Hanin qreis 2018 cv
Hanin qreis 2018 cvHanin qreis 2018 cv
Hanin qreis 2018 cv
 
Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.Joseph J. Raftery - Civil Engineer, P.E.
Joseph J. Raftery - Civil Engineer, P.E.
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016
 
Mohamed Abuzaid CV
Mohamed Abuzaid CVMohamed Abuzaid CV
Mohamed Abuzaid CV
 
SHYAMAL KUMAR DASS PPT
SHYAMAL KUMAR DASS PPTSHYAMAL KUMAR DASS PPT
SHYAMAL KUMAR DASS PPT
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
A_vivek
A_vivekA_vivek
A_vivek
 
AYMAN HELMY_CV
AYMAN HELMY_CVAYMAN HELMY_CV
AYMAN HELMY_CV
 
-PORTFOLIO MLADEN LUKIC
-PORTFOLIO     MLADEN LUKIC-PORTFOLIO     MLADEN LUKIC
-PORTFOLIO MLADEN LUKIC
 
Wissam chehab's CV
Wissam chehab's CVWissam chehab's CV
Wissam chehab's CV
 
Don Emanuel Resume
Don Emanuel ResumeDon Emanuel Resume
Don Emanuel Resume
 
Jonathan Danos Valuable Experience and Works
Jonathan Danos Valuable Experience and WorksJonathan Danos Valuable Experience and Works
Jonathan Danos Valuable Experience and Works
 
-----ENGLISH--HESHAM-C.V
-----ENGLISH--HESHAM-C.V-----ENGLISH--HESHAM-C.V
-----ENGLISH--HESHAM-C.V
 
cv amr
cv amrcv amr
cv amr
 
Eng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 NewEng. Hassan Ossama CV. 2016 New
Eng. Hassan Ossama CV. 2016 New
 
2016 CV_LININGTON, Andrew
2016 CV_LININGTON, Andrew2016 CV_LININGTON, Andrew
2016 CV_LININGTON, Andrew
 
Profesional Engineer c.v
Profesional Engineer c.vProfesional Engineer c.v
Profesional Engineer c.v
 
Resume Gilles Downing 2016
Resume Gilles Downing 2016Resume Gilles Downing 2016
Resume Gilles Downing 2016
 
Cv m.safdar.2016
Cv m.safdar.2016Cv m.safdar.2016
Cv m.safdar.2016
 

Viewers also liked

Viewers also liked (13)

Construction Of Multistoreyed Building
Construction Of Multistoreyed BuildingConstruction Of Multistoreyed Building
Construction Of Multistoreyed Building
 
Industrial report for civil engg. training
Industrial report for civil engg. trainingIndustrial report for civil engg. training
Industrial report for civil engg. training
 
Trainig Courses at The CENTER
Trainig Courses at The CENTERTrainig Courses at The CENTER
Trainig Courses at The CENTER
 
wind force presentation
wind force presentationwind force presentation
wind force presentation
 
Tamadun islam
Tamadun islamTamadun islam
Tamadun islam
 
Trainig a panacea of organization survival
Trainig a panacea of organization survivalTrainig a panacea of organization survival
Trainig a panacea of organization survival
 
Civil Engineering Action Plan
Civil Engineering Action PlanCivil Engineering Action Plan
Civil Engineering Action Plan
 
summer training report .... non destructive testing equipments for railway br...
summer training report .... non destructive testing equipments for railway br...summer training report .... non destructive testing equipments for railway br...
summer training report .... non destructive testing equipments for railway br...
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
 
4 week summer training report
4 week summer training report4 week summer training report
4 week summer training report
 
Summer training report in civil engineering
Summer training report in civil engineeringSummer training report in civil engineering
Summer training report in civil engineering
 
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
INDUSTRIAL TRAINING PRESENTATION FOR CIVIL ENGINEERING
 
Industrial Training (Civil Engineering)
Industrial Training (Civil Engineering)Industrial Training (Civil Engineering)
Industrial Training (Civil Engineering)
 

Similar to Trainig

Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
Jahangir R. Contractor
 
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
Shyamal Biswas
 

Similar to Trainig (20)

MMendes CV
MMendes CVMMendes CV
MMendes CV
 
Pm final
Pm finalPm final
Pm final
 
CURRICULAM VITAE - M
CURRICULAM VITAE - MCURRICULAM VITAE - M
CURRICULAM VITAE - M
 
Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
CV
CVCV
CV
 
CV
CVCV
CV
 
EDMA Maxcon Credential V1.7
EDMA Maxcon Credential V1.7EDMA Maxcon Credential V1.7
EDMA Maxcon Credential V1.7
 
Able construction pte ltd company profile
Able construction pte ltd   company profileAble construction pte ltd   company profile
Able construction pte ltd company profile
 
Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2Engr.riyaz cv 02 11-15-2
Engr.riyaz cv 02 11-15-2
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
Arun C.V (Civil) (1)
Arun C.V (Civil) (1)Arun C.V (Civil) (1)
Arun C.V (Civil) (1)
 
Arun C.V (Civil) (1)
Arun C.V (Civil) (1)Arun C.V (Civil) (1)
Arun C.V (Civil) (1)
 
Ramendu cv - for Bd
Ramendu cv - for BdRamendu cv - for Bd
Ramendu cv - for Bd
 
Rohitkaps.PDF
Rohitkaps.PDFRohitkaps.PDF
Rohitkaps.PDF
 
Shawki Hamzah 2
Shawki Hamzah 2Shawki Hamzah 2
Shawki Hamzah 2
 
ROHITRESUME
ROHITRESUMEROHITRESUME
ROHITRESUME
 
Ganesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts AdministratorGanesh Golande-CV-Senior Contracts Administrator
Ganesh Golande-CV-Senior Contracts Administrator
 
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
CV-1 Senior Professional - MEP Engineering, Procurement & Contracts- PM-CM Se...
 

Trainig

  • 2. Sierra Construction Company - Reverina Hotel Project 2
  • 3. ∗ Telecommunication Engineering and Construction ∗ Water Supply & Sewerage ∗ Power (Substation, Transmission & Distribution Systems) ∗ Roads & Bridges ∗ Civil ∗ Piling ∗ Services of Organization Services they provide 3
  • 4. Vision To be the preferred infrastructure development partner in the region. Mission ∗Exceptional performance in all aspects of our industry. ∗Outstanding customer service. ∗ Unparalleled value. 4
  • 5. ∗ Project : Reverina hotel project Location : Moragalla, Beruwala Client : LOLC Main Contractor : Sierra construction company Architect : Mr .Vinod Jayasinghe Consultants – Structural : NCD consultants pvt ltd Project Cost : Rs. 6 billion Project Manager :Mr. Saman Polhengoda Site Manager (Engineering) : MR.Thusitha PROFILE OF THE PROJECT 5
  • 8. ∗ Site management is the process of interrelation of major functions such as planning, organizing, controlling and leading. Those things are directed in the achievement of objectives and goals of the project. ∗ so it is important to have proper management at the construction site . To finish the work quickly as possible and in a good quality. 8
  • 9. In this company all workers must follow the health and safety rules. Also this company provide good welfare services to their workers. Health safety & welfare 9
  • 10. 10 EXPERIENCE GAINED First four months at the site Reinforcement I had to work as a supervisor in this site
  • 14. 14
  • 15. 15 TAKING OFF QUANTITIES Taking Quantities Referring Drawings Make bar schedules, concrete quantities. Also measure form work quantities using structural drawings
  • 16. 16 Preparation of bar schedules Preparing Monthly Progress Charts, Weather Reports , monthly bill, & Interim payments
  • 17. 17
  • 18. 18 Problems and Challenges Conflict with workers Unfamiliarity of Environment Lack of technical knowledge Incompleteness of monthly bills Incompleteness of the Drawings